Description
Unique amenities like a podium beach
Monte South is located in the heart of Byculla, Mumbai offers 2&3 BHK apartments ranging from 758-1678 sqft. The project is spread over 12.5 acres of land. It consists of 4 towers with 64 floors and 843 units. The amenities are designed to cater to the needs of modern-day families, offering a comfortable and luxurious lifestyle. Each apartment is well-appointed, offers unimpeded view of the lively city and is designed with a touch of opulence.Amenities
- Multi-Purpose Sports Court
- Gym
- Jogging Track
- Beach Volleyball
- Squash Court
- Basketball Court
- Indoor Games Room
- Pool Table
- Kids' Play Area
- Skating Rink
- Golf Putting Range
- Swimming Pool
- Pool Deck
- Senior Citizen Corner
- Multi-Level Security
Adani Realty part of the Adani Group, is focused on developing real estate projects in key locations, combining design aesthetics with advanced construction technology. They have completed 22.5 Mn. Sq. Ft. of projects and have 35.1 Mn. Sq. Ft. in progress in Ahmedabad, Mumbai, Pune, and Gurugram.
Marathon Realty with experience of 5 long decades, Mumbai based real estate development company, The group have implanted over 80 projects across the city and are progressing with several other township in neighbourhoods.
Highlights
- Power Back-up
- Water Softner
- Visitor Parking
- Maintenance Staff
- Water Supply / Storage
- Rain Water Harvesting
- Waste Disposal
- Centrally Air Conditioned
- Lifts
- Wi-Fi
- RO System
- Balcony
- Security Guards
- Electronic Security
- Intercom Facility
- Woodwork
- Modular Kitchen
- Feng Shui / Vaastu Compliant
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 2BHK Apartment | 746 SqFeet | Immediate/Ready to move | ₹ 3.33 crores |
| 3BHK Apartment | 1,090 SqFeet | Immediate/Ready to move | ₹ 4.59 crores |
RERA
P51800001585 MONTESOUTH-4 Lapsed 69% built
Confirmed with MahaRERA on 20 Sep 2026. Registered as "MONTESOUTH-4".
- Promoter
- SWAYAM REALTORS & TRADERS LLP
- Registered on
- 29 Jul 2017
- Proposed completion
- Jun 2025 (originally Jun 2024)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- BABUBHAI JAGTAP MARG NEAR FIRE BRIDGE, BYCULLA WEST, Ward E, Mumbai City, 400008
- Land area
- 1,476 sq m (15,885 sq ft)
- Sanctioned built-up area
- 11,031 sq m (118,735 sq ft)
- Buildings
- MONTESOUTH PILATUS-1 (34 floors) - 34 of 168 available
- Parking
- Open Space 50, Closed/Covered 336
- Complaints on the portal
- 2
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| MONTESOUTH PILATUS-1 | 3BHK | 106 sq m (1,141 sq ft) | 11 |
| MONTESOUTH PILATUS-1 | 3BHK | 105 sq m (1,132 sq ft) | 11 |
| MONTESOUTH PILATUS-1 | 2BHK | 79 sq m (849 sq ft) | 11 |
| MONTESOUTH PILATUS-1 | 3BHK | 106 sq m (1,141 sq ft) | 11 |
| MONTESOUTH PILATUS-1 | 3BHK | 118 sq m (1,272 sq ft) | 11 |
| MONTESOUTH PILATUS-1 | 2BHK | 79 sq m (847 sq ft) | 11 |
| MONTESOUTH PILATUS-1 | 3BHK | 105 sq m (1,132 sq ft) | 11 |
| MONTESOUTH PILATUS-1 | 2BHK | 79 sq m (854 sq ft) | 22 |
| MONTESOUTH PILATUS-1 | 2BHK | 87 sq m (932 sq ft) | 18 |
| MONTESOUTH PILATUS-1 | 2BHK | 87 sq m (935 sq ft) | 18 |
| MONTESOUTH PILATUS-1 | 3BHK | 118 sq m (1,266 sq ft) | 11 |
| MONTESOUTH PILATUS-1 | 3BHK | 119 sq m (1,285 sq ft) | 11 |
| MONTESOUTH PILATUS-1 | 3BHK | 119 sq m (1,279 sq ft) | 11 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2017-2018 | 19 Dec 2025 | - | - |
| Q3 FY 2017-2018 | 19 Aug 2026 | - | - |
| Q4 FY 2017-2018 | 19 Aug 2026 | - | - |
| Q1 FY 2018-2019 | 19 Aug 2026 | - | - |
| Q2 FY 2018-2019 | 19 Aug 2026 | - | - |
| Q3 FY 2018-2019 | 19 Dec 2025 | - | - |
| Q4 FY 2018-2019 | 19 Dec 2025 | - | - |
| Q1 FY 2019-2020 | 19 Dec 2025 | - | - |
| Q2 FY 2019-2020 | 19 Dec 2025 | - | - |
| Q3 FY 2019-2020 | 19 Dec 2025 | - | - |
| Q4 FY 2019-2020 | 19 Dec 2025 | - | - |
| Q1 FY 2020-2021 | 19 Aug 2026 | - | - |
