DNV Arcelia - Ravet, Pune
- Builder
- DNV Builders
- Construction
- Partially Completed
- Completion
- Dec, 2022
- Properties
- Apartments
- RERA
- P52100001934, P52100003478, P52100013972, P52100020144
Description
with 100% power backup available
DNV Arcelia is located in the heart of Ravet, Pune offers 2&3 BHK apartments ranging from 498 to 1130 sqft The project is spread over 2 acres of land. It consists of 5 towers with 11 floors and 116 acres of land. This project provides unmatched connectivity from all the important landmarks and places of everyday utility such as various well-known hospitals, educational institutions, departmental stores, and commercial shops.Amenities
- Landscape Garden
- Senior Citizen's Park
- Children's Play Area
- Gymnasium Top Floor
- Top Terrace Meditation Deck
- Jogging Track
- Basketball Court
- Climbing Wall
DNV Builders with an experience of over two decades in infrastructure development, The group has earned a reputation in the sector by providing residential and commercial spaces in Pune. It aims to maintain long-term relationships with the buyers by being transparent in all its dealings.
Highlights
- Landscape Garden
- Senior Citizen's Park
- Children's Play Area
- Gymnasium Top Floor
- Top Terrace Meditation Deck
- Jogging Track
- Basketball Court
- Climbing Wall
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 2BHK Apartment | 498 SqFeet | Immediate/Ready to move | ₹ 52.89 lakhs |
| 3BHK Apartment | 1,198 SqFeet | Immediate/Ready to move | ₹ 92.73 lakhs |
RERA
P52100001934 DNV ARCELIA PH 1 Completed
Confirmed with MahaRERA on 20 Sep 2026. Registered as "DNV ARCELIA PH 1".
- Promoter
- DNV REALTY
- Registered on
- 29 Jul 2017
- Proposed completion
- Dec 2018
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Survey NO 76 4 1, Pimpri Chinchawad (M Corp.), Haveli, Pune, 412101
- Land area
- 2,680 sq m (28,848 sq ft)
- Sanctioned built-up area
- 2,226 sq m (23,966 sq ft)
- Buildings
- Arcelia B (16 floors)
- Parking
- Open Space 27, Closed/Covered 4
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Arcelia B | 2BHK | 48 sq m (518 sq ft) | 6 |
| Arcelia B | 2BHK | 48 sq m (516 sq ft) | 1 |
| Arcelia B | 2 BHK | 47 sq m (510 sq ft) | 1 |
| Arcelia B | 2 BHK | 46 sq m (500 sq ft) | 6 |
| Arcelia B | 2 BHK | 46 sq m (499 sq ft) | 6 |
| Arcelia B | 2 BHK | 47 sq m (502 sq ft) | 1 |
| Arcelia B | 2 BHK | 46 sq m (501 sq ft) | 4 |
| Arcelia B | 2 BHK | 46 sq m (498 sq ft) | 1 |
| Arcelia B | 2BHK | 48 sq m (520 sq ft) | 3 |
| Arcelia B | 2 BHK | 47 sq m (502 sq ft) | 3 |
| Arcelia B | 2 BHK | 46 sq m (496 sq ft) | 1 |
| Arcelia B | 2BHK | 48 sq m (514 sq ft) | 4 |
| Arcelia B | 2 BHK | 48 sq m (513 sq ft) | 6 |
Construction progress as reported to the portal
Arcelia B
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 95%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 50% - Work In Progress
- Water Supply: 100% - Complete
- Sewerage (Chamber, Lines, Septic Tank , STP): 90% - Recycling is yet to happen due to underutilization
- Storm Water Drains: 100% - Complete
- Landscaping & Tree Planting: 0% - Work In Progress
- Street Lighting: 0% - Work In Progress
- Community Buildings: 50% - Work In Progress
- Treatment And Disposal Of Sewage And Sullage Water: 90% - Work In Progress
- Solid Waste Management And Disposal: 0% - Work In Progress
- Water conservation /Rain water harvesting: 100% - Harvesting pits done for building B & C
- Fire protection and fire safety requirements: 100% - Complete
- Electrical meter room, sub-station, receiving station: 100% - Complete
- Gates and Compound Wall common for whole complex: 80% - Gates and part compound wall is balance
P52100003478 DNV ARCELIA PH 2 Completed
Confirmed with MahaRERA on 20 Sep 2026. Registered as "DNV ARCELIA PH 2".
