


Udaan Aria - Karjat, Raigad
- Builder
- Udaan Builders
- Construction
- Under Construction
- Completion
- Apr, 2028
- Properties
- Apartments
- RERA
- P52000008827
Description
Feels like Heaven
Udaan Aria, a heaven like residential project by Udaan Homes which offer 1 Rk & 1 bHK studio apartments ranging between 187-451 sq.ft. which is spread over the total area of 3.04 acre of land. It is a project that every family deserve for the peace, happiness and bliss that every home bestows for its world class facilities along with modern amenities, luxury and lifestyle with affordable cost.Amenities
- Swimming Pool
- Gymnasium
- Club House
- Royal entrance gate with security cabin
- Society office
- Children’s play area
- Landscaped garden
- Power backup for lifts and general fittings
- 24×7 security system
- CCTV provision
- Intercom facility
UDAAN Builders, initiated in the year 2013 and since then we have been carving a smooth path between the clients and their dream homes. We have set benchmarks in the domain of real estate with our team of expert professionals. We are well recognized for our transparent deals in selling and development of residential, commercial and industrial property.
Highlights
- Power Back-up
- Visitor Parking
- Maintenance Staff
- Water Supply / Storage
- Boring / Tube-well
- Rain Water Harvesting
- Waste Disposal
- Centrally Air Conditioned
- Lifts
- High Speed Internet
- Wi-Fi
- RO System
- Balcony
- Reserved Parking
- Security Guards
- Electronic Security
- Intercom Facility
- Park Facing
- Woodwork
- Modular Kitchen
- Feng Shui / Vaastu Compliant
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
- Feng Shui / Vaastu Compliant
- Club / Community Center
- Park/Green Belt Facing
- Lifts
- 100% loan scheme Free Stampduty
- Ashane Water falls Matheran nearby
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 1BHK Apartment | 187 SqFeet | Within 2 Years | ₹ 7.03 lakhs |
| 1BHK Apartment | 227 SqFeet | Within 2 Years | ₹ 8.56 lakhs |
RERA
P52000008827 UDAAN ARIA Active 63% built
Confirmed with MahaRERA on 21 Sep 2026. Registered as "UDAAN ARIA".
- Promoter
- Udaan Builders and Developers
- Registered on
- 19 Aug 2017
- Proposed completion
- Apr 2028 (originally Jul 2022)
- Project type
- Others
- Planning authority
- Others
- Address as filed
- Chinchavali Fatak, Near Bhivpuri Railway Station, Chinchawali, Karjat, Raigarh, 410201
- Land area
- 12,310 sq m (132,508 sq ft)
- Sanctioned built-up area
- 7,367 sq m (79,296 sq ft)
- Buildings
- A TYPE 01 (8 floors); C TYPE 02 Wing A (8 floors); C TYPE 02 Wing B (8 floors); D TYPE 3 (8 floors); B TYPE 04 (8 floors); TEMPLE (1 floors); CLUB HOUSE (1 floors)
- Parking
- Open Space 70, Closed/Covered 6
- Complaints on the portal
- 12
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| A TYPE 01 | 1BHK | 25 sq m (270 sq ft) | 60 |
| A TYPE 01 | 1BHK | 25 sq m (270 sq ft) | 4 |
| A TYPE 01 | 1RK | 19 sq m (202 sq ft) | 8 |
| C TYPE 02 Wing A | 1RK | 17 sq m (187 sq ft) | 46 |
| C TYPE 02 Wing A | 1RK | 18 sq m (193 sq ft) | 5 |
| C TYPE 02 Wing A | 1BHK | 21 sq m (230 sq ft) | 1 |
| C TYPE 02 Wing A | 1BHK | 21 sq m (221 sq ft) | 2 |
| C TYPE 02 Wing B | 1BHK | 25 sq m (270 sq ft) | 4 |
| C TYPE 02 Wing B | 1BHK | 24 sq m (263 sq ft) | 56 |
| D TYPE 3 | 1RK | 17 sq m (187 sq ft) | 108 |
| B TYPE 04 | 1RK | 19 sq m (202 sq ft) | 4 |
| B TYPE 04 | 1BHK | 25 sq m (271 sq ft) | 6 |
| B TYPE 04 | Shop | 20 sq m (215 sq ft) | 4 |
| B TYPE 04 | Shop | 17 sq m (183 sq ft) | 2 |
| B TYPE 04 | 1BHK | 25 sq m (270 sq ft) | 50 |
| TEMPLE | Temple | 40 sq m (431 sq ft) | 0 |
| CLUB HOUSE | CLUB HOUSE | 84 sq m (904 sq ft) | 0 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
| Q4 FY 2024-2025 | not filed - in default | - | - |
| Q1 FY 2025-2026 | not filed - in default | - | - |
| Q2 FY 2025-2026 | not filed - in default | - | - |
| Q3 FY 2025-2026 | not filed - in default | - | - |
| Q4 FY 2025-2026 | not filed - in default | - | - |
| Q1 FY 2026-2027 | not filed - in default | - | - |
Construction progress as reported to the portal
A TYPE 01
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 85%
- Sanitary Fittings within the flats / premises: 85%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 60%
C TYPE 02 Wing A
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 65%
- Sanitary Fittings within the flats / premises: 55%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 90%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
