Elevation
Balcony View
Bedroom
 8

Godrej Origins - Vikhroli East, Mumbai

Builder
Godrej Properties
Construction
Completed
Completion
Jun, 2023
Properties
Apartments
RERA
P51800000158, P51800000161, P51800000165

Description

offers all lifestyle amenities

Godrej Origins is located in the heart of Vikhroli East, Mumbai. offers 1,2&3 BHK apartments ranging from 450 sqft to 1756 sqft. The project is spread over 1.86 acres of land. It consists of 5 towers with 17 floors and 235 units. The Trees offers the best aspects of city life close to nature and at a pace set by those living here. The development is a unique blend of uses that ensures a vibrant community will thrive.


Amenities :
  • Swimming Pool
  • Health Club
  • Gymnasium
  • High-speed elevators
  • Landscaped garden
  • Kid's play area
  • Indoor Games
  • Outdoor Games
  • Power Backup
  • Vitrified flooring
  • Marble flooring
  • Concealed Wiring
  • Concealed Plumbing
  • POP finished wall
  • Intercom/CCTV
  • Granite Platform
  • Modular Kitchen
Godrej Properties brings the Godrej Group philosophy of innovation, sustainability, and excellence to the real estate industry. Each development combines a 119–year legacy of excellence and trust with a commitment to cutting-edge design and technology. The group is developing residential, commercial, and township projects spread across approximately 11.98 million square meters and 129.56 million square feet in 12 cities.

Highlights

  • Power Back-up
  • Water Softner
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • Centrally Air Conditioned
  • Lifts
  • Security Guards
  • Electronic Security
  • Intercom Facility
  • Balcony
  • Woodwork
  • Modular Kitchen
  • Feng Shui / Vaastu Compliant
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center

Configurations

Type Area Possession Price *
2BHK Apartment724 SqFeetImmediate/Ready to move₹ 3 crores
3BHK Apartment1,283 SqFeetImmediate/Ready to move₹ 4 crores
4BHK Apartment1,756 SqFeetImmediate/Ready to move₹ 6 crores
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51800000158 The Trees, Origins Completed

Confirmed with MahaRERA on 17 Sep 2026. Registered as "The Trees, Origins".

Promoter
Godrej Properties Limited
Registered on
5 Jul 2017
Proposed completion
Jun 2023
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Part of 51/B, Kurla, Kurla, Mumbai Suburban, 400079
Land area
7,543 sq m (81,192 sq ft)
Sanctioned built-up area
23,696 sq m (255,073 sq ft)
Buildings
P (13 floors); Q (16 floors); R (16 floors); S (20 floors); T (20 floors)
Parking
Open Space 81, Closed/Covered 359
Complaints on the portal
2
BuildingUnit typeCarpet areaUnits
P2BHK62 sq m (671 sq ft)1
P1BHK44 sq m (471 sq ft)10
P1BHK44 sq m (477 sq ft)9
PSHOP26 sq m (276 sq ft)1
P1BHK42 sq m (450 sq ft)8
PShop24 sq m (253 sq ft)1
PShop16 sq m (177 sq ft)1
PShop16 sq m (173 sq ft)1
P1BHK46 sq m (499 sq ft)10
P1BHK46 sq m (493 sq ft)10
Q2BHK67 sq m (718 sq ft)13
QSHOP226 sq m (279 sq ft)1
QSHOP117 sq m (180 sq ft)1
QSHOP317 sq m (185 sq ft)1
QSHOP414 sq m (153 sq ft)1
QSHOP529 sq m (307 sq ft)1
QSHOP615 sq m (167 sq ft)1
Q1BHK42 sq m (454 sq ft)12
Q2BHK67 sq m (725 sq ft)13
Q1BHK42 sq m (455 sq ft)12
R3BHKCOMPACT77 sq m (829 sq ft)13
R1BHK42 sq m (454 sq ft)11
RSHOP415 sq m (157 sq ft)1
RSHOP318 sq m (193 sq ft)1
RSHOP217 sq m (186 sq ft)1
RSHOP119 sq m (201 sq ft)1
R2BHK72 sq m (772 sq ft)1
R2BHK67 sq m (718 sq ft)12
S3BHKCOMPACT95 sq m (1,026 sq ft)1
SShop18 sq m (189 sq ft)1
SPENTHOUSE1,303 sq m (14,028 sq ft)1
SShop29 sq m (317 sq ft)1
SShop25 sq m (272 sq ft)1
S3BHK118 sq m (1,272 sq ft)14
S1BHK47 sq m (502 sq ft)12
SShop19 sq m (203 sq ft)1
SShop20 sq m (210 sq ft)1
S2BHK85 sq m (917 sq ft)1
SShop21 sq m (225 sq ft)1
S3BHK119 sq m (1,283 sq ft)15
S3BHKCOMPACT82 sq m (887 sq ft)13
SShop21 sq m (230 sq ft)1
SShop22 sq m (236 sq ft)1
SShop15 sq m (157 sq ft)1
SShop17 sq m (181 sq ft)1
T2BHK98 sq m (1,052 sq ft)1
T4BHK147 sq m (1,585 sq ft)15
T2BHK73 sq m (788 sq ft)13
TShop20 sq m (213 sq ft)1
TShop47 sq m (511 sq ft)1
TShop52 sq m (554 sq ft)1
TShop17 sq m (181 sq ft)1
T2BHK87 sq m (939 sq ft)1
T3BHK111 sq m (1,192 sq ft)13
Construction progress as reported to the portal

