Front View
Elevation
Front View
 9

Today Oxy Fresh Homes - Kharghar, Navi Mumbai

Builder
Today Global Builders & Developers
Construction
Partially Completed
Completion
Oct, 2026
Properties
Apartments
RERA
P52000020292, P52000021559

Description

opportunity to experience a serene country life

Today Oxy Fresh Homes at Upper Kharghar offers 1, 2 & 3 BHK Luxury Homes, Residential projects towers will be 11 stories each. The size of apartments may ranges from 432 to 864 sqft with various amenities provided for the residents. The project offers competitively priced apartments to those looking for a stylish and classy lifestyle in Kharghar, Navi Mumbai gives high on connectivity and convenience as well.

Amenities :
  • Amphitheatre
  • Children's play area
  • Gymnasium
  • Swimming Pool
  • Mini Theatre
  • Jogging Track
  • Indoor Games
Global Group ,established in 2004 has become a name to be reckoned with as one of the leading developers in Navi Mumbai. At Today Global Group, we are proud of the reputation we have built. It is our commitment to the highest levels of customer service, practicing due diligence and transparency that has seen us grow in short span of 10 years.

Highlights

  • Power Back-up
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Lifts
  • High Speed Internet
  • Security Guards
  • Intercom Facility
  • Balcony
  • Reserved Parking
  • Swimming Pool
  • Park
  • Fitness Centre / GYM

Configurations

Type Area Possession Price *
1BHK Apartment432 SqFeetWithin 3 Months₹ 49 lakhs
1BHK Apartment650 SqFeetWithin 3 Months₹ 64.35 lakhs
2BHK Apartment665 SqFeetWithin 3 Months₹ 79 lakhs
2BHK Apartment1,020 SqFeetWithin 3 Months₹ 95 lakhs
3BHK Apartment950 SqFeetWithin 3 Months₹ 99 lakhs
3BHK Apartment1,480 SqFeetWithin 3 Months₹ 1.35 crore
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52000020292 ANANDAM - PHASE I Completed

Confirmed with MahaRERA on 22 Sep 2026. Registered as "ANANDAM - PHASE I".

Promoter
TODAY GLOBAL HOMES
Registered on
2 Apr 2019
Proposed completion
Dec 2024
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
ROHINJAN, ROHINJAN, Rohinjan, Panvel, Raigarh, 410210
Land area
10,216 sq m (109,963 sq ft)
Sanctioned built-up area
20,170 sq m (217,115 sq ft)
Buildings
BUILDING NO - 1 (14 floors); BUILDING NO - 2 (14 floors); BUILDING NO - 3 (17 floors)
Parking
Open Space 0, Closed/Covered 2
Complaints on the portal
4
BuildingUnit typeCarpet areaUnits
BUILDING NO - 12BHK 50 sq m (540 sq ft) 4
BUILDING NO - 12BHK 47 sq m (509 sq ft) 44
BUILDING NO - 11BHK 36 sq m (390 sq ft) 2
BUILDING NO - 11BHK 32 sq m (340 sq ft) 22
BUILDING NO - 11BHK 37 sq m (394 sq ft) 3
BUILDING NO - 11BHK 34 sq m (361 sq ft) 20
BUILDING NO - 22BHK 50 sq m (540 sq ft) 4
BUILDING NO - 22BHK 47 sq m (509 sq ft) 44
BUILDING NO - 21BHK 36 sq m (390 sq ft) 2
BUILDING NO - 21BHK 34 sq m (361 sq ft) 20
BUILDING NO - 21BHK 32 sq m (340 sq ft) 22
BUILDING NO - 21BHK 37 sq m (394 sq ft) 3
BUILDING NO - 31BHK 36 sq m (390 sq ft) 8
BUILDING NO - 32BHK 47 sq m (509 sq ft) 48
BUILDING NO - 32BHK 50 sq m (540 sq ft) 16
BUILDING NO - 31BHK 37 sq m (394 sq ft) 7
BUILDING NO - 31BHK 34 sq m (361 sq ft) 26
BUILDING NO - 31BHK 32 sq m (340 sq ft) 13
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Construction progress as reported to the portal

BUILDING NO - 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING NO - 2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING NO - 3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 70%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - WILL BE PROVIDED AS PER APPROVED PLAN
  • Water Supply: 0% - WILL BE PROVIDED AS PER GOVT NORMS
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - WILL BE PROVIDED AS PER GOVT NORMS
  • Storm Water Drains: 0% - WILL BE PROVIDED AS PER GOVT NORMS
  • Landscaping & Tree Planting: 0% - TREE PLANTING ONLY
  • Community Buildings: 0% - WILL BE PROVIDED AS PER APPROVED PLAN
  • Water conservation /Rain water harvesting: 0% - WILL BE PROVIDED AS PER GOVT NORMS
  • Fire protection and fire safety requirements: 0% - WILL BE PROVIDED AS PER GOVT NORMS
  • Electrical meter room, sub-station, receiving station: 0% - METER ROOM ONLY
  • Aggregate area of recreational Open Space: 0% - WILL BE PROVIDED AS PER APPROVED PLAN

P52000021559 ANANDAM PHASE - II Active 88% built

Confirmed with MahaRERA on 22 Sep 2026. Registered as "ANANDAM PHASE - II".

