Godrej Prive - Chembur East, Mumbai
- Builder
- Godrej Properties
- Construction
- Completed
- Completion
- Mar, 2021
- Properties
- Apartments
- RERA
- P51800001107
Description
The less you commute, the more you live
Godrej Prive has been thoughtfully crafted to provide you everything that is required to live a luxury & comfortable lifestyle. The project offers 1,2 & 3 Bhk apartments which is spread over a total area of 3.32 acres of land with facilities such as Gymnasium and Lift, etc. The project is in close proximity business park at Bandra-Kurla Complex and in close proximity to railway stations, highways and airports.RERA ID P51800001107
Amenities:
- Yoga Deck
- Jogging Track
- Kids Play Area
- Swimming Pool
- tennis
- Gymnasium
- Club house
- BBQ Area
- Gardens
- Amphitheater
Godrej Properties is one of the most trusted real estate developers which is committed to using cutting-edge designs and technologies in each of its projects. Company's portfolio includes residential, commercial and township projects. Innovation, sustainability, and excellence are the hallmarks of the company. Since inception, the company has received a plethora of awards and recognition including 'Real Estate Company Of The Year' at the Construction Week India Awards 2015 and 'Most Reliable Builder' at the CNBC AWAAZ Real Estate Awards 2014.
Highlights
- Lifts
- High Speed Internet
- Electronic Security
- Balcony
- Reserved Parking
- Corner Location
- Park Facing
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
- Maintenance Staff
- Water Supply / Storage
- Rain Water Harvesting
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 1BHK Apartment | 460 SqFeet | Immediate/Ready to move | ₹ 1.21 crore |
| 2BHK Apartment | 658 SqFeet | Immediate/Ready to move | ₹ 1.74 crore |
| 2BHK Apartment | 68.75 SqMeters | Immediate/Ready to move | ₹ 1.91 crore |
| 3BHK Apartment | 971 SqFeet | Immediate/Ready to move | ₹ 2.57 crores |
| 3BHK Apartment | 1,030 SqFeet | Immediate/Ready to move | ₹ 2.48 crores |
RERA
P51800001107 Godrej Central Completed
Confirmed with MahaRERA on 15 Sep 2026. Registered as "Godrej Central".
- Promoter
- Godrej Landmark Redevelopers Private Limited
- Registered on
- 26 Jul 2017
- Proposed completion
- Mar 2021
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- CTS 49/pt, 56, 54, 45, 58/pt, Kurla, Kurla, Mumbai Suburban, 400071
- Land area
- 17,542 sq m (188,826 sq ft)
- Sanctioned built-up area
- 81,664 sq m (879,054 sq ft)
- Buildings
- A (19 floors); B (19 floors); C (19 floors); D (19 floors); E (19 floors); F (19 floors); G (19 floors); BUILDING NO 14 TOWER I (18 floors); PRIVE TOWER J BUILDING NO 39 (16 floors); H (16 floors); L (16 floors); M (16 floors); N (16 floors); O (16 floors); P (16 floors); Q (16 floors); R (16 floors); MHADA BUILDING NO 2 (18 floors); MHADA BUILDING NO 23 (16 floors); MHADA BUILDING NO 37 (15 floors)
- Parking
- Open Space 63, Closed/Covered 1044
- Complaints on the portal
- 13
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| A | 1 BHK | 55 sq m (594 sq ft) | 1 |
| A | 2.5 BHK | 84 sq m (902 sq ft) | 15 |
| A | 2.5 BHK | 83 sq m (893 sq ft) | 1 |
| A | 2 BHK | 72 sq m (777 sq ft) | 14 |
| A | 2 BHK | 72 sq m (778 sq ft) | 16 |
| A | 2 BHK | 70 sq m (754 sq ft) | 16 |
| B | 3 BHK | 107 sq m (1,156 sq ft) | 15 |
| B | 3 BHK | 107 sq m (1,148 sq ft) | 15 |
| B | 3 BHK | 106 sq m (1,141 sq ft) | 15 |
| B | 3 BHK | 107 sq m (1,157 sq ft) | 15 |
| B | 3 BHK | 106 sq m (1,141 sq ft) | 1 |
| B | 3 BHK | 105 sq m (1,134 sq ft) | 1 |
| B | 3 BHK | 107 sq m (1,150 sq ft) | 2 |
| C | 2 BHK | 72 sq m (777 sq ft) | 30 |
| C | 2.5 BHK | 83 sq m (893 sq ft) | 1 |
| C | 2.5 BHK | 84 sq m (902 sq ft) | 15 |
| C | 2 BHK | 72 sq m (777 sq ft) | 14 |
| D | 2 BHK | 72 sq m (777 sq ft) | 16 |
| D | 2 BHK | 70 sq m (754 sq ft) | 14 |
| D | 2.5 BHK | 84 sq m (901 sq ft) | 14 |
| D | 2 BHK | 72 sq m (774 sq ft) | 16 |
