About
Operating Since: 1998
Dealing in: Sale/Purchase of Apartments / Flats, Independent Houses, Residential Plots / Lands
Areas of Operation
- Bangalore
- All Bangalore
- Begur Road
- Hosur Road
- Silk Board
- Chandapura Circle
- HSR Layout
- Electronic City
- JP Nagar
- JP Nagar Phase 8
- Kanakapura Road
- Hosa Road
- Whitefield
- Basapura
- AECS Layout
- Bommasandra
- Sarjapur
- Krishnaraja Puram(K R Puram)
- Jigani Circle
- Sarjapur Road
- KHB Surya City
- Haralur Road
- Electronic City Phase 2
- Chandapura
- Devanachicknhalli
- Gottigere
Properties
Expert Reviews By Venetion Group
Review of Chandapura Circle, Bangalore
Under construction 275 acres Allianz Eldorado Park on Anekal Jigani Road with 1100 villas plus 200 row houses, 500 apartments, 18 hole golf course, 4 screen Multiplex, 5 star hotel with 150 rooms
PES engineering college, Oxford Institutions - both on Hosur Road, will be about less than 15 kms. This Chandapura Anekal road from Chandapura Circle (C-Circle) till Anekal - which is about 14 kms long, is being widened into a huge massive 300 ft road and work is under progress now at this moment.
Phase II of Bangalore Metro to be done from 2015 to 2020 has already got Chandapura circle included in the rail network proposed and is expected that Anekal will be included in Phase III.
This Chandapur Anekal road will soon become a part of the Intermediate Ring Road
This Intermediate Ring Road will be a total length of 188 km which will connect Chandapura, Anekal, Nelamangala, Bidadi, Harohalli, Tattekere, Hosakote, Sarjapura, Jigani, Tavarekere, Aradeshanahalli and Mylenahalli and connect Devanahalli International Airport directly. This road (including the Chandapur Anekal stretch)
The ITRR will connect 8 towns viz., Devanahalli, Kanakapura, Hosakote, Nelamangala, Ramanagaram, Anekal, Magadi, Doddaballapur and will be a total of 190 km high speed corridor in length with 300 ft wide road, having 4 lanes of 180 kmph speed, plus 2 service lanes on either side (total 8 lanes)
The above project – all above roads mentioned is under the control of BMRDA.
Pros:
- The ITRR as above will be 190 km long
- The STRR is proposed to be 204 km long
- The above project – all above roads mentioned is under the control of BMRDA.
- Connected and with full features
Review of Ananthanagar, Bangalore
It is in Electronic City 2nd Phase. Just 3 km from Electronic city and about 10 minutes travel from 88 major IT companies like Infosys, Wipro, HP, Ge, TCS, Timken,etc.
Pros:
- A site seeing place