


DB Orchid Ozone - Dahisar East, Mumbai
- Builder
- DB Realty
- Construction
- Under Construction
- Completion
- Dec, 2024
- Properties
- Apartments
- RERA
- P51700003433
Description
Paradise abode
DB Orchid Ozone is a perfect residential project by DB Realty located at Dahisar (East), Mumbai. This project will let you experience the joys of living in a community, blessed with families from different walks of life which offers 2 & 3 Bhk apartments ranging between 585- 882 sq.ft. which is spread over the total area of 14 acre of land.Amenities
- Swimming Pool
- Children's play area
- Club House
- Landscaped Gardens
- Jogging Track
- Power Backup
- Lift Available
- Rain Water Harvesting
- 24*7 Security
- Car Parking
- Gymnasium
- Vaastu Compliant
Highlights
- Security Guards
- Fire Alarm
- Electronic Security
- Balcony
- Reserved Parking
- Marble Flooring
- Visitor Parking
- Maintenance Staff
- Water Supply / Storage
- Waste Disposal
- Power Back-up
- Club / Community Center
- Lifts
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 1BHK Apartment | 585 SqFeet | Immediate/Ready to move | ₹ 60 lakhs |
| 2BHK Apartment | 882 SqFeet | Immediate/Ready to move | ₹ 80 lakhs |
RERA
P51700003433 DB Ozone Lapsed 96% built
Confirmed with MahaRERA on 21 Sep 2026. Registered as "DB Ozone".
- Promoter
- NEELKAMAL REALTORS SUBURBAN PRIVATE LIMITED
- Registered on
- 5 Aug 2017
- Proposed completion
- Dec 2024 (originally Dec 2019)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- General A K Vaidya Marg, Goregaon East, Mira-Bhayandar (M Corp.), Thane, Thane, 400063
- Land area
- 38,401 sq m (413,354 sq ft)
- Sanctioned built-up area
- 161,994 sq m (1,743,746 sq ft)
- Buildings
- Building No 28 (25 floors); Building No 1 (24 floors); Building No 2 (24 floors); Building No 3 (24 floors); Building No 4 (24 floors); Building No 7 (24 floors); Building No 8 (25 floors); Building No 6 (26 floors); Building No 9 (24 floors); Building No 10 (24 floors); Building No 11 (26 floors); Building No 12 (26 floors); Building No 14 (24 floors); Building No 15 (26 floors); Building No 16 (25 floors); Building No 17 (24 floors); Building No 18 (26 floors); Building No 20 (24 floors); Building No 21 (25 floors); Building No 22 (25 floors); Building No 23 (24 floors); Building No 24 (26 floors); Building No 27 (26 floors); Building No 29 (24 floors); Building No 30 (26 floors)
- Parking
- Open Space 0, Closed/Covered 1563
- Complaints on the portal
- 71
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Building No 28 | B28 X03 EVEN 1BHK | 33 sq m (360 sq ft) | 16 |
| Building No 28 | B28 X01 ODD 1.5BHK | 45 sq m (479 sq ft) | 10 |
| Building No 28 | B28 X02 EVEN 2BHK | 51 sq m (554 sq ft) | 30 |
| Building No 28 | B28 X01 EVEN 1.5BHK | 45 sq m (487 sq ft) | 10 |
| Building No 28 | B28 X02 ODD 2BHK | 51 sq m (552 sq ft) | 30 |
| Building No 28 | B28 X04 EVEN 2BHK | 50 sq m (534 sq ft) | 18 |
| Building No 28 | B28 X04 ODD 2BHK | 50 sq m (540 sq ft) | 20 |
| Building No 28 | B28 X03 ODD 1BHK | 34 sq m (362 sq ft) | 20 |
| Building No 1 | B1 X01 EVEN 1.5BHK | 45 sq m (488 sq ft) | 9 |
| Building No 1 | B1 X03 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 1 | B1 X02 ODD 2BHK | 52 sq m (560 sq ft) | 30 |
| Building No 1 | B1 X02 EVEN 2BHK | 52 sq m (557 sq ft) | 27 |
| Building No 1 | B1 X03 EVEN 1BHK | 34 sq m (362 sq ft) | 30 |
| Building No 1 | B1 X01 ODD 1.5BHK | 45 sq m (487 sq ft) | 10 |
