Description

in the heart of prime location

Datta Ramanand Project at Vile Parle East These units are a perfect combination of comfort and style, specifically designed to suit your requirements and conveniences. There are 1&2 Bhk apartments available in this project. This housing society is now ready to be called home as families have started moving in.

Amenities :
  • Basket Ball Court
  • Club House
  • Compound Covered Car Parking
  • Cycling Track
  • Gated Community
  • Gym
  • Indoor Games
  • Landscaped Garden
  • Outdoor games
  • Play Area
  • Rain Water Harvesting
  • Swimming Pool
  • 24Hrs Backup Electricity
  • Fire Safety
Datta Ramanand CHS Ltd situated in Vile Parle East, Mumbai is a biggest re-development project in the area undertaken by Disha Construction. Disha Construction is a trusted name in the real estate industry with a strong reputation for quality and time bound delivery and legacy spanning 3 decades. With the team of professional Architects, Designers and Project Management Consultants the company has executed several residential and commercial projects in the western suburbs of Mumbai.

Highlights

  • Power Back-up
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • Lifts
  • Security Guards
  • Fire Alarm
  • Balcony
  • Reserved Parking
  • Basement
  • Woodwork
  • Modular Kitchen
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • Service / Goods Lift
  • Club / Community Center
  • Adjacent to Main Road
  • Water Connection
  • Electric Connection
  • Close to Hospital
  • Close to Shopping Center/Mall

Configurations

Type Area Possession Price *
2BHK Apartment642 SqFeetImmediate/Ready to move₹ 3.11 crores
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51800001236 DATTA RAMANAND CHS LTD Completed

Confirmed with MahaRERA on 22 Sep 2026. Registered as "DATTA RAMANAND CHS LTD".

Promoter
DISHA CONSTRUCTION
Registered on
27 Jul 2017
Proposed completion
Dec 2021 (originally Dec 2019)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
HANUMAN X ROAD NO.2, VILE PARLE (E), Andheri, Andheri, Mumbai Suburban, 400057
Land area
4,474 sq m (48,159 sq ft)
Sanctioned built-up area
10,332 sq m (111,219 sq ft)
Buildings
B WING PHASE 1 (7 floors); C WING PHASE 1 (7 floors); D WING PHASE 1 (7 floors); E WING PHASE 1 (7 floors); F WING PHASE 1 (7 floors); G WING PHASE 1 (7 floors); H WING PHASE 1 (7 floors); I WING PHASE 1 (7 floors); A WING PHASE 1 (7 floors)
Parking
Open Space 0, Closed/Covered 205
BuildingUnit typeCarpet areaUnits
B WING PHASE 11BHK 33 sq m (353 sq ft) 1
B WING PHASE 11BHK 34 sq m (368 sq ft) 1
B WING PHASE 11BHK 35 sq m (372 sq ft) 2
C WING PHASE 12BHK 60 sq m (642 sq ft) 2
D WING PHASE 11BHK 38 sq m (408 sq ft) 1
D WING PHASE 12BHK 69 sq m (741 sq ft) 1
D WING PHASE 12BHK 67 sq m (719 sq ft) 1
E WING PHASE 11BHK 39 sq m (418 sq ft) 1
E WING PHASE 11BHK 38 sq m (409 sq ft) 1
E WING PHASE 11BHK 35 sq m (372 sq ft) 1
E WING PHASE 12BHK 67 sq m (719 sq ft) 1
E WING PHASE 12BHK 67 sq m (717 sq ft) 1
F WING PHASE 12BHK 67 sq m (719 sq ft) 1
F WING PHASE 11BHK 35 sq m (372 sq ft) 1
F WING PHASE 11BHK 36 sq m (392 sq ft) 1
F WING PHASE 12BHK 48 sq m (515 sq ft) 1
F WING PHASE 11BHK 44 sq m (471 sq ft) 1
F WING PHASE 12BHK 66 sq m (713 sq ft) 1
G WING PHASE 11BHK 36 sq m (386 sq ft) 1
G WING PHASE 12 BHK 68 sq m (727 sq ft) 1
G WING PHASE 12 BHK 64 sq m (684 sq ft) 1
G WING PHASE 12BHK 48 sq m (514 sq ft) 1
G WING PHASE 11 BHK 42 sq m (450 sq ft) 1
G WING PHASE 12BHK 48 sq m (513 sq ft) 1
G WING PHASE 11 BHK 42 sq m (450 sq ft) 1
H WING PHASE 11BHK 34 sq m (367 sq ft) 1
H WING PHASE 11BHK 37 sq m (399 sq ft) 1
H WING PHASE 12BHK 48 sq m (514 sq ft) 1
H WING PHASE 12 BHK 74 sq m (800 sq ft) 5
H WING PHASE 12 BHK 67 sq m (719 sq ft) 2
I WING PHASE 11BHK 45 sq m (480 sq ft) 1
I WING PHASE 13BHK 82 sq m (888 sq ft) 5
I WING PHASE 13BHK 70 sq m (753 sq ft) 12
I WING PHASE 11RK 28 sq m (297 sq ft) 1
I WING PHASE 11RK 27 sq m (290 sq ft) 1
A WING PHASE 11BHK 35 sq m (372 sq ft) 1
A WING PHASE 11BHK 34 sq m (364 sq ft) 1
A WING PHASE 11BHK 38 sq m (409 sq ft) 1
A WING PHASE 12BHK 48 sq m (515 sq ft) 1
Construction progress as reported to the portal