P

  • Excavation: 100%
  • Basement (if any): 93%
  • Podiums (if any): 0%
  • Plinth: 93%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 40%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 21%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Q

  • Excavation: 100%
  • Basement (if any): 93%
  • Podiums (if any): 0%
  • Plinth: 93%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 23%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 17%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

R

  • Excavation: 100%
  • Basement (if any): 93%
  • Podiums (if any): 0%
  • Plinth: 93%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 15%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 8%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

S

  • Excavation: 100%
  • Basement (if any): 93%
  • Podiums (if any): 0%
  • Plinth: 93%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 8%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

T

  • Excavation: 100%
  • Basement (if any): 89%
  • Podiums (if any): 0%
  • Plinth: 89%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 8%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - Paver and Concrete Roads as designed by the Infra
  • Water Supply: 0% - From BMC Main water supply line in GI
  • Sewerage (Chamber, Lines, Septic Tank , STP): 35% - For traps Nahali Traps CI Pipes and RCC Hume pipes
  • Storm Water Drains: 5% - RCC trenches RCC hume pipe to navigate water
  • Landscaping & Tree Planting: 0% - Children play area landscape area including trees
  • Street Lighting: 0% - Street lights along the lenght of common road
  • Community Buildings: 10% - Common Clubhouse for all 3 resi phs regst in ph 2
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - STP of RMBR types 150 KLD capacity for Phase 3
  • Solid Waste Management And Disposal: 0% - Solid waste converter common for resi development
  • Water conservation /Rain water harvesting: 75% - Rainwater collection tank in basement 2
  • Energy managemcnt: 0% - Fire hydrants and extinguishers at common area
  • Fire protection and fire safety requirements: 0% - R stn common for phase 1 and 3 will constructed
  • Electrical meter room, sub-station, receiving station: 0% - R stn common for Phase 1 and 3 will constructed
  • Aggregate area of recreational Open Space: 0% - Common RG for all 3 Phases adm 5293 sq. mtrs.
  • Open Parking: 0% - 81 open parks provided

P51800000161 The Trees Residential Phase 2 Completed

Confirmed with MahaRERA on 17 Sep 2026. Registered as "The Trees Residential Phase 2".