C TYPE 02 Wing B
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 90%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 20%
D TYPE 3
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 75%
- Sanitary Fittings within the flats / premises: 45%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 60%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
B TYPE 04
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 40%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 30%
- Sanitary Fittings within the flats / premises: 50%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
TEMPLE
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
CLUB HOUSE
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 90%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 90%
Common areas and facilities
- Internal Roads & Footpaths: 90% - NA
- Water Supply: 90% - NA
- Sewerage (Chamber, Lines, Septic Tank , STP): 90% - NA
- Storm Water Drains: 90% - NA
- Landscaping & Tree Planting: 90% - NA
- Street Lighting: 90% - NA
- Fire protection and fire safety requirements: 0% - NA
- Electrical meter room, sub-station, receiving station: 65% - NA
- Aggregate area of recreational Open Space: 0% - NA
- Open Parking: 0% - NA
- Club House and Swimming Pool: 100% - NA
Reviews
Write a review
Be the first to write a review of Udaan Aria and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Udaan Aria
Enter some positive aspects of Udaan Aria
Cons:
Enter some negative aspects of Udaan Aria
Enter some negative aspects of Udaan Aria
Location
Udaan Aria,Chinchavali,Near Bhivpuri Railway Station, Karjat, Raigad - 410201 (Maharashtra)
Landmarks
Transportation
- Market Yard Ground (<10km)
Hospitals & Healthcare
- Shree Dental Clinic (G.S Jaggam) (<10km)
- SHREE CLINIC [Dr.Jangam] (<10km)
- Shree Dental & Oral Surgery Clinic (<10km)
Religious Places
- Holy Cross Church (<9km)
- Our Lady Of Fatima Church Karjat (<10km)
Recreation
- Mahesh theater Nikita diagnostic center (<1km)
- Mahesh Cinema Hall (<8km)
- MAHESH THEATER NIKITA LAB (<8km)
- Raj Nova Cinemas (<10km)
- Big Cinema (<10km)
- The Blue Lounge (<13km)
Hotels & Guest Houses
- Hotel Panorama - Hotel in Matheran (<9km)
- Matheran Bungalow (<9km)
- Hotel Girivihar (<2km)
- Amber Farms (<8km)
- Usha Ascot (<9km)
- Sayeban Hotel (<9km)
- Riviera Hotel (<9km)
- MTDC Resort Matheran (<8km)
- Pinewood Resort Karjat (<8km)
- Saguna Baug Agro Tourism Resort (<10km)
- DIVADKAR HOTEL (<9km)
- Blanco Vista (<2km)
- Rivergate Resort (<7km)
- TY Roshan Palace (<9km)
- Sesenta Vista (<10km)
- Liberty Farmhouse (<9km)
- Misty Matheran Resorts (<9km)
- Gujarat Bhavan Hotel Matheran (<9km)
- Cecil Hotel (<9km)
- Karjat Heritage Resort (<11km)
Restaurants & Clubs
- Monginis Cake Shop (<8km)
- Global Bakery And Cake Shop (<10km)
- Monginis Cake Shop (<10km)
- Celebration & More (<1km)
- Meher bakery (<6km)
- Meher Bakery Yusuf Khan (<7km)
- DELIGHT CAKE AND BAKE (<8km)
- Ayyangar Bekari (<8km)
- New Bangalore Iyanger
- CAKEZY CAKE SHOP (<9km)
- Monginis Cake Shop (<9km)
- Ladivali Bakery (<9km)
- Monginis cake (<9km)
- Dilawar bakery (<9km)
- K. G. N. Bakery Cake Shop (<9km)
- Meher Bakery (<10km)
- New Poona Bakery (<10km)
- Balaji Bakery (<10km)
Education
- India First Foundation School (<5km)
- Marathi School (<1km)
- Zilla Parishad School Eksal Sagaon (<2km)
- Haji Liyakat English High School & Junior College (<6km)
- Jeny
- Matheran Valley Institute of Excellence (<8km)
- Kes English Medium School (<10km)
- Good Shepherd Convent School Karjat (<11km)
- Zilla Parishad School Jambhiwali (<11km)
- Navjeevan Education Society (<12km)
- Calvary Baptist Bible College & Seminary (<13km)
- B.R.VIDYALAYA (<0.5km)
- Hon.Bhausaheb Raut Vidyalay (<0.5km)
- Hon. Bhausaheb High School (<0.5km)
- Bhausaheb Raut Vidyalay. (<0.5km)
- Daffodils English Medium School (<1km)
- sanket classes Diksal (<1km)
- Sharda english School (<1km)
- Shree Ram Fitness (<2km)
- Z. P. School (<2km)
Banks & ATMs
- Bank Of India ATM (<7km)
- HDFC Bank ATM (<8km)
- Axis Bank ATM (<8km)
- Union Bank of India ATM (<8km)
- Bank of Baroda ATM (<8km)
- Bank of Baroda ATM (<9km)
- Axis Bank ATM (<9km)
- Kotak Mahindra Bank ATM (<9km)
- ICICI Bank ATM (<10km)
- State Bank of India ATM (<10km)
- Bank Of Baroda ATM (<10km)
- Vijaya Bank ATM (<10km)
- BOI ATM (<10km)
- Bank Of India ATM (<11km)
- Bank of Baroda ATM (<14km)
- Karnala Bank ATM (<8km)
- Bank of India ATM (<8km)
- Project ID
- J289972311
- Updated
- Searches
- 5868
- Views
- 1296




