Seasons Green - Kalyan West, Thane

Builder
Seasons Group
Construction
Under Construction
Completion
Apr, 2028
Properties
Apartments
RERA
P51700051575

Description

spacious layouts with elegant interiors

Seasons Green is a luxurious residential development project located in Khadakpada, Kalyan West, Thane. The project development offers spacious 1 BHK and 2 BHK residential apartments ranging from 319 to 564 sq. ft., spanning approximately 3.2 acres of land. The project features 8 wings of G+6/7 in each story, maximizing natural light, modern homes blended, green open spaces with lifestyle amenities and 428-489 units.

Amenities:
  • Meditation Deck
  • Swimming Pool
  • Tree-Lined Community Areas
  • Landscaped Gardens
  • Jogging Tracks
  • Gazebo
  • Senior citizen sit-out
  • Kids’ Play Areas
  • Gymnasium
  • Multipurpose Hall
  • Clubhouse & Multipurpose Hall
  • Indoor Games Rooms
  • 24×7 Security
  • Power Backup
  • Covered Car Parking
  • High-speed Elevators
  • Intercom
  • CCTV Surveillance
Seasons Group is a real estate development brand focused on creating residential communities with modern living standards, thoughtful design, and quality construction. The group is positioned as a trusted developer in the Mumbai Metropolitan Region (MMR) with a mission to deliver comfortable homes that integrate contemporary amenities with natural surroundings.

Highlights

  • Meditation Deck
  • Swimming Pool
  • Tree-Lined Community Areas
  • Landscaped Gardens
  • Jogging Tracks
  • Gazebo
  • Senior citizen sit-out
  • Kids’ Play Areas
  • Gymnasium
  • Multipurpose Hall
  • Clubhouse & Multipurpose Hall
  • Indoor Games Rooms
  • 24×7 Security
  • Power Backup
  • Covered Car Parking
  • High-speed Elevators
  • Intercom
  • CCTV Surveillance

Configurations

Type Area Possession Price *
1BHK Apartment412 SqFeetWithin 2 Years₹ 40.99 lakhs
2BHK Apartment564 SqFeetWithin 2 Years₹ 60.99 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51700051575 SEASONS GREEN Active 54% built

Confirmed with MahaRERA on 21 Sep 2026. Registered as "SEASONS GREEN".

Promoter
JAI BALAJI SAI REALTORS
Registered on
27 Jun 2023
Proposed completion
Apr 2028 (originally Dec 2027)
Project type
Others
Planning authority
Others
Address as filed
H NO.2, KALYAN, Kalyan-Dombivali (M Corp.), Kalyan, Thane, 421301
Land area
12,965 sq m (139,559 sq ft)
Sanctioned built-up area
22,216 sq m (239,141 sq ft)
Buildings
A WING (8 floors) - 51 of 58 available; B WING (8 floors) - 34 of 72 available; C WING (8 floors) - 41 of 49 available; D WING (8 floors) - 26 of 67 available; E WING (8 floors) - 23 of 49 available; F WING (8 floors) - 13 of 45 available; G WING (8 floors) - 19 of 46 available; H WING (8 floors) - 46 of 49 available
Parking
Open Space 93, Closed/Covered 101
BuildingUnit typeCarpet areaUnits
A WINGShop 10 sq m (111 sq ft) 1
A WINGShop 12 sq m (129 sq ft) 1
A WINGShop 15 sq m (167 sq ft) 6
A WINGShop 11 sq m (116 sq ft) 2
A WINGShop 13 sq m (144 sq ft) 1
A WINGShop 13 sq m (139 sq ft) 1
A WINGShop 11 sq m (119 sq ft) 1
A WING1BHK 33 sq m (356 sq ft) 1
A WING2BHK 43 sq m (461 sq ft) 2
A WING1BHK 43 sq m (464 sq ft) 42
B WINGShop 11 sq m (116 sq ft) 2
B WINGShop 13 sq m (144 sq ft) 1
B WINGShop 10 sq m (111 sq ft) 2
B WINGShop 12 sq m (129 sq ft) 2
B WING1RK 21 sq m (222 sq ft) 1
B WING1BHK 32 sq m (346 sq ft) 3
B WING1BHK 30 sq m (319 sq ft) 49
B WING2BHK 43 sq m (459 sq ft) 7
B WINGShop 15 sq m (167 sq ft) 6
C WINGShop 11 sq m (116 sq ft) 2
C WINGShop 15 sq m (167 sq ft) 6
C WINGShop 13 sq m (144 sq ft) 1
C WINGShop 13 sq m (139 sq ft) 1
C WING2BHK 43 sq m (461 sq ft) 1
C WINGShop 10 sq m (111 sq ft) 1
C WINGShop 12 sq m (129 sq ft) 1
C WINGShop 11 sq m (119 sq ft) 1
C WINGShop 11 sq m (114 sq ft) 1
C WINGShop 11 sq m (121 sq ft) 1
C WINGShop 11 sq m (123 sq ft) 1
C WING1BHK 33 sq m (356 sq ft) 1
C WING2BHK 43 sq m (464 sq ft) 42
D WINGShop 15 sq m (167 sq ft) 11
D WINGShop 11 sq m (116 sq ft) 2
D WINGShop 10 sq m (111 sq ft) 2
D WINGShop 12 sq m (129 sq ft) 2
D WING1BHK 30 sq m (319 sq ft) 49
D WINGShop 13 sq m (144 sq ft) 1
D WING2BHK 43 sq m (459 sq ft) 7
E WING1BHK 30 sq m (319 sq ft) 49
E WING2BHK 43 sq m (459 sq ft) 7
F WING1BHK 30 sq m (319 sq ft) 49
F WING2BHK 43 sq m (459 sq ft) 7
G WING1BHK 30 sq m (319 sq ft) 49
G WING2BHK 43 sq m (459 sq ft) 7
H WING1BHK 30 sq m (319 sq ft) 49
H WING2BHK 43 sq m (459 sq ft) 7
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 not filed - in default - -
Q1 FY 2025-2026 31 Jan 2026 - -
Q2 FY 2025-2026 28 Mar 2026 - -
Q3 FY 2025-2026 2 Apr 2026 - -
Q4 FY 2025-2026 22 May 2026 - -
Q1 FY 2026-2027 10 Aug 2026 - -
Construction progress as reported to the portal

A WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 80%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
  • Sanitary Fittings within the flats / premises: 20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

B WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 80%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
  • Sanitary Fittings within the flats / premises: 20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

C WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 80%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
  • Sanitary Fittings within the flats / premises: 20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

D WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 80%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
  • Sanitary Fittings within the flats / premises: 20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

E WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

F WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 90%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

G WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

H WING

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 30%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 20%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Water Supply: 0% - NA
  • Sewerage (Chamber, Lines, Septic Tank , STP): 40% - DRAIN LINE
  • Storm Water Drains: 0% - NA
  • Landscaping & Tree Planting: 30% - NA
  • Water conservation /Rain water harvesting: 30% - NA
  • Fire protection and fire safety requirements: 0% - NA
  • Electrical meter room, sub-station, receiving station: 20% - METER ROOM
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Seasons Green and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Seasons Green
Cons:
Enter some negative aspects of Seasons Green

Location

Seasons Green, Khadakpada, Kalyan West, Thane - 421301 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • IndianOil Petrol Pump (<1 km)
    • Kalyan Junction (~5 km)
    • Shahad (~5 km)
    • Vitthalwadi (~7 km)
    • Navi Mumbai International Airport (~44 km)
    • Chhatrapati Shivaji Maharaj International Airport (~48 km)
  • Shopping & Dining

    • Kornish Multicuisine Restaurant (~1 km)
    • The Bookmark Cafe (~1 km)
    • The Vibe (~2 km)
    • Comida Multi-Cuisine Restaurant (~2 km)
    • Sarvoday mall (~5 km)
    • D'Mart (~14 km)
  • Healthcare

    • Zeelab Pharmacy (~2 km)
    • alfi diagnostics & smart clinics (~2 km)
    • SurgiSafe Clinic (~2 km)
    • Nayak Medical & General Stores (~3 km)
    • APEX HOSPITAL (~4 km)
    • redefine dental clinic (~4 km)
  • Education

    • Don Bosco School (~2 km)
    • Rita Memorial High school (~2 km)
    • Birla School (~4 km)
    • Birla College (~4 km)
    • Smt. Chandibai Himathmal Mansukhani College (~9 km)
    • Industrial Training Institute (ITI) (~27 km)
  • Leisure & Entertainment

    • Cinemax (~3 km)
    • KDMC City Park (~4 km)
    • KDMC sports complex (~9 km)
    • Tilak Movie Theater (~10 km)
    • Cannon Museum (~26 km)
    • Kharghar Valley Golf Course (~35 km)
  • Services

    • Axis Bank Branch (~1 km)
    • Mumbai - Kalyan west Swanad Nagar offsite ATM (~1 km)
    • Kalyan Fire Station (~3 km)
    • Kalyan-Dombivli Municipal Corporation (~4 km)
    • Kalyan RS Sub Post Office (~5 km)
    • Vishnunagar Police Station (~10 km)
  • Religious Places

    • Makbara Masjid (~3 km)
    • Shree Ram Mandir (~3 km)
    • Datta Mandir (~4 km)
    • Kali Masjid (~4 km)
  • Business & Hospitality

    • Electric/Diesel Locomotive Shed Kalyan (~5 km)
    • Century Rayon (~6 km)
    • The Fern Residency Bhiwandi-Pimplas, Series by Marriott (~11 km)
    • ibis Thane (~26 km)
    • Reliance Corporate Park (~28 km)
    • Ashar IT Park (~28 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J919255151
Updated
Searches
225
Views
224