Aerial View
Elevation
Kids Play Area
 15

Spenta Altavista - Chembur, Mumbai

Builder
Spenta
Construction
Partially Completed
Completion
Oct, 2028
Properties
Apartments
RERA
P51800000956, P51800001050, P51800021249

Description

filled with every necessity and convenience

Spenta Altavista lies in Chembur is a gated community which utilizes the old world charm of this central suburb in Mumbai marrying it with amenities of a club house, a terrace walk and majestic entrance lobbies to create an enviable living space. The project has 1, 2 & 3 bhk apartments, designed by renowned architect Hafeez Contractor that comes finished with Italian marble, air-conditioners, modular kitchens, finished and fully functional toilets and white goods including a refrigerator, washing machine and microwave oven.

Amenities :
  • Basket Ball Court
  • Club House
  • Compound Covered Car Parking
  • Cycling Track
  • Gated Community
  • Gym
  • Indoor Games
  • Landscaped Garden
  • Outdoor games
  • Play Area
  • Rain Water Harvesting
  • Swimming Pool
  • 24Hrs Backup Electricity
  • Fire Safety
  • Intercom
  • Jacuzzi
  • Steam
  • Sauna
Founded in 1989, Spenta is one of Mumbai’s leading real estate developers. Under the leadership of Aspan Cooper, a first generation entrepreneur, Farshid Cooper and Anaisha Cooper, the organization has created and delivered value with the design of every new project. Over the past 25 years, Spenta has redefined the landscape of Mumbai, dotting its skyline with landmarks at Forjett Street, Hughes Road, Walkeshwar, Altamount Road, Breach Candy, Tardeo, Mahim, Juhu, Andheri, Powai, Chembur and Thane. Spenta is transforming 12 million square feet of the city into iconic residential towers, housing complexes and shopping arcades, each a hallmark of intelligent space planning and keen attention to detail.

Highlights

  • Power Back-up
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Lifts
  • Security Guards
  • Fire Alarm
  • Balcony
  • Reserved Parking
  • Basement
  • Woodwork
  • Modular Kitchen
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • Cafeteria / Food Court
  • Service / Goods Lift
  • Club / Community Center
  • Adjacent to Main Road
  • Park/Green Belt Facing
  • Water Connection
  • Electric Connection
  • Close to Hospital
  • Close to School
  • Close to Shopping Center/Mall

Configurations

Type Area Possession Price *
3BHK Apartment1,040 SqFeetWithin 3 Years₹ 2.6 crores
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51800000956 Altavista - Phase 2 Active 74% built

Confirmed with MahaRERA on 22 Sep 2026. Registered as "Altavista - Phase 2".

Promoter
SPENTA ENCLAVE PRIVATE LIMITED
Registered on
25 Jul 2017
Proposed completion
Oct 2028 (originally Jun 2021)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Sion Trombay Road, Kurla, Kurla, Mumbai Suburban, 400071
Land area
2,912 sq m (31,346 sq ft)
Sanctioned built-up area
15,168 sq m (163,272 sq ft)
Buildings
Wing E (29 floors) - 1 of 45 available; Wing F (29 floors) - 12 of 124 available
Parking
Open Space 0, Closed/Covered 184
Complaints on the portal
12
BuildingUnit typeCarpet areaUnits
Wing E3BHK 89 sq m (958 sq ft) 45
Wing F3BHK 88 sq m (947 sq ft) 20
Wing F2BHK 71 sq m (764 sq ft) 1
Wing F3BHK 89 sq m (958 sq ft) 23
Wing F2BHK 61 sq m (657 sq ft) 36
Wing F2BHK 67 sq m (721 sq ft) 44
Quarterly returnFiledBuiltUnits booked
Q1 FY 2024-2025 26 May 2025 - -
Q2 FY 2024-2025 26 May 2025 - -
Q3 FY 2024-2025 26 May 2025 - -
Q4 FY 2024-2025 26 May 2025 - -
Q1 FY 2025-2026 13 Feb 2026 - -
Q2 FY 2025-2026 13 Feb 2026 - -
Q3 FY 2025-2026 16 Feb 2026 - -
Q4 FY 2025-2026 5 May 2026 - -
Q1 FY 2026-2027 15 Jul 2026 - -
Construction progress as reported to the portal

Wing E

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 50%

Wing F

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 75%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 85%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - No Footpaths
  • Water Supply: 0% - As per SRA Approval
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - STP As per SRA Approval
  • Storm Water Drains: 0% - As per SRA Approval
  • Landscaping & Tree Planting: 0% - As per SRA Approval
  • Street Lighting: 0% - Limited to driveways within property
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - As per SRA Approval
  • Solid Waste Management And Disposal: 0% - As per SRA Approval
  • Water conservation /Rain water harvesting: 0% - As per SRA Approval
  • Fire protection and fire safety requirements: 0% - As per SRA Approval
  • Electrical meter room, sub-station, receiving station: 0% - As per SRA Approval
  • Aggregate area of recreational Open Space: 0% - Common RG for all phases adm 3064 sq. mtrs.

