Front View
Main Entrance
Front View
 9

Rustomjee Urbania Azziano - Thane West, Thane

Builder
Rustomjee Constructions
Construction
Completed
Completion
Feb, 2023
Properties
Apartments
RERA
P51700000950, P51700001021, P51700001060, P51700001093, P51700001453, P51700013649, P51700015260

Description

built with the latest technology.

Rustomjee Urbania Azziano is an ultra modern residential project by Rustomjee Builders in Thane West, Mumbai. The project offers lavish 2 BHK and 3 BHK apartments built with the latest technology. At Rustomjee Azziano, living is fulfilling with an array of world-class amenities to serve you. Landscaped gardens provide serene interiors to this gated community. Stay indoors to enjoy table tennis and squash.All civic and commercial establishments like school, colleges, restaurants, hospitals, markets, petrol pumps, ATMs/ Banks are nearby. The bus stops, railway stations, and airport is close by.

Amenities:
  • Amphitheater
  • Basketball Court
  • Business Center
  • Cafeteria
  • Children's play area
  • Gymnasium
  • Indoor Games
  • Library
  • Squash Court
  • Swimming Pool
  • Tennis Court
  • Aggregate area of recreational Open Space
  • Electrical Meter Room, Sub-Station, Receiving Station
  • Energy management
  • Fire Protection And Fire Safety Requirements
  • Internal Roads & Footpaths
  • Landscaping & Tree Planting
  • Sewerage (Chamber, Lines, Septic Tank , STP)
  • Solid Waste Management And Disposal
  • Storm Water Drains
  • Street Lighting
  • Treatment And Disposal Of Sewage And Sullage Water
  • Rain water Harvesting
  • Water Supply
Rustomjee Constructions has successfully managed to carve a niche for itself in the contemporary real estate market in India. The company has specialized in the construction of residential units and commercial centres and is known for its strict delivery schedules and quality standards. At Rustomjee, quality is never compromised by prices and other aspects. Additionally, the company also believes in incorporating customer opinions into business decisions in addition to laying high emphasis on teamwork

Highlights

  • Power Back-up
  • Maintenance Staff
  • Rain Water Harvesting
  • Lifts
  • High Speed Internet
  • Security Guards
  • Fire Alarm
  • Electronic Security
  • Intercom Facility
  • Corner Location
  • Woodwork
  • Reserved Parking
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center

Configurations

Type Area Possession Price *
1BHK Apartment882 SqFeetImmediate/Ready to move₹ 1.03 crore
2BHK Apartment598 SqFeetImmediate/Ready to move₹ 1.02 crore
2BHK Apartment746 SqFeetImmediate/Ready to move₹ 1.04 crore
2BHK Apartment827 SqFeetImmediate/Ready to move₹ 1.03 crore
2BHK Apartment1,000 SqFeetImmediate/Ready to move₹ 1.38 crore
2BHK Apartment1,075 SqFeetImmediate/Ready to move₹ 99 lakhs
2BHK Apartment1,230 SqFeetImmediate/Ready to move₹ 1.07 crore
2BHK Apartment1,340 SqFeetImmediate/Ready to move₹ 1.13 crore
3BHK Apartment1,165 SqFeetImmediate/Ready to move₹ 1.22 crore
3BHK Apartment1,570 SqFeetImmediate/Ready to move₹ 1.36 crore
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51700000950 Rustomjee Azziano Wing J Completed

Confirmed with MahaRERA on 21 Sep 2026. Registered as "Rustomjee Azziano Wing J".

Promoter
Kapstone Constructions Private Limited
Registered on
25 Jul 2017
Proposed completion
Mar 2019
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Eastern Express Highway Majiwade, Thane West, Thane (M Corp.), Thane, Thane, 400601
Land area
641 sq m (6,904 sq ft)
Sanctioned built-up area
15,141 sq m (162,983 sq ft)
Buildings
Rustomjee Azziano Wing J (36 floors)
Parking
Open Space 0, Closed/Covered 0
Complaints on the portal
1
BuildingUnit typeCarpet areaUnits
Rustomjee Azziano Wing J3BHKTYPE2 97 sq m (1,043 sq ft) 35
Rustomjee Azziano Wing J2BHKTYPE4 59 sq m (640 sq ft) 36
Rustomjee Azziano Wing J3BHKTYPE1 94 sq m (1,014 sq ft) 35
Rustomjee Azziano Wing J2BHKTYPE3 58 sq m (624 sq ft) 35
Rustomjee Azziano Wing J2BHKTYPE2 57 sq m (619 sq ft) 24
Rustomjee Azziano Wing J2BHK TYPE1 61 sq m (652 sq ft) 35
Construction progress as reported to the portal