| Q2 FY 2020-2021 | 19 Dec 2025 | - | - |
| Q3 FY 2020-2021 | 19 Dec 2025 | - | - |
| Q4 FY 2020-2021 | 19 Dec 2025 | - | - |
| Q1 FY 2021-2022 | 19 Dec 2025 | - | - |
| Q2 FY 2021-2022 | 19 Aug 2026 | - | - |
| Q3 FY 2021-2022 | 19 Aug 2026 | - | - |
| Q4 FY 2021-2022 | 19 Aug 2026 | - | - |
| Q1 FY 2022-2023 | 6 Aug 2026 | - | - |
| Q2 FY 2022-2023 | 6 Aug 2026 | - | - |
| Q3 FY 2022-2023 | 6 Aug 2026 | - | - |
| Q4 FY 2022-2023 | 6 Aug 2026 | - | - |
| Q1 FY 2023-2024 | 5 Aug 2026 | - | - |
| Q2 FY 2023-2024 | 5 Aug 2026 | - | - |
| Q3 FY 2023-2024 | 5 Aug 2026 | - | - |
| Q4 FY 2023-2024 | 5 Aug 2026 | - | - |
| Q1 FY 2024-2025 | 30 Jul 2026 | - | - |
| Q2 FY 2024-2025 | 30 Jul 2026 | - | - |
| Q3 FY 2024-2025 | 30 Jul 2026 | - | - |
| Q4 FY 2024-2025 | 30 Jul 2026 | - | - |
| Q1 FY 2025-2026 | 30 Jul 2026 | - | - |
Construction progress as reported to the portal
MONTESOUTH PILATUS-1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 35%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 20%
Common areas and facilities
- Internal Roads & Footpaths: 0% - Not yet started
- Water Supply: 0% - Not yet started
- Sewerage (Chamber, Lines, Septic Tank , STP): 0% - Not yet started
- Storm Water Drains: 0% - Not yet started
- Landscaping & Tree Planting: 0% - Not yet started
- Street Lighting: 0% - Not yet started
- Community Buildings: 75% - WORKING IN PROGRESS
- Treatment And Disposal Of Sewage And Sullage Water: 0% - Not yet started
- Solid Waste Management And Disposal: 0% - Not yet started
- Water conservation /Rain water harvesting: 0% - Not yet started
- Fire protection and fire safety requirements: 0% - Not yet started
- Electrical meter room, sub-station, receiving station: 0% - Not yet started
P51800001681 MONTESOUTH-3 Completed
Confirmed with MahaRERA on 20 Sep 2026. Registered as "MONTESOUTH-3".
- Promoter
- SWAYAM REALTORS & TRADERS LLP
- Registered on
- 29 Jul 2017
- Proposed completion
- Jun 2024 (originally Jun 2023)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- BABURAO GANPATH MARG, BHAYCULLA, Ward E, Mumbai City, 400011
- Land area
- 1,476 sq m (15,885 sq ft)
- Sanctioned built-up area
- 7,800 sq m (83,961 sq ft)
- Buildings
- MONTESOUTH TITLIS-3 (9 floors)
- Parking
- Open Space 0, Closed/Covered 104
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| MONTESOUTH TITLIS-3 | 2BHK | 87 sq m (941 sq ft) | 16 |
| MONTESOUTH TITLIS-3 | 3BHK | 126 sq m (1,352 sq ft) | 16 |
| MONTESOUTH TITLIS-3 | 3BHK | 116 sq m (1,252 sq ft) | 15 |
| MONTESOUTH TITLIS-3 | 2.5 BHK | 108 sq m (1,165 sq ft) | 2 |
| MONTESOUTH TITLIS-3 | 3.5 BHK | 138 sq m (1,485 sq ft) | 2 |
| MONTESOUTH TITLIS-3 | 3.5 BHK | 157 sq m (1,694 sq ft) | 2 |
Construction progress as reported to the portal
MONTESOUTH TITLIS-3
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
- Sanitary Fittings within the flats / premises: 25%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 90%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 75%
Common areas and facilities
- Internal Roads & Footpaths: 40% - WORK IN PROGRESS
- Water Supply: 25% - WORKING IN PROGRESS
- Sewerage (Chamber, Lines, Septic Tank , STP): 25% - WORK IN PROGRESS
- Storm Water Drains: 80% - WORK IN PROGRESS
- Landscaping & Tree Planting: 0% - Not yet started
- Street Lighting: 0% - Not yet started
- Community Buildings: 75% - WORKING IN PROGRESS
- Treatment And Disposal Of Sewage And Sullage Water: 95% - WORKING IN PROGRESS
- Solid Waste Management And Disposal: 0% - Not yet started
- Water conservation /Rain water harvesting: 0% - Not yet started
- Fire protection and fire safety requirements: 25% - WORKING IN PROGRESS
- Electrical meter room, sub-station, receiving station: 0% - Not yet started
P51800001779 MONTESOUTH-2 Completed
Confirmed with MahaRERA on 20 Sep 2026. Registered as "MONTESOUTH-2".