B WING PHASE 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

C WING PHASE 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

D WING PHASE 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

E WING PHASE 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

F WING PHASE 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

G WING PHASE 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

H WING PHASE 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

I WING PHASE 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

A WING PHASE 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Water Supply: 100% - COMPLETED
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - COMPLETED
  • Storm Water Drains: 100% - COMPLETED
  • Landscaping & Tree Planting: 100% - COMPLETED
  • Solid Waste Management And Disposal: 100% - COMPLETED
  • Water conservation /Rain water harvesting: 100% - COMPLETED
  • Fire protection and fire safety requirements: 100% - COMPLETED
  • Electrical meter room, sub-station, receiving station: 100% - COMPLETED
  • Aggregate area of recreational Open Space: 100% - COMPLETED
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Datta Ramanand and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Datta Ramanand
Cons:
Enter some negative aspects of Datta Ramanand

Location

Datta Ramanand, Vile Parle East, Mumbai - 400057 (Maharashtra)

* Location may be approximate

Landmarks

  • Restaurant & Shops

    • Jeevdani Kirana General Stores (<0.5km)
    • Waghaji Ganesh Prajapati (<0.5km)
    • Green Current - the Organic Lifestyle Store (<0.5km)
    • Prabhus Saaga Fashions (<0.5km)
    • Virendra Provision General Stores (<0.5km)
    • Mustafa Kirana Store (<0.5km)
    • New Choudhary General Store (<0.5km)
    • Gala Stores (<0.5km)
    • Sadguru General Stores (<0.5km)
    • Shree Ganesh Stores (<0.5km)
    • Jitendra Trading Company (<0.5km)
    • Bhavesh Stores (<0.5km)
    • Veera Stores (<0.5km)
    • Sapre and Company (<0.5km)
    • Jaiswal Traders (<0.5km)
    • Jayant General Stores (<0.5km)
    • P S General Stores (<0.5km)
    • A R Stores (<0.5km)
    • Nagarik Dhanya Bhandar (<0.5km)
    • Jaiswal General Stores (<0.5km)
    • Kutuhal Toys Shop (<0.5km)
    • Yadav General Store (<0.5km)
    • Gupta General Stores (<0.5km)
    • Saraswati Daal Mill (<0.5km)
    • Kiran Foot Wear (<0.5km)
    • Hotel Satkar (<0.5km)
    • Shanti Stores (<0.5km)
    • Shree Mangesh Stores (<1km)
    • Pramanik Stores (<1km)
    • Mahendra Stores (<1km)
    • Azad General Stores (<1km)
    • D Mart Seawood Darave (<1km)
    • Singh General Stores (<1km)
    • Lobo Provision Store (<1km)
    • Bhairavnath Kirana Stores (<1km)
  • Hospitals & Clinics