Rustomjee Azziano Wing J

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 78%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 97%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 82%

Common areas and facilities

  • Internal Roads & Footpaths: 95% - Fire tender & Other Drive ways
  • Water Supply: 75% - Connection from ESR to UG Tank
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - STP Installation WIP
  • Storm Water Drains: 100% - SWD RCC Work & Covers fixing
  • Landscaping & Tree Planting: 80% - Tree Plantation on Podium & Ground RG
  • Street Lighting: 0% - Lights to be provided at Ground & Podium
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - STP work completed
  • Solid Waste Management And Disposal: 50% - OWC installation WIP
  • Water conservation /Rain water harvesting: 100% - RWH drains & Chambers WIP
  • Energy managemcnt: 50% - Solar panels provided as per MoEF
  • Fire protection and fire safety requirements: 100% - Works at Podium & Ground in progress
  • Electrical meter room, sub-station, receiving station: 100% - Meter room & Substation WIP
  • Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be delivered with Wing I / J
  • Mini theatre Air conditioned preview theatre for 12-16 seating.: 0% - Will be delivered with Wing I
  • Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be delivered with Wing I
  • Indoor Games zone Airconditioned space for pool, table tennis and board games like chess & carro: 30% - Will be delivered with Wing H
  • Mini Golf Semiopen Golf practice area in buiding foot print: 30% - Will be delivered with Wing F
  • Kid's play area Semi-Open Kids Play Area: 0% - Will be delivered with Wing J
  • Leons world Enclosed Kids Activity Area: 0% - Will be delivered with Wing J
  • Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
  • Prefunction area Guests Welcome Lounge for party hall: 0% - Will be delivered with Wing I / J
  • Business center / Meeting rooms (2 nos): 0% - Will be delivered with Wing K
  • Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be delivered with Wing H
  • Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be delivered with Wing G / H
  • Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Will be delivered with Wing K
  • Gymnasium Air conditioned work out area adm 222 sq. mtr. with cardio & strength equipments: 30% - Will be delivered with Wing F / G
  • Changing rooms with Showers: 50% - Will be delivered with Wing H

P51700001021 Rustomjee Azziano Wing F Completed

Confirmed with MahaRERA on 21 Sep 2026. Registered as "Rustomjee Azziano Wing F".

Promoter
Kapstone Constructions Private Limited
Registered on
25 Jul 2017
Proposed completion
Mar 2019
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Eastern Express Highway, Thane west, Thane (M Corp.), Thane, Thane, 400601
Land area
568 sq m (6,117 sq ft)
Sanctioned built-up area
13,581 sq m (146,190 sq ft)
Buildings
Rustomjee Azziano Wing F (36 floors)
Parking
Open Space 0, Closed/Covered 0
Complaints on the portal
7
BuildingUnit typeCarpet areaUnits
Rustomjee Azziano Wing F2BHKTYPE4 65 sq m (696 sq ft) 35
Rustomjee Azziano Wing F2BHKTYPE3 66 sq m (715 sq ft) 35
Rustomjee Azziano Wing F2BHKTYPE6 65 sq m (700 sq ft) 35
Rustomjee Azziano Wing F2BHKTYPE5 60 sq m (647 sq ft) 25
Rustomjee Azziano Wing F2BHKTYPE2 60 sq m (647 sq ft) 36
Rustomjee Azziano Wing F2BHK TYPE 1 67 sq m (720 sq ft) 35
Construction progress as reported to the portal

