Aerial View
Kids Play Area
Night View
 18

Sound Delight - Panvel, Navi Mumbai

Builder
Sound lines Realty
Construction
Under Construction
Completion
Dec, 2030
Properties
Apartments
RERA
P51900002485

Description

an eco-friendly haven

Sound Delight is located at Ashte, Panvel, Navi Mumbai. This project offers 1, 1.5 & 2.5 Bhk apartments with different size range between 485 sqft. - 722 sq. ft. There are 12 building and it has 171 unit with 4 floors which is spread over 4 acres of land with lots of below-mentioned amenities.

Amenities:
  • High-speed elevators
  • Kid's play area
  • Power Backup
  • Swimming Pool
  • Gymnasium
  • Indoor Games
  • Landscaped garden
  • Concealed Plumbing
  • Vitrified flooring
  • Concealed Wiring
  • Imported Sanitary Fittings
  • POP finished walls
  • Aluminum Sliding Windows
  • Intercom
  • CCTV security
  • Granite Platform
Sound lines Realty is a company that is focused on bringing world-class realty development to India, upgrading lifestyle and amenities that discerning customers across the world have come to accept as a Standard. To deliver a world-class level of quality construction services at fair and market-competitive prices that project our responsibility towards our customers and our vision.

Highlights

  • Power Back-up
  • Lifts
  • Security Guards
  • Intercom Facility
  • Swimming Pool
  • Fitness Centre / GYM
  • Club / Community Center
  • ATM
  • Club / Community Center
  • Adjacent to Main Road
  • Park/Green Belt Facing
  • Water Connection
  • Electric Connection
  • Close to Hospital
  • Close to School
  • Close to Shopping Center/Mall
  • Imported Sanitary Fittings
  • Aluminium Sliding Windows
  • High-speed elevators

Configurations

Type Area Possession Price *
1BHK Apartment458 SqFeetWithin 4 Years₹ 34 lakhs
2BHK Apartment722 SqFeetWithin 4 Years₹ 54 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51900002485 SOUND DELIGHT Active 52% built

Confirmed with MahaRERA on 18 Sep 2026. Registered as "SOUND DELIGHT".

Promoter
SOUNDLINES ECOHOMES
Registered on
1 Aug 2017
Proposed completion
Dec 2030 (originally Sep 2020)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
GUT NO 32, Ashte, Panvel, Raigarh, 410206
Land area
15,930 sq m (171,475 sq ft)
Sanctioned built-up area
15,605 sq m (167,976 sq ft)
Buildings
A WING (8 floors); B WING (7 floors); C WING (7 floors); D WING (4 floors); E WING (12 floors); F WING; G WING (14 floors); H WING (13 floors); I WING (12 floors); J WING (6 floors); K WING (10 floors); L WING; BUNGLOWS
Parking
Open Space 35, Closed/Covered 409
Complaints on the portal
5
BuildingUnit typeCarpet areaUnits
A WING2.5 BHK68 sq m (734 sq ft)2
A WING2.5 BHK74 sq m (792 sq ft)2
A WING2.5 BHK74 sq m (796 sq ft)6
A WING2.5 BHK68 sq m (737 sq ft)6
B WING2.568 sq m (737 sq ft)6
B WING1.552 sq m (555 sq ft)4
B WING2.574 sq m (796 sq ft)6
C WING1.552 sq m (555 sq ft)4
C WING2.568 sq m (734 sq ft)2
C WING2.574 sq m (792 sq ft)2
C WING2.574 sq m (796 sq ft)4
C WING2.571 sq m (766 sq ft)4
C WING2.568 sq m (737 sq ft)8
D WING2.568 sq m (736 sq ft)2
D WING2.574 sq m (795 sq ft)2
D WING2.574 sq m (796 sq ft)10
D WING2.568 sq m (737 sq ft)10
E WING1BHK43 sq m (461 sq ft)8
E WING1BHK44 sq m (472 sq ft)8
F WING2.568 sq m (737 sq ft)2
F WINGduplex125 sq m (1,340 sq ft)6
F WING2.574 sq m (796 sq ft)2
G WING1BHK45 sq m (480 sq ft)12
G WING1BHK45 sq m (482 sq ft)6
H WING1BHK45 sq m (480 sq ft)12
H WING1BHK45 sq m (482 sq ft)6
I WING2.563 sq m (680 sq ft)2
I WING1.552 sq m (555 sq ft)12
J WING2.572 sq m (773 sq ft)8
J WING2.574 sq m (796 sq ft)4
J WING2.568 sq m (737 sq ft)2
J WING2.568 sq m (734 sq ft)2
K WING2.5BHK69 sq m (738 sq ft)2
K WING2.5 BHK72 sq m (780 sq ft)2
L WING1.552 sq m (561 sq ft)4
BUNGLOWSBungalow153 sq m (1,643 sq ft)4
Construction progress as reported to the portal

A WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
  • Sanitary Fittings within the flats / premises: 70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 70%

B WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
  • Sanitary Fittings within the flats / premises: 70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 70%

C WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
  • Sanitary Fittings within the flats / premises: 70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 70%

D WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
  • Sanitary Fittings within the flats / premises: 70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 70%

E WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 90%

F WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 90%

G WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 90%

H WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 90%

I WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 90%

J WING

  • Excavation: 30%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

K WING

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

L WING

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

BUNGLOWS

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Water Supply: 70% - Gravity based water supply system is proposed
  • Sewerage (Chamber, Lines, Septic Tank , STP): 70%
  • Storm Water Drains: 70% - Peripheral Storm water drain is considered for dewatering of the facility
  • Landscaping & Tree Planting: 70% - IN PROGRESS
  • Street Lighting: 70% - Peripheral street lights are considered along compound wall
  • Treatment And Disposal Of Sewage And Sullage Water: 70%
  • Energy managemcnt: 70% - Basic kind of equipment control on sensors is considered
  • Electrical meter room, sub-station, receiving station: 70% - All the required infrastructure for MSEDCL is planned inside the facility.
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Sound Delight and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Sound Delight
Cons:
Enter some negative aspects of Sound Delight

Location

Sound Delight, Ashte, Panvel, Navi Mumbai - 410221 (Maharashtra)

* Location may be approximate

Landmarks

  • Department Store

    • Kwality Developers and Leo Infrastructures (<0.5km)
  • Hospitals & Clinics

    • Dr Pritesh B Zure (<1km)
    • Arogya Kendra-Kasalkhand (<1km)
    • Prathamik Arogya Kendra-Ajivali-Z P Raigad (<2km)
    • Dhanvantari Clinic (<2km)
    • Indrayani Clinic (<2km)
    • Sai Clinic (<2km)
    • Prathamik Arogya Kendra-Ajiwali (<2km)
    • Laxmi Clinic (<2km)
    • Government Arogya Kendra (<4km)
    • Bhavani Clinic (<4km)
    • Sai Health Care (<5km)
    • Dr Ravindra Kumar (<5km)
    • Jeevanalaya Rural Health Center (<5km)
    • Jogeshwari Clinic (<5km)
    • Dr Charushila Pote Clinic (<5km)
    • Dr Mandar Kunthe (<5km)
    • Shree Sai Samarth Clinic (<5km)
    • Shree Yamai Clinic (<5km)
    • Akshara Clinic (<5km)
  • Petrol Station

    • HP Petrol Pump (<2km)
    • Indian Oil (<2km)
    • Hindustan Petroleum Corporation (<2km)
    • Amol Automobiles (<2km)
    • Mahanagar Gas (<2km)
    • Hindustan Petroleum (<2km)
    • Bharat Petroleum (<5km)
  • Restaurant & Shops

    • Shri Ram Trilor (<2km)
    • Shri Ram Kirana (<2km)
    • Ladies Tailor (<2km)
    • Crazy Boys Bar (<3km)
    • Bindass Bar (<3km)
    • Fruit Shop Shrimant.Kon Fata (<3km)
    • Koyal The Bar (<3km)
    • Hrishivan Resort Khopoli (<4km)
    • Velvet Bar (<4km)
    • Raj Beer Shop (<5km)
    • Sree Collection (<5km)
    • Harish Kirana (<5km)
    • Utsav Garden Restaurant (<5km)
    • Shlok Kirana Shop (<5km)
    • Balkrishna Kirana Store (<5km)
    • Sham Kirana Store (<5km)
    • श्री समर्थ कृपा किराना दुकान (<5km)
    • Shirdhon Iron Clothes (<5km)
    • Suyog Sarees and Dress Materials (<5km)
    • Vaibhav Beer Shop (<6km)
  • Shopping Centre

    • Roshani Sports (<2km)
    • Bhatan Tunnel Towards Mumbai (<4km)
  • Public Transport

    • Kasalkhand Bus Stop (<2km)
    • Somtne Railway Station (<3km)
    • Somatane Railway Station (<3km)
    • Belvali Bus Stop (<4km)
    • Chikle Railway Station (<5km)
    • Mohape Railway Station (<5km)
    • Barvai Bus Stop (<5km)
    • Palaspe Phata Bus Station (<6km)
  • Recreation

    • Arivali Cricket Ground (<2km)
    • Samrat Nagar Play Ground (<2km)
    • Animation and Renewal Center Panvel (<4km)
    • Cci Logistics Park (<6km)
    • Maitri Garden (<6km)
  • ATM/Bank/Exchange

    • Axis Bank (<2km)
    • Idbi Bank ATM (<3km)
    • Indian Bank-Bhingar (<3km)
    • Canara Bank-Kolkhe (<5km)
    • Axis Bank Atm (<5km)
    • State Bank of India (<5km)
    • State Bank of India-Vichumbe (<5km)
    • Canara Bank Chikhale (<5km)
    • Bank of Maharashtra (<5km)
    • Bank of Maharashtra-Palaspe (<5km)
    • Yes Bank (<5km)
  • Accommodation

    • Aayush Resort (<2km)
    • Oyo 13468 Hotel Jai Malhar Residency (<6km)
  • Hotel

    • Hotel Shahi Executive (<2km)
    • Ekvira Hotel (<4km)
    • Patlacha Wada (<4km)
    • Raigad Resort (<4km)
    • Hotel Bhushan Lodging-Somatane (<4km)
    • Hotel Rahul Park-Bombay Pune Highway (<5km)
    • Hotel Dhruva Palace (<5km)
    • Sangram Lodge (<5km)
    • Enans (<5km)
    • Spot on 65618 Sangram Lodge (<5km)
    • Spicy Mango the Green Retreat (<5km)
  • Landmark/Attraction

    • Bhatan Pada (<3km)
    • Giravle (<4km)
    • Gavdevi (<4km)
    • Phadake Palace (<5km)
    • Kudave Stepwell 2 (<6km)
Project ID
J118984351
Updated
Searches
7801
Views
1352