- Promoter
- DNV REALTY
- Registered on
- 5 Aug 2017
- Proposed completion
- Dec 2018
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Survey No 76 4 1, Pimpri Chinchawad (M Corp.), Haveli, Pune, 412101
- Land area
- 2,680 sq m (28,848 sq ft)
- Sanctioned built-up area
- 4,984 sq m (53,647 sq ft)
- Buildings
- Arcelia A (12 floors); Arcelia D (15 floors)
- Parking
- Open Space 42, Closed/Covered 2
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Arcelia A | 2 BHK | 58 sq m (621 sq ft) | 1 |
| Arcelia A | 2 BHK | 56 sq m (604 sq ft) | 3 |
| Arcelia A | 2 BHK | 56 sq m (606 sq ft) | 1 |
| Arcelia A | 2 BHK | 57 sq m (613 sq ft) | 2 |
| Arcelia A | 2 BHK | 57 sq m (615 sq ft) | 3 |
| Arcelia A | 2 BHK | 57 sq m (616 sq ft) | 2 |
| Arcelia A | 2 BHK | 57 sq m (618 sq ft) | 2 |
| Arcelia A | 3 BHK | 71 sq m (764 sq ft) | 2 |
| Arcelia A | 3 BHK | 71 sq m (762 sq ft) | 1 |
| Arcelia A | 3 BHK | 71 sq m (761 sq ft) | 2 |
| Arcelia A | 3 BHK | 70 sq m (758 sq ft) | 2 |
| Arcelia A | 3 BHK | 70 sq m (757 sq ft) | 2 |
| Arcelia A | 2 BHK | 57 sq m (618 sq ft) | 1 |
| Arcelia A | 3 BHK | 70 sq m (756 sq ft) | 3 |
| Arcelia A | 3 BHK | 70 sq m (754 sq ft) | 2 |
| Arcelia A | 3 BHK | 69 sq m (748 sq ft) | 2 |
| Arcelia A | 3 BHK | 69 sq m (745 sq ft) | 3 |
| Arcelia A | 2 BHK | 58 sq m (623 sq ft) | 2 |
| Arcelia A | 2 BHK | 58 sq m (620 sq ft) | 1 |
| Arcelia A | 3 BHK | 70 sq m (758 sq ft) | 1 |
| Arcelia D | 2 BHK | 48 sq m (518 sq ft) | 6 |
| Arcelia D | 2 BHK | 46 sq m (498 sq ft) | 4 |
| Arcelia D | 2 BHK | 46 sq m (500 sq ft) | 6 |
| Arcelia D | 2 BHK | 47 sq m (502 sq ft) | 1 |
| Arcelia D | 2 BHK | 47 sq m (508 sq ft) | 4 |
| Arcelia D | 2 BHK | 48 sq m (516 sq ft) | 4 |
| Arcelia D | 2 BHK | 47 sq m (510 sq ft) | 4 |
| Arcelia D | 2 BHK | 48 sq m (513 sq ft) | 6 |
| Arcelia D | 2 BHK | 47 sq m (511 sq ft) | 7 |
| Arcelia D | 2 BHK | 48 sq m (512 sq ft) | 1 |
Construction progress as reported to the portal
Arcelia A
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 48%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 90%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
Arcelia D
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 55%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 90%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
Common areas and facilities
- Internal Roads & Footpaths: 30% - Work In Progress
- Water Supply: 50% - RCC WORK OF COMMON U G TANK
- Sewerage (Chamber, Lines, Septic Tank , STP): 60% - Work In Progress
- Storm Water Drains: 80% - Work In Progress
- Landscaping & Tree Planting: 0% - Work In Progress
- Street Lighting: 0% - Work In Progress
- Community Buildings: 50% - Work In Progress
- Treatment And Disposal Of Sewage And Sullage Water: 90% - Work In Progress
- Solid Waste Management And Disposal: 0% - Work In Progress
- Water conservation /Rain water harvesting: 40% - Work In Progress
- Fire protection and fire safety requirements: 40% - Work In Progress
- Electrical meter room, sub-station, receiving station: 50% - Transformer Done
- Gates and Compound Wall common for whole complex: 80% - Gates and part compound wall is balance
P52100013972 DNV ARCELIA PH 3 Completed
Confirmed with MahaRERA on 20 Sep 2026. Registered as "DNV ARCELIA PH 3".
