Elevation
Bedroom
Bathroom
 15

Nicco Residency - Jogeshwari East, Mumbai

Builder
Neelkamal Realty & Construction LLP
Construction
Under Construction
Completion
Apr, 2027
Properties
Apartments
RERA
P51800050433

Description

Multi-tier safety and security system

Nicco Residency is a residential development project located in Kranti Nagar, Jogeshwari East, Mumbai. The project development offers spacious 2, 3 and 4 BHK residential apartments ranging from 772 to 1671 sq ft., spanning approximately 1.4 acres of land. The project features 3 wings (A, B & C) — each tower of G+23 storeys, spacious apartments, adequate natural light, proper ventilation and approximately 230 residential units in the project.

Amenities:
  • Swimming Pool
  • Landscaped Gardens
  • Children’s Play Area
  • Yoga Area
  • Jogging Track
  • Indoor & Outdoor Games
  • Multipurpose Hall
  • Senior-Citizen Space
  • Power Backup
  • Covered Car Parking
  • 24×7 Water Supply
  • High-Speed Elevators
  • CCTV Surveillance
Neelkamal Realty & Construction LLP is a legally registered real estate developer in Mumbai, incorporated as a Limited Liability Partnership (LLP) in 2018. The company specialises in residential real estate development, with a focus on modern, mid-to-upper segment apartment projects.

Highlights

  • Swimming Pool
  • Landscaped Gardens
  • Children’s Play Area
  • Yoga Area
  • Jogging Track
  • Indoor & Outdoor Games
  • Multipurpose Hall
  • Senior-Citizen Space
  • Power Backup
  • Covered Car Parking
  • 24×7 Water Supply
  • High-Speed Elevators
  • CCTV Surveillance

Configurations

Type Area Possession Price *
2BHK Apartment772 SqFeetWithin 1 Year₹ 2.08 crores
3BHK Apartment1,002 SqFeetWithin 1 Year₹ 2.88 crores
4BHK Apartment1,671 SqFeetWithin 1 Year₹ 4.79 crores
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51800050433 NICCO RESIDENCY Active 28% built

Confirmed with MahaRERA on 21 Sep 2026. Registered as "NICCO RESIDENCY".

Promoter
NEELKAMAL REALTY & CONSTRUCTION LLP
Registered on
12 Apr 2023
Proposed completion
Apr 2027 (originally Dec 2026)
Project type
Others
Planning authority
Others
Address as filed
JVLR ROAD, JOGESHWARI EAST, Majas, Andheri, Mumbai Suburban, 400069
Land area
5,670 sq m (61,030 sq ft)
Sanctioned built-up area
14,910 sq m (160,499 sq ft)
Buildings
SALE WING A (24 floors) - 54 of 91 available; SALE WING B (24 floors) - 63 of 88 available; SALE WING C (25 floors) - 53 of 91 available; REHAB BUILDING (26 floors) - 5 of 5 available
Parking
Open Space 0, Closed/Covered 300
BuildingUnit typeCarpet areaUnits
SALE WING A2BHK 72 sq m (771 sq ft) 22
SALE WING AShop 18 sq m (190 sq ft) 1
SALE WING AShop 17 sq m (188 sq ft) 1
SALE WING AShop 23 sq m (251 sq ft) 1
SALE WING AShop 39 sq m (419 sq ft) 1
SALE WING AShop 18 sq m (192 sq ft) 1
SALE WING A2BHK 75 sq m (805 sq ft) 1
SALE WING A2BHK 74 sq m (792 sq ft) 1
SALE WING A3BHK 93 sq m (1,002 sq ft) 22
SALE WING A3BHK 99 sq m (1,069 sq ft) 21
SALE WING A2BHK 73 sq m (785 sq ft) 19
SALE WING BShop 17 sq m (188 sq ft) 1
SALE WING BShop 39 sq m (421 sq ft) 1
SALE WING BShop 22 sq m (233 sq ft) 1
SALE WING BShop 18 sq m (193 sq ft) 1
SALE WING BShop 18 sq m (192 sq ft) 1
SALE WING BShop 19 sq m (207 sq ft) 1
SALE WING BShop 18 sq m (188 sq ft) 1
SALE WING B2BHK 72 sq m (772 sq ft) 38
SALE WING B2BHK 72 sq m (771 sq ft) 44
SALE WING CShop 27 sq m (290 sq ft) 1
SALE WING CShop 26 sq m (275 sq ft) 1
SALE WING CShop 23 sq m (248 sq ft) 1
SALE WING CShop 39 sq m (418 sq ft) 1
SALE WING C2BHK 72 sq m (772 sq ft) 19
SALE WING CShop 18 sq m (195 sq ft) 1
SALE WING C1BHK 57 sq m (616 sq ft) 1
SALE WING C3BHK 88 sq m (948 sq ft) 1
SALE WING C4BHK 142 sq m (1,532 sq ft) 21
SALE WING C2BHK 72 sq m (771 sq ft) 21
SALE WING C3BHK 109 sq m (1,171 sq ft) 21
SALE WING CShop 18 sq m (190 sq ft) 1
SALE WING CShop 19 sq m (205 sq ft) 1
REHAB BUILDINGOffice space 32 sq m (347 sq ft) 1
REHAB BUILDINGOffice space 56 sq m (606 sq ft) 1
REHAB BUILDINGOffice space 152 sq m (1,633 sq ft) 2
REHAB BUILDINGOffice space 62 sq m (665 sq ft) 1
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 not filed - in default - -
Q1 FY 2025-2026 19 Jul 2025 - -
Q2 FY 2025-2026 10 Dec 2025 - -
Q3 FY 2025-2026 2 Feb 2026 - -
Q4 FY 2025-2026 21 Apr 2026 - -
Q1 FY 2026-2027 28 Jul 2026 - -
Construction progress as reported to the portal

