VTP Blue Waters - Mahalunge, Pune
- Builder
- VTP Realty
- Construction
- Partially Completed
- Completion
- Oct, 2026
- Properties
- Apartments
- RERA
- P52100007943, P52100009529, P52100020112, P52100020331, P52100026772
Description
Beautiful apartments with pleasant environment
VTP Blue Waters by VTP Realty is located in Mahalunge, one of the most promising location of Pune.The project carpet area is spread over 465 - 1445 sq.ft. comprising of 1, 2 and 3 bhk apartments in different sizes. The project is equipped with lot of below mentioned amenities.
Amenities :
- 24Hrs Water Supply
- Amphitheater
- Basket Ball Court
- CCTV Cameras
- Chess
- Club House
- Covered Car Parking
- Indoor Games
- Jogging Track
- Landscaped Garden
- Lift
- Party Area
- Play Area
- Seating Area
- Security Personnel
- Swimming Pool
VTP Realty is a leading player in Pune real estate industry. Everyone dreams to have their own home & they help many of them to make their dreams come true. They build each home painstakingly, with focus on Quality, Useful detailing & ensure Value for money. They desire to earn people's trust and confidence while they create whenever they launch their new product and services.
Highlights
- Power Back-up
- Visitor Parking
- Rain Water Harvesting
- Lifts
- High Speed Internet
- Security Guards
- Fire Alarm
- Electronic Security
- Intercom Facility
- Reserved Parking
- Independent Garage
- Servant Quarter
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
- Club / Community Center
- Park/Green Belt Facing
- Water Connection
- Electric Connection
- Close to Hospital
- Close to School
- Close to Shopping Center/Mall
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 1BHK Apartment | 465 SqFeet | Within 3 Months | ₹ 43 lakhs |
| 2BHK Apartment | 845 SqFeet | Within 3 Months | ₹ 59 lakhs |
| 3BHK Apartment | 1,445 SqFeet | Within 3 Months | ₹ 90 lakhs |
RERA
P52100007943 VTP Alpine Completed
Confirmed with MahaRERA on 22 Sep 2026. Registered as "VTP Alpine".
- Promoter
- NNP BUILDCON PVT. LTD
- Registered on
- 18 Aug 2017
- Proposed completion
- Jun 2023 (originally Jun 2022)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Mhalunge man road, mhalunge, Mahalunge, Mulshi, Pune, 411045
- Land area
- 1,066 sq m (11,478 sq ft)
- Sanctioned built-up area
- 19,892 sq m (214,127 sq ft)
- Buildings
- Kul Ecoloch - Phase 1 - Tower 1 - Society 1A (28 floors)
- Parking
- Open Space 83, Closed/Covered 278
- Complaints on the portal
- 2
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 3BHK | 87 sq m (939 sq ft) | 6 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 3BHK | 87 sq m (941 sq ft) | 1 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 2BHK | 58 sq m (621 sq ft) | 8 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 2BHK | 58 sq m (620 sq ft) | 7 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 2BHK | 58 sq m (619 sq ft) | 16 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 3BHK | 87 sq m (938 sq ft) | 2 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 3BHK | 87 sq m (931 sq ft) | 2 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 2BHK | 58 sq m (628 sq ft) | 6 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 2BHK | 58 sq m (620 sq ft) | 7 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 3BHK | 87 sq m (941 sq ft) | 11 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 2BHK | 58 sq m (626 sq ft) | 24 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 2BHK | 57 sq m (618 sq ft) | 28 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 2BHK | 58 sq m (628 sq ft) | 4 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 2BHK | 58 sq m (627 sq ft) | 12 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 2BHK | 58 sq m (626 sq ft) | 7 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 2BHK | 58 sq m (626 sq ft) | 13 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 3BHK | 87 sq m (933 sq ft) | 19 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 3BHK | 85 sq m (915 sq ft) | 13 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 3BHK | 85 sq m (915 sq ft) | 7 |