- Promoter
- DNV REALTY
- Registered on
- 2 Nov 2017
- Proposed completion
- Dec 2018
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Survey No 76/4/1, Pimpri Chinchawad (M Corp.), Haveli, Pune, 412101
- Land area
- 670 sq m (7,212 sq ft)
- Sanctioned built-up area
- 1,036 sq m (11,148 sq ft)
- Buildings
- Arcelia C (7 floors)
- Parking
- Open Space 6, Closed/Covered 12
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Arcelia C | 1 BHK | 38 sq m (405 sq ft) | 20 |
Construction progress as reported to the portal
Arcelia C
- Excavation: 100%
- Basement (if any): 50%
- Podiums (if any): 0%
- Plinth: 50%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 76%
Common areas and facilities
- Internal Roads & Footpaths: 50% - Work In Progress
- Water Supply: 100% - Done
- Sewerage (Chamber, Lines, Septic Tank , STP): 90% - Recycling is yet to happen due tounderutilization
- Storm Water Drains: 100% - Connected to rain water harvesting pits
- Landscaping & Tree Planting: 0% - Work In Progress
- Street Lighting: 0% - Work In Progress
- Community Buildings: 50% - RCC work and masonry work done
- Treatment And Disposal Of Sewage And Sullage Water: 90% - STP Provided
- Solid Waste Management And Disposal: 0% - Work In Progress
- Water conservation /Rain water harvesting: 100% - Harvesting pits done for building C
- Fire protection and fire safety requirements: 100% - Done
- Electrical meter room, sub-station, receiving station: 100% - Transformer Done
- Aggregate area of recreational Open Space: 50% - D.G Set is provided
- Open Parking: 70% - Work In Progress
- Gates And Compound Wall Common for whole complex: 80% - Work In Progress
P52100020144 DNV ARCELIA PH 4 Abeyance 64% built
Confirmed with MahaRERA on 20 Sep 2026. Registered as "DNV ARCELIA PH 4".
MahaRERA says: This Project is kept in Abeyance, bank account of this project is frozen, and promoter is prohibited to execute agreement for sale/sale deed with buyers, till further compliances done by the promoter.
- Promoter
- DNV REALTY
- Registered on
- 29 Mar 2019
- Proposed completion
- Dec 2022
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- ravet, ravet, Pimpri Chinchawad (M Corp.), Haveli, Pune, 412101
- Land area
- 670 sq m (7,212 sq ft)
- Sanctioned built-up area
- 856 sq m (9,211 sq ft)
- Buildings
- Arcelia E (8 floors)
- Parking
- Open Space 3, Closed/Covered 12
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Arcelia E | Shop 1 | 26 sq m (276 sq ft) | 1 |
| Arcelia E | Shop 2 | 26 sq m (282 sq ft) | 1 |
| Arcelia E | 2 BHK | 47 sq m (503 sq ft) | 4 |
| Arcelia E | 2 BHK | 47 sq m (502 sq ft) | 1 |
| Arcelia E | 2 BHK | 46 sq m (500 sq ft) | 8 |
| Arcelia E | 2 BHK | 46 sq m (498 sq ft) | 2 |
Construction progress as reported to the portal
Arcelia E
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 90% - Work in progress
- Water Supply: 90% - Work in progress
- Sewerage (Chamber, Lines, Septic Tank , STP): 90% - Work in progress
- Storm Water Drains: 100% - Work in progress
- Landscaping & Tree Planting: 90% - Work in progress
- Street Lighting: 80% - Work in progress
- Community Buildings: 100% - Done
- Treatment And Disposal Of Sewage And Sullage Water: 90% - Work In Progress
- Solid Waste Management And Disposal: 0% - Yet to start
- Water conservation /Rain water harvesting: 90% - Work in progress
- Fire protection and fire safety requirements: 80% - Work In Progress
- Electrical meter room, sub-station, receiving station: 80% - Work In Progress
- Aggregate area of recreational Open Space: 100% - Done
- Open Parking: 0% - Yet to start
Reviews