Promoter
Godrej Properties Limited
Registered on
5 Jul 2017
Proposed completion
Jun 2022
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
51/B Part, Kurla, Kurla, Mumbai Suburban, 400079
Land area
11,815 sq m (127,180 sq ft)
Sanctioned built-up area
23,548 sq m (253,477 sq ft)
Buildings
K (21 floors); L (21 floors); M (15 floors); N (21 floors); O (21 floors)
Parking
Open Space 94, Closed/Covered 411
Complaints on the portal
1
BuildingUnit typeCarpet areaUnits
KSTUDIO31 sq m (330 sq ft)1
K1BHK42 sq m (457 sq ft)18
K1BHK44 sq m (475 sq ft)15
K2BHKCOMPACT55 sq m (587 sq ft)1
K1BHK44 sq m (476 sq ft)18
K1BHK43 sq m (459 sq ft)17
L1BHK39 sq m (419 sq ft)1
L1BHK45 sq m (484 sq ft)1
L2BHK60 sq m (646 sq ft)15
L2BHK61 sq m (653 sq ft)18
L2BHK68 sq m (734 sq ft)18
M2BHK75 sq m (805 sq ft)1
M2BHK76 sq m (819 sq ft)1
M2BHK65 sq m (701 sq ft)12
M3BHK96 sq m (1,034 sq ft)11
M3BHK94 sq m (1,014 sq ft)11
N3BHKPENTHOUSE160 sq m (1,724 sq ft)1
N3BHKPENTHOUSE164 sq m (1,767 sq ft)1
N3BHKDUPLEX152 sq m (1,640 sq ft)1
N4BHKPENTHOUSE187 sq m (2,018 sq ft)1
N3BHK93 sq m (1,005 sq ft)12
N3BHKDUPLEX158 sq m (1,701 sq ft)1
N3BHKCOMPACT82 sq m (882 sq ft)16
N3BHKCOMPACT80 sq m (860 sq ft)16
O3BHKCOMPACT82 sq m (881 sq ft)13
O4BHKCOMPACT105 sq m (1,128 sq ft)14
O4BHKCOMPACT103 sq m (1,110 sq ft)16
O4BHKPENTHOUSE202 sq m (2,172 sq ft)1
O4BHKPENTHOUSE199 sq m (2,146 sq ft)1
O3BHKPENTHOUSE162 sq m (1,740 sq ft)1
O4BHKDUPLEX149 sq m (1,604 sq ft)1
O3BHKCOMPACT86 sq m (924 sq ft)1
Construction progress as reported to the portal

K

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

L

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

M

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

N

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

O

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - Paver and Concrete Roads as designed by the Infra
  • Water Supply: 100% - From MCGM water supply line
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - Floor traps Nahani Trap CI pipe and RCC Hume pipe
  • Storm Water Drains: 100% - RCC Tranch RCC Hume Pipe
  • Landscaping & Tree Planting: 100% - Landscape area including Trees shurbs Jogging path
  • Street Lighting: 100% - Street lights along the lenght of the common road
  • Community Buildings: 100% - Common Clubhouse for 3 resi phas regist in Ph 2
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - STP of RMBR types of 150 KLD for Phase 2
  • Solid Waste Management And Disposal: 100% - Solid waste convertor common for all RESI Phases
  • Water conservation /Rain water harvesting: 100% - Rainwater collection tank in basement 2
  • Energy managemcnt: 100% - Solar PV Panels to take partial load of common
  • Fire protection and fire safety requirements: 100% - Fire hydrants and extinguishers at common area
  • Electrical meter room, sub-station, receiving station: 100% - R stn for phase 2 will be constructed
  • Aggregate area of recreational Open Space: 0% - Common RG for all 3 Phases adm 5293 sq. mtrs.
  • Open Parking: 0% - 94 open car parking provided

P51800000165 The Trees, Residential Phase 1 Completed

Confirmed with MahaRERA on 17 Sep 2026. Registered as "The Trees, Residential Phase 1".