| Kul Ecoloch - Phase 1 - Tower 1 - Society 1A | 3BHK | 84 sq m (909 sq ft) | 21 |
Construction progress as reported to the portal
Kul Ecoloch - Phase 1 - Tower 1 - Society 1A
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 66%
- Sanitary Fittings within the flats / premises: 3%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 69%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 65%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 75%
Common areas and facilities
- Internal Roads & Footpaths: 90% - WIP-Township Ph 1 is ready hence work in progress
- Internal Roads & Footpaths: 0% - WORK IN PROGRESS
- Internal Roads & Footpaths: 90% - WIP-Township Ph 1 is ready hence work in progress
- Internal Roads & Footpaths: 90% - WIP-Township Ph 1 is ready hence work in progress
- Internal Roads & Footpaths: 25% - WORK IN PROGRESS
- Water Supply: 0% - WORK IN PROGRESS
- Water Supply: 100% - WTP and main artery lines are laid down
- Water Supply: 40% - WORK IN PROGRESS
- Water Supply: 100% - WTP and main artery lines are laid down
- Sewerage (Chamber, Lines, Septic Tank , STP): 0% - WORK IN PROGRESS
- Sewerage (Chamber, Lines, Septic Tank , STP): 60% - Sewerage line and septic tank ready
- Sewerage (Chamber, Lines, Septic Tank , STP): 70% - Sewarage line and septic tank ready
- Sewerage (Chamber, Lines, Septic Tank , STP): 95% - Sewarage line and septic tank ready
- Sewerage (Chamber, Lines, Septic Tank , STP): 70% - Sewarage line and septic tank ready
- Storm Water Drains: 0% - STP - WIP
- Storm Water Drains: 0% - WORK IN PROGRESS
- Storm Water Drains: 35% - WORK IN PROGRESS
- Storm Water Drains: 0% - STP - WIP
- Landscaping & Tree Planting: 0% - WORK YET TO BE STARTED
- Landscaping & Tree Planting: 80% - WIP
- Landscaping & Tree Planting: 80% - WIP
- Street Lighting: 0% - WIP
- Street Lighting: 0% - WIP
- Street Lighting: 0% - WORK YET TO BE STARTED
- Community Buildings: 65% - WIP
- Community Buildings: 10% - WORK IN PROGRESS
- Community Buildings: 65% - WIP
- Treatment And Disposal Of Sewage And Sullage Water: 70% - WIP
- Treatment And Disposal Of Sewage And Sullage Water: 60% - Work in progress
- Treatment And Disposal Of Sewage And Sullage Water: 15% - WORK IN PROGRESS
- Treatment And Disposal Of Sewage And Sullage Water: 70% - WIP
- Solid Waste Management And Disposal: 0% - WIP
- Solid Waste Management And Disposal: 15% - Work in progress
- Solid Waste Management And Disposal: 0% - WIP
- Solid Waste Management And Disposal: 15% - WORK IN PROGRESS
- Solid Waste Management And Disposal: 0% - WORK IN PROGRESS
- Water conservation /Rain water harvesting: 0% - WORK YET TO BE STARTED
- Water conservation /Rain water harvesting: 50% - WIP
- Water conservation /Rain water harvesting: 50% - WIP
- Energy managemcnt: 0% - As per agreement
- Energy managemcnt: 0% - WORK YET TO BE STARTED
- Energy managemcnt: 0% - As per agreement
- Fire protection and fire safety requirements: 0% - As perNOC
- Fire protection and fire safety requirements: 0% - As perNOC
- Fire protection and fire safety requirements: 0% - WORK IN PROGRESS
- Fire protection and fire safety requirements: 35% - WORK IN PROGRESS
- Electrical meter room, sub-station, receiving station: 0% - WORK IN PROGRESS
- Electrical meter room, sub-station, receiving station: 40% - WORK IN PROGRESS
- Electrical meter room, sub-station, receiving station: 75% - WIP
- Electrical meter room, sub-station, receiving station: 75% - WIP
- Aggregate area of recreational Open Space: 0% - WORK YET TO BE STARTED
- Aggregate area of recreational Open Space: 0% - WIP
- Aggregate area of recreational Open Space: 0% - WIP
- Open Parking: 0% - WORK YET TO BE STARTED
- Open Parking: 0% - As per agreement will be allotted
- Open Parking: 0% - As per agreement will be allotted
- Swimming Pool: 0% - WORK YET TO BE STARTED
- Lounge: 0% - WORK YET TO BE STARTED
- Multipurpose Court: 0% - WORK YET TO BE STARTED
- Sky Walk: 0% - WORK YET TO BE STARTED
P52100009529 VTP Leonara H building Completed
Confirmed with MahaRERA on 22 Sep 2026. Registered as "VTP Leonara H building".
