


Sound Delight - Panvel, Navi Mumbai
- Builder
- Sound lines Realty
- Construction
- Under Construction
- Completion
- Dec, 2030
- Properties
- Apartments
- RERA
- P51900002485
Description
an eco-friendly haven
Sound Delight is located at Ashte, Panvel, Navi Mumbai. This project offers 1, 1.5 & 2.5 Bhk apartments with different size range between 485 sqft. - 722 sq. ft. There are 12 building and it has 171 unit with 4 floors which is spread over 4 acres of land with lots of below-mentioned amenities.
Amenities:
- High-speed elevators
- Kid's play area
- Power Backup
- Swimming Pool
- Gymnasium
- Indoor Games
- Landscaped garden
- Concealed Plumbing
- Vitrified flooring
- Concealed Wiring
- Imported Sanitary Fittings
- POP finished walls
- Aluminum Sliding Windows
- Intercom
- CCTV security
- Granite Platform
Sound lines Realty is a company that is focused on bringing world-class realty development to India, upgrading lifestyle and amenities that discerning customers across the world have come to accept as a Standard. To deliver a world-class level of quality construction services at fair and market-competitive prices that project our responsibility towards our customers and our vision.
Highlights
- Power Back-up
- Lifts
- Security Guards
- Intercom Facility
- Swimming Pool
- Fitness Centre / GYM
- Club / Community Center
- ATM
- Club / Community Center
- Adjacent to Main Road
- Park/Green Belt Facing
- Water Connection
- Electric Connection
- Close to Hospital
- Close to School
- Close to Shopping Center/Mall
- Imported Sanitary Fittings
- Aluminium Sliding Windows
- High-speed elevators
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 1BHK Apartment | 458 SqFeet | Within 4 Years | ₹ 34 lakhs |
| 2BHK Apartment | 722 SqFeet | Within 4 Years | ₹ 54 lakhs |
RERA
P51900002485 SOUND DELIGHT Active 52% built
Confirmed with MahaRERA on 18 Sep 2026. Registered as "SOUND DELIGHT".
- Promoter
- SOUNDLINES ECOHOMES
- Registered on
- 1 Aug 2017
- Proposed completion
- Dec 2030 (originally Sep 2020)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- GUT NO 32, Ashte, Panvel, Raigarh, 410206
- Land area
- 15,930 sq m (171,475 sq ft)
- Sanctioned built-up area
- 15,605 sq m (167,976 sq ft)
- Buildings
- A WING (8 floors); B WING (7 floors); C WING (7 floors); D WING (4 floors); E WING (12 floors); F WING; G WING (14 floors); H WING (13 floors); I WING (12 floors); J WING (6 floors); K WING (10 floors); L WING; BUNGLOWS
- Parking
- Open Space 35, Closed/Covered 409
- Complaints on the portal
- 5
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| A WING | 2.5 BHK | 68 sq m (734 sq ft) | 2 |
| A WING | 2.5 BHK | 74 sq m (792 sq ft) | 2 |
| A WING | 2.5 BHK | 74 sq m (796 sq ft) | 6 |
| A WING | 2.5 BHK | 68 sq m (737 sq ft) | 6 |
| B WING | 2.5 | 68 sq m (737 sq ft) | 6 |
| B WING | 1.5 | 52 sq m (555 sq ft) | 4 |
| B WING | 2.5 | 74 sq m (796 sq ft) | 6 |
| C WING | 1.5 | 52 sq m (555 sq ft) | 4 |
| C WING | 2.5 | 68 sq m (734 sq ft) | 2 |
| C WING | 2.5 | 74 sq m (792 sq ft) | 2 |
| C WING | 2.5 | 74 sq m (796 sq ft) | 4 |