Promoter
Godrej Properties Limited
Registered on
7 Jul 2017
Proposed completion
Jun 2022
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
51/B, Kurla, Kurla, Mumbai Suburban, 400079
Land area
14,067 sq m (151,421 sq ft)
Sanctioned built-up area
34,306 sq m (369,277 sq ft)
Buildings
A (10 floors); B (10 floors); C (10 floors); D (10 floors); E (21 floors); F (21 floors); G (15 floors); H (14 floors); I (21 floors); J (21 floors)
Parking
Open Space 124, Closed/Covered 551
Complaints on the portal
5
BuildingUnit typeCarpet areaUnits
ASHOP18 sq m (198 sq ft)1
ASHOP19 sq m (200 sq ft)1
ASHOP19 sq m (202 sq ft)1
A1BHK44 sq m (475 sq ft)20
A3BHKCOMPACT78 sq m (840 sq ft)1
ASHOP21 sq m (224 sq ft)1
A1BHK44 sq m (469 sq ft)6
BSHOP15 sq m (164 sq ft)1
BSHOP14 sq m (155 sq ft)1
BSHOP12 sq m (124 sq ft)1
B3BHKCOMPACT78 sq m (839 sq ft)1
B1BHK44 sq m (471 sq ft)6
B1BHK44 sq m (469 sq ft)6
B1BHK45 sq m (481 sq ft)14
BSHOP17 sq m (180 sq ft)1
BSHOP16 sq m (175 sq ft)1
CSHOP21 sq m (231 sq ft)1
CSHOP18 sq m (192 sq ft)1
CSHOP12 sq m (124 sq ft)1
C3BHKCOMPACT77 sq m (828 sq ft)1
C1BHK43 sq m (464 sq ft)6
C1BHK44 sq m (469 sq ft)6
C1BHK45 sq m (481 sq ft)14
CSHOP23 sq m (247 sq ft)1
D1BHK44 sq m (474 sq ft)19
D1BHK45 sq m (480 sq ft)7
E2BHKCOMPACT61 sq m (653 sq ft)1
EPENTHOUSE207 sq m (2,231 sq ft)1
ESHOP15 sq m (159 sq ft)1
E3BHKCOMPACT80 sq m (857 sq ft)15
EPENTHOUSE209 sq m (2,251 sq ft)1
E3BHKCOMPACT82 sq m (882 sq ft)16
E2BHK65 sq m (704 sq ft)13
E1BHK48 sq m (520 sq ft)1
ESHOP22 sq m (232 sq ft)1
ESHOP19 sq m (203 sq ft)1
ESHOP17 sq m (186 sq ft)1
F2BHK65 sq m (705 sq ft)14
F2BHK76 sq m (815 sq ft)1
F3BHKCOMPACT81 sq m (875 sq ft)1
F3BHK95 sq m (1,018 sq ft)14
F4BHKCOMPACTDUPLEX138 sq m (1,486 sq ft)1
FPENTHOUSE202 sq m (2,179 sq ft)1
F3BHK98 sq m (1,050 sq ft)16
FPENTHOUSE193 sq m (2,081 sq ft)1
G1BHK46 sq m (501 sq ft)11
G1BHK48 sq m (515 sq ft)11
G1BHK52 sq m (560 sq ft)1
G2BHK61 sq m (656 sq ft)1
G2BHK64 sq m (692 sq ft)11
H2BHK76 sq m (816 sq ft)11
H1BHK51 sq m (548 sq ft)1
H2BHK66 sq m (710 sq ft)11
H2BHK65 sq m (699 sq ft)12
H1BHK49 sq m (526 sq ft)1
I2BHK67 sq m (723 sq ft)14
IPENTHOUSE206 sq m (2,217 sq ft)1
IPENTHOUSE199 sq m (2,143 sq ft)1
I3BHK99 sq m (1,061 sq ft)16
I3BHK97 sq m (1,039 sq ft)15
I2BHK78 sq m (834 sq ft)1
I1BHK48 sq m (522 sq ft)1
J2BHK66 sq m (711 sq ft)17
JPENTHOUSE213 sq m (2,291 sq ft)1
J3BHKCOMPACT93 sq m (997 sq ft)1
J4BHKCOMPACT122 sq m (1,315 sq ft)14
JPENTHOUSE208 sq m (2,241 sq ft)1
J5BHKCOMPACT144 sq m (1,554 sq ft)1
J4BHKCOMPACT120 sq m (1,292 sq ft)15
Construction progress as reported to the portal

A

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

C

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

D

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

E

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

F

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

G

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

H

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

I

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

J

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - Paver and Concrete Roads as designed by the Infra
  • Water Supply: 100% - From BMC main water supply line in GI.
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - Floor traps Nahani Traps CI Pipes & RCC Hume Pipe
  • Storm Water Drains: 100% - RCC Trenches RCC Hume pipe
  • Landscaping & Tree Planting: 100% - Childrens play area Landscape area
  • Street Lighting: 100% - Street lights along the common road
  • Community Buildings: 100% - Common Clubhouse for all 3 resi phs regst in ph 2
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - STP of 200 KLD provided for Phase 1
  • Solid Waste Management And Disposal: 100% - Solid waste converter common for all RESI phases
  • Water conservation /Rain water harvesting: 100% - Rainwater collection tank provided in basement 2
  • Energy managemcnt: 100% - Solar PV panels to take partial load of common
  • Fire protection and fire safety requirements: 100% - Fire Hydrants and extingushishers at common area
  • Electrical meter room, sub-station, receiving station: 100% - R stn common for all 3 Resi phases
  • Aggregate area of recreational Open Space: 100% - Common RG for all 3 Phases adm 5293 sq. mtrs.
  • Open Parking: 100% - 124 Open car park provided
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Godrej Origins and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Godrej Origins
Cons:
Enter some negative aspects of Godrej Origins

Location

Godrej Origins, Vikhroli East, Mumbai - 400086 (Maharashtra)