- Promoter
- NNP BUILDCON PVT. LTD
- Registered on
- 22 Aug 2017
- Proposed completion
- May 2025 (originally Dec 2022)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Mhalunge Man road, Mhalunge, Mahalunge, Mulshi, Pune, 411045
- Land area
- 627 sq m (6,745 sq ft)
- Sanctioned built-up area
- 11,173 sq m (120,267 sq ft)
- Buildings
- Society 6 Tower 17 H Building (24 floors)
- Parking
- Open Space 0, Closed/Covered 40
- Complaints on the portal
- 27
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Society 6 Tower 17 H Building | 1BHK | 34 sq m (363 sq ft) | 44 |
| Society 6 Tower 17 H Building | 1BHK | 34 sq m (366 sq ft) | 22 |
| Society 6 Tower 17 H Building | 1BHK | 31 sq m (332 sq ft) | 44 |
| Society 6 Tower 17 H Building | 1BHK | 32 sq m (348 sq ft) | 44 |
| Society 6 Tower 17 H Building | 1BHK | 31 sq m (335 sq ft) | 22 |
| Society 6 Tower 17 H Building | 1BHK | 32 sq m (345 sq ft) | 88 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
| Q4 FY 2024-2025 | not filed - in default | - | - |
| Q1 FY 2025-2026 | not filed - in default | - | - |
Construction progress as reported to the portal
Society 6 Tower 17 H Building
Common areas and facilities
- Internal Roads & Footpaths: 80% - WORK IN PROGRESS
- Internal Roads & Footpaths: 80% - As per agreement
- Internal Roads & Footpaths: 0% - As per agreement
- Internal Roads & Footpaths: 0% - As per agreement
- Internal Roads & Footpaths: 80% - WORK IN PROGRESS
- Water Supply: 10% - Yet Not Stared
- Water Supply: 0% - As per agreement
- Water Supply: 10% - As per agreement
- Water Supply: 10% - Work Not Yet Stared
- Sewerage (Chamber, Lines, Septic Tank , STP): 0% - As per agreement
- Sewerage (Chamber, Lines, Septic Tank , STP): 35% - WORK IN PROGRESS
- Storm Water Drains: 0% - As per agreement
- Storm Water Drains: 0% - Yet Not Stared
- Storm Water Drains: 50% - Work Not Yet Stared
- Landscaping & Tree Planting: 0% - As per agreement
- Landscaping & Tree Planting: 0% - Work Not Yet Stared
- Landscaping & Tree Planting: 0% - Yet Not Stared
- Street Lighting: 0% - As per agreement
- Street Lighting: 0% - Work Not Yet Stared
- Street Lighting: 0% - Yet Not Stared
- Community Buildings: 0% - As per agreement
- Community Buildings: 0% - Work Not Yet Stared
- Community Buildings: 0% - Yet Not Stared
- Treatment And Disposal Of Sewage And Sullage Water: 0% - As per agreement
- Treatment And Disposal Of Sewage And Sullage Water: 5% - WORK IN PROGRESS
- Solid Waste Management And Disposal: 0% - As per agreement
- Solid Waste Management And Disposal: 0% - Work Not Yet Stared
- Solid Waste Management And Disposal: 0% - Yet Not Stared
- Water conservation /Rain water harvesting: 0% - WORK IN PROGRESS
- Water conservation /Rain water harvesting: 0% - As per agreement
- Energy managemcnt: 0% - As per agreement
- Energy managemcnt: 0% - Yet Not Stared
- Energy managemcnt: 0% - Work Not Yet Stared