Promoter
TODAY GLOBAL HOMES
Registered on
8 Jul 2019
Proposed completion
Oct 2026 (originally Dec 2024)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
ROHINJAN, PANVEL, Rohinjan, Panvel, Raigarh, 410206
Land area
11,624 sq m (125,128 sq ft)
Sanctioned built-up area
52,581 sq m (565,992 sq ft)
Buildings
BUILDING NO - 4 (28 floors) - 38 of 182 available; BUILDING NO - 5A (31 floors) - 53 of 130 available; BUILDING NO - 5 B (31 floors) - 80 of 213 available; BUILDING NO - 5C (31 floors) - 44 of 130 available
Parking
Open Space 0, Closed/Covered 600
Complaints on the portal
34
BuildingUnit typeCarpet areaUnits
BUILDING NO - 42BHK 59 sq m (637 sq ft) 46
BUILDING NO - 41BHK 35 sq m (373 sq ft) 35
BUILDING NO - 41BHK 34 sq m (368 sq ft) 27
BUILDING NO - 42BHK 57 sq m (614 sq ft) 39
BUILDING NO - 5AShop 35 sq m (378 sq ft) 1
BUILDING NO - 5AOffice space 29 sq m (314 sq ft) 2
BUILDING NO - 5AShop 26 sq m (280 sq ft) 1
BUILDING NO - 5AOffice space 22 sq m (232 sq ft) 2
BUILDING NO - 5A3BHK 76 sq m (823 sq ft) 44
BUILDING NO - 5A1BHK 36 sq m (390 sq ft) 4
BUILDING NO - 5A1BHK 35 sq m (379 sq ft) 4
BUILDING NO - 5AShop 38 sq m (407 sq ft) 2
BUILDING NO - 5AShop 36 sq m (384 sq ft) 3
BUILDING NO - 5AShop 35 sq m (374 sq ft) 1
BUILDING NO - 5AOffice space 32 sq m (345 sq ft) 2
BUILDING NO - 5AOffice space 30 sq m (325 sq ft) 4
BUILDING NO - 5AOffice space 29 sq m (316 sq ft) 1
BUILDING NO - 5AOffice space 29 sq m (315 sq ft) 1
BUILDING NO - 5 BShop 26 sq m (275 sq ft) 2
BUILDING NO - 5 BOffice space 24 sq m (263 sq ft) 1
BUILDING NO - 5 BOffice space 24 sq m (256 sq ft) 1
BUILDING NO - 5 BShop 26 sq m (279 sq ft) 2
BUILDING NO - 5 B2BHK 54 sq m (584 sq ft) 64
BUILDING NO - 5 B2BHK 54 sq m (582 sq ft) 59
BUILDING NO - 5 BShop 38 sq m (406 sq ft) 1
BUILDING NO - 5 BShop 35 sq m (380 sq ft) 3
BUILDING NO - 5 BShop 35 sq m (379 sq ft) 1
BUILDING NO - 5 BOffice space 21 sq m (228 sq ft) 2
BUILDING NO - 5 BOffice space 22 sq m (237 sq ft) 2
BUILDING NO - 5 BShop 33 sq m (356 sq ft) 2
BUILDING NO - 5 BOffice space 32 sq m (343 sq ft) 2
BUILDING NO - 5 BOffice space 30 sq m (319 sq ft) 4
BUILDING NO - 5 BShop 29 sq m (309 sq ft) 1
BUILDING NO - 5 BShop 28 sq m (302 sq ft) 1
BUILDING NO - 5 BOffice space 27 sq m (296 sq ft) 2
BUILDING NO - 5CShop 26 sq m (280 sq ft) 1
BUILDING NO - 5C3BHK 76 sq m (823 sq ft) 20
BUILDING NO - 5CShop 38 sq m (407 sq ft) 1
BUILDING NO - 5C1BHK 36 sq m (390 sq ft) 7
BUILDING NO - 5CShop 36 sq m (384 sq ft) 3
BUILDING NO - 5C1BHK 35 sq m (379 sq ft) 7
BUILDING NO - 5CShop 35 sq m (378 sq ft) 1
BUILDING NO - 5COffice space 32 sq m (345 sq ft) 1
BUILDING NO - 5COffice space 30 sq m (325 sq ft) 2
BUILDING NO - 5COffice space 29 sq m (314 sq ft) 1
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 not filed - in default - -
Q1 FY 2025-2026 12 Sep 2025 - -
Q2 FY 2025-2026 27 Dec 2025 - -
Q3 FY 2025-2026 31 Jan 2026 - -
Q4 FY 2025-2026 1 Jun 2026 - -
Q1 FY 2026-2027 21 Sep 2026 - -
Construction progress as reported to the portal