Rustomjee Azziano Wing F

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 95% - Fire tender & Other Drive ways
  • Water Supply: 75% - Connection from ESR to UG Tank
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - STP Installation WIP
  • Storm Water Drains: 100% - SWD RCC Work & Covers fixing
  • Landscaping & Tree Planting: 80% - Tree Plantation on Podium & Ground level RG
  • Street Lighting: 0% - Lights at Ground & Podium Level
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - STP work in progress.
  • Solid Waste Management And Disposal: 50% - OWC Unit to be installed
  • Water conservation /Rain water harvesting: 100% - RWH drains and chambers WIP
  • Energy managemcnt: 50% - Solar Panels at terrace level as per MoEF
  • Fire protection and fire safety requirements: 100% - Fire fighting works at Podium and Ground level
  • Electrical meter room, sub-station, receiving station: 100% - Meter room & Substation WIP
  • Aggregate area of recreational Open Space: 40% - Common for the Whole Project
  • Gymnasium Air conditioned work out area adm 222 sq. mtr. with cardio & strength equipments: 30% - Will be delivered with Wing F / G
  • Indoor game zone Airconditioned space for pool, table tennis and board games like chess & carrom: 30% - Will be delivered with Wing H
  • Prefunction area Guests Welcome Lounge for party hall: 0% - Will be delivered with Wing I / J
  • Business center / Meeting rooms (2 nos): 0% - Will be delivered with wing K
  • Leons world Enclosed Kids Activity Area: 0% - Will be delivered with wing J
  • Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Will be provided with Wing K
  • Mini theatre Air conditioned preview theatre for 12-16 seating.: 0% - Will be delivered with wing I
  • Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
  • Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be delivered with wing H
  • Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be delivered with Wing I / J
  • Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be delivered with wing H
  • Kid's play area Semi-Open Kids Play Area: 0% - Will be delivered with wing J
  • Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be delivered with Wing I
  • Changing rooms with Showers: 50% - Will be delivered with wing H
  • Minigolf Semiopen golf practice area in buiding foot print: 30% - Will be delivered with wing F

P51700001060 Rustomjee Azziano Wing G Completed

Confirmed with MahaRERA on 21 Sep 2026. Registered as "Rustomjee Azziano Wing G".

Promoter
Kapstone Constructions Private Limited
Registered on
25 Jul 2017
Proposed completion
Mar 2019
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Eastern Express Highway Majiwade, Thane West, Thane (M Corp.), Thane, Thane, 400601
Land area
568 sq m (6,117 sq ft)
Sanctioned built-up area
13,581 sq m (146,190 sq ft)
Buildings
Rustomjee Azziano Wing G (36 floors)
Parking
Open Space 0, Closed/Covered 0
Complaints on the portal
4
BuildingUnit typeCarpet areaUnits
Rustomjee Azziano Wing G2BHKTYPE4 65 sq m (696 sq ft) 35
Rustomjee Azziano Wing G2BHKTYPE5 60 sq m (647 sq ft) 25
Rustomjee Azziano Wing G2BHKTYPE6 65 sq m (700 sq ft) 35
Rustomjee Azziano Wing G2BHKTYPE3 66 sq m (715 sq ft) 35
Rustomjee Azziano Wing G2BHKTYPE2 60 sq m (647 sq ft) 36
Rustomjee Azziano Wing G2BHKTYPE1 67 sq m (720 sq ft) 35
Construction progress as reported to the portal

Rustomjee Azziano Wing G

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 95% - Fire tender & Other Drive ways
  • Water Supply: 75% - Connection from ESR to UG Tank
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - STP Installation WIP
  • Storm Water Drains: 100% - SWD RCC Work & Covers fixing
  • Landscaping & Tree Planting: 80% - Tree Plantation on Podium & Ground RG
  • Street Lighting: 0% - Lights to be provided at Ground & Podium
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - STP Installation WIP
  • Solid Waste Management And Disposal: 50% - OWC Unit to be installed
  • Water conservation /Rain water harvesting: 100% - RWH drains & Chambers WIP
  • Energy managemcnt: 50% - Solar panels provided as per MoEF
  • Fire protection and fire safety requirements: 100% - Works at Podium & Ground in progress
  • Electrical meter room, sub-station, receiving station: 100% - Meter room & Substation WIP
  • Gymnasium Air conditioned work out area adm 222 sq. mtr. with cardio & strength equipments: 30% - Will be delivered with Wing F / G
  • Changing rooms with Showers: 50% - Will be delivered with wing H
  • Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be delivered with Wing I / J
  • Business center / Meeting rooms (2 nos): 0% - Will be delivered with wing K
  • Leons world Enclosed Kids Activity Area: 0% - Will be delivered with wing J
  • Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Will be delivered with wing K
  • Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be delivered with Wing I
  • Prefunction area Guests Welcome Lounge for party hall: 0% - Will be delivered with Wing I / J
  • Mini theatre Air conditioned preview theatre for 12-16 seating.: 0% - Will be delivered with Wing I
  • Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be delivered with wing H
  • Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be delivered with wing H
  • Kid's play area Semi-Open Kids Play Area: 0% - Will be delivered with Wing J
  • Mini Golf Semiopen Golf practice area in buiding foot print: 30% - Will be delivered with Wing F
  • Indoor game zone Airconditioned space for pool, table tennis and board games like chess & carrom: 30% - Will be delivered with wing H
  • Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project

P51700001093 Rustomjee Azziano Wing I Completed

Confirmed with MahaRERA on 21 Sep 2026. Registered as "Rustomjee Azziano Wing I".

