filled with every necessity and convenience
Spenta Altavista lies in Chembur is a gated community which utilizes the old world charm of this central suburb in Mumbai marrying it with amenities of a club house, a terrace walk and majestic entrance lobbies to create an enviable living space. The project has 1, 2 & 3 bhk apartments, designed by renowned architect Hafeez Contractor that comes finished with Italian marble, air-conditioners, modular kitchens, finished and fully functional toilets and white goods including a refrigerator, washing machine and microwave oven. Amenities :
- Basket Ball Court
- Club House
- Compound Covered Car Parking
- Cycling Track
- Gated Community
- Gym
- Indoor Games
- Landscaped Garden
- Outdoor games
- Play Area
- Rain Water Harvesting
- Swimming Pool
- 24Hrs Backup Electricity
- Fire Safety
- Intercom
- Jacuzzi
- Steam
- Sauna
Founded in 1989, Spenta is one of Mumbai’s leading real estate developers. Under the leadership of Aspan Cooper, a first generation entrepreneur, Farshid Cooper and Anaisha Cooper, the organization has created and delivered value with the design of every new project. Over the past 25 years, Spenta has redefined the landscape of Mumbai, dotting its skyline with landmarks at Forjett Street, Hughes Road, Walkeshwar, Altamount Road, Breach Candy, Tardeo, Mahim, Juhu, Andheri, Powai, Chembur and Thane. Spenta is transforming 12 million square feet of the city into iconic residential towers, housing complexes and shopping arcades, each a hallmark of intelligent space planning and keen attention to detail.
Highlights
- Power Back-up
- Visitor Parking
- Maintenance Staff
- Water Supply / Storage
- Rain Water Harvesting
- Lifts
- Security Guards
- Fire Alarm
- Balcony
- Reserved Parking
- Basement
- Woodwork
- Modular Kitchen
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
- Cafeteria / Food Court
- Service / Goods Lift
- Club / Community Center
- Adjacent to Main Road
- Park/Green Belt Facing
- Water Connection
- Electric Connection
- Close to Hospital
- Close to School
- Close to Shopping Center/Mall
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 3BHK Apartment | 1,040 SqFeet | Within 3 Years | ₹ 2.6 crores |
RERA
P51800000956 Altavista - Phase 2 Active 74% built
Confirmed with MahaRERA on 22 Sep 2026. Registered as "Altavista - Phase 2".
- Promoter
- SPENTA ENCLAVE PRIVATE LIMITED
- Registered on
- 25 Jul 2017
- Proposed completion
- Oct 2028 (originally Jun 2021)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Sion Trombay Road, Kurla, Kurla, Mumbai Suburban, 400071
- Land area
- 2,912 sq m (31,346 sq ft)
- Sanctioned built-up area
- 15,168 sq m (163,272 sq ft)
- Buildings
- Wing E (29 floors) - 1 of 45 available; Wing F (29 floors) - 12 of 124 available
- Parking
- Open Space 0, Closed/Covered 184
- Complaints on the portal
- 12
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Wing E | 3BHK | 89 sq m (958 sq ft) | 45 |
| Wing F | 3BHK | 88 sq m (947 sq ft) | 20 |
| Wing F | 2BHK | 71 sq m (764 sq ft) | 1 |
| Wing F | 3BHK | 89 sq m (958 sq ft) | 23 |
| Wing F | 2BHK | 61 sq m (657 sq ft) | 36 |
| Wing F | 2BHK | 67 sq m (721 sq ft) | 44 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q1 FY 2024-2025 | 26 May 2025 | - | - |
| Q2 FY 2024-2025 | 26 May 2025 | - | - |
| Q3 FY 2024-2025 | 26 May 2025 | - | - |
| Q4 FY 2024-2025 | 26 May 2025 | - | - |
| Q1 FY 2025-2026 | 13 Feb 2026 | - | - |
| Q2 FY 2025-2026 | 13 Feb 2026 | - | - |
| Q3 FY 2025-2026 | 16 Feb 2026 | - | - |
| Q4 FY 2025-2026 | 5 May 2026 | - | - |
| Q1 FY 2026-2027 | 15 Jul 2026 | - | - |
Construction progress as reported to the portal
Wing E
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 50%
Wing F
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 75%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 85%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Common areas and facilities
- Internal Roads & Footpaths: 0% - No Footpaths
- Water Supply: 0% - As per SRA Approval
- Sewerage (Chamber, Lines, Septic Tank , STP): 0% - STP As per SRA Approval
- Storm Water Drains: 0% - As per SRA Approval
- Landscaping & Tree Planting: 0% - As per SRA Approval
- Street Lighting: 0% - Limited to driveways within property
- Treatment And Disposal Of Sewage And Sullage Water: 0% - As per SRA Approval
- Solid Waste Management And Disposal: 0% - As per SRA Approval
- Water conservation /Rain water harvesting: 0% - As per SRA Approval
- Fire protection and fire safety requirements: 0% - As per SRA Approval
- Electrical meter room, sub-station, receiving station: 0% - As per SRA Approval
- Aggregate area of recreational Open Space: 0% - Common RG for all phases adm 3064 sq. mtrs.