- Promoter
- SWAYAM REALTORS & TRADERS LLP
- Registered on
- 29 Jul 2017
- Proposed completion
- Dec 2023 (originally Dec 2022)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- BABURAO GANPATH MARG, Ward E, Mumbai City, 400011
- Land area
- 1,476 sq m (15,885 sq ft)
- Sanctioned built-up area
- 15,662 sq m (168,588 sq ft)
- Buildings
- MONTESOUTH TITLIS-2 (15 floors) - 12 of 113 available
- Parking
- Open Space 0, Closed/Covered 208
- Complaints on the portal
- 1
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| MONTESOUTH TITLIS-2 | 2.5BHK | 113 sq m (1,222 sq ft) | 18 |
| MONTESOUTH TITLIS-2 | 3.5BHK | 138 sq m (1,485 sq ft) | 31 |
| MONTESOUTH TITLIS-2 | 3.5BHK | 157 sq m (1,694 sq ft) | 32 |
| MONTESOUTH TITLIS-2 | 2.5BHK | 108 sq m (1,165 sq ft) | 32 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2017-2018 | 7 Aug 2026 | - | - |
| Q1 FY 2018-2019 | 7 Aug 2026 | - | - |
| Q2 FY 2019-2020 | 7 Aug 2026 | - | - |
| Q4 FY 2022-2023 | 7 Aug 2026 | - | - |
| Q2 FY 2023-2024 | 15 Dec 2025 | - | - |
Construction progress as reported to the portal
MONTESOUTH TITLIS-2
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 82%
- Sanitary Fittings within the flats / premises: 82%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 59%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 81%
Common areas and facilities
- Internal Roads & Footpaths: 40% - Work in Progress
- Water Supply: 45% - Work in Progress
- Sewerage (Chamber, Lines, Septic Tank , STP): 45% - Work in Progress
- Storm Water Drains: 80% - Work in Progress
- Landscaping & Tree Planting: 35% - Work in Progress
- Street Lighting: 0% - Not yet started
- Community Buildings: 75% - WORK IN PROGRESS
- Treatment And Disposal Of Sewage And Sullage Water: 45% - Work in Progress
- Solid Waste Management And Disposal: 0% - Not yet started
- Water conservation /Rain water harvesting: 0% - Not yet started
- Fire protection and fire safety requirements: 45% - Work in Progress
- Electrical meter room, sub-station, receiving station: 45% - Work in Progress
P51900001936 MONTESOUTH-1 Completed
Confirmed with MahaRERA on 20 Sep 2026. Registered as "MONTESOUTH-1".