| Building No 2 | B2 X02 EVEN 2BHK | 52 sq m (557 sq ft) | 27 |
| Building No 2 | B2 X03 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 2 | B2 X01 ODD 1.5BHK | 45 sq m (487 sq ft) | 10 |
| Building No 2 | B2 X02 ODD 2BHK | 52 sq m (560 sq ft) | 30 |
| Building No 2 | B X01 EVEN 1.5BHK | 45 sq m (488 sq ft) | 9 |
| Building No 2 | B2 X03 EVEN 1BHK | 34 sq m (362 sq ft) | 30 |
| Building No 3 | B3 X03 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 3 | B3 X01 EVEN 1.5BHK | 45 sq m (488 sq ft) | 9 |
| Building No 3 | B3 X02 EVEN 2BHK | 52 sq m (557 sq ft) | 27 |
| Building No 3 | B3 X03 EVEN 1BHK | 34 sq m (362 sq ft) | 30 |
| Building No 3 | B3 X01 ODD 1.5BHK | 45 sq m (487 sq ft) | 10 |
| Building No 3 | B3 X02 ODD 2BHK | 52 sq m (560 sq ft) | 30 |
| Building No 4 | B4 X03 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 4 | B4 X02 ODD 2BHK | 52 sq m (560 sq ft) | 30 |
| Building No 4 | B4 X02 EVEN 2BHK | 52 sq m (557 sq ft) | 27 |
| Building No 4 | B4 X01 EVEN 1.5BHK | 45 sq m (488 sq ft) | 9 |
| Building No 4 | B4 X03 EVEN 1BHK | 34 sq m (362 sq ft) | 30 |
| Building No 4 | B4 X01 ODD 1.5BHK | 45 sq m (487 sq ft) | 10 |
| Building No 7 | B7 X01 ODD 1.5BHK | 45 sq m (487 sq ft) | 10 |
| Building No 7 | B7 XO2 ODD 2BHK | 52 sq m (560 sq ft) | 30 |
| Building No 7 | B7 X02 EVEN 2BHK | 52 sq m (557 sq ft) | 27 |
| Building No 7 | B7 X01 EVEN 1.5BHK | 45 sq m (488 sq ft) | 9 |
| Building No 7 | B7 X03 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 7 | B7 X03 EVEN 1BHK | 34 sq m (362 sq ft) | 30 |
| Building No 8 | B8 X01 ODD 1.5BHK | 45 sq m (489 sq ft) | 10 |
| Building No 8 | B8 X02 ODD 2BHK | 52 sq m (558 sq ft) | 10 |
| Building No 8 | B8 X03 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 8 | B8 X01 EVEN 1.5BHK | 45 sq m (489 sq ft) | 10 |
| Building No 8 | B8 X02 EVEN 2BHK | 52 sq m (558 sq ft) | 10 |
| Building No 8 | B8 X03 EVEN 1BHK | 34 sq m (363 sq ft) | 36 |
| Building No 6 | B6 X03 ODD 2BHK | 49 sq m (531 sq ft) | 22 |
| Building No 6 | B6 X04 ODD 2BHK | 46 sq m (499 sq ft) | 11 |
| Building No 6 | B6 X03 EVEN 2BHK | 49 sq m (526 sq ft) | 20 |
| Building No 6 | B6 X04 EVEN 2BHK | 46 sq m (495 sq ft) | 8 |
| Building No 6 | B6 X01 ODD 2BHK | 52 sq m (556 sq ft) | 33 |
| Building No 6 | B6 X02 ODD 1.5BHK | 45 sq m (480 sq ft) | 11 |
| Building No 6 | B6 X02 EVEN 1.5BHK | 45 sq m (486 sq ft) | 10 |
| Building No 6 | B6 X01 EVEN 2BHK | 52 sq m (554 sq ft) | 30 |
| Building No 9 | B9 X01 ODD 1.5BHK | 45 sq m (487 sq ft) | 10 |
| Building No 9 | B9 X02 ODD 2BHK | 52 sq m (560 sq ft) | 30 |
| Building No 9 | B9 XO3 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 9 | B9 X03 EVEN 1BHK | 34 sq m (362 sq ft) | 30 |
| Building No 9 | B9 X02 EVEN 2BHK | 52 sq m (557 sq ft) | 27 |
| Building No 9 | B9 X01 EVEN 1.5BHK | 45 sq m (488 sq ft) | 9 |
| Building No 10 | B10 X01 ODD 1.5BHK | 45 sq m (487 sq ft) | 10 |
| Building No 10 | B10 X03 EVEN 1BHK | 34 sq m (362 sq ft) | 30 |
| Building No 10 | B10 X02 EVEN 2BHK | 52 sq m (557 sq ft) | 27 |
| Building No 10 | B10 X01 EVEN 1.5BHK | 45 sq m (488 sq ft) | 9 |
| Building No 10 | B10 X03 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 10 | B10 X02 ODD 2BHK | 52 sq m (560 sq ft) | 30 |
| Building No 11 | B11 X02 EVEN 1BHK | 34 sq m (362 sq ft) | 16 |
| Building No 11 | B11 X01 ODD 2BHK | 51 sq m (553 sq ft) | 44 |
| Building No 11 | B11 X02 ODD 1BHK | 33 sq m (358 sq ft) | 22 |
