Elevation
Gymnasium
Multipurpose Court
 8

Saheel Itrend Futura NX - Mahalunge, Pune

Builder
Saheel Properties
Construction
Under Construction
Completion
Apr, 2029
Properties
Apartments
RERA
P52100050688

Description

rainwater harvesting for eco- friendly water conservation

Saheel Itrend Futura NX is located in the heart of Mahalunge, Pune offers 2,3&4 BHK apartments ranging from 669-1342 sqft. The project is spread over an area of 6 acres of land. It consists of 6 buildings with 25 floors and 1250 units to offer. It also boasts proximity to renowned international schools, educational institutions, and high-profile commercial hubs, making it an ideal location for those seeking a well-rounded and convenient living experience.

Amenities
  • Yoga Studio
  • Creative Corner
  • Swimming Pool
  • Meditation Spot
  • Oxygen Oasis
  • Event Emporium
  • BBQ Junction
  • Starlight Sanctuary
  • Party Lawn
  • Tenting Area
  • Celebration Court
  • Spa Suites
Saheel Properties is a company built on a strong foundation of ethics and elevated values. We believe in transparency, quality and integrity. We are dedicated to providing affordable housing, and appreciate the value of our customer's aspirations-and hard-earned money. So for us, ‘fulfilling our promises, meeting deadlines and delivering value for money are primary concerns.

Highlights

  • Power Back-up
  • Water Softner
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • Centrally Air Conditioned
  • Room AC
  • Lifts
  • High Speed Internet
  • Wi-Fi
  • RO System
  • Balcony
  • Security Guards
  • Electronic Security
  • Intercom Facility
  • Woodwork
  • Modular Kitchen
  • Feng Shui / Vaastu Compliant
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center

Configurations

Type Area Possession Price *
2BHK Apartment669 SqFeetWithin 3 Years₹ 74 lakhs
3BHK Apartment987 SqFeetWithin 3 Years₹ 1.07 crore
4BHK Apartment1,342 SqFeetWithin 3 Years₹ 1.42 crore
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52100050688 Itrend Futura Active 40% built

Confirmed with MahaRERA on 20 Sep 2026. Registered as "Itrend Futura".

Promoter
Highpoint Landmark LLP
Registered on
28 Apr 2023
Proposed completion
Apr 2029 (originally Dec 2028)
Project type
Others
Planning authority
Others
Address as filed
Mahalunge, Mahalunge, Mahalunge, Mulshi, Pune, 411045
Land area
24,281 sq m (261,367 sq ft)
Sanctioned built-up area
124,600 sq m (1,341,227 sq ft)
Buildings
Building A (26 floors); Building B (28 floors); Bulding C (29 floors); Building D (26 floors); Building E (26 floors); Building F (26 floors)
Parking
Open Space 0, Closed/Covered 1249
BuildingUnit typeCarpet areaUnits
Building AShop 43 sq m (461 sq ft) 1
Building A2BHK 64 sq m (684 sq ft) 25
Building A3BHK 84 sq m (903 sq ft) 117
Building A3BHK 93 sq m (999 sq ft) 50
Building AShop 43 sq m (461 sq ft) 2
Building AShop 40 sq m (435 sq ft) 1
Building AShop 39 sq m (420 sq ft) 6
Building AShop 41 sq m (440 sq ft) 4
Building AShop 47 sq m (502 sq ft) 1
Building AShop 40 sq m (434 sq ft) 2
Building BShop 50 sq m (535 sq ft) 1
Building BShop 39 sq m (420 sq ft) 6
Building BShop 39 sq m (422 sq ft) 1
Building BShop 41 sq m (440 sq ft) 5
Building BShop 43 sq m (461 sq ft) 3
Building BShop 44 sq m (471 sq ft) 1
Building B2BHK 64 sq m (684 sq ft) 102
Building B3BHK 83 sq m (890 sq ft) 52
Building B3BHK 93 sq m (999 sq ft) 54
Bulding CShop 57 sq m (612 sq ft) 1
Bulding CShop 44 sq m (471 sq ft) 1
Bulding CShop 55 sq m (588 sq ft) 1
Bulding CShop 55 sq m (589 sq ft) 1
Bulding C2BHK 57 sq m (615 sq ft) 77
Bulding C2BHK 59 sq m (638 sq ft) 52
Bulding C2BHK 60 sq m (643 sq ft) 26
Bulding CShop 61 sq m (654 sq ft) 1
Bulding CShop 21 sq m (222 sq ft) 1
Bulding CShop 31 sq m (333 sq ft) 7
Bulding CShop 32 sq m (350 sq ft) 1
Bulding CShop 36 sq m (389 sq ft) 1
Bulding CShop 20 sq m (212 sq ft) 8
Bulding C2BHK 64 sq m (684 sq ft) 27
Bulding C3BHK 83 sq m (890 sq ft) 54
Building D2BHK 57 sq m (615 sq ft) 71
Building D2BHK 59 sq m (638 sq ft) 50
Building D2BHK 60 sq m (643 sq ft) 25
Building D2BHK 64 sq m (684 sq ft) 25
Building D3BHK 83 sq m (890 sq ft) 50
Building DShop 31 sq m (329 sq ft) 2
Building DShop 19 sq m (208 sq ft) 1
Building DShop 20 sq m (212 sq ft) 16
Building DShop 21 sq m (222 sq ft) 2
Building DShop 22 sq m (233 sq ft) 2
Building DShop 25 sq m (264 sq ft) 1
Building E2BHK 64 sq m (684 sq ft) 96
Building E3BHK 93 sq m (999 sq ft) 100
Building F2BHK 64 sq m (684 sq ft) 96
Building F3BHK 93 sq m (999 sq ft) 100
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 not filed - in default - -
Q1 FY 2025-2026 not filed - in default - -
Q2 FY 2025-2026 18 Oct 2025 - -
Q3 FY 2025-2026 20 Jan 2026 - -
Q4 FY 2025-2026 19 Apr 2026 - -
Q1 FY 2026-2027 17 Jul 2026 - -
Construction progress as reported to the portal