- Promoter
- SWAYAM REALTORS & TRADERS LLP
- Registered on
- 29 Jul 2017
- Proposed completion
- Dec 2022
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- KHATAU MILL COMPOUND, NEXT TO BYCULLA FIRE BRIGADE, Ward E, Mumbai City, 400011
- Land area
- 1,476 sq m (15,885 sq ft)
- Sanctioned built-up area
- 24,384 sq m (262,474 sq ft)
- Buildings
- MONTESOUTH TITLIS-1 (34 floors)
- Parking
- Open Space 0, Closed/Covered 336
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| MONTESOUTH TITLIS-1 | 3.5 BHK | 115 sq m (1,236 sq ft) | 3 |
| MONTESOUTH TITLIS-1 | 3.5 BHK | 115 sq m (1,237 sq ft) | 2 |
| MONTESOUTH TITLIS-1 | 3.5 BHK | 115 sq m (1,237 sq ft) | 1 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 115 sq m (1,236 sq ft) | 2 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 117 sq m (1,262 sq ft) | 1 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 117 sq m (1,262 sq ft) | 1 |
| MONTESOUTH TITLIS-1 | 3.5 BHK | 147 sq m (1,578 sq ft) | 3 |
| MONTESOUTH TITLIS-1 | 2.5BHK | 113 sq m (1,222 sq ft) | 11 |
| MONTESOUTH TITLIS-1 | 3.5BHK | 157 sq m (1,694 sq ft) | 14 |
| MONTESOUTH TITLIS-1 | 2.5BHK | 107 sq m (1,150 sq ft) | 18 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 115 sq m (1,236 sq ft) | 2 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 115 sq m (1,237 sq ft) | 1 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 115 sq m (1,237 sq ft) | 2 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 112 sq m (1,201 sq ft) | 18 |
| MONTESOUTH TITLIS-1 | 2.5BHK | 108 sq m (1,165 sq ft) | 15 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 146 sq m (1,576 sq ft) | 1 |
| MONTESOUTH TITLIS-1 | 3.5BHK | 136 sq m (1,464 sq ft) | 22 |
| MONTESOUTH TITLIS-1 | 3.5 BHK | 115 sq m (1,236 sq ft) | 2 |
| MONTESOUTH TITLIS-1 | 3.5BHK | 156 sq m (1,678 sq ft) | 15 |
| MONTESOUTH TITLIS-1 | 3.5BHK | 138 sq m (1,485 sq ft) | 19 |
| MONTESOUTH TITLIS-1 | 3.5 BHK | 115 sq m (1,237 sq ft) | 1 |
| MONTESOUTH TITLIS-1 | 3.5 BHK | 115 sq m (1,238 sq ft) | 1 |
| MONTESOUTH TITLIS-1 | 3.5 BHK | 117 sq m (1,262 sq ft) | 1 |
| MONTESOUTH TITLIS-1 | 3.5 BHK | 117 sq m (1,262 sq ft) | 2 |
| MONTESOUTH TITLIS-1 | 3.5 BHK | 146 sq m (1,576 sq ft) | 2 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 146 sq m (1,576 sq ft) | 2 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 147 sq m (1,578 sq ft) | 1 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 147 sq m (1,579 sq ft) | 1 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 115 sq m (1,237 sq ft) | 3 |
| MONTESOUTH TITLIS-1 | 2.5 BHK | 117 sq m (1,262 sq ft) | 1 |
Construction progress as reported to the portal
MONTESOUTH TITLIS-1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 70%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 93%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 81%
Common areas and facilities
- Internal Roads & Footpaths: 40% - Work in Progress
- Water Supply: 100% - Done
- Sewerage (Chamber, Lines, Septic Tank , STP): 95% - Work in Progress
- Storm Water Drains: 80% - Work in Progress
- Landscaping & Tree Planting: 35% - Work in progress
- Street Lighting: 0% - Not yet started
- Community Buildings: 75% - WORKING IN PROGRESS
- Treatment And Disposal Of Sewage And Sullage Water: 95% - Work in Progress
- Solid Waste Management And Disposal: 0% - Not yet started
- Water conservation /Rain water harvesting: 0% - Not yet started
- Fire protection and fire safety requirements: 100% - Done
- Electrical meter room, sub-station, receiving station: 100% - Done
Reviews
Write a review
Be the first to write a review of Monte South and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Monte South