| Building No 11 | B11 X01 EVEN 2BHK | 51 sq m (547 sq ft) | 40 |
| Building No 12 | B12 X02 EVEN 1BHK | 33 sq m (360 sq ft) | 16 |
| Building No 12 | B12 X03 EVEN 2BHK | 52 sq m (558 sq ft) | 20 |
| Building No 12 | B12 X01 EVEN 1BHK | 34 sq m (369 sq ft) | 20 |
| Building No 12 | B12 X03 ODD 2BHK | 52 sq m (561 sq ft) | 22 |
| Building No 12 | B12 X02 ODD 1BHK | 33 sq m (360 sq ft) | 22 |
| Building No 12 | B12 X01 ODD 1BHK | 34 sq m (367 sq ft) | 22 |
| Building No 14 | B14 X02 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 14 | B14 X03 ODD 2BHK | 52 sq m (560 sq ft) | 20 |
| Building No 14 | B14 X01 EVEN 1BHK | 34 sq m (362 sq ft) | 48 |
| Building No 14 | B14 X01 ODD 1BHK | 34 sq m (365 sq ft) | 20 |
| Building No 14 | B14 X02 EVEN 2BHK | 51 sq m (554 sq ft) | 18 |
| Building No 15 | B15 X01 ODD 1BHK | 33 sq m (356 sq ft) | 22 |
| Building No 15 | B15 X02 ODD 1BHK | 33 sq m (360 sq ft) | 44 |
| Building No 15 | B15 X01 EVEN 1BHK | 33 sq m (358 sq ft) | 20 |
| Building No 15 | B15 X02 EVEN 1BHK | 34 sq m (364 sq ft) | 36 |
| Building No 16 | B16 X02 EVEN 2BHK | 52 sq m (559 sq ft) | 20 |
| Building No 16 | B16 X02 ODD 2BHK | 52 sq m (557 sq ft) | 20 |
| Building No 16 | B16 X01 EVEN 1BHK | 33 sq m (360 sq ft) | 36 |
| Building No 16 | B16 X01 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 17 | B17 X01 ODD 1BHK | 34 sq m (365 sq ft) | 20 |
| Building No 17 | B17 X02 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 17 | B17 X01 EVEN 1BHK | 34 sq m (362 sq ft) | 48 |
| Building No 17 | B17 X02 EVEN 2BHK | 51 sq m (554 sq ft) | 18 |
| Building No 17 | B17 X03 ODD 2BHK | 52 sq m (560 sq ft) | 20 |
| Building No 18 | B18 X03 EVEN 2BHK | 51 sq m (552 sq ft) | 20 |
| Building No 18 | B18 X02 EVEN 2BHK | 49 sq m (527 sq ft) | 20 |
| Building No 18 | B18 X01 ODD 1BHK | 33 sq m (355 sq ft) | 22 |
| Building No 18 | B18 X04 ODD 2BHK | 48 sq m (522 sq ft) | 11 |
| Building No 18 | B18 X01 EVEN 1BHK | 33 sq m (353 sq ft) | 20 |
| Building No 18 | B18 X04 EVEN 2BHK | 49 sq m (526 sq ft) | 8 |
| Building No 18 | B18 X03 ODD 2BHK | 51 sq m (554 sq ft) | 22 |
| Building No 18 | B18 X02 ODD 2BHK | 50 sq m (534 sq ft) | 22 |
| Building No 20 | B20 X02 ODD 2BHK | 52 sq m (560 sq ft) | 30 |
| Building No 20 | B20 X03 EVEN 1BHK | 34 sq m (362 sq ft) | 30 |
| Building No 20 | B20 X02 EVEN 2BHK | 52 sq m (557 sq ft) | 27 |
| Building No 20 | B20 X01 EVEN 1.5BHK | 45 sq m (488 sq ft) | 9 |
| Building No 20 | B20 X03 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 20 | B20 X01 ODD 1.5BHK | 45 sq m (487 sq ft) | 10 |
| Building No 21 | B21 X01 ODD 1.5BHK | 45 sq m (489 sq ft) | 10 |
| Building No 21 | B21 X02 ODD 2BHK | 52 sq m (558 sq ft) | 10 |
| Building No 21 | B21 X01 EVEN 1.5BHK | 45 sq m (489 sq ft) | 10 |
| Building No 21 | B21 X03 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 21 | B21 X03 EVEN 1BHK | 34 sq m (363 sq ft) | 36 |
| Building No 21 | B21 X02 EVEN 2BHK | 52 sq m (558 sq ft) | 10 |
| Building No 22 | B 22 X01 ODD 1 BHK | 33 sq m (360 sq ft) | 40 |
| Building No 22 | B 22 X02 ODD 2 BHK | 52 sq m (557 sq ft) | 20 |
| Building No 22 | B 22 X01 EVEN 1 BHK | 33 sq m (360 sq ft) | 36 |
| Building No 22 | B 22 X02 EVEN 2 BHK | 52 sq m (559 sq ft) | 20 |
| Building No 23 | 23 X01 ODD 1.5BHK | 45 sq m (487 sq ft) | 10 |
| Building No 23 | 23 X02 ODD 2BHK | 52 sq m (560 sq ft) | 30 |