    • Neelam Clinic (<0.5km)
    • Shree Dhanvantri Clinic (<0.5km)
    • Dr Shah Polyclinic (<0.5km)
    • Karnik Dental Clinic (<0.5km)
    • Bodas Clinical Laboratory (<0.5km)
    • Uday V Prabhu (<0.5km)
    • Dr Puja Singhs Health Forever (<0.5km)
    • Doctor Anish Dhume (<0.5km)
    • Madhu Homeopathic Clinic (<0.5km)
    • Sant Nirankari Blood Bank (<0.5km)
    • Dr Prashant D Gawde (<0.5km)
    • Dr Ashish Deshpande (<0.5km)
    • Mihir Clinic (<0.5km)
    • Doctor Ajit D Bal Clinic (<0.5km)
    • MS Vaital Laboratories (<0.5km)
    • Dr S M Shuaib (<0.5km)
    • Guhagarkar
    • Dr Saritas Pain & Weight Management Clinic (<0.5km)
    • Health F1 (<0.5km)
    • Dr Subhash D Japtiwale (<0.5km)
    • Doctor Sameer Joshi (<0.5km)
    • Doctor Jayant B Joshi (<0.5km)
    • CGHS Hospital Wellness Centre (<0.5km)
    • Dental Perfection (<0.5km)
    • Vital Health Care (<0.5km)
    • Shruti Vinit Barde Stu (<1km)
    • Dr Ashok V Sheth (<1km)
    • Dr Alpana Sowani Diabetes Speciality Centre (<1km)
    • Four Care Hospital-ER (<1km)
    • Four Care Hospital (<1km)
    • Chaitanya Physiotherapy Kendra (<1km)
    • Dr Hemali Bhatt (<1km)
    • Doctor Anjali Bhojne (<1km)
    • Physiotherapy Clinic (<1km)
    • Dr Sharada G Gaikwad (<1km)
    • Doctor Manjiri Juvekar (<1km)
    • Doctor Sunil V Kenkare (<1km)
  • Hostel

    • Kamar Mansions (<0.5km)
  • Public Transport

    • Nav Prabhat (<0.5km)
    • Sambhaji Nagar (<0.5km)
    • Highway Bus Stand (<0.5km)
    • New Quarters (<0.5km)
    • Mahant Road (<0.5km)
    • Nav Sarvoday (<1km)
    • Andheri Hanuman Road Bus Stop (<1km)
    • Hanuman Road Bus Stop (<1km)
  • ATM/Bank/Exchange

    • Greater Bombay Co-operative Bank (<0.5km)
    • The Greater Bombay Co-Operative Bank-Vile Parle (<0.5km)
    • Punjab National Bank Atm (<0.5km)
    • ICICI Bank (<0.5km)
    • Niket Bank (<0.5km)
    • Kotak Mahindra Bank (<1km)
    • State Bank of Hyderabad (<1km)
    • State Bank of India (<1km)
    • Corporation Bank-Mumbai Vile Parle (<1km)
    • Corporation Bank (<1km)
    • Bank Of Anuana (<1km)
    • Indian Overseas Bank (<1km)
    • Karnataka Bank (<1km)
  • Hotel

    • Hotel Transit (<0.5km)
    • Townhouse 876 Highway Inn (<1km)
  • Shopping Centre

    • Crossroads Mall (<1km)
Project ID
J623118983
Updated
Searches
4038
Views
989