Godrej Prive - Chembur East, Mumbai

Builder
Godrej Properties
Construction
Completed
Completion
Mar, 2021
Properties
Apartments
RERA
P51800001107

Description

The less you commute, the more you live

Godrej Prive has been thoughtfully crafted to provide you everything that is required to live a luxury & comfortable lifestyle. The project offers 1,2 & 3 Bhk apartments which is spread over a total area of 3.32 acres of land with facilities such as Gymnasium and Lift, etc. The project is in close proximity business park at Bandra-Kurla Complex and in close proximity to railway stations, highways and airports.
Amenities:
  • Yoga Deck
  • Jogging Track
  • Kids Play Area
  • Swimming Pool
  • tennis
  • Gymnasium
  • Club house
  • BBQ Area
  • Gardens
  • Amphitheater
Godrej Properties is one of the most trusted real estate developers which is committed to using cutting-edge designs and technologies in each of its projects. Company's portfolio includes residential, commercial and township projects. Innovation, sustainability, and excellence are the hallmarks of the company. Since inception, the company has received a plethora of awards and recognition including 'Real Estate Company Of The Year' at the Construction Week India Awards 2015 and 'Most Reliable Builder' at the CNBC AWAAZ Real Estate Awards 2014.

Highlights

  • Lifts
  • High Speed Internet
  • Electronic Security
  • Balcony
  • Reserved Parking
  • Corner Location
  • Park Facing
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting

Configurations

Type Area Possession Price *
1BHK Apartment460 SqFeetImmediate/Ready to move₹ 1.21 crore
2BHK Apartment658 SqFeetImmediate/Ready to move₹ 1.74 crore
2BHK Apartment68.75 SqMetersImmediate/Ready to move₹ 1.91 crore
3BHK Apartment971 SqFeetImmediate/Ready to move₹ 2.57 crores
3BHK Apartment1,030 SqFeetImmediate/Ready to move₹ 2.48 crores
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51800001107 Godrej Central Completed

Confirmed with MahaRERA on 22 Sep 2026. Registered as "Godrej Central".

Promoter
Godrej Landmark Redevelopers Private Limited
Registered on
26 Jul 2017
Proposed completion
Mar 2021
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
CTS 49/pt, 56, 54, 45, 58/pt, Kurla, Kurla, Mumbai Suburban, 400071
Land area
17,542 sq m (188,826 sq ft)
Sanctioned built-up area
81,664 sq m (879,054 sq ft)
Buildings
A (19 floors); B (19 floors); C (19 floors); D (19 floors); E (19 floors); F (19 floors); G (19 floors); BUILDING NO 14 TOWER I (18 floors); PRIVE TOWER J BUILDING NO 39 (16 floors); H (16 floors); L (16 floors); M (16 floors); N (16 floors); O (16 floors); P (16 floors); Q (16 floors); R (16 floors); MHADA BUILDING NO 2 (18 floors); MHADA BUILDING NO 23 (16 floors); MHADA BUILDING NO 37 (15 floors)
Parking
Open Space 63, Closed/Covered 1044
Complaints on the portal
14
BuildingUnit typeCarpet areaUnits
A1 BHK 55 sq m (594 sq ft) 1
A2.5 BHK 84 sq m (902 sq ft) 15
A2.5 BHK 83 sq m (893 sq ft) 1
A2 BHK 72 sq m (777 sq ft) 14
A2 BHK 72 sq m (778 sq ft) 16
A2 BHK 70 sq m (754 sq ft) 16
B3 BHK 107 sq m (1,156 sq ft) 15
B3 BHK 107 sq m (1,148 sq ft) 15
B3 BHK 106 sq m (1,141 sq ft) 15
B3 BHK 107 sq m (1,157 sq ft) 15
B3 BHK 106 sq m (1,141 sq ft) 1
B3 BHK 105 sq m (1,134 sq ft) 1
B3 BHK 107 sq m (1,150 sq ft) 2
C2 BHK 72 sq m (777 sq ft) 30
C2.5 BHK 83 sq m (893 sq ft) 1
C2.5 BHK 84 sq m (902 sq ft) 15
C2 BHK 72 sq m (777 sq ft) 14
D2 BHK 72 sq m (777 sq ft) 16
D2 BHK 70 sq m (754 sq ft) 14
D2.5 BHK 84 sq m (901 sq ft) 14
D2 BHK 72 sq m (774 sq ft) 16
E3 BHK 107 sq m (1,157 sq ft) 30
E2.5 BHK 81 sq m (869 sq ft) 1
E3 BHK 107 sq m (1,150 sq ft) 2
E2.5 BHK 81 sq m (876 sq ft) 15
F2.5 BHK 84 sq m (901 sq ft) 15
F2.5 BHK 81 sq m (876 sq ft) 15
F2.5 BHK 81 sq m (868 sq ft) 1
F2.5 BHK 83 sq m (893 sq ft) 1
F2 BHK 72 sq m (777 sq ft) 16
G3 BHK 107 sq m (1,157 sq ft) 30
G2 BHK 72 sq m (777 sq ft) 32
G3 BHK 107 sq m (1,150 sq ft) 2
BUILDING NO 14 TOWER I1BHK 45 sq m (479 sq ft) 16
BUILDING NO 14 TOWER I2BHK 66 sq m (706 sq ft) 15
BUILDING NO 14 TOWER I2 BHK 69 sq m (738 sq ft) 16
PRIVE TOWER J BUILDING NO 393 BHK 101 sq m (1,085 sq ft) 28
H2 BHK 63 sq m (682 sq ft) 14
H2 BHK 68 sq m (732 sq ft) 14
H1 BHK 44 sq m (475 sq ft) 14
L3 BHK 92 sq m (989 sq ft) 13
L3 BHK 92 sq m (986 sq ft) 14
L3 BHK 92 sq m (989 sq ft) 14
M3 BHK 89 sq m (958 sq ft) 13
M3 BHK 92 sq m (989 sq ft) 14
M3 BHK 92 sq m (989 sq ft) 14
N3 BHK 92 sq m (988 sq ft) 14
N1 BHK 37 sq m (401 sq ft) 1
N3 BHK 92 sq m (987 sq ft) 13
O3 BHK 92 sq m (988 sq ft) 14
O3 BHK 93 sq m (999 sq ft) 14
O3 BHK 92 sq m (988 sq ft) 13
P3 BHK 92 sq m (989 sq ft) 13
P1 BHK 34 sq m (362 sq ft) 1
P3 BHK 92 sq m (989 sq ft) 14
Q3 BHK 91 sq m (981 sq ft) 13
Q3 BHK 92 sq m (989 sq ft) 14
Q3 BHK 92 sq m (987 sq ft) 14
R3 BHK 92 sq m (987 sq ft) 14
R2.5 BHK 82 sq m (888 sq ft) 13
R3 BHK 92 sq m (989 sq ft) 14
MHADA BUILDING NO 21 BHK 34 sq m (368 sq ft) 64
MHADA BUILDING NO 231 BHK 43 sq m (465 sq ft) 1
MHADA BUILDING NO 231 BHK 37 sq m (395 sq ft) 13
MHADA BUILDING NO 231 BHK 35 sq m (373 sq ft) 41
MHADA BUILDING NO 371 BHK 33 sq m (359 sq ft) 52
Construction progress as reported to the portal

