Aerial View
Swimming Pool
Master Plan
 9

Aswani Miravet District - Ravet, Pune

Builder
Aswani Promoters and Builders
Construction
Under Construction
Completion
Dec, 2026
Properties
Apartments
RERA
P52100030203

Description

16 acres of open and green spaces

Aswani Miravet District is located in the heart of Ravet, Pune offers 2&3 BHK apartments ranging from 842-1013 sqft. The project is spread over 27 acres of land consists of 4 towers with 14 floors over 450 residential units. The spacious and luxurious 3 BHK flats are thoughtfully designed to ensure complete satisfaction and comfort with top-notch amenities.

Amenities
  • Shrub Bed
  • Cycle Track
  • Skating Rink
  • Swimming pool
  • Kids play Area
  • Sunken Seating
  • Jogging Track
  • Toddlers Play Area
  • Pergola with Seating
  • Multi-Purpose Play Court
  • kids pool
  • Gymnasium
  • Club House
  • Party Lawn
  • Yoga Pavilion
  • Indoor Sports
  • Terrace Sitouts
  • Acupressure Pathway
  • Open Amphitheatre
  • Performance Stage
  • Open Play Ground
  • Multiple Seating Area
Aswani Promoters and Builders It all began with a single project in 2004. That project was for Aswani Associates. Today, the company has completed numerous successful projects. They have served over 5,000 happy clients. This success comes from the consistent efforts of the founding members.

Highlights

  • Swimming pool
  • Kids play Area
  • Sunken Seating
  • Jogging Track
  • Toddlers Play Area
  • Pergola with Seating
  • Multi-Purpose Play Court
  • kids pool
  • Gymnasium
  • Club House
  • Party Lawn
  • Yoga Pavillion
  • Indoor Sports
  • Acupressure Pathway
  • Open Amphitheatre
  • Performance Stage
  • Open Play Ground
  • Multiple Seating Area

Configurations

Type Area Possession Price *
2BHK Apartment842 SqFeetWithin 3 Months₹ 66.67 lakhs
3BHK Apartment1,013 SqFeetWithin 3 Months₹ 87.63 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52100030203 MIravet District Phase - I Active 92% built

Confirmed with MahaRERA on 20 Sep 2026. Registered as "MIravet District Phase - I".

Promoter
AUM DEVELOPERS
Registered on
5 Aug 2021
Proposed completion
Dec 2026 (originally Dec 2025)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
45 Mtr BRT Road, Mhaske Wasti, Ravet, Ravet, Haveli, Pune, 412101
Land area
13,267 sq m (142,814 sq ft)
Sanctioned built-up area
46,379 sq m (499,240 sq ft)
Buildings
WING A (24 floors) - 16 of 154 available; Wing - C (18 floors) - 2 of 70 available; Wing - B (18 floors) - 2 of 70 available; Wing - D (18 floors) - 6 of 112 available
Parking
Open Space 0, Closed/Covered 1029
Complaints on the portal
3
BuildingUnit typeCarpet areaUnits
WING A3BHK 85 sq m (910 sq ft) 22
WING A3BHK 84 sq m (907 sq ft) 22
WING A3BHK 84 sq m (907 sq ft) 22
WING A3BHK 84 sq m (905 sq ft) 22
WING A3BHK 80 sq m (864 sq ft) 22
WING A3BHK 79 sq m (849 sq ft) 22
WING A3BHK 79 sq m (851 sq ft) 22
Wing - C2BHK 64 sq m (687 sq ft) 14
Wing - C2BHK 64 sq m (690 sq ft) 28
Wing - C2BHK 64 sq m (687 sq ft) 28
Wing - B2BHK 64 sq m (687 sq ft) 28
Wing - B2BHK 64 sq m (690 sq ft) 28
Wing - B2BHK 64 sq m (687 sq ft) 14
Wing - D2BHK 64 sq m (691 sq ft) 28
Wing - D2BHK 64 sq m (689 sq ft) 28
Wing - D2BHK 63 sq m (682 sq ft) 28
Wing - D2BHK 62 sq m (667 sq ft) 14
Wing - D2BHK 62 sq m (667 sq ft) 14
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 25 Jun 2025 - -
Q4 FY 2024-2025 25 Jun 2025 - -
Q1 FY 2025-2026 3 Sep 2025 - -
Q2 FY 2025-2026 28 Nov 2025 - -
Q3 FY 2025-2026 27 Jan 2026 - -
Q4 FY 2025-2026 20 Apr 2026 - -
Q1 FY 2026-2027 20 Jul 2026 - -
Construction progress as reported to the portal