| Building No 23 | 23 X03 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 23 | 23 X01 EVEN 1.5BHK | 45 sq m (488 sq ft) | 9 |
| Building No 23 | 23 X02 EVEN 2BHK | 52 sq m (557 sq ft) | 27 |
| Building No 23 | 23 X03 EVEN 1BHK | 34 sq m (362 sq ft) | 30 |
| Building No 24 | 24 X02 ODD 1BHK | 33 sq m (358 sq ft) | 22 |
| Building No 24 | 24 X01 EVEN 2BHK | 51 sq m (547 sq ft) | 40 |
| Building No 24 | 24 X02 EVEN 1BHK | 34 sq m (362 sq ft) | 16 |
| Building No 24 | 24 X01 ODD 2BHK | 51 sq m (553 sq ft) | 44 |
| Building No 27 | 27 X03 EVEN 2BHK | 50 sq m (533 sq ft) | 20 |
| Building No 27 | 27 X02 EVEN 2BHK | 52 sq m (556 sq ft) | 20 |
| Building No 27 | 27 X01 ODD 2BHK | 52 sq m (556 sq ft) | 11 |
| Building No 27 | 27 X02 ODD 2BHK | 51 sq m (549 sq ft) | 22 |
| Building No 27 | 27 X03 ODD 2BHK | 49 sq m (532 sq ft) | 22 |
| Building No 27 | 27 X01 EVEN 2BHK | 48 sq m (517 sq ft) | 8 |
| Building No 29 | 29 X03 EVEN 1BHK | 34 sq m (362 sq ft) | 30 |
| Building No 29 | 29 X02 EVEN 2BHK | 52 sq m (557 sq ft) | 27 |
| Building No 29 | 29 X01 EVEN 1.5BHK | 45 sq m (488 sq ft) | 9 |
| Building No 29 | 29 X03 ODD 1BHK | 33 sq m (360 sq ft) | 40 |
| Building No 29 | 29 X01 ODD 1.5BHK | 45 sq m (487 sq ft) | 10 |
| Building No 29 | 29 X02 ODD 2BHK | 52 sq m (560 sq ft) | 30 |
| Building No 30 | 30 X02 EVEN 1.5BHK | 45 sq m (486 sq ft) | 10 |
| Building No 30 | 30 X01 ODD 2BHK | 52 sq m (556 sq ft) | 33 |
| Building No 30 | 30 X01 EVEN 2BHK | 52 sq m (554 sq ft) | 30 |
| Building No 30 | 30 X04 EVEN 2BHK | 46 sq m (495 sq ft) | 8 |
| Building No 30 | 30 X03 EVEN 2BHK | 49 sq m (526 sq ft) | 20 |
| Building No 30 | 30 X03 ODD 2BHK | 49 sq m (531 sq ft) | 22 |
| Building No 30 | 30 X02 ODD 1.5BHK | 45 sq m (480 sq ft) | 11 |
| Building No 30 | 30 X04 ODD 2BHK | 46 sq m (499 sq ft) | 11 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
Construction progress as reported to the portal
Building No 28
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 98%
- Sanitary Fittings within the flats / premises: 78%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 98%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 82%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 76%
Building No 1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Building No 2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Building No 3
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Building No 4
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Building No 7
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 89%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 98%
Building No 8
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 93%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 98%
Building No 6
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 79%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 98%
Building No 9
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 87%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 98%
Building No 10
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 88%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 98%
Building No 11
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 72%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 99%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 99%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 92%
Building No 12
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 98%
