Elevation
Master Plan
Floor Plan-A
 5

Metro Swiss Boulevard - Chembur, Mumbai

Builder
Metro Group
Construction
Completed
Completion
Mar, 2022
Properties
Apartments
RERA
P51700000636

Description

Equipped with essential facilities

Metro Swiss Boulevard is a premium residential development nestled in the serene and well-connected Postal Colony area of Chembur East, Mumbai. This elegant project offers a refined living experience with a selection of spacious 2 and 3 BHK apartments, ranging in carpet area from 648 to 1058 sq. ft. spread across 0.15 acres. It stands as a single, well-crafted tower comprising Ground + 13 floors with lot of needed amenities.

Amenities
  • Swimming pool
  • Gymnasium
  • Children’s play area
  • Tennis court
  • Clubhouse
  • Power backup
  • 24/7 security
  • Lift access
  • Barbecue area
  • Terrace garden
  • Gazebo and sun deck
Metro Group is a real estate company focused on building high-quality residential and commercial spaces. Founded in 2000, they have delivered over 2.5 million sq.ft of space. The company aims to impact lives by providing world-class properties and exceptional customer service.

Highlights

  • Swimming pool
  • Gymnasium
  • Children’s play area
  • Tennis court
  • Clubhouse
  • Power backup
  • 24/7 security
  • Lift access
  • Barbecue area
  • Terrace garden
  • Gazebo and sun deck

Configurations

Type Area Possession Price *
3BHK Apartment1,000 SqFeetImmediate/Ready to move₹ 3.1 crores
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51700000636 Swiss Boulevard Completed

Confirmed with MahaRERA on 19 Jul 2026. Registered as "Swiss Boulevard".

Promoter
Chaurang Associates
Registered on
19 Jul 2017
Proposed completion
Mar 2022
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
498, Kurla, Kurla, Mumbai Suburban, 400071
Land area
666 sq m (7,171 sq ft)
Sanctioned built-up area
595 sq m (6,401 sq ft)
Buildings
Swiss Boulevard Phase 1-1st to 4th Floor (6 floors); Swiss Boulevard Phase 2 - 5th-11th floor (7 floors); Swiss Boulevard Phase 3 - 12th and 13th floor (2 floors)
Parking
Open Space 0, Closed/Covered 20
Construction progress as reported to the portal

Swiss Boulevard Phase 1-1st to 4th Floor

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Swiss Boulevard Phase 2 - 5th-11th floor

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Swiss Boulevard Phase 3 - 12th and 13th floor

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Water Supply: 0% - P-form obtained
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - Septic tank
  • Storm Water Drains: 0% - STP not required
  • Fire protection and fire safety requirements: 0% - NA
  • Electrical meter room, sub-station, receiving station: 0% - NA
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Metro Swiss Boulevard and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Metro Swiss Boulevard
Cons:
Enter some negative aspects of Metro Swiss Boulevard

Location

Metro Swiss Boulevard, Chembur, Mumbai - 400071 (Maharashtra)

* Location may be approximate

Landmarks

  • Transportation

    • Postal Colony Bus Station (<0.5km)
    • Kurla (<0.5km)
    • Everest Co OP Society (<0.5km)
    • Chamber Phatak (<0.5km)
    • Everest Society (<0.5km)
  • Banks & ATMs

    • Union Bank of India (<0.5km)
    • Bank of Baroda (<0.5km)
    • Kotak Mahindra Bank ATM (<0.5km)
    • Paramhans Sahakari Gruh Nirman Sanstha (<0.5km)
    • Axis Bank (<0.5km)
    • Hitachi ATM (<0.5km)
  • Education

    • Adagio. (<0.5km)
    • Shri Bhagwandin Shukla Sabhagruha (<0.5km)
    • Fitnesslive Massage Training Program (<0.5km)
    • Dreamz Classes (<0.5km)
    • Sagar Motor Driving School (<0.5km)
    • Voice over & Dubbing Training (<0.5km)
    • Vanchit Bahujan Yuva Aghadi (<0.5km)
    • Vedant Classes (<0.5km)
    • The Language Network (<0.5km)
    • Little Millennium (<0.5km)
    • Sagar Motor Training School (<0.5km)
    • Carnatic Gurukul (<0.5km)
    • smart Kids Nursery & Play Group (<0.5km)
  • Offices