P51800001050 Altavista - Phase 1 Completed

Confirmed with MahaRERA on 22 Sep 2026. Registered as "Altavista - Phase 1".

Promoter
SPENTA ENCLAVE PRIVATE LIMITED
Registered on
25 Jul 2017
Proposed completion
Jul 2024 (originally Dec 2019)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
343 Part, Kurla, Kurla, Mumbai Suburban, 400071
Land area
5,795 sq m (62,379 sq ft)
Sanctioned built-up area
30,657 sq m (330,000 sq ft)
Buildings
Wing A (29 floors); Wing B (29 floors); Wing C (29 floors); Wing D (29 floors)
Parking
Open Space 0, Closed/Covered 486
Complaints on the portal
18
BuildingUnit typeCarpet areaUnits
Wing A2BHK 64 sq m (689 sq ft) 44
Wing A2BHK 61 sq m (657 sq ft) 46
Wing C1BHK 40 sq m (431 sq ft) 40
Wing C1BHK 39 sq m (420 sq ft) 90
Wing C2BHK 61 sq m (657 sq ft) 46
Wing D3BHK 92 sq m (990 sq ft) 22
Wing D3BHK 90 sq m (969 sq ft) 22
Wing D3BHK 84 sq m (904 sq ft) 23
Wing D3BHK 93 sq m (1,001 sq ft) 22
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Construction progress as reported to the portal

Wing A

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Wing B

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Wing C

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Wing D

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - No Footpaths. Only Driveways.
  • Water Supply: 100% - As per SRA Approval
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - STP As per SRA Approval
  • Storm Water Drains: 100% - As per SRA Approval
  • Landscaping & Tree Planting: 0% - As per SRA Approval
  • Street Lighting: 0% - Limited to driveways within property
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - As per SRA approval
  • Solid Waste Management And Disposal: 100% - As per SRA approval
  • Water conservation /Rain water harvesting: 100% - As per SRA approval
  • Fire protection and fire safety requirements: 100% - As per SRA Approval
  • Electrical meter room, sub-station, receiving station: 100% - Sub station only
  • Aggregate area of recreational Open Space: 0% - Common RG for all phases adm 3064 sq. mtrs.

P51800021249 Altavista - Phase 3 Active 51% built

Confirmed with MahaRERA on 22 Sep 2026. Registered as "Altavista - Phase 3".

Promoter
SPENTA ENCLAVE PRIVATE LIMITED
Registered on
14 Jun 2019
Proposed completion
Oct 2028 (originally Jun 2025)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Off V.N. Purav Marg, Chembur, Kurla, Kurla, Mumbai Suburban, 400071
Land area
300 sq m (3,234 sq ft)
Sanctioned built-up area
5,456 sq m (58,730 sq ft)
Buildings
Wing H (29 floors) - 29 of 64 available
Parking
Open Space 0, Closed/Covered 64
Complaints on the portal
1
BuildingUnit typeCarpet areaUnits
Wing H2 BHK 58 sq m (623 sq ft) 42
Wing H3 BHK 97 sq m (1,041 sq ft) 22
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 19 Jun 2025 - -
Q1 FY 2025-2026 13 Feb 2026 - -
Q2 FY 2025-2026 13 Feb 2026 - -
Q3 FY 2025-2026 13 Feb 2026 - -
Q4 FY 2025-2026 29 Apr 2026 - -
Q1 FY 2026-2027 16 Jul 2026 - -
Construction progress as reported to the portal

Wing H

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 8%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - Only Internal Driveways
  • Water Supply: 0% - As per Approval
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - As per Approval
  • Storm Water Drains: 0% - As per Approval
  • Landscaping & Tree Planting: 0% - As per Approval
  • Street Lighting: 0% - Only Internal roads/streets
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - As per Approval
  • Solid Waste Management And Disposal: 0% - As per Approval
  • Water conservation /Rain water harvesting: 0% - As per Approval
  • Fire protection and fire safety requirements: 0% - As per Approval
  • Electrical meter room, sub-station, receiving station: 0% - As per Approval
  • Aggregate area of recreational Open Space: 0% - 234 square meters
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Spenta Altavista and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Spenta Altavista
Cons:
Enter some negative aspects of Spenta Altavista

Location

Spenta Altavista, Chembur, Mumbai - 400071 (Maharashtra)