- Sanitary Fittings within the flats / premises: 70%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 98%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 98%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 92%
Building No 14
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 98%
- Sanitary Fittings within the flats / premises: 81%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 98%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 98%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 92%
Building No 15
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 97%
- Sanitary Fittings within the flats / premises: 73%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 97%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 98%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 92%
Building No 16
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 98%
- Sanitary Fittings within the flats / premises: 81%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 98%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 98%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 92%
Building No 17
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 98%
- Sanitary Fittings within the flats / premises: 81%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 98%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 98%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 92%
Building No 18
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 98%
- Sanitary Fittings within the flats / premises: 78%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 98%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 98%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 78%
Building No 20
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 77%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 96%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 91%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 77%
Building No 21
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 75%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 96%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 91%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 77%
Building No 22
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 77%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 96%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 91%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 77%
Building No 23
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 72%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 96%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 91%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 74%
Building No 24
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 70%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 96%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 94%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 80%
Building No 27
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
- Sanitary Fittings within the flats / premises: 78%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 96%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 82%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 76%
Building No 29
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 97%
- Sanitary Fittings within the flats / premises: 82%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 82%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 76%
Building No 30
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
- Sanitary Fittings within the flats / premises: 66%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 82%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 76%
Common areas and facilities
- Internal Roads & Footpaths: 80% - Minimum 6m road width
- Water Supply: 55% - Fresh water supply from MCGM
- Sewerage (Chamber, Lines, Septic Tank , STP): 75% - Dispose thru STP & bal treated water thru drains
- Storm Water Drains: 100% - Rain water downtake to rainwater harvesting tank
- Landscaping & Tree Planting: 0% - Proposed ground floor and podium top
- Street Lighting: 70% - lighting designed as per Authority regulation
- Treatment And Disposal Of Sewage And Sullage Water: 75% - Into STP & reused treated water disposed to drains
- Solid Waste Management And Disposal: 30% - As per waste management rules of MBMC
- Water conservation /Rain water harvesting: 0% - Rainwater harvesting tanks
- Energy managemcnt: 40% - Power supply through utility provider
- Fire protection and fire safety requirements: 60% - As per CFO
- Electrical meter room, sub-station, receiving station: 60% - MBMC and NBC Norms
- Aggregate area of recreational Open Space: 0% - Meter Room and sub-station & Receiving stations
- Other facilities: 0% - Clubhouse & swimming pool
Reviews
Write a review
Be the first to write a review of DB Orchid Ozone and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of DB Orchid Ozone
Enter some positive aspects of DB Orchid Ozone
Cons:
Enter some negative aspects of DB Orchid Ozone
Enter some negative aspects of DB Orchid Ozone
Location
DB Orchid Ozone, Dahisar East, Mumbai - 400068 (Maharashtra)
Landmarks
Offices
- SAMAJ KALYAN KENDRA HALL (<2km)
- Anant Royal Banquet (<10km)
- sanskruti Hall (<10km)
Shopping
- Top Line (<6km)
- Tsangpo
- Soul Foods (<11km)
- Coffee & Tea Instant Premix (<11km)
- Maa Mamta Collection (<3km)
- Neelkamal Medical & General Stores (<3km)
- Kala Medical And General Stores (<3km)
- Emeis (<4km)
- Ganga Jamuna Saraswati Chana Shop (<6km)
- Jay Bhavani Kirana And General Store (<7km)
- Kakade Discount Store (<7km)
- Dinoo
- The Hungry Birds (<10km)
- A1 Coffee & Tea Instant Premix Powder (<11km)
- Shubh Laxmi General Store (<12km)
- Kb
- Bhawani Provision Store (<13km)
- The Main Street (<13km)
- Aashapura Convenience Stores (<13km)
- Navina General Store (<14km)
Education
- ETENCA (<6km)
- V.K. Krishna Menon Academy (<8km)
- Uttkarsh Vidya Mandir (<12km)
- St Paul
- Maharani Saibai Vidya Mandir (<11km)
- Lets Talk (<5km)
- Dr. S.Radhakrishnan International School (<8km)
- Podar Jumbo Kids (<3km)
- Inner Space Counseling Center (<13km)
- St. Xavier
- Blue Heaven Nursery (<5km)
- English Speaking Institute in Mumbai (<5km)
- Prerna Academy (<4km)
- The Don Bosco High School (<6km)
- St. Louis’ High School Dahisar (<3km)
- Himalaya High School (<8km)
- S M Public High School (<8km)
- Nursery Borivali Chikowadi (<8km)
- Mother
Transportation
- Jobs In Airline (<7km)
- Helper (<11km)
- RMP Helipad (<11km)
- international courier service (<12km)
- Hawre Helipad (<13km)
Hotels & Guest Houses
- Eskay Resort (<6km)
- GCC Hotel and Club (<3km)
- OYO Apartments Malad Raheja Complex Road (<11km)
- OYO 618 Maharaja Hotel (<2km)
- D69 residency (<0.5km)
- Monalisa Spacious Room (<7km)
- Shantidhoot Society (<11km)
- OYO 28681 Tuliip - Kanjurmarg (<10km)