| C WING | 2.5 | 71 sq m (766 sq ft) | 4 |
| C WING | 2.5 | 68 sq m (737 sq ft) | 8 |
| D WING | 2.5 | 68 sq m (736 sq ft) | 2 |
| D WING | 2.5 | 74 sq m (795 sq ft) | 2 |
| D WING | 2.5 | 74 sq m (796 sq ft) | 10 |
| D WING | 2.5 | 68 sq m (737 sq ft) | 10 |
| E WING | 1BHK | 43 sq m (461 sq ft) | 8 |
| E WING | 1BHK | 44 sq m (472 sq ft) | 8 |
| F WING | 2.5 | 68 sq m (737 sq ft) | 2 |
| F WING | duplex | 125 sq m (1,340 sq ft) | 6 |
| F WING | 2.5 | 74 sq m (796 sq ft) | 2 |
| G WING | 1BHK | 45 sq m (480 sq ft) | 12 |
| G WING | 1BHK | 45 sq m (482 sq ft) | 6 |
| H WING | 1BHK | 45 sq m (480 sq ft) | 12 |
| H WING | 1BHK | 45 sq m (482 sq ft) | 6 |
| I WING | 2.5 | 63 sq m (680 sq ft) | 2 |
| I WING | 1.5 | 52 sq m (555 sq ft) | 12 |
| J WING | 2.5 | 72 sq m (773 sq ft) | 8 |
| J WING | 2.5 | 74 sq m (796 sq ft) | 4 |
| J WING | 2.5 | 68 sq m (737 sq ft) | 2 |
| J WING | 2.5 | 68 sq m (734 sq ft) | 2 |
| K WING | 2.5BHK | 69 sq m (738 sq ft) | 2 |
| K WING | 2.5 BHK | 72 sq m (780 sq ft) | 2 |
| L WING | 1.5 | 52 sq m (561 sq ft) | 4 |
| BUNGLOWS | Bungalow | 153 sq m (1,643 sq ft) | 4 |
Construction progress as reported to the portal
A WING
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
- Sanitary Fittings within the flats / premises: 70%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 70%
B WING
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
- Sanitary Fittings within the flats / premises: 70%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 70%
C WING
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
- Sanitary Fittings within the flats / premises: 70%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 70%
D WING
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
- Sanitary Fittings within the flats / premises: 70%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 70%
E WING
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 90%
F WING
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 90%
G WING
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 90%
H WING
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 90%
I WING
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 90%
J WING
- Excavation: 30%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
K WING
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
L WING
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
BUNGLOWS
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
Common areas and facilities
- Water Supply: 70% - Gravity based water supply system is proposed
- Sewerage (Chamber, Lines, Septic Tank , STP): 70%
- Storm Water Drains: 70% - Peripheral Storm water drain is considered for dewatering of the facility
- Landscaping & Tree Planting: 70% - IN PROGRESS
- Street Lighting: 70% - Peripheral street lights are considered along compound wall
- Treatment And Disposal Of Sewage And Sullage Water: 70%
- Energy managemcnt: 70% - Basic kind of equipment control on sensors is considered
- Electrical meter room, sub-station, receiving station: 70% - All the required infrastructure for MSEDCL is planned inside the facility.