| E | 3 BHK | 107 sq m (1,157 sq ft) | 30 |
| E | 2.5 BHK | 81 sq m (869 sq ft) | 1 |
| E | 3 BHK | 107 sq m (1,150 sq ft) | 2 |
| E | 2.5 BHK | 81 sq m (876 sq ft) | 15 |
| F | 2.5 BHK | 84 sq m (901 sq ft) | 15 |
| F | 2.5 BHK | 81 sq m (876 sq ft) | 15 |
| F | 2.5 BHK | 81 sq m (868 sq ft) | 1 |
| F | 2.5 BHK | 83 sq m (893 sq ft) | 1 |
| F | 2 BHK | 72 sq m (777 sq ft) | 16 |
| G | 3 BHK | 107 sq m (1,157 sq ft) | 30 |
| G | 2 BHK | 72 sq m (777 sq ft) | 32 |
| G | 3 BHK | 107 sq m (1,150 sq ft) | 2 |
| BUILDING NO 14 TOWER I | 1BHK | 45 sq m (479 sq ft) | 16 |
| BUILDING NO 14 TOWER I | 2BHK | 66 sq m (706 sq ft) | 15 |
| BUILDING NO 14 TOWER I | 2 BHK | 69 sq m (738 sq ft) | 16 |
| PRIVE TOWER J BUILDING NO 39 | 3 BHK | 101 sq m (1,085 sq ft) | 28 |
| H | 2 BHK | 63 sq m (682 sq ft) | 14 |
| H | 2 BHK | 68 sq m (732 sq ft) | 14 |
| H | 1 BHK | 44 sq m (475 sq ft) | 14 |
| L | 3 BHK | 92 sq m (989 sq ft) | 13 |
| L | 3 BHK | 92 sq m (986 sq ft) | 14 |
| L | 3 BHK | 92 sq m (989 sq ft) | 14 |
| M | 3 BHK | 89 sq m (958 sq ft) | 13 |
| M | 3 BHK | 92 sq m (989 sq ft) | 14 |
| M | 3 BHK | 92 sq m (989 sq ft) | 14 |
| N | 3 BHK | 92 sq m (988 sq ft) | 14 |
| N | 1 BHK | 37 sq m (401 sq ft) | 1 |
| N | 3 BHK | 92 sq m (987 sq ft) | 13 |
| O | 3 BHK | 92 sq m (988 sq ft) | 14 |
| O | 3 BHK | 93 sq m (999 sq ft) | 14 |
| O | 3 BHK | 92 sq m (988 sq ft) | 13 |
| P | 3 BHK | 92 sq m (989 sq ft) | 13 |
| P | 1 BHK | 34 sq m (362 sq ft) | 1 |
| P | 3 BHK | 92 sq m (989 sq ft) | 14 |
| Q | 3 BHK | 91 sq m (981 sq ft) | 13 |
| Q | 3 BHK | 92 sq m (989 sq ft) | 14 |
| Q | 3 BHK | 92 sq m (987 sq ft) | 14 |
| R | 3 BHK | 92 sq m (987 sq ft) | 14 |
| R | 2.5 BHK | 82 sq m (888 sq ft) | 13 |
| R | 3 BHK | 92 sq m (989 sq ft) | 14 |
| MHADA BUILDING NO 2 | 1 BHK | 34 sq m (368 sq ft) | 64 |
| MHADA BUILDING NO 23 | 1 BHK | 43 sq m (465 sq ft) | 1 |
| MHADA BUILDING NO 23 | 1 BHK | 37 sq m (395 sq ft) | 13 |
| MHADA BUILDING NO 23 | 1 BHK | 35 sq m (373 sq ft) | 41 |
| MHADA BUILDING NO 37 | 1 BHK | 33 sq m (359 sq ft) | 52 |
Construction progress as reported to the portal
A
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
B
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
C
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
D
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
E
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
F
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
G
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
BUILDING NO 14 TOWER I
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
PRIVE TOWER J BUILDING NO 39
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
H
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
L
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
M
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
N
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
O
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
P
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Q
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
R
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
MHADA BUILDING NO 2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
MHADA BUILDING NO 23
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
MHADA BUILDING NO 37
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 100% - Complete
- Water Supply: 100% - TO BE SUPPLIED BY BMC
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - WORK IN PROGRESS
- Storm Water Drains: 100% - Complete
- Landscaping & Tree Planting: 100% - Complete
- Street Lighting: 100% - IN MCGM SCOPE
- Treatment And Disposal Of Sewage And Sullage Water: 100% - Complete
- Solid Waste Management And Disposal: 100% - WORK IN PROGRESS
- Water conservation /Rain water harvesting: 100% - Water tank provided
- Energy managemcnt: 100% - IGBC COMPLIANT
- Fire protection and fire safety requirements: 100% - AS PER CFO REQUIREMENTS