Promoter
Kapstone Constructions Private Limited
Registered on
26 Jul 2017
Proposed completion
Dec 2020
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Eastern Express Highway, Thane West, Thane (M Corp.), Thane, Thane, 400601
Land area
642 sq m (6,905 sq ft)
Sanctioned built-up area
15,235 sq m (163,995 sq ft)
Buildings
Rustomjee Azziano Wing I (36 floors)
Parking
Open Space 0, Closed/Covered 0
Complaints on the portal
1
BuildingUnit typeCarpet areaUnits
Rustomjee Azziano Wing I3BHKTYPE1 98 sq m (1,052 sq ft) 35
Rustomjee Azziano Wing I3BHKTYPE2 94 sq m (1,011 sq ft) 36
Rustomjee Azziano Wing I2BHKTYPE1 58 sq m (623 sq ft) 35
Rustomjee Azziano Wing I2BHKTYPE2 58 sq m (620 sq ft) 24
Rustomjee Azziano Wing I2BHKTYPE3 60 sq m (647 sq ft) 35
Rustomjee Azziano Wing I2BHKTYPE4 59 sq m (638 sq ft) 36
Construction progress as reported to the portal

Rustomjee Azziano Wing I

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 69%
  • Sanitary Fittings within the flats / premises: 39%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 97%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 77%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 52%

Common areas and facilities

  • Internal Roads & Footpaths: 95% - Fire tender & Other Drive ways
  • Water Supply: 75% - Connection from ESR to UG Tank
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - STP completed
  • Storm Water Drains: 90% - SWD RCC Work & Covers fixing
  • Landscaping & Tree Planting: 80% - Tree Plantation on Podium & Ground RG
  • Street Lighting: 0% - Lights to be provided at Ground & Podium
  • Treatment And Disposal Of Sewage And Sullage Water: 90% - STP work in progress
  • Solid Waste Management And Disposal: 50% - OWC unit to be Installed
  • Water conservation /Rain water harvesting: 90% - RWH drains & Chambers WIP
  • Energy managemcnt: 0% - Solar Panels at terrace level as per MoEF
  • Fire protection and fire safety requirements: 100% - Works at Podium & Ground in progresso
  • Electrical meter room, sub-station, receiving station: 100% - Meter room & Substation WIP
  • Aggregate area of recreational Open Space: 0% - Yet to commence
  • Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be Provided with Wing H
  • Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be delivered with wing I
  • Resting cabanas Outdoor furniture for resting & relaxation: 0% - Will be delivered with Wing I
  • Prefunction area Guests Welcome Lounge for party hall: 0% - Will be delivered with Wing I / J
  • Swimming pool 49 x 11.3 m swimming pool, 1.2 m deep: 85% - Will be delivered with Wing I
  • Alfresco dining Out door dining area for informal get together.: 0% - Will be delivered with WIng I
  • Business center / Meeting rooms (2 nos): 0% - Will be provided with Wing K
  • Party Spill out area Capacity 100 to 120 pax open to sky: 0% - Will be delivered with Wing I
  • Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be Provided with Wing H
  • Changing rooms with Showers: 50% - Will be Provided with Wing H
  • Cooling mist pod Located near ramp: 0% - Will be delived with Wing I
  • Dry fountain Fun activity .: 0% - Will be delivered with Wing I
  • Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
  • Gymnasium Air conditioned work out area adm 222 sq. mtr. with cardio & strength equipments: 30% - Will be provided with Wing F / G
  • Indoor Games zone Airconditioned space for pool, table tennis and board games like chess & carrom: 30% - Will be Provided with Wing H
  • Kid's play area Semi-Open Kids Play Area: 0% - Will be provided with Wing J
  • Kid's pool Shallow pool 600mm depth: 80% - Will be delivered with Wing I
  • Leons world Enclosed Kids Activity Area: 0% - Will be provided with Wing J
  • Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Will be provided with Wing K
  • Mini Golf Semiopen Golf practice area in buiding foot print: 30% - Will be provided with Wing F
  • Mini theatre Air conditioned preview theatre for 12-16 seating: 0% - Will be delivered with wing I
  • Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be delivered with Wing I / J

P51700001453 Rustomjee Azziano Wing H Completed

Confirmed with MahaRERA on 21 Sep 2026. Registered as "Rustomjee Azziano Wing H".