Reviews
Write a review
Be the first to write a review of Sound Delight and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Sound Delight
Enter some positive aspects of Sound Delight
Cons:
Enter some negative aspects of Sound Delight
Enter some negative aspects of Sound Delight
Location
Sound Delight, Ashte, Panvel, Navi Mumbai - 410221 (Maharashtra)
Landmarks
Department Store
- Kwality Developers and Leo Infrastructures (<0.5km)
Hospitals & Clinics
- Dr Pritesh B Zure (<1km)
- Arogya Kendra-Kasalkhand (<1km)
- Prathamik Arogya Kendra-Ajivali-Z P Raigad (<2km)
- Dhanvantari Clinic (<2km)
- Indrayani Clinic (<2km)
- Sai Clinic (<2km)
- Prathamik Arogya Kendra-Ajiwali (<2km)
- Laxmi Clinic (<2km)
- Government Arogya Kendra (<4km)
- Bhavani Clinic (<4km)
- Sai Health Care (<5km)
- Dr Ravindra Kumar (<5km)
- Jeevanalaya Rural Health Center (<5km)
- Jogeshwari Clinic (<5km)
- Dr Charushila Pote Clinic (<5km)
- Dr Mandar Kunthe (<5km)
- Shree Sai Samarth Clinic (<5km)
- Shree Yamai Clinic (<5km)
- Akshara Clinic (<5km)
Petrol Station
- HP Petrol Pump (<2km)
- Indian Oil (<2km)
- Hindustan Petroleum Corporation (<2km)
- Amol Automobiles (<2km)
- Mahanagar Gas (<2km)
- Hindustan Petroleum (<2km)
- Bharat Petroleum (<5km)
Restaurant & Shops
- Shri Ram Trilor (<2km)
- Shri Ram Kirana (<2km)
- Ladies Tailor (<2km)
- Crazy Boys Bar (<3km)
- Bindass Bar (<3km)
- Fruit Shop Shrimant.Kon Fata (<3km)
- Koyal The Bar (<3km)
- Hrishivan Resort Khopoli (<4km)
- Velvet Bar (<4km)
- Raj Beer Shop (<5km)
- Sree Collection (<5km)
- Harish Kirana (<5km)
- Utsav Garden Restaurant (<5km)
- Shlok Kirana Shop (<5km)
- Balkrishna Kirana Store (<5km)
- Sham Kirana Store (<5km)
- श्री समर्थ कृपा किराना दुकान (<5km)
- Shirdhon Iron Clothes (<5km)
- Suyog Sarees and Dress Materials (<5km)
- Vaibhav Beer Shop (<6km)
Shopping Centre
- Roshani Sports (<2km)
- Bhatan Tunnel Towards Mumbai (<4km)
Public Transport
- Kasalkhand Bus Stop (<2km)
- Somtne Railway Station (<3km)
- Somatane Railway Station (<3km)
- Belvali Bus Stop (<4km)
- Chikle Railway Station (<5km)
- Mohape Railway Station (<5km)
- Barvai Bus Stop (<5km)
- Palaspe Phata Bus Station (<6km)
Recreation
- Arivali Cricket Ground (<2km)
- Samrat Nagar Play Ground (<2km)
- Animation and Renewal Center Panvel (<4km)
- Cci Logistics Park (<6km)
- Maitri Garden (<6km)
ATM/Bank/Exchange
- Axis Bank (<2km)
- Idbi Bank ATM (<3km)
- Indian Bank-Bhingar (<3km)
- Canara Bank-Kolkhe (<5km)
- Axis Bank Atm (<5km)
- State Bank of India (<5km)
- State Bank of India-Vichumbe (<5km)
- Canara Bank Chikhale (<5km)
- Bank of Maharashtra (<5km)
- Bank of Maharashtra-Palaspe (<5km)
- Yes Bank (<5km)
Accommodation
- Aayush Resort (<2km)
- Oyo 13468 Hotel Jai Malhar Residency (<6km)
Hotel
- Hotel Shahi Executive (<2km)
- Ekvira Hotel (<4km)
- Patlacha Wada (<4km)
- Raigad Resort (<4km)
- Hotel Bhushan Lodging-Somatane (<4km)
- Hotel Rahul Park-Bombay Pune Highway (<5km)
- Hotel Dhruva Palace (<5km)
- Sangram Lodge (<5km)
- Enans (<5km)
- Spot on 65618 Sangram Lodge (<5km)
- Spicy Mango the Green Retreat (<5km)
Landmark/Attraction
- Bhatan Pada (<3km)
- Giravle (<4km)
- Gavdevi (<4km)
- Phadake Palace (<5km)
- Kudave Stepwell 2 (<6km)
- Project ID
- J118984351
- Updated
- Searches
- 7801
- Views
- 1352