WING A

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Wing - C

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Wing - B

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Wing - D

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - -
  • Water Supply: 100% - -
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - -
  • Storm Water Drains: 100% - -
  • Landscaping & Tree Planting: 0% - -
  • Street Lighting: 0% - -
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - -
  • Solid Waste Management And Disposal: 100% - -
  • Water conservation /Rain water harvesting: 100% - -
  • Energy managemcnt: 0% - -
  • Fire protection and fire safety requirements: 100% - -
  • Electrical meter room, sub-station, receiving station: 100% - -
  • Aggregate area of recreational Open Space: 0% - -
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Aswani Miravet District and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Aswani Miravet District
Cons:
Enter some negative aspects of Aswani Miravet District

Location

Aswani Miravet District, Ravet, Pune - 412101 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Ganesh Nagar Ravet (<1 km)
    • Hindustan Petroleum (<1 km)
    • Akurdi (~3 km)
    • Sant Tukaram Nagar (~12 km)
    • Pune International Airport (~27 km)
    • Navi Mumbai International Airport (~114 km)
  • Shopping & Dining

    • KFC (~1 km)
    • DMart (~2 km)
    • Reliance Smart Superstore (~2 km)
    • Parking1 (~3 km)
    • Pokket Cafe (~3 km)
    • Chinchwad Gaon Bhaji Mandai (~6 km)
  • Healthcare

    • Genericart Medicine Store (~1 km)
    • Flora Hospital (~2 km)
    • Global Hospital and Research Center (~2 km)
    • Aesthecity Clinic (~2 km)
    • 24 Bliss Mother and child care (~2 km)
    • Generic Aadhar (~3 km)
  • Education

    • S.B.Patil Public School (~1 km)
    • Pimpri Chinchwad College of Engineering and Research (~2 km)
    • Pimpri Chinchwad College Of Engineering (~2 km)
    • D. Y. Patil Dnyanshanti School (~2 km)
    • D. Y. Patil Educational Complex (~2 km)
    • Mahadyan Library (~3 km)
  • Leisure & Entertainment

    • Veer Savarkar Udyan (~2 km)
    • INOX (~7 km)
    • Maharashtra Cricket Association Stadium (~7 km)
    • Ganeshnagar Maidan (~7 km)
    • Japalouppe (~11 km)
    • Blue Ridge Golf Course (~13 km)
  • Services

    • HDFC Bank ATM (~2 km)
    • Indian Overseas Bank (~3 km)
    • Akurdi Police Chowky (~3 km)
    • Fire Station Pradhikaran (~3 km)
    • Maha e Sewa Kendra (~8 km)
    • DTDC (~12 km)
  • Religious Places

    • Iskon Temple (<1 km)
    • Ganesh Mandir (~1 km)
    • Datta Mandir (~2 km)
    • Mata Amritanandamayi Math माता अमृतानंदमयी मठ (~4 km)
    • church (~4 km)
    • vishweshwar mandir (~4 km)
  • Business & Hospitality

    • Bajaj Auto (~5 km)
    • Tata Motors (~6 km)
    • Vivanta Pune, Hinjawadi (~10 km)
    • Courtyard Marriott Hinjawadi (~10 km)
    • Rajiv Gandhi Infotech Park (~12 km)
    • Embassy Qubix IT Park (~13 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J326625119
Updated
Searches
696
Views
657