Promoter
Kapstone Constructions Private Limited
Registered on
28 Jul 2017
Proposed completion
May 2019
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Eastern Express Highway Majiwade, Thane West, Thane (M Corp.), Thane, Thane, 400601
Land area
568 sq m (6,117 sq ft)
Sanctioned built-up area
13,716 sq m (147,644 sq ft)
Buildings
Rustomjee Azziano Wing H (36 floors)
Parking
Open Space 0, Closed/Covered 0
BuildingUnit typeCarpet areaUnits
Rustomjee Azziano Wing H2BHKTYPE1 66 sq m (715 sq ft) 35
Rustomjee Azziano Wing H2BHKTYPE2 60 sq m (647 sq ft) 36
Rustomjee Azziano Wing H2BHKTYPE3 67 sq m (720 sq ft) 36
Rustomjee Azziano Wing H2BHKTYPE4 65 sq m (700 sq ft) 36
Rustomjee Azziano Wing H2BHKTYPE5 60 sq m (647 sq ft) 25
Rustomjee Azziano Wing H2BHKTYPE6 65 sq m (696 sq ft) 35
Construction progress as reported to the portal

Rustomjee Azziano Wing H

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 99%
  • Sanitary Fittings within the flats / premises: 81%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 95% - Fire tender & Other Drive ways
  • Water Supply: 75% - Connection from ESR to UG Tank
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - STP Installation WIP
  • Storm Water Drains: 100% - SWD RCC Work & Covers fixing
  • Landscaping & Tree Planting: 80% - Tree Plantation on Podium & Ground RG
  • Street Lighting: 0% - Provided on Podium & Ground RG
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - STP work in progress
  • Solid Waste Management And Disposal: 50% - OWC installation WIP
  • Water conservation /Rain water harvesting: 100% - RWH drains & Chambers WIP
  • Energy managemcnt: 50% - Solar Panels as per MoEF Requirement
  • Fire protection and fire safety requirements: 100% - Works at Podium & Ground in progress
  • Electrical meter room, sub-station, receiving station: 100% - Meter room & Substation WIP
  • Aggregate area of recreational Open Space: 0% - Yet to commence
  • Kid's play area Semi-Open Kids Play Area: 0% - Will be provided with Wing J
  • Prefunction area Guests Welcome Lounge for party hall: 0% - Will be delivered with Wing I / J
  • Business center / Meeting rooms (2 nos): 0% - Will be delivered with Wing K
  • Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Will be delivered with Wing K
  • Mini Golf Semiopen Golf practice area in buiding foot print: 30% - Will be provided with Wing F
  • Leons world Enclosed Kids Activity Area: 0% - Will be provided with Wing J
  • Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be delivered with wing H
  • Indoor game zone Airconditioned space for pool, table tennis and board games like chess & carrom: 30% - Will be delivered with wing H
  • Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be delivered with Wing I / J
  • Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
  • Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be delivered with Wing H
  • Changing rooms with Showers: 50% - Will be delivered with wing H
  • Gymnasium Air conditioned work out area adm 222 sq. mtr. with cardio & strength equipments: 30% - Will be provided with F / G
  • Mini theatre Air conditioned preview theatre for 12-16 seating.: 0% - Will be delivered with wing I
  • Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be delivered with Wing I

P51700013649 Rustomjee Azziano Wing K Completed

Confirmed with MahaRERA on 21 Sep 2026. Registered as "Rustomjee Azziano Wing K".

