Aerial View
Main Entrance
Front View
 9

Saket Codename Upgrade - Kalyan East, Thane

Builder
Saket Group
Construction
Completed
Completion
Jun, 2026
Properties
Apartments
RERA
P51700024797

Description

apartments with pleasant environment

Saket Codename Upgrade in Pisavli, Kalyan is a residential project by Saket Group. The project offers apartments with perfect combination of contemporary architecture and features to provide comfortable living. Codename Upgrade is a 6 acre self-sustained luxury destination in the smart city of Kalyan. The project is spread over a total area of 5.94 acres of land. It has a total of 6 towers. The construction is of 18 floors. The towers have spacious rooms with premium finishes and are of 2 and 3 BHK configurations.

Amenities:
  • Basketball Court
  • Business Center
  • Cafeteria
  • Children's Play Area
  • Gymnasium
  • Health Facilities
  • Indoor Games
  • Landscape Garden and Tree Planting
  • Multipurpose Room
  • Party Hall
  • Skating Rink
  • Spa/Sauna/Steam
  • Swimming Pool
  • Yoga/Meditation Area
  • Aerobics Room
Saket Group is always in the pursuit to transform three key aspects of life - living, learning and loving. By redefining lifestyles, education and welfare, it has nurtured & created avenues of a promising future. With a vested interest in realty, trade and education, the group forayed into being real estate developers since 1988. The group has an enormous presence in Kalyan, shaping it to be one of the fastest developing suburbs of Mumbai. Over three decades of pioneering real estate development in and around Kalyan, Saket Group has become one of the most trusted names in the real estate domains.

Highlights

  • Power Back-up
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • Lifts
  • Security Guards
  • Fire Alarm
  • Balcony
  • Reserved Parking
  • Basement
  • Modular Kitchen
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • Cafeteria / Food Court
  • Service / Goods Lift
  • Club / Community Center
  • Water Connection
  • Electric Connection
  • Close to Hospital
  • Close to School
  • Close to Shopping Center/Mall

Configurations

Type Area Possession Price *
1BHK Apartment413 SqFeetImmediate/Ready to move₹ 45 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51700024797 SAKET WORLD Completed

Confirmed with MahaRERA on 16 Sep 2026. Registered as "SAKET WORLD".

Promoter
Anand Associates
Registered on
9 Mar 2020
Proposed completion
Jun 2026
Project type
Others
Planning authority
Others
Address as filed
15, 166A, 585A, PISAVALI, Kalyan, Thane, 421306
Land area
3,612 sq m (38,878 sq ft)
Sanctioned built-up area
8,317 sq m (89,523 sq ft)
Buildings
Building Type A (27 floors); Building Type B; Building Type C; Building Type D; Building Type E, Wing A; Building Type E, Wing B
Parking
Open Space 0, Closed/Covered 228
BuildingUnit typeCarpet areaUnits
Building Type AMHADA UNITS 1BHK50 sq m (538 sq ft)4
Building Type AMHADA UNITS 2BHK45 sq m (484 sq ft)4
Building Type A1BHK39 sq m (424 sq ft)45
Building Type AMHADA UNITS 1BHK47 sq m (506 sq ft)4
Building Type A2BHK60 sq m (644 sq ft)36
Building Type A2BHK59 sq m (640 sq ft)18
Building Type A1BHK39 sq m (416 sq ft)45
Building Type AMHADA UNITS 1BHK38 sq m (407 sq ft)3
Building Type B1BHK-0
Building Type C1BHK-0
Building Type D1BHK-0
Building Type E, Wing A1BHK-0
Building Type E, Wing B1BHK-0
Construction progress as reported to the portal

Building Type A

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 50%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 50%
  • Sanitary Fittings within the flats / premises: 15%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Building Type B

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Building Type C

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Building Type D

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Building Type E, Wing A

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Building Type E, Wing B

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 5% - To be given on completion of the entire project
  • Water Supply: 0% - To be given on completion of the entire project
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - To be given on completion of the entire project
  • Storm Water Drains: 0% - To be given on completion of the entire project
  • Landscaping & Tree Planting: 0% - To be given on completion of the entire project
  • Street Lighting: 0% - To be given on completion of the entire project
  • Community Buildings: 0% - To be given on completion of the entire project
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - To be given on completion of the entire project
  • Solid Waste Management And Disposal: 0% - Building Type A
  • Water conservation /Rain water harvesting: 0% - To be given on completion of the entire project
  • Energy managemcnt: 0% - Building Type A
  • Fire protection and fire safety requirements: 0% - Building Type A
  • Electrical meter room, sub-station, receiving station: 0% - To be given on completion of the entire project
  • Aggregate area of recreational Open Space: 0% - To be given on completion of the entire project
  • Water Supply: 0% - To be given on completion of the entire project
  • Solid Waste Management And Disposal: 0% - Building Type A
  • Fire Protection And Fire Safety Requirements: 0% - Building Type A
  • Energy management: 0% - Building Type A
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Saket Codename Upgrade and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Saket Codename Upgrade
Cons:
Enter some negative aspects of Saket Codename Upgrade

