Elevation
Play Area
Amenities View
 6

Vtp Bellissimo - Hinjewadi Phase-1, Pune

Builder
VTP Realty
Construction
Under Construction
Completion
Apr, 2027
Properties
Apartments
RERA
P52100033888

Description

live in the heights

Vtp Bellissimo is located in the heart of Hinjewadi 1, Pune offers 1,2&3 BHK luxurious apartments with different sizes ranging from 465-1445 sqft. The project is spread over an area of 8.5 acres of land having 9 buildings with G-29 floors. The locality is placed at Mumbai Highway (NH-48) and is closely connected to Wakad, Baner, Tathawade and Balewadi.

Amenities
  • Clubhouse
  • Library
  • Swimming Pool
  • Gymnasium
  • Amphitheatre
  • Swimming Pool
  • Parking Area
  • Games Room
  • Jogging Track
  • Food Plaza
  • CCTV
  • Party Lawn
  • Kids Play Area
VTP Realty is a developer that has come up with amazing residential projects with unique features & specifications. The realtor focuses on giving their customers the satisfaction of living a spacious & luxurious life with all the comforts. Their USP is delivering the project on time with all the said requirements. The company has set a benchmark in the Mumbai-Pune region with its pioneering approach to work. The VTP’s group of trained personnel work day & night to give the best to the end-users.

Highlights

  • Power Back-up
  • Water Softner
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • Lifts
  • Wi-Fi
  • RO System
  • Balcony
  • Reserved Parking
  • Security Guards
  • Fire Alarm
  • Electronic Security
  • Intercom Facility
  • Park Facing
  • Woodwork
  • Modular Kitchen
  • Feng Shui / Vaastu Compliant
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • Cafeteria / Food Court
  • ATM
  • Service / Goods Lift
  • Feng Shui / Vaastu Compliant
  • Club / Community Center
  • Adjacent to Main Road
  • Water Connection
  • Electric Connection
  • Close to Hospital
  • Close to School
  • Close to Shopping Center/Mall

Configurations

Type Area Possession Price *
2BHK Apartment695 SqFeetWithin 1 Year₹ 94.1 lakhs
2BHK Apartment765 SqFeetWithin 1 Year₹ 1.04 crore
2BHK Apartment851 SqFeetWithin 1 Year₹ 1.2 crore
3BHK Apartment905 SqFeetWithin 1 Year₹ 1.16 crore
3BHK Apartment905 SqFeetWithin 1 Year₹ 1.16 crore
3BHK Apartment1,034 SqFeetWithin 1 Year₹ 1.58 crore
3BHK Apartment1,217 SqFeetWithin 1 Year₹ 1.66 crore
3BHK Apartment1,445 SqFeetWithin 1 Year₹ 1.88 crore
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52100033888 VTP BELLISSIMO PHASE 1 Active 69% built

Confirmed with MahaRERA on 20 Sep 2026. Registered as "VTP BELLISSIMO PHASE 1".

Promoter
MAGNITE DEVELOPERS PRIVATE LIMITED
Registered on
14 Mar 2022
Proposed completion
Apr 2027 (originally Mar 2026)
Project type
Others
Planning authority
Others
Address as filed
HINJEWADI MANN ROAD, HINJEWADI, Hinjavadi (CT), Mulshi, Pune, 411057
Land area
4,464 sq m (48,047 sq ft)
Sanctioned built-up area
97,739 sq m (1,052,087 sq ft)
Buildings
TOWER 1 (31 floors) - 0 of 205 available; TOWER 2 (31 floors) - 2 of 240 available; TOWER 3 (34 floors) - 15 of 208 available; TOWER 4 (34 floors) - 13 of 156 available; TOWER 5 (34 floors) - 11 of 160 available; TOWER 6 (34 floors) - 2 of 117 available; TOWER 7 (34 floors) - 12 of 160 available
Parking
Open Space 70, Closed/Covered 7
Complaints on the portal
17
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 22 May 2025 - -
Q1 FY 2025-2026 18 Oct 2025 - -
Q2 FY 2025-2026 18 Oct 2025 - -
Q3 FY 2025-2026 16 Jan 2026 - -
Q4 FY 2025-2026 15 Apr 2026 - -
Q1 FY 2026-2027 8 Jul 2026 - -
Construction progress as reported to the portal

TOWER 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 87%
  • Sanitary Fittings within the flats / premises: 57%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 65%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 49%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 29%

TOWER 2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 80%
  • Sanitary Fittings within the flats / premises: 58%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 65%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 46%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 29%

TOWER 3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 79%
  • Sanitary Fittings within the flats / premises: 59%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 52%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 21%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 22%

TOWER 4

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 85%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 53%
  • Sanitary Fittings within the flats / premises: 32%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 10%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 6%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 5

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 59%
  • Sanitary Fittings within the flats / premises: 27%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 23%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 6%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 6

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 63%
  • Sanitary Fittings within the flats / premises: 24%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 39%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 25%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 14%

TOWER 7

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 64%
  • Sanitary Fittings within the flats / premises: 23%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 39%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 29%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 14%

