


Ekta Greenville - Pathardi Phata, Nashik
- Builder
- EKta World
- Construction
- Partially Completed
- Completion
- Apr, 2027
- Properties
- Apartments
- RERA
- P51600000685, P51600001224, P51600001510
Description
elegant apartments and edition of luxury villas
Ekta Greenville lies at Pathardi Phata with the configuration of 2, 3 & 4 apartments as housing society with 2,3 & 4 bhk apartments available in this project. This housing society is now ready to be called home as families have started moving in. The project has total 18 towers, with 8 floors each and 696 units on offer with spread over an area of 12 acres,- Basket Ball Court
- Club House
- Compound Covered Car Parking
- Cycling Track
- Gated Community
- Gym
- Indoor Games
- Landscaped Garden
- Outdoor games
- Play Area
- Rain Water Harvesting
- Swimming Pool
- 24Hrs Backup Electricity
- Fire Safety
Highlights
- Power Back-up
- Visitor Parking
- Maintenance Staff
- Water Supply / Storage
- Rain Water Harvesting
- Waste Disposal
- Lifts
- Security Guards
- Fire Alarm
- Balcony
- Reserved Parking
- Basement
- Woodwork
- Modular Kitchen
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
- Service / Goods Lift
- Club / Community Center
- Adjacent to Main Road
- Park/Green Belt Facing
- Water Connection
- Electric Connection
- Close to Hospital
- Close to School
- Close to Shopping Center/Mall
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 3BHK Apartment | 967 SqFeet | Within 1 Year | - |
RERA
P51600000685 EKTA GREENVILLE PHASE 2 WING O , P , Q AND R Active 80% built
Confirmed with MahaRERA on 17 Sep 2026. Registered as "EKTA GREENVILLE PHASE 2 WING O , P , Q AND R".
- Promoter
- EKTA HOUSING PRIVATE LIMITED
- Registered on
- 20 Jul 2017
- Proposed completion
- Apr 2027 (originally Jun 2019)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- S NO 231 AT PATHARDI NASHIK, Nashik, Nashik, Nashik, 422010
- Land area
- 1,219 sq m (13,120 sq ft)
- Sanctioned built-up area
- 9,007 sq m (96,950 sq ft)
- Buildings
- WING O (10 floors); WING P (10 floors); WING Q (10 floors); WING R (10 floors)
- Parking
- Open Space 25, Closed/Covered 4
- Complaints on the portal
- 8
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| WING O | 2 BHK | 57 sq m (612 sq ft) | 32 |
| WING P | 2bhk | 57 sq m (612 sq ft) | 32 |
| WING Q | 2 BHK | 57 sq m (612 sq ft) | 16 |
| WING Q | 3 BHK | 90 sq m (967 sq ft) | 16 |
| WING R | 3 BHK | 90 sq m (967 sq ft) | 32 |
Construction progress as reported to the portal
WING O
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 90%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
WING P
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 90%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
WING Q
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 55%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 50%
WING R
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 95%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 75%
- Sanitary Fittings within the flats / premises: 20%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 30%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 30%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 11%
Common areas and facilities
- Water Supply: 80% - WORK IN PROGRESS
- Sewerage (Chamber, Lines, Septic Tank , STP): 90% - WORK IN PROGRESS
- Storm Water Drains: 80% - WORK IN PROGRESS
- Landscaping & Tree Planting: 100% - WORK IN PROGRESS NO SEPTIC TANK
- Treatment And Disposal Of Sewage And Sullage Water: 100% - WORK IN PROGRESS
- Solid Waste Management And Disposal: 86% - Complete
- Water conservation /Rain water harvesting: 100% - Complete
- Fire protection and fire safety requirements: 80% - Q
- Electrical meter room, sub-station, receiving station: 0% - R in progress
- Aggregate area of recreational Open Space: 80% - WORK IN PROGRESS
- Open Parking: 80% - WORK IN PROGRESS
- Gazebo with size 8 feet x 8 feet for people to sit and relax: 65% - COMPLETED
- Children Play Area with playing equipments: 100% - Complete
- CHESS and CARDS area will be in CLUB HOUSE: 100% - R in progress
- PAVED SITTING AREA: 85% - WORK IN PROGRESS.