Location

Saket Codename Upgrade, Nandivali Gaon, Pisavli Village, Kalyan East, Thane - 421306 (Maharashtra)

* Location may be approximate

Landmarks

  • ATM/Bank/Exchange

    • Axis Bank (<0.5km)
    • Axis Bank Atm (<0.5km)
    • ICICI Bank (<0.5km)
    • Utkarsha Gram B Sahakari Path Sanstha-Pisavli (<0.5km)
    • Canara Bank (<0.5km)
    • BHR Credit Society-Tisgaon (<0.5km)
    • Kalyan Janata Sahakari Bank Atm (<0.5km)
    • The Kalyan Janta Ahkari Bank Limited (<0.5km)
    • HDFC Atm (<1km)
    • Hdfc Bank Atm (<1km)
    • Axis Bank-Kalyan East (<1km)
    • Bank of Baroda (<1km)
    • Bank of Baroda-Tisgaon Naka (<1km)
    • Tisgaon Road (<1km)
  • Hospitals & Clinics

    • Trust Hospital (<0.5km)
    • Trust Hospital-ER (<0.5km)
    • Sanjeevani Hospital (<0.5km)
    • Dr B P Rao (<0.5km)
    • Jeevanjyoti Hospital (<0.5km)
    • Ramchandra General Hospital (<0.5km)
    • Jeevanjyoti Hospital-ER (<0.5km)
    • Ramchandra General Hospital-ER (<0.5km)
    • Bhagwati Clinic (<0.5km)
    • Shreya Clinic (<0.5km)
    • Swami Shrddha Clinic (<0.5km)
    • Srushti Clinic (<0.5km)
    • Sai Veterinary Clinic (<0.5km)
    • Shri Harida Dental Care (<0.5km)
    • Parwati Clinic and Family Health Care Center (<0.5km)
    • Sunidi Clinic (<0.5km)
    • Star Pathology Lab (<0.5km)
    • Anshika Chemist & Druggist (<0.5km)
    • Sadguru Clinic (<0.5km)
    • Newase Clinic (<0.5km)
    • Smile City Dental Clinic (<1km)
    • D M C T Hospital (<1km)
    • D M C T Hospital-ER (<1km)
    • Soham Clinic (<1km)
    • Padyalakshmi Clinic (<1km)
    • Doctor Meenakshi Clinic (<1km)
    • Chaitanyanath Clinic (<1km)
    • Amey Multispecialty Hospital (<1km)
    • Amey Multispecialty Hospital-ER (<1km)
    • Siddharth Clinic (<1km)
    • Vidya Health Care Foundation (<1km)
    • Smile Care Dental Clinic (<1km)
    • Atharv Clinic (<1km)
    • Panchmukhi Clinic (<1km)
    • Rukmini Clinic (<1km)
    • Life Care Hospital (<1km)
    • Shri Krushna Clinic (<1km)
    • Kalavanti Clinic (<1km)
    • Om Sai Kiran Hospital-ER (<1km)
    • Om Sai Kiran Hospital (<1km)
    • Pushpak Clinic (<1km)
    • Shrirangh Tai (<1km)
    • Siddhi Clinic (<1km)
    • Shri Hospital (<1km)
    • Shri Hospital-Er (<1km)
    • Shaikh Clinic (<1km)
    • Om Sai Clinic (<1km)
    • Ankur Pathology Clinic (<1km)
    • Kalyan Metro Multispeciality Hospital-ER (<1km)
    • Kalyan Metro Multispeciality Hospital (<1km)
    • Shree Thakkar Hospital (<1km)
    • Ganga Polyclinic (<1km)
    • Denial Plaza Clinic (<1km)
    • Shri Samarth Clinics (<1km)
    • Harbada Dawakhana (<1km)
    • J B Loading Center (<1km)
    • Datacha Dawakhana (<1km)
    • Singh Clinic (<1km)
    • Dr J P Sukhla (<1km)
  • Landmark/Attraction

    • Malanggad (<0.5km)
    • Old Hanuman Mandir (<1km)
  • Restaurant & Shops

    • Mens Boutique (<0.5km)
    • SONY (<1km)
    • Indra (<1km)
    • Shree Sadaguru Krupa (<1km)
    • Shaheen Ladies Tailor Specialist (<1km)
    • Gajanan Sareea Centre (<1km)
    • Raaj Gents and Ladies Fashion (<1km)
    • Tisai Collection (<1km)
    • Ramdev Super Market (<1km)
  • Recreation

    • Gavyan Events (<0.5km)
    • Chatrapati Sambhaji Udyan (<0.5km)
    • Anmol Garden (<1km)
  • Hostel

    • JH Zojwalla (<1km)
  • Hotel

    • Relax Hotel (<1km)
    • Kashish Family Restaurant and Bar (<1km)
    • Kasturi-Shree Malang Road (<1km)
    • Hotel Jai Sadguru (<1km)
Project ID
J688118981
Updated
Searches
1483
Views
718