- Fire protection and fire safety requirements: 10% - WORK IN PROGRESS
- Fire protection and fire safety requirements: 0% - As per NOC
- Electrical meter room, sub-station, receiving station: 10% - WORK IN PROGRESS
- Electrical meter room, sub-station, receiving station: 0% - As per agreement
- Aggregate area of recreational Open Space: 0% - Yet Not Stared
- Aggregate area of recreational Open Space: 0% - Work Not Yet Stared
- Aggregate area of recreational Open Space: 0% - As per agreement
- Open Parking: 0% - WILL BE ALLOTTED As per agreement
- Open Parking: 0% - Work Not Yet Stared
- Open Parking: 0% - Work Yet Not Stared
- Swimming Pool: 0% - Yet Not Stared
- Swimming Pool: 0% - Work Not Yet Stared
- Swimming Pool: 0% - As per agreement
P52100020112 VTP Leonara A and D Building Completed
Confirmed with MahaRERA on 22 Sep 2026. Registered as "VTP Leonara A and D Building".
- Promoter
- NNP BUILDCON PRIVATE LIMITED
- Registered on
- 28 Mar 2019
- Proposed completion
- Dec 2024
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Mhalunge Man road, Mhalunge, Mahalunge, Mulshi, Pune, 411045
- Land area
- 1,382 sq m (14,876 sq ft)
- Sanctioned built-up area
- 27,286 sq m (293,713 sq ft)
- Buildings
- A Building (26 floors); D building (26 floors)
- Parking
- Open Space 40, Closed/Covered 2
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| A Building | 3BHK | 83 sq m (898 sq ft) | 44 |
| A Building | 2BHK | 50 sq m (543 sq ft) | 88 |
| A Building | 2BHK | 56 sq m (604 sq ft) | 22 |
| A Building | 2BHK | 56 sq m (606 sq ft) | 22 |
| D building | 3BHK | 78 sq m (839 sq ft) | 44 |
| D building | 2BHK | 50 sq m (537 sq ft) | 88 |
| D building | 2BHK | 56 sq m (598 sq ft) | 44 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
Construction progress as reported to the portal
A Building
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
D building
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 100% - WORK IN PROGRESS
- Water Supply: 100% - WORK IN PROGRESS
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - WORK IN PROGRESS
- Storm Water Drains: 100% - WORK IN PROGRESS
- Landscaping & Tree Planting: 100% - YET TO START
- Street Lighting: 100% - WORK IN PROGRESS
- Community Buildings: 0% - YET TO START
- Treatment And Disposal Of Sewage And Sullage Water: 100% - WORK IN PROGRESS
- Solid Waste Management And Disposal: 100% - WORK IN PROGRESS
- Water conservation /Rain water harvesting: 100% - WORK IN PROGRESS
- Energy managemcnt: 100% - WORK IN PROGRESS
- Fire protection and fire safety requirements: 100% - WORK IN PROGRESS
- Electrical meter room, sub-station, receiving station: 100% - WORK IN PROGRESS
- Aggregate area of recreational Open Space: 0% - YET TO START
- Open Parking: 0% - YET TO START
P52100020331 VTPBelair A Building Completed
Confirmed with MahaRERA on 22 Sep 2026. Registered as "VTPBelair A Building".
- Promoter
- NNP BUILDCON PVT. LTD.
