Elevation
Aerial View
Side View
 13

Sumer Avenue 54 - Santacruz East, Mumbai

Builder
Sumer Group & Radius Developers
Construction
Under Construction
Completion
Dec, 2024
Properties
Apartments
RERA
P51800007149

Description

Exclusive lifestyle in a luxurious way.

Sumer Avenue 54 lies at Santacruz (West), Mumbai South West a residential project offers 3BHK- 6BHK in range between 131.55 sq. mt.- 388.15 Sq. mt. The project is spread over a total area of 4.78 acres of land. It has a total of 6 towers with construction is of 23 floors. An accommodation of 469 units has been provided and has indoor activities such as Squash court.

Amenities:
  • Basket Ball Court
  • Club House
  • Compound Covered Car Parking
  • Cycling Track
  • Gated Community
  • Gym
  • Indoor Games
  • Landscaped Garden
  • Outdoor game
  • Play Area
  • Rain Water Harvesting
  • Swimming Pool
  • 24Hrs Backup Electricity
  • Fire Safety
Radius Developers is a name synonymous with the traits of integrity and transparency. Backed by a team of highly talented professionals, it is one of the leading real estate development companies in Mumbai. Established by Mr. Sanjay Chhabria, it is an outcome of the succession plan at the renowned Wadhwa Group. A premier real estate company in Mumbai, Sumer Group was founded in the year 1965. It is committed to providing space solutions that evolve the lifestyle of its residents. Radius Developers and Sumer Group have partnered together to develop quality projects.

Highlights

  • Power Back-up
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Boring / Tube-well
  • Rain Water Harvesting
  • Waste Disposal
  • Lifts
  • Security Guards
  • Fire Alarm
  • Balcony
  • Reserved Parking
  • Basement
  • Woodwork
  • Modular Kitchen
  • Feng Shui / Vaastu Compliant
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • Service / Goods Lift
  • Club / Community Center
  • Adjacent to Main Road
  • Water Connection
  • Electric Connection
  • Close to Hospital
  • Close to School
  • Close to Shopping Center/Mall

Configurations

Type Area Possession Price *
3BHK Apartment2,096 SqFeetImmediate/Ready to move-
4BHK Apartment2,234 SqFeetImmediate/Ready to move-
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51800007149 AVENUE 54 Abeyance 13% built

Confirmed with MahaRERA on 22 Sep 2026. Registered as "AVENUE 54".

MahaRERA says: This Project is kept in Abeyance, bank account of this project is frozen, and promoter is prohibited to execute agreement for sale/sale deed with buyers, till further compliances done by the promoter.

Promoter
SUMER RADIUS REALTY PVT LTD
Registered on
17 Aug 2017
Proposed completion
Dec 2024
Project type
Others
Planning authority
Others
Address as filed
Swami Vivekanand Road, Santacruz west, Andheri, Andheri, Mumbai Suburban, 400054
Land area
19,339 sq m (208,173 sq ft)
Sanctioned built-up area
29,668 sq m (319,358 sq ft)
Buildings
TOWER 1A (13 floors); TOWER 1B (27 floors); TOWER 1C (27 floors); TOWER 2 (27 floors); TOWER 3 (27 floors); TOWER 4 (26 floors)
Parking
Open Space 0, Closed/Covered 1467
Complaints on the portal
22
BuildingUnit typeCarpet areaUnits
TOWER 1A6 BHK 345 sq m (3,712 sq ft) 12
TOWER 1B4 BHK D 194 sq m (2,086 sq ft) 33
TOWER 1B4 BHK A 194 sq m (2,090 sq ft) 1
TOWER 1B4 BHK C 194 sq m (2,089 sq ft) 34
TOWER 1B4 BHK B 194 sq m (2,088 sq ft) 1
TOWER 1C5.5 BHK A 265 sq m (2,855 sq ft) 18
TOWER 1C4.5 BHK 226 sq m (2,432 sq ft) 1
TOWER 1C4 BHK M 197 sq m (2,118 sq ft) 1
TOWER 24 BHK I 195 sq m (2,101 sq ft) 1
TOWER 24 BHK H 195 sq m (2,101 sq ft) 1
TOWER 24 BHK F 208 sq m (2,234 sq ft) 1
TOWER 23 BHK B 132 sq m (1,416 sq ft) 1
TOWER 25 BHK 228 sq m (2,449 sq ft) 36
TOWER 24 BHK E 204 sq m (2,195 sq ft) 2
TOWER 23 BHK A 132 sq m (1,416 sq ft) 29
TOWER 24 BHK G 195 sq m (2,101 sq ft) 29
TOWER 23 BHK C 132 sq m (1,416 sq ft) 1
TOWER 34 BHK H 195 sq m (2,101 sq ft) 1
TOWER 33 BHK C 132 sq m (1,416 sq ft) 1
TOWER 33 BHK B 132 sq m (1,416 sq ft) 1
TOWER 35 BHK 228 sq m (2,449 sq ft) 36
TOWER 34BHK E 204 sq m (2,195 sq ft) 2
TOWER 34 BHK G 195 sq m (2,101 sq ft) 29
TOWER 33 BHK A 132 sq m (1,416 sq ft) 29
TOWER 34 BHK I 195 sq m (2,101 sq ft) 1
TOWER 34 BHK F 208 sq m (2,234 sq ft) 1
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Construction progress as reported to the portal