A

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

C

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

D

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

E

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

F

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

G

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING NO 14 TOWER I

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

PRIVE TOWER J BUILDING NO 39

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

H

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

L

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

M

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

N

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

O

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

P

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Q

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

R

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

MHADA BUILDING NO 2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

MHADA BUILDING NO 23

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

MHADA BUILDING NO 37

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - Complete
  • Water Supply: 100% - TO BE SUPPLIED BY BMC
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - WORK IN PROGRESS
  • Storm Water Drains: 100% - Complete
  • Landscaping & Tree Planting: 100% - Complete
  • Street Lighting: 100% - IN MCGM SCOPE
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - Complete
  • Solid Waste Management And Disposal: 100% - WORK IN PROGRESS
  • Water conservation /Rain water harvesting: 100% - Water tank provided
  • Energy managemcnt: 100% - IGBC COMPLIANT
  • Fire protection and fire safety requirements: 100% - AS PER CFO REQUIREMENTS
  • Electrical meter room, sub-station, receiving station: 100% - Complete
  • Open Parking: 100% - BY DEVELOPER
  • CLUB HOUSE: 100% - Complete
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Godrej Prive and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Godrej Prive
Cons:
Enter some negative aspects of Godrej Prive

Location

Godrej Prive, Chembur East, Mumbai - 400071 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • VNP & RC Marg Junction (~1 km)
    • Dr. B. R. Ambedkar Udyan (~1 km)
    • Bharat Petroleum (~1 km)
    • Chembur (~2 km)
    • Chhatrapati Shivaji Maharaj International Airport (~8 km)
    • Navi Mumbai International Airport (~26 km)
  • Shopping & Dining

    • Barista (<1 km)
    • Wok hei (<1 km)
    • A.P.MANI AND SONS (<1 km)
    • Jai Kisan Mandai (~2 km)
    • Shopper's Stop (~3 km)
    • Phoenix Market City Kurla (~6 km)
  • Healthcare

    • Wellness Forever - Chembur (<1 km)
    • Niramaya General Hospital (<1 km)
    • Shatabdi Hospital (~1 km)
    • Aayush Eye Clinic & Aayush Lasik Centre (~1 km)
    • Dr Smita Mukherjees Eye Clinic (~2 km)
    • Zeelab Pharmacy (~3 km)
  • Education

    • St. Gregorios High School (<1 km)
    • St. Anthony's Girls High School (<1 km)
    • Shah & Anchor Kutchhi Engineering College (~1 km)
    • Tiss Library (~2 km)
    • V.E.S College of Arts, Science and Commerce (~2 km)
    • Somaiya Vidyavihar University (~3 km)
  • Leisure & Entertainment

    • Cinepolis (<1 km)
    • Diamond Garden (<1 km)
    • Bombay Presidency Golf Club (<1 km)
    • General Arun Kumar Vaidya Swimming Pool (~2 km)
    • Veermata Jijabai Bhosale Zoo & Botanical Garden (~15 km)
    • Mumbai Football Arena (~16 km)
  • Services

    • Chembur Branch ATM (<1 km)
    • State Bank of India Specialised NRI Branch (<1 km)
    • Chembur Head Post Office (<1 km)
    • Chembur Fire Station (~1 km)
    • BMC M Ward Office (~2 km)
    • chembur police station (~2 km)
  • Religious Places

    • Sharadambal Temple (<1 km)
    • Ahobila Mutt (<1 km)
    • Our Lady of Perpetual Succour Church (<1 km)
    • Gurudwara (~2 km)
    • hari masjid (~2 km)
    • Muhammadi Masjid (~3 km)
  • Business & Hospitality

    • Corporate Park (~2 km)
    • Rashtriya Chemicals & Fertilizers (~3 km)
    • Anik Bus Depot (~4 km)
    • Equinox Business Park (~5 km)
    • Sofitel (~6 km)
    • Grand Hyatt Mumbai Hotel & Residences (~9 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J741190156
Updated
Searches
5988
Views
1361