Common areas and facilities

  • Internal Roads & Footpaths: 45% - Work in progress
  • Water Supply: 35% - Work in progress
  • Sewerage (Chamber, Lines, Septic Tank , STP): 60% - Work in progress
  • Storm Water Drains: 60% - Work in progress
  • Landscaping & Tree Planting: 10% - Work in progress
  • Street Lighting: 10% - Work in progress
  • Community Buildings: 10% - Work in progress
  • Treatment And Disposal Of Sewage And Sullage Water: 70% - Work in progress
  • Solid Waste Management And Disposal: 50% - Work in progress
  • Water conservation /Rain water harvesting: 50% - Work in progress
  • Fire protection and fire safety requirements: 50% - Work in progress
  • Electrical meter room, sub-station, receiving station: 55% - Work in progress
  • Aggregate area of recreational Open Space: 10% - work in progress
  • Open Parking: 35% - work in progress
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Vtp Bellissimo and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Vtp Bellissimo
Cons:
Enter some negative aspects of Vtp Bellissimo

News

VTP Realty Residential Projects in West Pune

panasiabiz.com · · Residential

VTP Realty showcases multiple residential projects in West Pune including Earth 1, VTP Bellissimo, VTP Cielo, and VTP Sierra, with upcoming launches in Hinjewadi Phase 1.

Key facts

Earth 1: 35-story tower with 2, 3, and 4 BHK apartments. Features 4-acre podium level, clubhouses, infinity edge pool, professional sports academies, earthquake-resistant RCC structure, work-from-home zones, solar pod, amphitheaters, gardens, and designer infinity pool with central stage.

VTP Bellissimo: High-rise project in West Pune hills with spacious apartments and grand façade design.

VTP Cielo: Located adjacent to 7,000-acre NDA forest with 2 and 3 BHK units. Peaceful setting with sightings of local animals and fresh air.

VTP Sierra: 6 towers, 26 floors each in Baner-Sus area. Mix of 2 and 3 BHK flats. Common 2-level amenities block with clubhouse and gymnasium. Each tower has decorated lobby, 3 passenger lifts, service lift, 100% DG power backup.

VTP Altitude: Grade A commercial establishments (offices, showrooms) in Wakad.

Upcoming: Premium 2 and 3 BHK homes coming soon to Hinjewadi Phase 1.

News items from other publishers are their reports, condensed; follow the link for the full report. PropertyWala.com is not their source.

Location

Vtp Bellissimo, Hinjewadi Phase-1, Pune - 411057 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Hindustan Petroleum (~1 km)
    • Sutarwadi Bus Terminus (~10 km)
    • Akurdi (~12 km)
    • Sant Tukaram Nagar (~14 km)
    • Pune International Airport (~28 km)
    • Navi Mumbai International Airport (~117 km)
  • Shopping & Dining

    • Leafy Green Cafe (<1 km)
    • Bird Valley Hijewadi (~1 km)
    • Grand Highstreet (~2 km)
    • DMart (~3 km)
    • M&S Outlet (~12 km)
    • Laxman Jagtap Vegetable Market (~13 km)
  • Healthcare

    • Wellwish Chemist (~1 km)
    • Wellness Forever (~1 km)
    • Ruby Hall Clinic Hinjawadi (~2 km)
    • Healing Hands Clinic - Hinjewadi, Pune (~2 km)
    • Dr.Ranjeet Hospital (~2 km)
    • Shree Clinic (~2 km)
  • Education

    • I2IT library (~1 km)
    • international institute of information technology (~1 km)
    • Mahindra International School (~1 km)
    • Blue Ridge Public School (~2 km)
    • Indira Group of Institute (IGI) (~5 km)
    • International School of Business and Media (~6 km)
  • Leisure & Entertainment

    • Blue Ridge Golf Course (~2 km)
    • E-Square Multiplex (~4 km)
    • Shri Sant Savatamali Udyan Wakad (~5 km)
    • Shree Shivchhatrapati Kridanagari (~5 km)
    • Shree Shiv Chhatrapati Sports Complex Stadium (~5 km)
    • Japalouppe (~19 km)
  • Services

    • Axis Bank (<1 km)
    • Hinjawadi Fire Station - Phase 1 (<1 km)
    • Hinjawadi police station (~1 km)
    • Punjab National Bank (~1 km)
    • Hinjawadi Sub Post Office (~1 km)
    • Hinjawadi Gram Panchayat (~2 km)
  • Religious Places

    • Swami Samarth Datta Mandir (<1 km)
    • Shri Swami Samarth Mandir, Hinjawadi (~2 km)
    • Ganesh Temple (~2 km)
    • Bhavani Temple (~3 km)
    • Hirai Sitai Mandir (~4 km)
    • Disciples Community Church (Hinjewadi Fellowship) (~4 km)
  • Business & Hospitality

    • Hyatt Palace (~1 km)
    • Embassy Qubix IT Park (~1 km)
    • Courtyard by Marriott Pune Hinjewadi (~2 km)
    • Rajiv Gandhi Infotech Park (~2 km)
    • Tata Motors (~12 km)
    • Automotive Research Association of India (ARAI) (~16 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J919242821
Updated
Searches
3799
Views
1890