- CLUB HOUSE with gymnasium and games room with squash court and steam facility: 100% - Complete
- GUARD HOUSE with separate Entry and Exit: 100% - WORK IN PROGRESS
- GYMNASIUM with area of approx 62 sqm with fitness equipment will be in CLUB HOUSE: 100% - Complete
- KIDS POOL of size 4 m x 4m: 77% - Complete
- MUTIPURPOSE COURT to play Basketball and Badminton: 100% - Complete
- NET CRICKET with cricket pitch enclosed with net around: 100% - Complete
- PARTY LAWN with lush green grass for party functions get together: 100% - Complete
- PATHWAY of 5 feet in width for jogging and walking through the landscape area: 91% - WORK IN PROGRESS.
- SNOOKER TABLE area will be in Club House: 100% - WORK IN PROGRESS.
- SQUASH COURT will be in CLUB HOUSE: 100% - Complete
- SWIMMING POOL of size 11 m x 5 m: 67% - Complete
- TABLE TENNIS area will be in Club House: 100% - for whole project & to be handed over to apex body
- TEMPLE with size of 8 feet x 8 feet: 100% - Complete
- TREE PITS WITH SEATS AROUND: 90% - (size 8.8 m x 5.9m )to be handed over to apex body
P51600001224 EKTA GREENVILLE PHASE 1 WING I AND J Completed
Confirmed with MahaRERA on 17 Sep 2026. Registered as "EKTA GREENVILLE PHASE 1 WING I AND J".
- Promoter
- EKTA HOUSING PRIVATE LIMITED
- Registered on
- 27 Jul 2017
- Proposed completion
- Oct 2019 (originally Oct 2018)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- SURVEY NO 231 AT PATHARDI NASHIK, Nashik, Nashik, Nashik, 422010
- Land area
- 709 sq m (7,635 sq ft)
- Sanctioned built-up area
- 5,213 sq m (56,110 sq ft)
- Buildings
- WING I (10 floors); WING J (10 floors)
- Parking
- Open Space 16, Closed/Covered 2
- Complaints on the portal
- 1
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| WING I | 2BHK | 57 sq m (612 sq ft) | 16 |
| WING I | 3BHK | 90 sq m (967 sq ft) | 16 |
| WING J | 3BHK | 90 sq m (967 sq ft) | 32 |
Construction progress as reported to the portal
WING I
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 95%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
WING J
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 99%
- Sanitary Fittings within the flats / premises: 45%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Water Supply: 100% - COMPLETE
- Sewerage (Chamber, Lines, Septic Tank , STP): 95% - 5 SEPTIK TANK PROVIDED
- Storm Water Drains: 98% - WORK IN PROGRESS
- Landscaping & Tree Planting: 70% - WORK IN PROGRESS
- Street Lighting: 60% - WORK IN PROGRESS
- Community Buildings: 95% - Club house DONE
- Treatment And Disposal Of Sewage And Sullage Water: 90% - WORK IN PROGRESS
- Solid Waste Management And Disposal: 90% - WORK IN PROGRESS
- Water conservation /Rain water harvesting: 90% - WORK IN PROGRESS
- Fire protection and fire safety requirements: 100% - COMPLETED
- Electrical meter room, sub-station, receiving station: 100% - COMPLETED
- Open Parking: 90% - WORK IN PROGRESS
P51600001510 EKTA GREENVILLE PHASE 3 Completed
Confirmed with MahaRERA on 17 Sep 2026. Registered as "EKTA GREENVILLE PHASE 3".