    • Suryaputra Bhaiyasaheb Ambedkar Sabhagruha (<0.5km)
    • Dr. Babasaheb Ambedkar Bhavan (<0.5km)
  • Hotels & Guest Houses

    • Chanda Mahila Seva Sanstha (<0.5km)
    • Hotelsunny (<0.5km)
  • Hospitals & Healthcare

    • Swastik Hospital & Research Centre (<0.5km)
    • Sutej Dental Clinic (<0.5km)
    • Spandan Clinic & Ambulance Service (<0.5km)
    • Dr Bhavana Jadhav (<0.5km)
    • Mauli Clinic (<0.5km)
    • Anurag Dental and Woman Health Care (<0.5km)
    • Mumbai Eye & Retina Clinic (<0.5km)
    • Suman Clinic (<0.5km)
    • Dr B Y Dhabdhabe (<0.5km)
    • Soham Optics (<0.5km)
    • Visivesh Clinic (<0.5km)
    • Acme Fertility (<0.5km)
    • Dr Madhusudan Davda Clinic (<0.5km)
    • Sai Diagnostic Clinic (<0.5km)
    • Dr Londhe Clinic (<0.5km)
    • Rajaul Nariyal Pani (<0.5km)
    • Dr Manjiri S Hadapad (<0.5km)
    • Shri Sai Sidhi Clinic (<0.5km)
    • Dr Yogita Chawhan (<0.5km)
    • Dr. Kirti Shankhdhar Clinic (<0.5km)
    • Asian Surrogacy (<0.5km)
    • Dr Neelam Bhise (<0.5km)
    • Dr. Disha Prusty - Ent (<0.5km)
    • Smiles N Giggles (<0.5km)
    • Physiotherapy Home Visits (<0.5km)
    • Dr Revathi Pechimuthu (<0.5km)
    • Pristyn Care (<0.5km)
    • Apt Dentistry (<0.5km)
    • Shri Krishna Clinic (<0.5km)
    • Mumbai Monorail Pillar No-2f19 (<0.5km)
    • Lebu Nariyal Pani (<0.5km)
    • Maa Hospital-ER (<0.5km)
    • Maa Hospital (<0.5km)
    • Sai Krupa Dental Clinic (<0.5km)
    • DR.Pramod Mishra (<0.5km)
    • Self Improvisation Prana Healing (<0.5km)
    • Mauli Charitable Medical Trust (<0.5km)
  • Religious Places

    • Prashik Vihar (<0.5km)
    • Ganesh Mandir (<0.5km)
    • Kedarnath Asann (<0.5km)
    • Sunni Mosque & Madarsa Arabia Talimul Islam (<0.5km)
    • Terapanth Bhavan Chamber (<0.5km)
    • Baba Ramdevji Mandir (<0.5km)
    • Associated Christian Fellowship (<0.5km)
    • Bhuvaneshwar Mandir (<0.5km)
    • Durga Mandir (<0.5km)
    • ST.Mary's Church (<0.5km)
    • Samaj Mandir Hall (<0.5km)
    • Samaj Mandir Hall Bus Station (<0.5km)
    • Karunalya Missionary Church (<0.5km)
    • Shri Sai Mitra Mandal (<0.5km)
  • Restaurants & Cafes

    • Mumbai Tadka (<0.5km)
    • Satishkumar Dubey (<0.5km)
    • Joel's Cafe (<0.5km)
    • Vijaya Laxmi Restaurant and Bar (<0.5km)
    • Orange & Chilli Biryani (<0.5km)
    • Zaika Fast Foods & Soda Pub (<0.5km)
    • Liplick Pizzeria (<0.5km)
    • Jangos Pizza (<0.5km)
    • Morgan Snacks Center (<0.5km)
  • Entertainment

    • Ramnaresh (<0.5km)
    • Metro Pillar 2f 15 (<0.5km)
  • Shopping

    • Dmart (<0.5km)
    • Bhawani Supermart (<0.5km)
    • Tomorrow Needs (<0.5km)
  • Leisure and Outdoor

    • The Jym (<0.5km)
    • Sra Pilates Fitness Rehab (<0.5km)
Project ID
J565511898
Updated
Searches
589
Views
548