Promoter
Kapstone Constructions Private Limited
Registered on
16 Oct 2017
Proposed completion
Sep 2022
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Eastern Express Highway Majiwade, Thane West, Thane (M Corp.), Thane, Thane, 400601
Land area
647 sq m (6,960 sq ft)
Sanctioned built-up area
16,247 sq m (174,887 sq ft)
Buildings
Rustomjee Azziano Wing K (36 floors)
Parking
Open Space 0, Closed/Covered 0
Complaints on the portal
1
BuildingUnit typeCarpet areaUnits
Rustomjee Azziano Wing K2 BHK Type 10 61 sq m (657 sq ft) 4
Rustomjee Azziano Wing K2 BHK Type 11 60 sq m (651 sq ft) 4
Rustomjee Azziano Wing K2 BHK Type 12 61 sq m (653 sq ft) 3
Rustomjee Azziano Wing K2 BHK Type 13 61 sq m (653 sq ft) 4
Rustomjee Azziano Wing K2 BHK Type 1 58 sq m (620 sq ft) 32
Rustomjee Azziano Wing K2 BHK Type 9 62 sq m (671 sq ft) 4
Rustomjee Azziano Wing K2 BHK Type 8 58 sq m (620 sq ft) 32
Rustomjee Azziano Wing K2 BHK Type 7 56 sq m (601 sq ft) 31
Rustomjee Azziano Wing K2 BHK Type 15 61 sq m (651 sq ft) 4
Rustomjee Azziano Wing K2 BHK Type 16 62 sq m (671 sq ft) 4
Rustomjee Azziano Wing K2 BHK Type 6 56 sq m (600 sq ft) 31
Rustomjee Azziano Wing K2 BHK Type 5 56 sq m (603 sq ft) 32
Rustomjee Azziano Wing K2 BHK Type 14 60 sq m (651 sq ft) 4
Rustomjee Azziano Wing K2 BHK Type 4 56 sq m (603 sq ft) 22
Rustomjee Azziano Wing K2 BHK Type 3 56 sq m (600 sq ft) 31
Rustomjee Azziano Wing K2 BHK Type 2 56 sq m (606 sq ft) 31
Construction progress as reported to the portal

Rustomjee Azziano Wing K

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 99%
  • Sanitary Fittings within the flats / premises: 90%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 99%

Common areas and facilities

  • Internal Roads & Footpaths: 50% - Fire tender & Other Drive ways
  • Water Supply: 60% - Connection from ESR to UG Tank
  • Sewerage (Chamber, Lines, Septic Tank , STP): 33% - STP RCC work commenced
  • Storm Water Drains: 50% - RCC Work of SWD Cover fixing WIP
  • Landscaping & Tree Planting: 0% - Yet to commence
  • Street Lighting: 0% - Yet to commence
  • Treatment And Disposal Of Sewage And Sullage Water: 33% - STP work in progress.
  • Solid Waste Management And Disposal: 0% - OWC Unit to be installed
  • Water conservation /Rain water harvesting: 0% - RWH Drains and Chambers WIP
  • Energy managemcnt: 0% - Solar Panels at terrace level as per MoEF
  • Fire protection and fire safety requirements: 0% - Fire fighting works at Podium and Ground level WIP
  • Electrical meter room, sub-station, receiving station: 0% - Yet to commence
  • Box Cricket / Basket ball Court 14.5 x15.5 m designed for multisport activities.: 0% - Will be delivered with Wing K
  • Tennis court: 0% - Will be delivered with Wing K
  • Party Spill out area Capacity 100 to 120 pax open to sky: 0% - Will be provided with Wing I
  • Alfresco dining Out door dining area for informal get together.: 0% - Will be provided with Wing I
  • Resting cabanas Outdoor furniture for resting & relaxation: 0% - Will be provided with Wing I
  • Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be provided with Wing I
  • Prefunction area Guests Welcome Lounge for party hall: 0% - Will be provided with Wing I / J
  • Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be provided with Wing I / J
  • Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be Provided with Wing H
  • Cooling mist pod Located near ramp: 0% - Will be provided with Wing I
  • Dry fountain Fun activity .: 0% - Will be provided with Wing I
  • Mini theatre Air conditioned preview theatre for 12-16 seating.: 0% - Will be provided with Wing I
  • Changing rooms with Showers: 50% - Will be Provided with Wing H
  • Business center / Meeting rooms (2 nos): 0% - Will be delivered with Wing K
  • Swimming pool 49 x 11.3 m x 1.2 m deep: 85% - Will be provided with WIng I
  • Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Will be delivered with Wing K
  • Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be Provided with Wing H
  • Mini Golf Semiopen Golf practice area in buiding foot print: 30% - Will be provided with Wing F
  • Gymnasium Air conditioned work out area adm 222 sq. mtr. with cardio & strength equipments: 30% - Will be provided with Wing F / G
  • Kid's play area Semi-Open Kids Play Area: 0% - Will be provided with Wing J
  • Indoor Games zone Airconditioned space for pool, table tennis and board games like chess & carro: 30% - Will be Provided with Wing H
  • Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
  • Kid's pool Shallow pool 600mm depth: 80% - will be provided with Wing I
  • Leons world Enclosed Kids Activity Area: 0% - Will be provided with Wing J

P51700015260 RUSTOMJEE AZZIANO WING E Completed

Confirmed with MahaRERA on 21 Sep 2026. Registered as "RUSTOMJEE AZZIANO WING E".