BUILDING NO - 4

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING NO - 5A

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 95%
  • Sanitary Fittings within the flats / premises: 50%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 80%

BUILDING NO - 5 B

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 95%
  • Sanitary Fittings within the flats / premises: 60%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 80%

BUILDING NO - 5C

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 80%
  • Sanitary Fittings within the flats / premises: 55%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 80%

Common areas and facilities

  • Internal Roads & Footpaths: 95% - WILL BE PROVIDED AS PER APPROVED PLAN
  • Water Supply: 0% - WILL BE PROVIDED AS PER GOVT NORMS
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - WILL BE PROVIDED AS PER APPROVED PLAN
  • Storm Water Drains: 100% - WILL BE PROVIDED AS PER APPROVED PLAN
  • Landscaping & Tree Planting: 75% - TREE PLANTING ONLY
  • Community Buildings: 0% - WILL BE PROVIDED AS PER APPROVED PLAN
  • Water conservation /Rain water harvesting: 100% - WILL BE PROVIDED AS PER GOVT NORMS
  • Fire protection and fire safety requirements: 10% - WILL BE PROVIDED AS PER GOVT NORMS
  • Electrical meter room, sub-station, receiving station: 0% - ELECTRICAL METER ROOM ONLY
  • Aggregate area of recreational Open Space: 0% - WILL BE PROVIDED AS PER APPROVED PLAN
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Today Oxy Fresh Homes and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Today Oxy Fresh Homes
Cons:
Enter some negative aspects of Today Oxy Fresh Homes

Location

Today Oxy Fresh Homes, Kharghar, Navi Mumbai - 410210 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Reliance Petrol Pump (<1 km)
    • Taloje Panchanand (~2 km)
    • Sector-34 (~3 km)
    • Belapur Bus Depot (~12 km)
    • Navi Mumbai International Airport (~15 km)
    • Chhatrapati Shivaji Maharaj International Airport (~31 km)
  • Shopping & Dining

    • Gazebo Dhaba (<1 km)
    • The Coffee Bistro (~3 km)
    • Kitchen Wold (~9 km)
    • Little World Mall (~9 km)
    • Glomax Mall (~9 km)
    • APMC Fruit & Vegetable Market (~10 km)
  • Healthcare

    • Advanced Key Physiotherapy (~3 km)
    • Jeevandeep Hospital (~3 km)
    • Bharat Medical (~3 km)
    • Apex Multispeciality Hospital (~3 km)
    • Taloja Multispeciality Hospital (~3 km)
    • Advanced Centre for Treatment, Research and Education in Cancer (~4 km)
  • Education

    • Empyrean School (~3 km)
    • Ramsheth Thakur Public School (~6 km)
    • Dhirubhai Ambani Knowledge City (~10 km)
    • S.I.E.S College (~11 km)
    • Cht.Sahu Maharaj Vachnalaya (~12 km)
    • T.S. Chanakya Maritime University (~15 km)
  • Leisure & Entertainment

    • Central Park (~5 km)
    • Kharghar Valley Golf Course (~6 km)
    • Maxus Cinema Hall (~7 km)
    • Dr. DY Patil Sports Stadium (~10 km)
    • Dr. DY Patil Sports Complex (~11 km)
    • Butterfly Park (~11 km)
  • Services

    • Axis Bank (~3 km)
    • Bank of Baroda (~3 km)
    • Panvel Muni Corp. Ward A Office (Kharghar Gram Panchayat) (~7 km)
    • Tawa Delight (~8 km)
    • Kharghar Post Office (~9 km)
    • chaitra cafe (~9 km)
  • Religious Places

    • Ganesh Temple (~3 km)
  • Business & Hospitality

    • Aditya Birla Science and Technology Company (~6 km)
    • Maharashtra Industrial Development Centre - MIDC Taloja (~8 km)
    • Navi Mumbai Marriott Hotel (~9 km)
    • Millennium Business Park, Mahape Village (~9 km)
    • Courtyard by Marriott Navi Mumbai (~10 km)
    • Reliance Corporate Park (~11 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J697118981
Updated
Searches
7337
Views
1431