


Metro Nakshatra - Chembur East, Mumbai
- Builder
- Metro Group
- Construction
- Completed
- Completion
- Mar, 2023
- Properties
- Apartments
- RERA
- P51800002370
Description
Exclusive Single Tower Project
Metro Nakshatra by Metro Group is a boutique residential development located at Chembur Naka, Sion-Trombay Road, Mumbai. It is spread across 0.17 acres of land, this premium project comprises a single tower with 18 floors, offering a total of around 34–38 exclusive apartments. The project features a grand Italian marble entrance lobby, high-speed elevators, and premium safety systems.Amenities
- Gymnasium
- Indoor games area
- Landscaped garden
- Vastu-compliant design
- CCTV surveillance
- Video door phone and intercom facility
- Fire safety systems
- Security staff
- Double-height entrance lobby
- High-speed elevators
- Car lift with covered parking
- 24×7 water supply and power backup
Metro Group is a Mumbai-based real estate developer known for boutique luxury residential and commercial projects. Established with a vision to redefine urban living, the group has been active for over two decades, focusing on quality construction, timely delivery, and premium design standards.
Highlights
- Gymnasium
- Indoor games area
- Landscaped garden
- Vastu-compliant design
- CCTV surveillance
- Video door phone and intercom facility
- Fire safety systems
- Security staff
- Double-height entrance lobby
- High-speed elevators
- Car lift with covered parking
- 24×7 water supply and power backup
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 2BHK Apartment | 716 SqFeet | Immediate/Ready to move | ₹ 2.25 crores |
RERA
P51800002370 Nakshatra Completed
Confirmed with MahaRERA on 22 Sep 2026. Registered as "Nakshatra".
- Promoter
- METRO DEVELOPERS CO.
- Registered on
- 31 Jul 2017
- Proposed completion
- Mar 2023 (originally Mar 2022)
- Project type
- Others
- Planning authority
- Others
- Address as filed
- V. N. Purav Marg, Chembur, Kurla, Kurla, Mumbai Suburban, 400071
- Land area
- 778 sq m (8,380 sq ft)
- Sanctioned built-up area
- 697 sq m (7,500 sq ft)
- Buildings
- Phase 1 - Ground to 2nd floor (4 floors); Phase 2- 3rd to 6th floor (4 floors); Phase 3- 7th to 12th Floor (6 floors)
- Parking
- Open Space 0, Closed/Covered 48
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Phase 1 - Ground to 2nd floor | 4BHK | 120 sq m (1,290 sq ft) | 1 |
| Phase 1 - Ground to 2nd floor | Shop6 | 21 sq m (221 sq ft) | 1 |
| Phase 1 - Ground to 2nd floor | Shop7 | 24 sq m (255 sq ft) | 1 |
| Phase 1 - Ground to 2nd floor | 2BHK | 68 sq m (731 sq ft) | 2 |
| Phase 1 - Ground to 2nd floor | 2BHK | 59 sq m (634 sq ft) | 1 |
| Phase 1 - Ground to 2nd floor | 2BHK | 59 sq m (638 sq ft) | 1 |
| Phase 2- 3rd to 6th floor | 2BHK | 59 sq m (634 sq ft) | 4 |
| Phase 2- 3rd to 6th floor | 2BHK | 59 sq m (638 sq ft) | 4 |
| Phase 2- 3rd to 6th floor | 2BHK | 68 sq m (731 sq ft) | 4 |
| Phase 3- 7th to 12th Floor | 2BHK | 68 sq m (731 sq ft) | 6 |
| Phase 3- 7th to 12th Floor | 2BHK | 71 sq m (768 sq ft) | 1 |
| Phase 3- 7th to 12th Floor | 2BHK | 59 sq m (638 sq ft) | 5 |
| Phase 3- 7th to 12th Floor | 2BHK | 59 sq m (634 sq ft) | 5 |
Construction progress as reported to the portal
Phase 1 - Ground to 2nd floor
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Phase 2- 3rd to 6th floor
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Phase 3- 7th to 12th Floor
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Water Supply: 0% - In later stage
- Sewerage (Chamber, Lines, Septic Tank , STP): 0% - In later stage
- Storm Water Drains: 0% - In later stage
- Water conservation /Rain water harvesting: 0% - In later stage
- Fire protection and fire safety requirements: 0% - In later stage
- Electrical meter room, sub-station, receiving station: 0% - In later stage
Reviews
Write a review
Be the first to write a review of Metro Nakshatra and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Metro Nakshatra
Enter some positive aspects of Metro Nakshatra
Cons:
Enter some negative aspects of Metro Nakshatra
Enter some negative aspects of Metro Nakshatra
Location
Metro Nakshatra, Chembur East, Mumbai - 400071 (Maharashtra)
Nearby
-
Transport
- Bharat Petroleum (<1 km)
- VNP & RC Marg Junction (<1 km)
- Dr. B. R. Ambedkar Udyan (~1 km)
- Lokmanya Tilak Terminus (~2 km)
- Chhatrapati Shivaji Maharaj International Airport (~7 km)
- Navi Mumbai International Airport (~27 km)
-
Shopping & Dining
- Domino's (<1 km)
- Barista (~1 km)
- Jai Kisan Mandai (~1 km)
- Satjeevan (~2 km)
- Shopper's Stop (~3 km)
- Phoenix Market City Kurla (~5 km)
-
Healthcare
- Satvic Hospital (<1 km)
- Sushrut Hospital and Research Centre (<1 km)
- Wellness Forever - Chembur (~1 km)
- Aayush Eye Clinic & Aayush Lasik Centre (~1 km)
- Dr Smita Mukherjees Eye Clinic (~1 km)
- Zeelab Pharmacy (~2 km)
-
Education
- National Society For Equal Opportunities For the Handicapped - NASEOH (<1 km)
- V.E.S College of Arts, Science and Commerce (~1 km)
- St. Gregorios High School (~1 km)
- Adarsha Vidyalaya (~1 km)
- Anukool Circulating Library (~2 km)
- Somaiya Vidyavihar University (~3 km)
-
Leisure & Entertainment
- Diamond Garden (<1 km)
- Bombay Presidency Golf Club (~1 km)
- Cinepolis (~1 km)
- General Arun Kumar Vaidya Swimming Pool (~1 km)
- Kohinoor Cricket Ground (~4 km)
- Veermata Jijabai Bhosale Zoo & Botanical Garden (~15 km)
-
Services
- Chembur Fire Station (<1 km)
- ICICI Bank (<1 km)
- Yes Bank ATM (<1 km)
- Chembur Head Post Office (<1 km)
- BMC M Ward Office (~1 km)
- chembur police station (~2 km)
-
Religious Places
- Siddhi Vinayak Temple (<1 km)
- Dakshin Mukhi Hanuman Temple (<1 km)
- Gurudwara (<1 km)
- Our Lady of Perpetual Succour Church (~1 km)
- Gulshan Baug (~2 km)
- Hanuman Mandir (~2 km)
-
Business & Hospitality
- Corporate Park (~1 km)
- Rashtriya Chemicals & Fertilizers (~3 km)
- Anik Bus Depot (~3 km)
- Equinox Business Park (~4 km)
- Sofitel (~4 km)
- Grand Hyatt Mumbai Hotel & Residences (~7 km)
- Project ID
- J486541189
- Updated
- Searches
- 451
- Views
- 415