P51800001050 Altavista - Phase 1 Completed
Confirmed with MahaRERA on 22 Sep 2026. Registered as "Altavista - Phase 1".
- Promoter
- SPENTA ENCLAVE PRIVATE LIMITED
- Registered on
- 25 Jul 2017
- Proposed completion
- Jul 2024 (originally Dec 2019)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- 343 Part, Kurla, Kurla, Mumbai Suburban, 400071
- Land area
- 5,795 sq m (62,379 sq ft)
- Sanctioned built-up area
- 30,657 sq m (330,000 sq ft)
- Buildings
- Wing A (29 floors); Wing B (29 floors); Wing C (29 floors); Wing D (29 floors)
- Parking
- Open Space 0, Closed/Covered 486
- Complaints on the portal
- 18
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Wing A | 2BHK | 64 sq m (689 sq ft) | 44 |
| Wing A | 2BHK | 61 sq m (657 sq ft) | 46 |
| Wing C | 1BHK | 40 sq m (431 sq ft) | 40 |
| Wing C | 1BHK | 39 sq m (420 sq ft) | 90 |
| Wing C | 2BHK | 61 sq m (657 sq ft) | 46 |
| Wing D | 3BHK | 92 sq m (990 sq ft) | 22 |
| Wing D | 3BHK | 90 sq m (969 sq ft) | 22 |
| Wing D | 3BHK | 84 sq m (904 sq ft) | 23 |
| Wing D | 3BHK | 93 sq m (1,001 sq ft) | 22 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
Construction progress as reported to the portal
Wing A
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Wing B
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Wing C
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Wing D
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 100% - No Footpaths. Only Driveways.
- Water Supply: 100% - As per SRA Approval
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - STP As per SRA Approval
- Storm Water Drains: 100% - As per SRA Approval
- Landscaping & Tree Planting: 0% - As per SRA Approval
- Street Lighting: 0% - Limited to driveways within property
- Treatment And Disposal Of Sewage And Sullage Water: 0% - As per SRA approval
- Solid Waste Management And Disposal: 100% - As per SRA approval
- Water conservation /Rain water harvesting: 100% - As per SRA approval
- Fire protection and fire safety requirements: 100% - As per SRA Approval
- Electrical meter room, sub-station, receiving station: 100% - Sub station only
- Aggregate area of recreational Open Space: 0% - Common RG for all phases adm 3064 sq. mtrs.
P51800021249 Altavista - Phase 3 Active 51% built
Confirmed with MahaRERA on 22 Sep 2026. Registered as "Altavista - Phase 3".
- Promoter
- SPENTA ENCLAVE PRIVATE LIMITED
- Registered on
- 14 Jun 2019
- Proposed completion
- Oct 2028 (originally Jun 2025)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Off V.N. Purav Marg, Chembur, Kurla, Kurla, Mumbai Suburban, 400071
- Land area
- 300 sq m (3,234 sq ft)
- Sanctioned built-up area
- 5,456 sq m (58,730 sq ft)
- Buildings
- Wing H (29 floors) - 29 of 64 available
- Parking
- Open Space 0, Closed/Covered 64
- Complaints on the portal
- 1
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Wing H | 2 BHK | 58 sq m (623 sq ft) | 42 |
| Wing H | 3 BHK | 97 sq m (1,041 sq ft) | 22 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
| Q4 FY 2024-2025 | 19 Jun 2025 | - | - |
| Q1 FY 2025-2026 | 13 Feb 2026 | - | - |
| Q2 FY 2025-2026 | 13 Feb 2026 | - | - |
| Q3 FY 2025-2026 | 13 Feb 2026 | - | - |
| Q4 FY 2025-2026 | 29 Apr 2026 | - | - |
| Q1 FY 2026-2027 | 16 Jul 2026 | - | - |
Construction progress as reported to the portal
Wing H
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 8%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 50%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
Common areas and facilities
- Internal Roads & Footpaths: 0% - Only Internal Driveways
- Water Supply: 0% - As per Approval
- Sewerage (Chamber, Lines, Septic Tank , STP): 0% - As per Approval
- Storm Water Drains: 0% - As per Approval
- Landscaping & Tree Planting: 0% - As per Approval
- Street Lighting: 0% - Only Internal roads/streets
- Treatment And Disposal Of Sewage And Sullage Water: 0% - As per Approval