* Location may be approximate

Landmarks

  • Hospitals & Healthcare

    • DR.Sangeetha Clinic (<0.5km)
    • Dr Sneha AA Kadam (<0.5km)
    • Bhargithi Clinic (<0.5km)
    • Dr Jiten Chowdhry Clinic (<1km)
    • Mirah Hospital-ER (<1km)
    • Mirah Hospital (<1km)
    • Ganesh Nagar Health Centre (<1km)
    • Echopoint Imaging Centre (<1km)
    • Ghatkopar Charitable Dental Clinic (<1km)
    • Unicare Health Center (<1km)
    • Aditya Hospital (<1km)
    • Shri Dhootapapeshwar Ayurved Trust (<1km)
    • Aditya Hospital-ER (<1km)
    • Zimmer Biomet Dental India (<1km)
    • Nitro Dentists (<1km)
    • Riddhi Opticians (<1km)
    • Samarpan Blood Centre (<1km)
  • Hotels & Guest Houses

    • Taj the Trees Mumbai (<0.5km)
    • Godrej Employee Guesthouse 2 (<0.5km)
  • Banks & ATMs

    • ICICI Bank (<0.5km)
    • Kotak Mahindra Bank (<0.5km)
    • Luxembourg Grahak Sahakari Bhandar Maryadit (<0.5km)
    • Central Bank of India-Vikhroli (<1km)
    • Central Bank of India (<1km)
    • Axis Bank Atm (<1km)
  • Restaurants & Cafes

    • Vikhroli Social (<0.5km)
    • Nonya (<0.5km)
    • Shamiana (<0.5km)
    • Hubble Godrej (<0.5km)
    • Hungry Jacks (<1km)
    • Cycle Cafe (<1km)
    • Laziz Biryaniwala (<1km)
    • Cafe Shalimar (<1km)
    • Shreeraj (<1km)
    • Abhinandan (<1km)
    • Naturals (<1km)
    • Desi Twist (<1km)
    • Baalbek (<1km)
    • The JS (<1km)
    • Granmamas Cafe (<1km)
    • The Hill Green (<1km)
    • Balaji Pure Veg (<1km)
    • Salsa Salsa (<1km)
    • MM Maroosh (<1km)
    • Kings Kulfi (<1km)
    • Domino
    • Kailash Parbat (<1km)
    • Tibb
    • McDonald
    • Sizzle Cafe (<1km)
    • Pappe di Hatti (<1km)
  • Education

    • Unique Educare Coaching Classes (<0.5km)
    • Ganeshnagar Laxmibaug Municiple School (<0.5km)
    • Blossom Buds Preschool (<1km)
    • Jinal Shah
    • Math Tuition Classes Cuemath (<1km)
    • Khushi
    • Eurokids Pre-School (<1km)
    • Pace (<1km)
    • Acb Playschool-High Impact Training (<1km)
    • Kiddie Planet International (<1km)
    • Karrox Centre of Technology & Management (<1km)
    • TOYOTA Technical Coaching Centre (<1km)
    • A Square Academy (<1km)
    • Almamater (<1km)
  • Offices

    • Amaltas (<0.5km)
    • Palash (<0.5km)
    • Kadamba (<0.5km)
    • Parijat (<0.5km)
    • Ganesh Nagae M na Pa Shala (<0.5km)
  • Entertainment

    • The Mangrove Bar (<0.5km)
    • Pop Tate
  • Transportation

    • Tata Power (<0.5km)
    • Godrej Soaps (<1km)
    • EV Charging Station (<1km)
    • Mahanagar Gas (<1km)
    • Dargah (<1km)
    • Maa Saheb Meenatai Thakre Mano Ranjan Maidan (<1km)
    • Bharat Petroleum (<1km)
    • Dinesh Auto (<1km)
  • Religious Places

    • Qadri Mosque (<0.5km)
    • Hazrat Alauddin Shah Baba (<1km)
    • Sunni Mosque (<1km)
    • Jesus Calls Prayer Tower (<1km)
    • Pankeshah Baba Rehmatulla Alaihi Dargah (<1km)
  • Shopping

    • Raheja Plaza (<0.5km)
    • M&S (<1km)
  • Leisure and Outdoor

    • Shiv Prerana Gymnasium (<1km)
    • Wadhwa Address Tennis Court (<1km)
    • Meenatai Thackeray Udyan (<1km)
    • Shreemati Sheela Raheja Udyan (<1km)
    • Fit N Trim Gym (<1km)
    • The Rock Fitness (<1km)
    • Kidzania (<1km)
    • Smaaash Mumbai (<1km)
Project ID
J811897974
Updated
Searches
1335
Views
1052