- Promoter
- EKTA HOUSING PRIVATE LIMITED
- Registered on
- 28 Jul 2017
- Proposed completion
- Dec 2019 (originally Dec 2018)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- S NO 231 AT PATHARDI NASHIK, Nashik, Nashik, Nashik, 422010
- Land area
- 2,614 sq m (28,141 sq ft)
- Sanctioned built-up area
- 4,552 sq m (48,999 sq ft)
- Buildings
- VILLA NO 1 (3 floors); VILLA NO 2 (3 floors); VILLA NO 7 (3 floors); VILLA NO 8 (3 floors); VILLA NO 11 (3 floors); VILLA NO 13 (3 floors); VILLA NO 47 (3 floors); VILLA NO 48 (3 floors); VILLA NO 49 (3 floors); VILLA NO 50 (3 floors); VILLA NO 53 (3 floors); VILLA NO 54 (3 floors); ROW HOUSE NO 15 (3 floors); ROW HOUSE NO 16 (3 floors); ROW HOUSE NO 17 (3 floors); ROW HOUSE NO 18 (3 floors); ROW HOUSE NO 19 (3 floors); ROW HOUSE NO 20 (3 floors); ROW HOUSE NO 21 (3 floors); ROW HOUSE NO 24 (3 floors); ROW HOUSE NO 25 (3 floors); ROW HOUSE NO 26 (3 floors); ROW HOUSE NO 27 (3 floors); ROW HOUSE NO 31 (3 floors); ROW HOUSE NO 33 (3 floors); ROW HOUSE NO 34 (3 floors); ROW HOUSE NO 35 (3 floors); ROW HOUSE NO 36 (4 floors); ROW HOUSE NO 37 (3 floors); ROW HOUSE NO 38 (3 floors); ROW HOUSE NO 39 (3 floors); ROW HOUSE NO 40 (3 floors); ROW HOUSE NO 41 (3 floors); ROW HOUSE NO 42 (3 floors); ROW HOUSE NO 43 (3 floors); ROW HOUSE NO 44 (3 floors); ROW HOUSE NO 45 (3 floors); ROW HOUSE NO 46 (3 floors)
- Parking
- Open Space 133, Closed/Covered 38
- Complaints on the portal
- 3
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| VILLA NO 1 | VILLA NO 1 | 125 sq m (1,350 sq ft) | 1 |
| VILLA NO 2 | VILLA NO 2 | 125 sq m (1,350 sq ft) | 1 |
| VILLA NO 7 | VILLA NO 7 | 125 sq m (1,350 sq ft) | 1 |
| VILLA NO 8 | VILLA NO 8 | 125 sq m (1,350 sq ft) | 1 |
| VILLA NO 11 | VILLA NO 11 | 125 sq m (1,350 sq ft) | 1 |
| VILLA NO 13 | VILLA NO 13 | 125 sq m (1,350 sq ft) | 1 |
| VILLA NO 47 | VILLA NO 47 | 125 sq m (1,350 sq ft) | 1 |
| VILLA NO 48 | VILLA NO 48 | 125 sq m (1,350 sq ft) | 1 |
| VILLA NO 49 | Villa No. 49 | 125 sq m (1,350 sq ft) | 1 |
| VILLA NO 50 | VILLA NO 50 | 125 sq m (1,350 sq ft) | 1 |
| VILLA NO 53 | VILLA NO 53 | 125 sq m (1,350 sq ft) | 1 |
| VILLA NO 54 | VILLA NO 54 | 125 sq m (1,350 sq ft) | 1 |
| ROW HOUSE NO 15 | ROW HOUSE NO 15 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 16 | ROW HOUSE NO 16 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 17 | ROW HOUSE NO 17 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 18 | ROW HOUSE NO 18 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 19 | ROW HOUSE NO 19 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 20 | ROW HOUSE NO 20 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 21 | ROW HOUSE NO 21 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 24 | ROW HOUSE NO 24 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 25 | ROW HOUSE NO 25 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 26 | ROW HOUSE NO 26 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 27 | ROW HOUSE NO 27 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 31 | ROW HOUSE NO 31 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 33 | ROW HOUSE NO 33 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 34 | ROW HOUSE NO 34 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 35 | ROW HOUSE NO 35 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 36 | Row House No. 36 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 37 | ROW HOUSE NO 37 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 38 | Row House No. 38 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 39 | Row House No. 39 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 40 | ROW HOUSE NO 40 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 41 | ROW HOUSE NO 41 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 42 | ROW HOUSE NO 42 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 43 | ROW HOUSE NO 43 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 44 | ROW HOUSE NO 44 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 45 | ROW HOUSE NO 45 | 111 sq m (1,194 sq ft) | 1 |
| ROW HOUSE NO 46 | ROW HOUSE NO 46 | 111 sq m (1,194 sq ft) | 1 |
Construction progress as reported to the portal
VILLA NO 1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
- Sanitary Fittings within the flats / premises: 50%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 60%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 80%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
VILLA NO 2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
- Sanitary Fittings within the flats / premises: 50%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 60%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 80%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
VILLA NO 7
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 95%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