- Registered on
- 5 Apr 2019
- Proposed completion
- Dec 2024
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Mhalunge Mann Road, Mhalunge, Mahalunge, Mulshi, Pune, 411045
- Land area
- 528 sq m (5,687 sq ft)
- Sanctioned built-up area
- 11,152 sq m (120,039 sq ft)
- Buildings
- VTP Belair A Building (27 floors)
- Parking
- Open Space 25, Closed/Covered 1
- Complaints on the portal
- 5
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| VTP Belair A Building | 2BHK | 47 sq m (506 sq ft) | 184 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
Construction progress as reported to the portal
VTP Belair A Building
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 100% - COMPLETED
- Water Supply: 50% - WORK IN PROGRESS
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - WORK IN PROGRESS
- Storm Water Drains: 100% - Completed
- Landscaping & Tree Planting: 100% - WORK YET TO BE STARTED
- Street Lighting: 100% - WORK YET TO BE STARTED
- Community Buildings: 100% - WORK YET TO BE STARTED
- Treatment And Disposal Of Sewage And Sullage Water: 100% - WORK YET TO BE STARTED
- Solid Waste Management And Disposal: 100% - WORK YET TO BE STARTED
- Water conservation /Rain water harvesting: 100% - COMPLETED
- Energy managemcnt: 100% - COMPLETED
- Fire protection and fire safety requirements: 80% - WORK IN PROGRESS
- Electrical meter room, sub-station, receiving station: 100% - COMPLETED
- Aggregate area of recreational Open Space: 0% - WORK YET TO BE STARTED
- Open Parking: 0% - WORK YET TO BE STARTED
P52100026772 VTP Aethereus- Phase1 Active 100% built
Confirmed with MahaRERA on 16 Sep 2026. Registered as "VTP Aethereus- Phase1".
- Promoter
- HOME RISING CONSTRUCTION LLP
- Registered on
- 22 Oct 2020
- Proposed completion
- Oct 2026 (originally Dec 2025)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Mhalunge Mann Road, Mhalunge, Mahalunge, Mulshi, Pune, 411045
- Land area
- 1,951 sq m (20,997 sq ft)
- Sanctioned built-up area
- 55,203 sq m (594,220 sq ft)
- Buildings
- Tower-1 (34 floors); Tower-5 (35 floors); Tower-3 (35 floors)
- Parking
- Open Space 42, Closed/Covered 3
- Complaints on the portal
- 25
Construction progress as reported to the portal
Tower-1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Tower-5
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Tower-3
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 100% - WORK COMPLETED
- Water Supply: 100% - WORK COMPLETED
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - WORK COMPLETED
- Storm Water Drains: 100% - WORK COMPLETED
- Landscaping & Tree Planting: 100% - WORK COMPLETED
- Street Lighting: 100% - WORK COMPLETED
- Community Buildings: 100% - WORK COMPLETED
- Treatment And Disposal Of Sewage And Sullage Water: 100% - WORK COMPLETED
- Solid Waste Management And Disposal: 100% - WORK IN PROGRESS
- Water conservation /Rain water harvesting: 100% - WORK COMPLETED
- Fire protection and fire safety requirements: 100% - WORK COMPLETED
- Electrical meter room, sub-station, receiving station: 100% - WORK COMPLETED
- Aggregate area of recreational Open Space: 0% - YET TO START
- Open Parking: 0% - YET TO START
Reviews
Write a review
Be the first to write a review of VTP Blue Waters and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of VTP Blue Waters