- Solid Waste Management And Disposal: 0% - As per Approval
- Water conservation /Rain water harvesting: 0% - As per Approval
- Fire protection and fire safety requirements: 0% - As per Approval
- Electrical meter room, sub-station, receiving station: 0% - As per Approval
- Aggregate area of recreational Open Space: 0% - 234 square meters
Reviews
Write a review
Be the first to write a review of Spenta Altavista and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Spenta Altavista
Enter some positive aspects of Spenta Altavista
Cons:
Enter some negative aspects of Spenta Altavista
Enter some negative aspects of Spenta Altavista
Location
Spenta Altavista, Chembur, Mumbai - 400071 (Maharashtra)
Landmarks
Hospitals & Clinics
- Get-Well Clinic (<0.5km)
- Dr Samir B Mahadik (<0.5km)
- BMC Hospital (<0.5km)
- Lal Dongar Aaroya Kendra (<0.5km)
- Dr Rajan V Shirsat (<0.5km)
- Ashok Khambodiya Clinic (<0.5km)
- Sangles Clinic (<0.5km)
- Dnyaneshwar Clinic (<0.5km)
- Aumaar Pathology Laboratory (<0.5km)
- Pramukh Swami Eye Hospital (<0.5km)
- Siddhanath Clinic (<0.5km)
- Smile Care Clinic (<0.5km)
- Dr Archanas (<0.5km)
- Rohan Clinic (<0.5km)
- Laxmi Mahadev Clinic (<0.5km)
- Parvati Clinic (<0.5km)
- Tanclean Hygiene and Healthcare Mumbai (<0.5km)
- Menzel Labrotechnik (<0.5km)
- Neurogen Brain and Spine Institute (<0.5km)
- Surana Sethia Hospital-ER (<0.5km)
- Surana Sethia Hospital (<0.5km)
- Sujata Clinic (<0.5km)
- Janki Optics (<0.5km)
- Manohar Clinic (<0.5km)
- Eagles Eye Hospital (<0.5km)
- Mscda Limited (<0.5km)
- Dr L G Harisinghani (<1km)
- The Physio Clinic (<1km)
- Dr R M Thapar (<1km)
- Ruchi Clinic (<1km)
- Dr Anita V Jagasia (<1km)
- Dr Sulochana G Sahajwala (<1km)
- Dr K P Karamchandani (<1km)
- Arvind Eye Clinic (<1km)
- Shushrut Hospital-ER (<1km)
- Shushrut Hospital (<1km)
- Doctor Ramesh Shankars Dental Clinic (<1km)
- Dr Priti A Rahulan (<1km)
Petrol Station
- Indian Oil (<0.5km)
- Hemant Automobile Services (<0.5km)
- Reliance (<0.5km)
- Ad-Hoc Kapadia Brothers Petrol Pump (<1km)
Restaurant & Shops
- Deepak General Stores (<0.5km)
- Darshana General Stores (<0.5km)
- Mahendra General Stores (<0.5km)
- Ramesh Provision Store (<0.5km)
- Laxmi General Stores (<0.5km)
- Sakshi General Stores (<0.5km)
- Shri Ramdev Medical and General Store (<0.5km)
- Mahalaxmi General Stores (<0.5km)
- Keval Darshan Store (<0.5km)
- Laxmi Fast Food (<0.5km)
- Kamal General Stores (<0.5km)
- Bhavesh Enterprise (<0.5km)
- Ceekay Garments (<0.5km)
- Mayur Premises (<0.5km)
- New Bombay Apparels (<0.5km)
- Gurukrupa Kirana Stores (<0.5km)
- Ratndeep Kirana (<0.5km)
- Shiv Kirana (<0.5km)
- My Fizz (<0.5km)
- Ardas by Harsh Vig (<0.5km)
- Tara Punjab Foodland (<1km)
- Woodland (<1km)
- Gurunanak Stores (<1km)
- Pink Corner (<1km)
- Narayan General Stores (<1km)
- A & S Wardrobes (<1km)
- LOTUS (<1km)
- Shiv Shankar General Stores (<1km)
- Surbhi Restaurant and Bar (<1km)
- S Lounge (<1km)
ATM/Bank/Exchange
- Canara Bank (<0.5km)
- Uti Bank (<0.5km)
- Axis Bank (<0.5km)
- State Bank of India (<1km)
- Sbi Swastik Park (<1km)
- ICICI Bank (<1km)
- Janakalyan Sahakari Bank-Sindhi Colony Chamber (<1km)
Hostel
- Vijay Salassamarth Pg (<0.5km)
- Johndevi Mansion Sindhi Society (<0.5km)
- Moryoni Mansion Sindhi Society (<0.5km)
Hotel
- Vasanti Vilas (<0.5km)
- The Maratha Lunch Home (<0.5km)
- K Bhagat Tarachand Banquet (<1km)
Public Transport
- Lokshahir Annabhau Sathe Udyan Suman Nagar Bus Stop (<0.5km)
- Umarshi Aapp Chowk Bus Stop (<0.5km)
- Lok Shahir Anna Bhau Sathe Udyan-Suman Nagar (<1km)
- Umarshi Baapp Chowk (<1km)
Recreation
- Lokshahir Aanabhau Sathe Udyan (<0.5km)
- Anna Bhau Sathe Udyan (<0.5km)
- Sahajivan Park (<1km)
- Sindhi Society Garden (<1km)
- Trishul Garden (<1km)
Wine & Spirits
- Queens Wine Centre (<0.5km)
Shopping Centre
- Food Mall (<1km)
- Project ID
- J522311898
- Updated
- Searches
- 4068
- Views
- 1006