Promoter
Kapstone Constructions Private Limited
Registered on
12 Feb 2018
Proposed completion
Feb 2023
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Eastern Express Highway Majiwade, THANE WEST, Thane (M Corp.), Thane, Thane, 400601
Land area
568 sq m (6,117 sq ft)
Sanctioned built-up area
13,698 sq m (147,449 sq ft)
Buildings
RUSTOMJEE AZZINO WING E (36 floors)
Parking
Open Space 0, Closed/Covered 0
Complaints on the portal
1
BuildingUnit typeCarpet areaUnits
RUSTOMJEE AZZINO WING E2BHK TYPE 6 65 sq m (698 sq ft) 35
RUSTOMJEE AZZINO WING E2 BHK TYPE 5 60 sq m (647 sq ft) 25
RUSTOMJEE AZZINO WING E2BHK TYPE 4 65 sq m (696 sq ft) 35
RUSTOMJEE AZZINO WING E2BHK TYPE 3 66 sq m (715 sq ft) 35
RUSTOMJEE AZZINO WING E2 BHK TYPE1 67 sq m (720 sq ft) 36
RUSTOMJEE AZZINO WING E2BHK TYPE 2 60 sq m (647 sq ft) 35
Construction progress as reported to the portal

RUSTOMJEE AZZINO WING E

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 99%
  • Sanitary Fittings within the flats / premises: 91%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 35% - FIRE TENDER AND OTHER DRIVE WAYS
  • Water Supply: 60% - CONNECTION FROM ESR TO UGT
  • Sewerage (Chamber, Lines, Septic Tank , STP): 22% - STP RCC WORKS COMMENCED
  • Storm Water Drains: 50% - SWD RCC Work & Covers fixing
  • Landscaping & Tree Planting: 0% - ON PODIUM AND GROUND RG
  • Street Lighting: 0% - LIGHTS AT GROUND AND PODIUM
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - STP Installation WIP
  • Solid Waste Management And Disposal: 0% - OWC Unit installed
  • Water conservation /Rain water harvesting: 0% - RWH Drains and Chambers WIP
  • Energy managemcnt: 0% - SOLAR PANELS AT TERRACE
  • Fire protection and fire safety requirements: 0% - FIRE FIGHTING WORKS AT PODIUM
  • Electrical meter room, sub-station, receiving station: 0% - METER ROOM AND SUBSTATION WIP
  • Aggregate area of recreational Open Space: 0% - Common for the Whole Project
  • Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be Delivered with Wing H
  • kids Pool Shallow Pool for Kids 600 mm deepth: 80% - Will be Delivered with Wing I
  • Dry fountain Fun activity .: 80% - Will be Delivered with Wing I
  • Box Cricket / Basket ball Court 14.5 x15.5 m designed for multisport activities.: 0% - Common Amenity will be Delivered with Wing K
  • Leons World Enclosed Kids Activity Area: 0% - Will be Delivered Wing J
  • Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be Delivered with Wing I
  • Barbeque Corner Open Air Barbeque Pod: 0% - Common Amenity will be Delivered with Wing E
  • Business center / Meeting rooms (2 nos): 0% - Common Amenity will be Delivered with Wing K
  • Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be Delivered Wing J
  • Jumping Garden Varing Level Lawn Patches for Kids to enjoy Jumping: 0% - Common Amenity will be Delivered with Wing E
  • Changing rooms with Showers: 50% - Will be Delivered with Wing H
  • Feature Deck Pavilion Landscape Feature with Outdoor Seating: 0% - Common Amenity will be Delivered with Wing E
  • Hammocks Pavilion Hammocks places below Tree Shade: 0% - Common Amenity will be Delivered with Wing E
  • Puzzle Path Puzzle Pathway created with Shrubs: 0% - Common Amenity will be Delivered with Wing E
  • Meditation POD Deck Area in Building Footprint for Meditation: 0% - Common Amenity will be Delivered with Wing E
  • Climbing wall Deigned in Building Footprint: 0% - Common Amenity will be Delivered with Wing E
  • Squash Court Standard Size Squash Court: 0% - Common Amenity will be Delivered with Wing E
  • Guest Rooms Twin Sharing Guest Rooms 6 nos: 0% - Common Amenity will be Delivered with Wing E
  • Amphitheatre Designed Space for 20 25 pax gatherings: 0% - Common Amenity will be Delivered with Wing E
  • Childrens Play Area Kids play activity zone.: 0% - Common Amenity will be Delivered with Wing E
  • Kid's play area Semi-Open Kids Play Area: 0% - Will be Delivered Wing J
  • Prefunction area Guests Welcome Lounge for party hall: 0% - Will be Delivered Wing J
  • Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be Delivered with Wing H
  • Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
  • Indoor Games zone Airconditioned space for pool, table tennis and board games like chess & carro: 0% - Will be Delivered with Wing H
  • Mini Golf Semiopen Golf practice area in buiding foot print: 0% - Will be Delivered with Wing F & G
  • Tennis court Flood Lit size 24 X 11 mts: 0% - Common Amenity will be Delivered with Wing K
  • Mini theatre Air conditioned preview theatre for 12-16 seating.: 0% - Will be Delivered with Wing I
  • Yoga Hall Deck Air Conditioned Space for Yoga Activity: 0% - Common Amenity will be Delivered with Wing E
  • Resting cabanas Outdoor furniture for resting & relaxation: 0% - Will be Delivered with Wing I
  • Prefunction area Guests Welcome Lounge for party hall: 0% - Will be Delivered with Wing I
  • Alfresco dining Out door dining area for informal get together.: 0% - Will be Delivered with Wing I
  • Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Common Amenity will be Delivered with Wing K
  • Swimming pool 49 x 11.3 m x 1.2 m deep: 85% - Will be Delivered with Wing I
  • Party Spill out area Capacity 100 to 120 pax open to sky: 0% - Will be Delivered with Wing I
  • Cooling mist pod Located near ramp: 0% - Will be Delivered with Wing I
  • Gymnasium Air conditioned work out space with cardio & strength equipments: 0% - Will be Delivered with Wing F & G
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Rustomjee Urbania Azziano and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Rustomjee Urbania Azziano
Cons:
Enter some negative aspects of Rustomjee Urbania Azziano