Enter some positive aspects of VTP Blue Waters
Cons:
Enter some negative aspects of VTP Blue Waters
Enter some negative aspects of VTP Blue Waters
Location
VTP Blue Waters, Nande - Balewadi Road, Mahalunge, Pune - 411045 (Maharashtra)
Landmarks
Hotel
- Sunnys World-the Tiger
- Oyo Home 77983 Shantanu Villa (<1km)
- Oyo Home 49709 Leisure Stay (<1km)
- Shri Swami Service Apartments (<2km)
- Hotel Kohinoor (<2km)
- Fabexpress ABC Inn (<2km)
- Oyo Homes Hinjewadi Pune (<2km)
- Sargam Fresta-Hinjewadi (<3km)
- Radisson Blu Hotel (<3km)
- Regal Inn-Pimpri (<3km)
- Hotel Shivraj (<3km)
- Radisson Blu (<3km)
- Oyo 12042 Green Olives Apartments (<3km)
Recreation
- The Aquamarine Water Sports (<1km)
Restaurant & Shops
- Shopping Glory (<1km)
- Theforestrestopune (<1km)
- The Forest Resto (<2km)
- Archies (<2km)
- Vittal Rukhamai Market (<2km)
- Ridhhi Sidhhi General Stores (<3km)
- Sai Provision Stores (<3km)
- Hanuman Super Market (<3km)
- Bar Lounge (<3km)
- Ott Bar & Grill (<3km)
- Over the Top (<3km)
- Prashant General Store (<3km)
- Baba Super Market (<3km)
- Gurukrupa Super Shoppe (<3km)
- Purabji Supermarket (<3km)
- Ratan Traders (<3km)
- Laxmi Super Market (<3km)
- Lakshmi General Stores (<3km)
- Shri Krishna General Stores (<3km)
- Parihar Super Market (<3km)
- Shri Ramdev Sweets (<3km)
- Pooja Saree Center (<3km)
- Puja Sadi Center (<3km)
- Kiran Provision Stores (<3km)
- Balaji Super Market (<3km)
- Vaibhav Laxmi Collection (<3km)
- Suvarn Kirana Stoar (<3km)
- Chandan Traders (<3km)
- Dhanlaxmi Super Market (<3km)
- Sahil Collections (<3km)
- Tamanna Bag House & Footwear All Variety (<3km)
- Nageshiya Footwear (<3km)
- Mahadev General Stores (<3km)
- Bhakties Collection (<3km)
Hostel
- PKD Estates (<1km)
- Bhairav Pg (<2km)
- PG in Pune (<2km)
- Signature Pg (<2km)
- Signature Homes Pg (<3km)
- Mithila Girls Hostel Iit College (<3km)
- Symbiosis Infotech (<3km)
- Aarusha Hostel (<3km)
- Maratha Boys Hostel (<3km)
- Panchami Pg (<3km)
- Relax Pg (<3km)
- Mithila Hostel (<3km)
- Prestigepg (<3km)
- Akhil PG (<3km)
- Isquareit College Boyshostel (<3km)
Hospitals & Clinics
- Kaushal Dental Clinic (<2km)
- Ridgeway Dental Spa (<2km)
- Ayush Clinic (<3km)
- Chaitanya Clinic (<3km)
- Suryaprakash Clinic (<3km)
- Dr. Thaval Polyclinic (<3km)
- Siddharth Dental Clinic (<3km)
- Mahalunge Hospital-ER (<3km)
- Mahalunge Hospital (<3km)
- smart Tooth Dental Clinic (<3km)
- Krushna Hospital-ER (<3km)
- Krushna Hospital (<3km)
- Siddhi Clinic (<3km)
- Sanjeevan Clinic (<3km)
ATM/Bank/Exchange
- ICICI Bank (<2km)
- Axis Bank-Blueridge Hinjewadi (<2km)
- HDFC Bank (<2km)
- IDFC First Bank-Pune (<2km)
- Axis Bank (<2km)
- HDFC Bank Hinjewadi II Blue Ridge (<2km)
- State Bank of India Atm (<2km)
- State Bank of India (<3km)
- Citibank (<3km)
- Bank of Maharashtra-Mahalunge (<3km)
- Bank of Maharashtra (<3km)
- Shubham Nagari Sahakari Patsanstha Maryadit-Baner (<3km)
- Idbi Bank (<3km)
Accommodation
- Live Innovative (<2km)
- Kalpataru Hostel (<3km)
- Aarusha Homes Pg (<3km)
Department Store
- Glow Mart (<2km)
- Pramod Department Stores (<3km)
Landmark/Attraction
- Gangaji Sakhare Chowk (<2km)
Public Transport
- Mhalunge Gaon (<3km)
- Project ID
- J395791118
- Updated
- Searches
- 6097
- Views
- 1034