* Location may be approximate

Landmarks

  • Hospitals & Clinics

    • Get-Well Clinic (<0.5km)
    • Dr Samir B Mahadik (<0.5km)
    • BMC Hospital (<0.5km)
    • Lal Dongar Aaroya Kendra (<0.5km)
    • Dr Rajan V Shirsat (<0.5km)
    • Ashok Khambodiya Clinic (<0.5km)
    • Sangles Clinic (<0.5km)
    • Dnyaneshwar Clinic (<0.5km)
    • Aumaar Pathology Laboratory (<0.5km)
    • Pramukh Swami Eye Hospital (<0.5km)
    • Siddhanath Clinic (<0.5km)
    • Smile Care Clinic (<0.5km)
    • Dr Archanas (<0.5km)
    • Rohan Clinic (<0.5km)
    • Laxmi Mahadev Clinic (<0.5km)
    • Parvati Clinic (<0.5km)
    • Tanclean Hygiene and Healthcare Mumbai (<0.5km)
    • Menzel Labrotechnik (<0.5km)
    • Neurogen Brain and Spine Institute (<0.5km)
    • Surana Sethia Hospital-ER (<0.5km)
    • Surana Sethia Hospital (<0.5km)
    • Sujata Clinic (<0.5km)
    • Janki Optics (<0.5km)
    • Manohar Clinic (<0.5km)
    • Eagles Eye Hospital (<0.5km)
    • Mscda Limited (<0.5km)
    • Dr L G Harisinghani (<1km)
    • The Physio Clinic (<1km)
    • Dr R M Thapar (<1km)
    • Ruchi Clinic (<1km)
    • Dr Anita V Jagasia (<1km)
    • Dr Sulochana G Sahajwala (<1km)
    • Dr K P Karamchandani (<1km)
    • Arvind Eye Clinic (<1km)
    • Shushrut Hospital-ER (<1km)
    • Shushrut Hospital (<1km)
    • Doctor Ramesh Shankars Dental Clinic (<1km)
    • Dr Priti A Rahulan (<1km)
  • Petrol Station

    • Indian Oil (<0.5km)
    • Hemant Automobile Services (<0.5km)
    • Reliance (<0.5km)
    • Ad-Hoc Kapadia Brothers Petrol Pump (<1km)
  • Restaurant & Shops

    • Deepak General Stores (<0.5km)
    • Darshana General Stores (<0.5km)
    • Mahendra General Stores (<0.5km)
    • Ramesh Provision Store (<0.5km)
    • Laxmi General Stores (<0.5km)
    • Sakshi General Stores (<0.5km)
    • Shri Ramdev Medical and General Store (<0.5km)
    • Mahalaxmi General Stores (<0.5km)
    • Keval Darshan Store (<0.5km)
    • Laxmi Fast Food (<0.5km)
    • Kamal General Stores (<0.5km)
    • Bhavesh Enterprise (<0.5km)
    • Ceekay Garments (<0.5km)
    • Mayur Premises (<0.5km)
    • New Bombay Apparels (<0.5km)
    • Gurukrupa Kirana Stores (<0.5km)
    • Ratndeep Kirana (<0.5km)
    • Shiv Kirana (<0.5km)
    • My Fizz (<0.5km)
    • Ardas by Harsh Vig (<0.5km)
    • Tara Punjab Foodland (<1km)
    • Woodland (<1km)
    • Gurunanak Stores (<1km)
    • Pink Corner (<1km)
    • Narayan General Stores (<1km)
    • A & S Wardrobes (<1km)
    • LOTUS (<1km)
    • Shiv Shankar General Stores (<1km)
    • Surbhi Restaurant and Bar (<1km)
    • S Lounge (<1km)
  • ATM/Bank/Exchange

    • Canara Bank (<0.5km)
    • Uti Bank (<0.5km)
    • Axis Bank (<0.5km)
    • State Bank of India (<1km)
    • Sbi Swastik Park (<1km)
    • ICICI Bank (<1km)
    • Janakalyan Sahakari Bank-Sindhi Colony Chamber (<1km)
  • Hostel

    • Vijay Salassamarth Pg (<0.5km)
    • Johndevi Mansion Sindhi Society (<0.5km)
    • Moryoni Mansion Sindhi Society (<0.5km)
  • Hotel

    • Vasanti Vilas (<0.5km)
    • The Maratha Lunch Home (<0.5km)
    • K Bhagat Tarachand Banquet (<1km)
  • Public Transport

    • Lokshahir Annabhau Sathe Udyan Suman Nagar Bus Stop (<0.5km)
    • Umarshi Aapp Chowk Bus Stop (<0.5km)
    • Lok Shahir Anna Bhau Sathe Udyan-Suman Nagar (<1km)
    • Umarshi Baapp Chowk (<1km)
  • Recreation

    • Lokshahir Aanabhau Sathe Udyan (<0.5km)
    • Anna Bhau Sathe Udyan (<0.5km)
    • Sahajivan Park (<1km)
    • Sindhi Society Garden (<1km)
    • Trishul Garden (<1km)
  • Wine & Spirits

    • Queens Wine Centre (<0.5km)
  • Shopping Centre

    • Food Mall (<1km)
Project ID
J522311898
Updated
Searches
4068
Views
1006