SALE WING A

  • Excavation: 100%
  • Basement (if any): 50%
  • Podiums (if any): 0%
  • Plinth: 50%
  • Stilt Floor: 50%
  • Slabs of Super Structure: 50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 30%
  • Sanitary Fittings within the flats / premises: 30%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

SALE WING B

  • Excavation: 100%
  • Basement (if any): 50%
  • Podiums (if any): 0%
  • Plinth: 50%
  • Stilt Floor: 50%
  • Slabs of Super Structure: 50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 30%
  • Sanitary Fittings within the flats / premises: 30%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

SALE WING C

  • Excavation: 100%
  • Basement (if any): 50%
  • Podiums (if any): 0%
  • Plinth: 50%
  • Stilt Floor: 50%
  • Slabs of Super Structure: 50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 50%
  • Sanitary Fittings within the flats / premises: 30%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

REHAB BUILDING

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - WIP
  • Water Supply: 0% - WIP
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - WIP
  • Storm Water Drains: 0% - WIP
  • Landscaping & Tree Planting: 0% - WIP
  • Street Lighting: 0% - WIP
  • Community Buildings: 0% - WIP
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - WIP
  • Solid Waste Management And Disposal: 0% - WIP
  • Water conservation /Rain water harvesting: 0% - WIP
  • Fire protection and fire safety requirements: 0% - WIP
  • Electrical meter room, sub-station, receiving station: 0% - WIP
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Nicco Residency and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Nicco Residency
Cons:
Enter some negative aspects of Nicco Residency

Location

Nicco Residency, Kranti Nagar, Jogeshwari East, Mumbai - 400093 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • SEEPZ Bus Station (~2 km)
    • Aarey JVLR (~2 km)
    • Jogeshwari (Harbour Line) (~3 km)
    • Indian Oil (~4 km)
    • Chhatrapati Shivaji Maharaj International Airport (~7 km)
    • Navi Mumbai International Airport (~37 km)
  • Shopping & Dining

    • Spice Of China (<1 km)
    • SMART Sahakari Bhandar (<1 km)
    • Cafe Coffee Day (<1 km)
    • Andheri Market (~4 km)
    • Shoppers Stop (~6 km)
    • Citi Mall (~6 km)
  • Healthcare

    • Aarey Hospital (~2 km)
    • Holy Spirit Hospital (~2 km)
    • Apollo Pharmacy Mahakali Caves Road (~2 km)
    • Nirmal Clinic (~2 km)
    • Rx Medicine Suppliers (~3 km)
    • Walk In care (~4 km)
  • Education

    • Sivai Ground (<1 km)
    • Oberoi International School - JVLR Campus (<1 km)
    • Ismail Yusuf College (~3 km)
    • National Institute of Industrial Engineering (~4 km)
    • Indian Institute of Technology Bombay (~6 km)
    • IIT Bombay Central Library (~7 km)
  • Leisure & Entertainment

    • Matoshri Sport Club (<1 km)
    • Hemant Karkare Park (<1 km)
    • Mumbai Football Arena (~5 km)
    • Infiniti Mall (~6 km)
    • Bombay Presidency Golf Club (~15 km)
    • Veermata Jijabai Bhosale Zoo & Botanical Garden (~25 km)
  • Services

    • Punjab National Bank (<1 km)
    • HDFC Bank ATM (~1 km)
    • Marol Police Camp (~3 km)
    • DTDC (~4 km)
    • Marol fire brigade (~5 km)
    • Regional Transport Office, Mumbai (West Zone), Andheri (~6 km)
  • Religious Places

    • Mahvir Jain Temple (~2 km)
    • Kalavati Aai temple (~2 km)
    • Sher-e-Punjab Gurudwara (~2 km)
    • St.Vincent Pallotti Church (~3 km)
    • Saifee Masjid (~4 km)
    • Holy Family Church (~4 km)
  • Business & Hospitality

    • Ginger Mumbai Andheri (MIDC) (~2 km)
    • Aarey Metro Depot (~2 km)
    • National Dairy Development Board (~2 km)
    • Nesco IT Park (~3 km)
    • Nirlon Knowledge Park (~4 km)
    • The Westin Mumbai Powai Lake (~4 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J119259121
Updated
Searches
376
Views
376