Building A

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 70%
  • Slabs of Super Structure: 4%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 11%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Building B

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 51%
  • Sanitary Fittings within the flats / premises: 2%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 72%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Bulding C

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 48%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 73%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Building D

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 8%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 18%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Building E

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 65%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 28%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Building F

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 35%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 4%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 28%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - As per Sanction Plan
  • Water Supply: 0% - through local Authorities and Bore
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - As per requirement
  • Storm Water Drains: 0% - As per Norms
  • Landscaping & Tree Planting: 0% - As per Sanction Plan
  • Street Lighting: 0% - As per Plan
  • Community Buildings: 0% - -
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - As per Norms
  • Solid Waste Management And Disposal: 0% - As per Requirement
  • Water conservation /Rain water harvesting: 0% - As per norms
  • Energy managemcnt: 0% - Solar Power
  • Fire protection and fire safety requirements: 0% - As per CFO Requirement
  • Electrical meter room, sub-station, receiving station: 0% - As per Requirement
  • Aggregate area of recreational Open Space: 0% - -
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Saheel Itrend Futura NX and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Saheel Itrend Futura NX
Cons:
Enter some negative aspects of Saheel Itrend Futura NX

Location

Saheel Itrend Futura NX, Mahalunge, Pune - 412115 (Maharashtra)

* Location may be approximate

Landmarks

  • Restaurant & Shops

    • Pratik Stores (<0.5km)
    • Preetam Dresses (<0.5km)
    • Om Sai Footwear (<0.5km)
    • Dhan Lakshami Wholesale Kirana (<0.5km)
    • Vama Life Style (<0.5km)
    • Tamanna Bag House & Footwear All Variety (<0.5km)
    • Mahalaxmi Super Market (<0.5km)
    • Sahil Collection (<0.5km)
    • Pornima Trading (<0.5km)
    • Nageshiya Footwear (<0.5km)
    • Hindlag Mata Footwear (<0.5km)
    • Bhavani Trading (<0.5km)
    • Chandan Traders (<0.5km)
    • Chandan Collection (<0.5km)
    • New Bhawani Super Market (<0.5km)
    • LOTUS Emporium (<0.5km)
    • Hanuman Trading Company (<0.5km)
    • Pooja Saree Center (<0.5km)
    • Ashiya Collection All Dresses (<0.5km)
    • Shri Krishna General Stores (<0.5km)
    • Purabji Super Market (<0.5km)
    • Gurukrupa Super Shoppee (<0.5km)
    • Mataji Super Market (<0.5km)
    • Sai Provision Stores (<0.5km)
    • Laxmi Super Market (<0.5km)
    • Baba Super Market (<0.5km)
    • Rudra Collection (<0.5km)
    • Kiran Provision Stores (<0.5km)
    • Mahadev Provision Stores (<0.5km)
    • Rudra Super Market (<1km)
    • Vittal Rukhamai Market (<1km)
    • Merlins Karaoke Bar (<1km)
    • Hotel Sarovar Garden Family Restaurant & Bar (<1km)
    • Sai Vegetable & Food Stall (<1km)
    • Ambika Super Market (<1km)
    • Radha Resto & Bar (<1km)
    • Connexions Lounge & Bar (<1km)
    • Kaveri Hotel (<1km)
    • Kisan Kirana Market (<1km)
  • Hospitals & Clinics