- Electrical meter room, sub-station, receiving station: 100% - Complete
- Open Parking: 100% - BY DEVELOPER
- CLUB HOUSE: 100% - Complete
Reviews
Write a review
Be the first to write a review of Godrej Prive and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Godrej Prive
Enter some positive aspects of Godrej Prive
Cons:
Enter some negative aspects of Godrej Prive
Enter some negative aspects of Godrej Prive
Location
Godrej Prive, Chembur East, Mumbai - 400071 (Maharashtra)
Landmarks
Hotel
- Trident Bandra Kurla
- The Fern Residency Mumbai (<2km)
- Hotel Golden Swan (<10km)
- JW Marriott Mumbai Sahar-Mumbai (<9km)
- Hotel Maharana Inn (<1km)
- Hyatt Regency Mumbai (<9km)
- Grand Hyatt-Santacruz East (<9km)
- Vits Hotel (<10km)
- Hotel Manas Residency (<2km)
- Yauatcha (<6km)
- Hotel Broadway-Chamber (<0.5km)
- Kamran Residency (<5km)
- Holiday Inn-Saki Naka (<8km)
- COURTYARD by Marriott Mumbai International Airport (<11km)
- Meluha The Fern An Ecotel (<10km)
- SOFITEL Luxury Hotels-BKC (<5km)
- The Leela-Mumbai (<10km)
- Orchid Hotel Mumbai (<10km)
- ITC Grand Central Hotel Mumbai (<13km)
- The Beatle Hotel (<11km)
- Hotel Milan International Private Limited (<11km)
- Ramada by Wyndham Powai Hotel & Convention Centre (<13km)
- Hotel Karl Residency (<13km)
- Hotel Rang Sharda (<10km)
- Tulip Star Hotel (<13km)
- Hotel Kohinoor Elite (<5km)
- Hotel Kohinoor Continental (<11km)
- JW Marriott Mumbai Juhu (<14km)
- Hotel Executive Enclave (<11km)
- Taj Lands End Mumbai (<12km)
- Bahri Residency Hotel (<1km)
- Club Emerald (<2km)
- The Royal Orchid (<1km)
- Citizen Hotel (<13km)
- Hotel Jewel Of Chembur (<2km)
- Hotel Rajhans (<2km)
- Sai Palace Hotel (<12km)
- Landmark Asia Serviced Apartments (<11km)
- Ram Ashraya (<8km)
- Hotel Crescent-Ghatkopar Link Road Andheri East (<8km)
Other Features
- Mumbai (<6km)
Shopping Centre
- K Star Mall (<0.5km)
- Phoenix Market City (<6km)
- R Odeon Mall (<4km)
- Kohinoor City Mall (<5km)
- R City Mall (<8km)
- Cubic (<1km)
Public Transport
- Lokmanya Tilak Terminus (<3km)
- Chembur Railway Station (<2km)
- Tilak Nagar (<3km)
- Lokmanya Tilak Terminal-Main Entrance (<3km)
- Kurla (<4km)
- Maitri Park (<1km)
- Ghatkopar (<5km)
- Sion Railway Station (<6km)
- Chembur-Monorail Station Entrance 2 (<2km)
- Chhatrapati Shivaji Maharaj International Airport (BOM) (<9km)
- Shivshrusti (<3km)
- Bandra Railway Terminus (<9km)
- Govandi Station (<2km)
- Sakinaka Metro Station-Gate 5 (<8km)
- Domestic Airport Terminal 1-A (<10km)
- Bandra Railway Station (<9km)
- Dadar Railway Station (<10km)
- Bandra Railway Station West (<9km)
- Santacruz Station (<10km)
- Terminal Building 1-B (<10km)
- Pratiksha Nagar Bus Station-Entrance 1 (<4km)
- Vidhyavihar Railway Station East (<4km)
- Guru Teg Bhadhur Nagar Railway Station (<6km)
ATM/Bank/Exchange
- Canara Bank (<3km)
- Saraswat Bank-Chembur Diamond Garden (<0.5km)
- Abhyudaya Co-Op Bank-Nehru Nagar (<3km)
- Bank of India-Chamber Naka (<1km)
Recreation
- Diamond Garden (<0.5km)
- Police Ground (<5km)
- Inox-Neelyog Square Mall (<5km)
- Supreme Business Park (<9km)
- Fun Cinemas (<0.5km)
- Odeon Swimming Pool Open Ground (<5km)
- Movietime Cinemas-Cubic Mall (<1km)
Hospitals & Clinics
- Surana Sethia Hospital (<2km)
- Dr Aijaz Ahmed Shaikh (<4km)
- Bhabha Atomic Research Centre Hospital (<2km)
- Pancholi Hospital (<4km)
- Sushrut Hospital (<2km)
- Kohinoor Hospital-Kurla West (<4km)
- Sarvodaya Hospital (<6km)
- Rajawadi Hospital (<4km)
- Niron Hospital (<8km)
Building
- Chamber Tilak Nagar Adarsh CHS (<3km)
- RCF Colony Gate No 4 (<1km)
- Orient Regency (<3km)
- Neelkanth Valley (<4km)
- Atur Park Shiv Parvati (<0.5km)
Restaurant & Shops
- Toto
- Eat Around The Corner (<10km)
- The Peninsula Grand Hotel (<8km)
- Hotel Golden Sagar (<5km)
- D Mart (<9km)
Business & Services
- Universal Majestic (<2km)
- Project ID
- J741190156
- Updated
- Searches
- 5976
- Views
- 1349