Enter some positive aspects of Monte South
Cons:
Enter some negative aspects of Monte South
Enter some negative aspects of Monte South
Location
Monte South, Byculla, Mumbai - 400008 (Maharashtra)
Landmarks
Education
- Speakwell-Byculla (<0.5km)
- Byculla Computer Typing Training Center (<0.5km)
- Madarsa Gousia Talimul Quran (<0.5km)
- Meghraj Sethi Marg Mont School (<0.5km)
- V Tech Computer Education (<0.5km)
- MS-Cit-V-Tech Computer Education (<0.5km)
- Umar Coaching Classes (<0.5km)
- Sunni Madrasa E Arabia (<0.5km)
- Shaikh Tutorial (<0.5km)
- Madrasa Arbia Talimul Quran (<0.5km)
- Byculla Commercial Institute (<0.5km)
- Ektas Home Tuitions (<0.5km)
- Traffic Training Institute (<0.5km)
- RM Home Private Tuition (<0.5km)
- Regina Paci S (<0.5km)
- Aly
- Divine Mercy Nursery (<0.5km)
- Dance Riders Academy (<0.5km)
- Pragati Pratishtan (<0.5km)
Transportation
- A H Ansari Chowk (<0.5km)
- B J Marg (<0.5km)
- Byculla Police Station (<0.5km)
Hospitals & Healthcare
- Jansewak Dawakhana (<0.5km)
- DTC Medicine (<0.5km)
- Orthosquare Dental Clinic for Dental Implants Braces Invisalign & Cosmetic Dentist (<0.5km)
- Vital Diagnostic Sonography Centre & Health Care (<0.5km)
- Dr Kershasp N Kasad (<0.5km)
- Fracture & X-Ray Clinic (<0.5km)
- Drishti Optician (<0.5km)
- Sahara Medical Centre (<0.5km)
- Zaras Dental Care (<0.5km)
- Homeopathic Dr. Shakil Khan Clinic (<0.5km)
- Dr Ramesh R Dethia Clinic (<0.5km)
- Dental Care (<0.5km)
- Dr Iysha Nadkar (<0.5km)
- Dr M. L. Macarenhas (<0.5km)
- Dr Salim A Sachani (<0.5km)
- Dhadkan Healthcare (<0.5km)
- Dr Samreens Excel Dentalcare (<0.5km)
- Sai Clinic (<0.5km)
- Dr Sameer S Sachani (<0.5km)
- Dr. Minnu Bhonsle Clinic (<0.5km)
- Rehman Clinic (<0.5km)
- Dr Hozie D Kapadia (<0.5km)
- DR.Rajan Bhonsle Clinic (<0.5km)
- DR. Samreen K. Ansari (<0.5km)
- Dr Diksha (<0.5km)
- Blood Collection Centre (<0.5km)
- Perfe Care Diagnostics (<0.5km)
- Metro Plus Pathology Laboratory (<0.5km)
- Dr Shabbir A Tajir (<0.5km)
Religious Places
- Shri Mahsoba VA Maruti Mandir (<0.5km)
- Shri Mahsoba Mandir (<0.5km)
- Robinson Memorial Methodi st Central Church (<0.5km)
- Shri Mahakaleshwar Shiv Mandir (<0.5km)
- Robinson Memorial Methodist Marathi Central Church (<0.5km)
- Sai Mandir (<0.5km)
- Shri Pandare Sankat Mochan Hanuman Mandir (<0.5km)
- Gloria Church (<0.5km)
Restaurants & Cafes
- Maasoli Malvani Lunch Home (<0.5km)
- Shabnam Hotel (<0.5km)
- Gazni Biryani (<0.5km)
- Deliccacy Chocolary (<0.5km)
- Albrost Fast Food (<0.5km)
- Mom
- Ice N Spice (<0.5km)
- Cafe Shalimar (<0.5km)
- Domino
- Maratti Biryani House (<0.5km)
- Modern (<0.5km)
- Grills & Wok (<0.5km)
- Mama Mia Pizzas & Subs (<0.5km)
- RENAULT (<0.5km)
- Being Healthy Kitchen (<0.5km)
- Vishal Jain Dhughdalay (<0.5km)
Banks & ATMs
- State Bank of India (<0.5km)
- The Municipal Co-op Bank -Byculla (<0.5km)
- Punjab National Bank (<0.5km)
- Uco Bank (<0.5km)
- The Municipal Co-op Bank (<0.5km)
- Vakrangee Kendra ATM (<0.5km)
- Bank of Baroda (<0.5km)
- Union Bank of India (<0.5km)
- Indian Overseas Bank-Capital Market Services (<0.5km)
Offices
- Brihanmumbai Mahanagarpalika E Ward Office (<0.5km)
- Balgopal Utsav Mandal (<0.5km)
- Police Station-Bycull a (<0.5km)
- Cafe Service (<0.5km)
- Byculla Sarvajanik Navtrastav Mandal (<0.5km)
- India Post Office (<0.5km)
Shopping
- Sakleni (<0.5km)
Hotels & Guest Houses
- Dr Vepul (<0.5km)
- Hotel Hiramani-Byculla House (<0.5km)
Entertainment
- Khada Parsi (<0.5km)
Leisure and Outdoor
- Desire (<0.5km)
- Project ID
- J326949119
- Updated
- Searches
- 1398
- Views
- 1243