    • Thawal Hospital-ER (<0.5km)
    • Thawal Hospital (<0.5km)
    • Vision World (<0.5km)
    • Sanjeevan Clinic (<0.5km)
    • Alpha Dental Clinic (<0.5km)
    • Siddhi Clinic (<0.5km)
    • smart Tooth Dental Clinic (<0.5km)
    • Mahalunge Hospital-ER (<0.5km)
    • Mahalunge Hospital (<0.5km)
    • Dr Aparna Clinic (<0.5km)
    • King Optics & Photo Studio (<0.5km)
    • Sahyadri Speciality Labs (<0.5km)
    • Desire Clinic (<0.5km)
    • Perfect Pathology (<0.5km)
    • Krushna Hospital-ER (<0.5km)
    • Krushna Hospital (<0.5km)
    • Siddharth Dental Clinic (<0.5km)
    • Suyprakash Clinic (<0.5km)
    • Mauli Hospital (<0.5km)
    • Mauli Hospital-ER (<0.5km)
    • Sursk Clinic (<0.5km)
    • Golhvilkar Metropolis (<0.5km)
    • DR. Thaval Polyclinic (<0.5km)
    • Surya Prakash Clinic (<0.5km)
    • Chaitanya Clinic (<0.5km)
    • Ayush Clinic (<0.5km)
    • Chandra Sai Clinic (<1km)
    • Sumit Hospital-ER (<1km)
    • Sumit Hospital (<1km)
    • Shri Renuka Clinic (<1km)
    • DR. Rasika Naiks Microdentistry Clinic (<1km)
    • Dr Ninad Sheodes Learn Ac (<1km)
  • Public Transport

    • Mhalunge Gaon (<0.5km)
    • Chha. Shivaji Krida Sankul (<1km)
    • Mhalunge Corner (<1km)
    • Baner Sadanand Hotel Bus Stop (<1km)
  • Department Store

    • Pramod Department Stores (<0.5km)
  • ATM/Bank/Exchange

    • Shubham Nagari Sahakari Patsanstha Maryadit-Baner (<0.5km)
    • Axis Bank (<0.5km)
    • Bank of Maharashtra-Mahalunge (<0.5km)
    • Bank of Maharashtra (<0.5km)
    • ICICI Bank (<0.5km)
    • Airtel Payments Bank (<0.5km)
    • Bank Of Maharashtra ATM (<1km)
    • Bank of Maharashtra-Balewadi (<1km)
    • Fino Payments Banks-Baner (<1km)
    • State Bank of India-PBB Balewadi (<1km)
  • Hotel

    • Viorica Hotels (<0.5km)
    • Treebo Trend Sumati Baner (<1km)
    • The Orchid Hotel-Balewadi (<1km)
    • The Tulip Hotel (<1km)
    • Hotel Bhairavee (<1km)
    • Aarav Regency (<1km)
    • Hotel Radha-Baner (<1km)
    • Radha Restro and Bar (<1km)
    • Fab Hotel Woods Regency (<1km)
    • Oyo Taghouse-Balewadi (<1km)
  • Hostel

    • Spots Hostel (<0.5km)
  • Landmark/Attraction

    • Chhatrapati Shivaji Maharaj Statue (<1km)
  • Shopping Centre

    • Balewadi Plaza (<1km)
Project ID
J721192417
Updated
Searches
2452
Views
1170