Write a review
Be the first to write a review of DNV Arcelia and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of DNV Arcelia
Enter some positive aspects of DNV Arcelia
Cons:
Enter some negative aspects of DNV Arcelia
Enter some negative aspects of DNV Arcelia
Location
DNV Arcelia, Ravet, Pune - 412101 (Maharashtra)
Landmarks
Education
- Eurokids Pre-School Ravet 1 (<0.5km)
- Kidzee (<0.5km)
- City Pride School (<0.5km)
- Spiel Academy (<0.5km)
- Destiny Home Tutor (<1km)
- Door Step School (<1km)
- Masti Ki Paathshala Maske Vasti Ravet (<1km)
- Powermaths (<1km)
- Crystals the Preschool (<1km)
- Pimpri Chinchwad College of Engineering and Research, Ravet (<1km)
- Cuemath Center for Math Excellence (<1km)
- Planet Wisdom Preschool. (<1km)
- Dnyanjyoti Vidyamandir Uccha Prathamik School (<1km)
- Learning Ladder Pre-Primary School (<1km)
- Handwriting Classes (<1km)
- Anus Learning Institute (<1km)
- Play School (<1km)
- Home Tuition Services (<1km)
- Sapling Pre-School (<1km)
- Maples Beauty Salon & Academy (<1km)
- Caddesk & Itdesk (<2km)
Hospitals & Healthcare
- Arya Clinic (<0.5km)
- Dr. Mahesh Jadhav Clinic (<0.5km)
- Dr. Priyankas Vedacure Clinic (<1km)
- Medi Ascent Hospital-ER (<1km)
- Medi Ascent Hospital (<1km)
- Shushrut Clinic (<1km)
- Ratnaroop Clinic (<1km)
- Suman Clinic (<1km)
- Varad Hospital & Critical Care-ER (<1km)
- Varad Hospital & Critical Care (<1km)
- Punit Clinic (<1km)
- Aman Clinic (<1km)
- Arogyam Clinic (<1km)
- Dharmaraj Clinic (<1km)
- Muktai Clinic (<1km)
- DR. Jagtap Clinic (<1km)
- Anugrah Physiotherapy & Rehabilitation Clinic (<1km)
- Sarthak Maternity & Plastic Surgery Clinic (<1km)
- Dr Mundkar & Patils (<1km)
- Dr. Pallavi's Dental Clinic & Implant Center (<1km)
- Ameya Clinic Child Care And Vaccination Centre (<1km)
- Dr. Mundkars Cardio Diabetic & Thyroid Clinic. (<1km)
- Apollo Diagnostics Blood Test Sers (<1km)
- Leenas Physiotherapy Clinic (<1km)
- Dr Priya Makode Gynaecologist (<1km)
- Radiant Sonography Centre (<1km)
- Shir Samrath General Hospital (<2km)
- Shir Samrath General Hospital-ER (<2km)
Restaurants & Cafes
- Aditi's Cake Studio (<0.5km)
- Hotel Maratha Darbar (<1km)
- Le Stone (<1km)
- Crazy Momo (<1km)
- Valley of Cake (<1km)
- Good Food Restaurant (<1km)
- Vidya's Book Cafe (<1km)
- Hotel Samrat (<1km)
- Hotel Platinum Veg Non Veg Restaurant (<1km)
- Hotel Varsham (<1km)
- Ammas Kitchen (<1km)
- Rachanascake (<1km)
- Sairaj Chinese & Fast Food Center (<1km)
- Twelve21 Multi Cuisine Family Resto Bar (<1km)
- Delhi Delights (<1km)
- Koustube Ka Ghar (<1km)
- Bhau Special Chinese (<1km)
- Ufo Fries & Corn (<1km)
- Sairaj Restaurant and Chinese (<1km)
- Matruchhaya Restaurant (<1km)
- Hotel Urrus (<1km)
- Merak Cake Shop Govandi (<1km)
- Starters Spot (<1km)
- S. Kumar Wadewale (<1km)
- Delhi Bites (<1km)
- Kebab Thikana (<1km)
- Divine Foods (<1km)
- Swayampak Poly Bhaji Kendra (<1km)
- Pokket Cafe (<1km)
- Cafe Durga (<1km)
- Kelvin 77 (<1km)
- Twelve 21 (<1km)
- Kgn Xprs Ravet (<1km)
- Chicago Delight's Pizza & Grillz (<2km)
- Arshi's Cafe (<2km)
- Aditya Misal and Chinese (<2km)
- P K Burgers (<2km)
- Hotel Sadguru Bhojnalaya (<2km)
Shopping
- Dmart Ready (<1km)
- One Mall (<2km)
Religious Places
- Shri Tulaja Bhavani Mandir (<1km)
Banks & ATMs
- Axis Bank ATM (<1km)
- HDFC Bank (<1km)
- Axis Bank-Ravet (<1km)
Leisure and Outdoor
- Smash It Badminton Academy (<1km)
- Hopping Totz (<2km)
- GOLD'S GYM (<2km)
Transportation
- Marwale Nagar (<1km)
- Vitbhatti (Ravet) (<1km)
- Kiwale Phata (<1km)
- Project ID
- J627119267
- Updated
- Searches
- 886
- Views
- 653