Location

Rustomjee Urbania Azziano, Thane West, Thane - 401208 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Hindustan Petroleum (~1 km)
    • ST Bus Stand - Khopat (~3 km)
    • Kalva (~3 km)
    • Azad Nagar Bus Stop (~5 km)
    • Chhatrapati Shivaji Maharaj International Airport (~26 km)
    • Navi Mumbai International Airport (~36 km)
  • Shopping & Dining

    • Samudra Restaurant (<1 km)
    • Boulevard (<1 km)
    • Patel General Store (<1 km)
    • The One Storyy Bistro (~2 km)
    • Shoppers Stop (~2 km)
    • laxmi market (~4 km)
  • Healthcare

    • Wellness Forever Pharmacy - Rustomjee Urbania Majiwada (<1 km)
    • Apollo Pharmacy (<1 km)
    • Thane COVID Hospital (~1 km)
    • Aishwarya Nursing Home - Thane (~2 km)
    • Jupiter Hospital (~2 km)
    • TMC C R Wadia Dispensary (~3 km)
  • Education

    • Rustomjee Cambridge International School and Junior College (<1 km)
    • Shreerang Vidyalaya (~1 km)
    • The Indian Library (~2 km)
    • University of Mumbai Thane Sub-Campus (~2 km)
    • Vidya Prasarak Mandal Polytechnic (~3 km)
    • Industrial Training Institute (ITI) (~5 km)
  • Leisure & Entertainment

    • Saket Waterfront Park (<1 km)
    • Cinepolis (~2 km)
    • Dadoji Konddev Stadium (~3 km)
    • Dosti Clubhouse (~4 km)
    • Kharghar Valley Golf Course (~26 km)
    • Butterfly Park (~29 km)
  • Services

    • ICICI Bank (<1 km)
    • Rustomjee Fire Station (<1 km)
    • Rabodi Police Station (<1 km)
    • HDFC Bank ATM (~2 km)
    • Thane Municipal Corporation (~4 km)
    • DHL (~4 km)
  • Religious Places

    • Sri Sri Radha Govind Dev Temple (~2 km)
    • Vitthal Temple (~2 km)
    • Dawoodi Bohra Masjid (~2 km)
    • Nandibaba temple (~3 km)
    • Saint John the Baptist Church (~3 km)
    • Nuri Baba Darga (~3 km)
  • Business & Hospitality

    • Colour Chem (~1 km)
    • Ginger Thane (~2 km)
    • Raymond Mills (~3 km)
    • ibis Thane (~3 km)
    • Ashar IT Park (~5 km)
    • Reliance Corporate Park (~13 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J421821190
Updated
Searches
10530
Views
2096