- Suvi Palace (<10km)
- Hexa A1 Stay (<12km)
- Hotel Sea N Rock (<5km)
- Room Maangta 112 @ Andheri (<13km)
- OYO 35522 Global Marketing Service Apartment (<13km)
- OYO 10166 Hotel D69 Residency (<0.5km)
- Executive Orchid Apt (<14km)
- Tripvillas @ Dream Home (<14km)
- Surya Prakash Lodging (<1km)
- Room Maangta 218 @ Thane East (<1km)
- Shreya Lodgiing (<6km)
Recreation
- INOX Raguleela (<8km)
- Movie time cinema (<13km)
- INOX (<0.5km)
- Movie Time (<2km)
- Phoenix Films (<4km)
- PVR Cinemas - Mira Road (<5km)
- Maxus Cinemas (<7km)
- Carnival Cinemas Annex Mall Borivali (<7km)
- INOX (<8km)
- PVR Milap Kandivali (<11km)
- City Studio (<11km)
- Ramdev Studio (<11km)
- PVR Growel / Kandivali East (<9km)
- PVR Cinemas (<13km)
- Sona Gold Digital Cinema (<4km)
- PVR ICON - Oberoi (<14km)
- Thakur Miraj Cinemas (<8km)
- Inox Movie Vishnu Shivam Mall (<8km)
- Rassaz Multiplex (<4km)
- Bharti Art Studio (<1km)
Banks & ATMs
- Corporation Bank ATM (<3km)
- IDBI Bank (<8km)
- Federal Bank (<7km)
- IDBI Bank ATM (<10km)
- IDBI Bank (<12km)
- Syndicate Bank ATM (<3km)
- ICICI Bank ATM (<6km)
- Abhyudya Co - Op Bank & Atm (<10km)
- Axis Bank ATM (<5km)
- Oriental Bank Of Commerce bhayandar west branch (<8km)
- Union Bank of India (<5km)
- IndusInd Bank (<7km)
- IndusInd Bank ATM (<8km)
- Cosmos Bank ATM (<8km)
- Union Bank Of India ATM (<5km)
- Axis Bank ATM (<6km)
- Dena Bank ATM (<2km)
- HDFC Bank ATM (<8km)
- Bank of Baroda ATM (<9km)
Hospitals & Healthcare
- Shivam Dental Clinic (<3km)
- Synergy Dental Clinic (<5km)
- Lifetime Smiles Dental Clinic (<4km)
- FabSmyle Dental clinic (<8km)
- Dr Mrugank - Lifetime Smiles Dental Clinic (<4km)
- Smile Zone Dental Care Centre (<3km)
- Dr Pritam Assrani - Akshar Dental Solutions (<8km)
- Sharda Dental Clinic (<4km)
- Smile Designers Dental Clinic (<8km)
- Swasth Dental Clinic (<2km)
- Dr. Shah
- Dentist In Mira Road Smiling Teeth (<3km)
- The smile zone (<2km)
- Smiles Ahead Clinic (<5km)
- Dr. Khot
- Dr Shalini Agarwal (<8km)
- Easel Dental Laboratory (<8km)
- Central Dental Clinic (<3km)
- Dr. Gauri P. Maligi (<5km)
- SMILE CREATIONS DENTAL CLINIC (<2km)
Religious Places
- Immanuel Mar Thoma Church (<3km)
- St. Louis Church (<3km)
- New Life Fellowship (<6km)
- Sacred Heart Catholic Church (<7km)
- St. Gregorios Orthodox Church (<5km)
- St. Thomas Church (<3km)
- Mira Road Assembly Of God Church (<5km)
- Our Lady of Remedy Church (<8km)
- The Crown Of Life Ministries Mira Road (<3km)
- Holy Cross Church (<4km)
- Our Lady of the Immaculate Conception Church (<4km)
- Methodist Gujarati & Marathi Borivali Church (<4km)
- New Testament Church (<9km)
- Kingdom Hall of Jehovah
- Our Lady Of Nazareth Church (<7km)
- Elim Church Poisar (<9km)
- St. Kuriakose Elias Chavara Church (<9km)
- Nativity of Our Lord Church (<10km)
- Holy Cross Chapel (<10km)
- Aurlience Solutions (<11km)
Restaurants & Clubs
- Baskin Robbins (<8km)
- The French Connection (<8km)
- Monginis Cake Shop (<3km)
- Monginis (<8km)
- Birdy
- Monginis Cake Shop (<8km)
- Savita Enterprises (<2km)
- Ribbons & Balloons (<9km)
- Sweet Treats (<10km)
- Happiness Deli (<8km)
- Janta Bakery (<2km)
- Caek Cafe (<2km)
- Denish - Bhagwati food (<2km)
- International Baking Company (<2km)
- Nice & Yummy (<2km)
- Melting Moments Cake Shop (<2km)
- Monginis Cake Shop (<2km)
- Melting Moment Cake shop (<3km)
- Project ID
- J301200119
- Updated
- Searches
- 6403
- Views
- 1834