TOWER 1A

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 1B

  • Excavation: 5%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 1C

  • Excavation: 5%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 32%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 1%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 47%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 3

  • Excavation: 100%
  • Basement (if any): 75%
  • Podiums (if any): 0%
  • Plinth: 75%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 19%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 4

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Water Supply: 0% - COMMON FOR PHASE 1 & 2
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - COMMON FOR PHASE 1 & 2
  • Storm Water Drains: 0% - COMMON FOR PHASE 1 & 2
  • Landscaping & Tree Planting: 0% - COMMON FOR PHASE 1 & 2
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - COMMON FOR PHASE 1 & 2
  • Solid Waste Management And Disposal: 0% - COMMON FOR PHASE 1 & 2
  • Water conservation /Rain water harvesting: 0% - RWH TANKS
  • Fire protection and fire safety requirements: 0% - COMMON FOR PHASE 1 & 2
  • Electrical meter room, sub-station, receiving station: 0% - NO RECEIVING STATION
  • Aggregate area of recreational Open Space: 0% - COMMON FOR PHASE 1 & 2
  • SENIOR CITIZEN AREA: 0% - COMMON FOR PHASE 1 & 2
  • SCULPTURE: 0% - COMMON FOR PHASE 1 & 2
  • REFLEXOLOGY PATH: 0% - COMMON FOR PHASE 1 & 2
  • OUTDOOR KIDS PLAY AREA WITH PLAY EQUIPMENTS: 0% - COMMON FOR PHASE 1 & 2
  • MULTIPURPOSE PATH: 0% - COMMON FOR PHASE 1 & 2
  • MULTIPURPOSE LAWN: 0% - COMMON FOR PHASE 1 & 2
  • FOUNTAIN PLAY: 0% - COMMON FOR PHASE 1 & 2
  • CLIMBING WALL: 0% - COMMON FOR PHASE 1 & 2
  • AMPHI THEATRE TIERED SEATING: 0% - COMMON FOR PHASE 1 & 2
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Sumer Avenue 54 and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Sumer Avenue 54
Cons:
Enter some negative aspects of Sumer Avenue 54

Location

Sumer Avenue 54, Santacruz East, Mumbai - 400055 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Santa Cruz Station (E) (<1 km)
    • Santa Cruz (<1 km)
    • Santacruz (<1 km)
    • Indian Oil (~2 km)
    • Chhatrapati Shivaji Maharaj International Airport (~4 km)
    • Navi Mumbai International Airport (~35 km)
  • Shopping & Dining

    • Cafe Montana (<1 km)
    • Tiffanys Snack Bar (<1 km)
    • Marks & Spencer (~1 km)
    • Parle Market (~3 km)
    • Nature's Basket (~4 km)
    • Jio World Drive (~5 km)
  • Healthcare

    • Mangal nursing home (<1 km)
    • V.N. Desai Hospital (<1 km)
    • Apollo Pharmacy (<1 km)
    • Zeelab Pharmacy (~1 km)
    • 24byMe Diabetes Treatment Clinic (~2 km)
    • Anuvansh Clinic (~2 km)
  • Education

    • Santa Cruz Library (<1 km)
    • Patuck Technical School Ground (<1 km)
    • Smt. Lilavatibai Podar High School (~1 km)
    • Police Training Academy (~2 km)
    • Mithibai College of Arts and Jitendra Chauhan College of Science (~3 km)
    • Narsee Monjee Institute Of Management Studies (~3 km)
  • Leisure & Entertainment

    • Dinkar Park (<1 km)
    • University of Mumbai Sports Complex (~2 km)
    • G7 Multiplex (~3 km)
    • Mumbai Football Arena (~7 km)
    • Bombay Presidency Golf Club (~10 km)
    • Veermata Jijabai Bhosale Zoo & Botanical Garden (~16 km)
  • Services

    • Mumbai - Santacruz East Branch ATM (<1 km)
    • HDFC Bank (<1 km)
    • Santacruz Police Station (~1 km)
    • MCGM H West Ward Office (~2 km)
    • Andheri Fire Station (~5 km)
    • Sion Post Office (~7 km)
  • Religious Places

    • Mahakali Mandir (<1 km)
    • Hanuman Mandir (temple) (~1 km)
    • St. Anthony’s Church (~1 km)
    • Guru Nanak Satsang Kalina Gurudwara (~3 km)
    • Harba Mauli Temple (~3 km)
    • Navpada Jama Masjid (~4 km)
  • Business & Hospitality

    • Grand Hyatt Mumbai Hotel & Residences (~1 km)
    • Taj Santacruz Mumbai (~2 km)
    • Equinox Business Park (~5 km)
    • Agastya Corporate Park (~6 km)
    • Anik Bus Depot (~8 km)
    • Wadala Truck Terminal (~9 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J761189803
Updated
Searches
5668
Views
947