VILLA NO 8
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 95%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
VILLA NO 11
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 95%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
VILLA NO 13
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 95%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
VILLA NO 47
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 55%
- Sanitary Fittings within the flats / premises: 40%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 38%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 55%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
VILLA NO 48
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 55%
- Sanitary Fittings within the flats / premises: 40%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 38%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 55%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
VILLA NO 49
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 55%
- Sanitary Fittings within the flats / premises: 40%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 38%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 55%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
VILLA NO 50
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 55%
- Sanitary Fittings within the flats / premises: 40%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 38%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 55%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
VILLA NO 53
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
- Sanitary Fittings within the flats / premises: 70%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
VILLA NO 54
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
- Sanitary Fittings within the flats / premises: 70%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 15
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 96%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 16
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 96%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 17
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 96%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 18
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 96%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 19
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 96%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 20
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 96%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 21
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 96%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 24
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 96%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 25
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 96%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 26
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 96%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 27
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 96%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 31
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 92%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 33
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 92%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 34
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 72%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 92%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 35
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 92%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 36
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 92%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 37
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 92%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 38
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 91%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 72%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 91%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 39
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 91%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 72%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 91%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 40
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 91%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 72%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 91%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 41
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 91%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 72%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 91%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 42
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 92%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 43
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 92%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 44
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 92%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 45
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 92%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ROW HOUSE NO 46
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 96%
- Sanitary Fittings within the flats / premises: 80%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 92%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 90% - WORK IN PROGRESS
- Water Supply: 100% - COMPLETE
- Sewerage (Chamber, Lines, Septic Tank , STP): 87% - NO SEPTIC TANK
- Storm Water Drains: 87% - WORK IN PROGRESS
- Landscaping & Tree Planting: 80% - WORK IN PROGRESS
- Street Lighting: 2% - WORK IN PROGRESS
- Treatment And Disposal Of Sewage And Sullage Water: 58% - WORK IN PROGRESS
- Solid Waste Management And Disposal: 80% - WORK IN PROGRESS
- Water conservation /Rain water harvesting: 85% - WORK IN PROGRESS
- Electrical meter room, sub-station, receiving station: 52% - ONLY TRANSFORMER NO SUBSTATION & RECEIVING STATION
- Open Parking: 68% - WORK IN PROGRESS
Reviews
Be the first to write a review of Ekta Greenville and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Enter some positive aspects of Ekta Greenville
Enter some negative aspects of Ekta Greenville
Location
Ekta Greenville, Pathardi Phata, Nashik - 422010 (Maharashtra)
Landmarks
Hotel
- Radisson Blu Hotel & Spa (<0.5km)
- Teerth Villa (<1km)
- Oyo 2597 Pathardi Phata (<1km)
- Radisson Blu Hotel & Spa Nashik (<1km)
- Hotel Sumanchandra-Agra Mumbai Road (<1km)
- Hotel Aangan Nashik (<1km)
- After Dark Sky Lounge Express Inn (<1km)
Restaurant & Shops
- Hrutika Kirana & General Stores (<1km)
- Narendra Super Shopee (<1km)
- Striyam Wholesale & Retailer (<1km)
- Annapurna Kirana & General Store (<1km)
- Gangotri Kirana and General Stores (<1km)
- Nitin Kirana & General Stores (<1km)
- Ram Traders (<1km)
- Maitri Collection (<1km)
- Balaji Market (<1km)
- Aaradhya Collection (<1km)
- Harshada Collection (<1km)
- Gurukrupa Super Market (<1km)
- Narendra Traders (<1km)
- Shri Aashapuri (<1km)
- Om Sai Collection (<1km)
- Rudra Collection (<1km)
- Kamyani Collection (<1km)
- Navratan Market (<1km)
- Aastha Ladies Shopee (<1km)
- Varad Apartment (<1km)
- Shivnath Provision (<1km)
- Mauli Collection (<1km)
- Tanishka Collection (<1km)
- Kamal Super Market (<1km)
- Aaradhya Kirana (<1km)
- Saidatta Kirana & General Stores (<1km)
- Playboy Lounge (<1km)
- A R Collection (<1km)
- Saptashrungi Kirana (<1km)
- Jogeshwari Traders (<1km)
- Chandani Collection (<1km)
- Factory Outlet (<1km)
- Narayan Textiles (<1km)
- Quality Bag And Leds (<1km)
- Aashapuri Kirana (<1km)
- Swami Sarees & Dresses (<1km)
- Radhika Collection (<1km)
- Charansparsha Footwear (<1km)
- Ramlila Steshnari (<1km)
- He Maher Collection (<1km)
- Renuka Mata Kirana (<1km)
- Sakshi General Stores (<1km)
- Yogiraj Restaurant and Bar (<1km)
- Shri Krupa Collection (<1km)
- Mahalaxmi (<1km)
- Gajanan Kirana (<1km)
- Aai Tulja Bhavani Super Market (<1km)
- Shivdatta Foot Wear (<1km)
- Harsule Readymades (<1km)
- Vaibhav Traders (<1km)
- Shri Swami Samarth Provision & Collection (<1km)
- Shivam Provision Stores (<1km)
Hospitals & Clinics
- Ganesh Clinic (<1km)
- Shruti Clinic (<1km)
- Shri Samarth Clinic (<1km)
- Sakali Medical And General Stores (<1km)
- Matoshree Clinic (<1km)
- Sundal Welfare Sevath Davakhana (<1km)
- Shri Sai Clinic (<1km)
- Dr. Patils Dental & Homeopathy Clinic (<1km)
- Shri Samarh Ayurvedic Clinic (<1km)
- Pooja Clinic (<1km)
- Yash Day Night Clinic (<1km)
- Siddhata Clinic (<1km)
- Mothar & Baby Care Clinic (<1km)
- Akshadeep Dental Clinic (<1km)
- Shri Punarvasu Clinic (<1km)
- Balpan Clinic (<1km)
- Shri Clinic (<1km)
Department Store
- Shri Mart (<1km)
Recreation
- Blue Lagun Water Park (<1km)
- Pandavlane Water Park (<1km)
- Jay Hanuman Udyan (<1km)
- Gurupeeth Ashram (<1km)
- Symphony (<1km)
- Dadasaheb Phalke Memorial (<1km)
- Blue Lagoon Water Park (<1km)
- Pandava Leni Caves (<1km)
- Rajsabha Maharaj Park (<1km)
ATM/Bank/Exchange
- Bank Of Maharashtra-Ambaid Industrial Estate (<1km)
- Hdfc Bank Atm (<1km)
- Axis Bank Atm (<1km)
- Union Bank of India-Ambad (<1km)
- Union Bank of India (<1km)
- Indian Bank-Ambad Industrial Estate (<1km)
Landmark/Attraction
- Trirashmi Buddha Smarak (<1km)
Natural or Geographical
- Pandav Leni (<1km)
Museum
- Pradeshik Vastu Sanghralay (<1km)
Petrol Station
- HP Petrol Pump (<1km)
- Indian Oil Petrol Pump (<1km)
Public Transport
- Phalke Smarak Bus Stop (<1km)
- Project ID
- J483121189
- Updated
- Searches
- 2817
- Views
- 2246







