Rustomjee Urbania Azziano - Thane West, Thane
- Builder
- Rustomjee Constructions
- Construction
- Completed
- Completion
- Feb, 2023
- Properties
- Apartments
- RERA
- P51700000950, P51700001021, P51700001060, P51700001093, P51700001453, P51700013649, P51700015260
Description
built with the latest technology.
Rustomjee Urbania Azziano is an ultra modern residential project by Rustomjee Builders in Thane West, Mumbai. The project offers lavish 2 BHK and 3 BHK apartments built with the latest technology. At Rustomjee Azziano, living is fulfilling with an array of world-class amenities to serve you. Landscaped gardens provide serene interiors to this gated community. Stay indoors to enjoy table tennis and squash.All civic and commercial establishments like school, colleges, restaurants, hospitals, markets, petrol pumps, ATMs/ Banks are nearby. The bus stops, railway stations, and airport is close by.- Amphitheater
- Basketball Court
- Business Center
- Cafeteria
- Children's play area
- Gymnasium
- Indoor Games
- Library
- Squash Court
- Swimming Pool
- Tennis Court
- Aggregate area of recreational Open Space
- Electrical Meter Room, Sub-Station, Receiving Station
- Energy management
- Fire Protection And Fire Safety Requirements
- Internal Roads & Footpaths
- Landscaping & Tree Planting
- Sewerage (Chamber, Lines, Septic Tank , STP)
- Solid Waste Management And Disposal
- Storm Water Drains
- Street Lighting
- Treatment And Disposal Of Sewage And Sullage Water
- Rain water Harvesting
- Water Supply
Highlights
- Power Back-up
- Maintenance Staff
- Rain Water Harvesting
- Lifts
- High Speed Internet
- Security Guards
- Fire Alarm
- Electronic Security
- Intercom Facility
- Corner Location
- Woodwork
- Reserved Parking
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 1BHK Apartment | 882 SqFeet | Immediate/Ready to move | ₹ 1.03 crore |
| 2BHK Apartment | 598 SqFeet | Immediate/Ready to move | ₹ 1.02 crore |
| 2BHK Apartment | 746 SqFeet | Immediate/Ready to move | ₹ 1.04 crore |
| 2BHK Apartment | 827 SqFeet | Immediate/Ready to move | ₹ 1.03 crore |
| 2BHK Apartment | 1,000 SqFeet | Immediate/Ready to move | ₹ 1.38 crore |
| 2BHK Apartment | 1,075 SqFeet | Immediate/Ready to move | ₹ 99 lakhs |
| 2BHK Apartment | 1,230 SqFeet | Immediate/Ready to move | ₹ 1.07 crore |
| 2BHK Apartment | 1,340 SqFeet | Immediate/Ready to move | ₹ 1.13 crore |
| 3BHK Apartment | 1,165 SqFeet | Immediate/Ready to move | ₹ 1.22 crore |
| 3BHK Apartment | 1,570 SqFeet | Immediate/Ready to move | ₹ 1.36 crore |
RERA
P51700000950 Rustomjee Azziano Wing J Completed
Confirmed with MahaRERA on 15 Sep 2026. Registered as "Rustomjee Azziano Wing J".
- Promoter
- Kapstone Constructions Private Limited
- Registered on
- 25 Jul 2017
- Proposed completion
- Mar 2019
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- 49/1,2,3 , 50/1a,2,3 , 51/1,2,3,4 pt ,5 pt, 53/2/3,383pt, Thane (M Corp.), Thane, Thane, 400601
- Land area
- 641 sq m (6,904 sq ft)
- Sanctioned built-up area
- 15,141 sq m (162,983 sq ft)
- Buildings
- Rustomjee Azziano Wing J (36 floors)
- Parking
- Open Space 0, Closed/Covered 0
- Complaints on the portal
- 1
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Rustomjee Azziano Wing J | 3BHKTYPE2 | 97 sq m (1,043 sq ft) | 35 |
| Rustomjee Azziano Wing J | 2BHKTYPE4 | 59 sq m (640 sq ft) | 36 |
| Rustomjee Azziano Wing J | 3BHKTYPE1 | 94 sq m (1,014 sq ft) | 35 |
| Rustomjee Azziano Wing J | 2BHKTYPE3 | 58 sq m (624 sq ft) | 35 |
| Rustomjee Azziano Wing J | 2BHKTYPE2 | 57 sq m (619 sq ft) | 24 |
| Rustomjee Azziano Wing J | 2BHK TYPE1 | 61 sq m (652 sq ft) | 35 |
Construction progress as reported to the portal
Rustomjee Azziano Wing J
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 78%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 97%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 82%
Common areas and facilities
- Internal Roads & Footpaths: 95% - Fire tender & Other Drive ways
- Water Supply: 75% - Connection from ESR to UG Tank
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - STP Installation WIP
- Storm Water Drains: 100% - SWD RCC Work & Covers fixing
- Landscaping & Tree Planting: 80% - Tree Plantation on Podium & Ground RG
- Street Lighting: 0% - Lights to be provided at Ground & Podium
- Treatment And Disposal Of Sewage And Sullage Water: 100% - STP work completed
- Solid Waste Management And Disposal: 50% - OWC installation WIP
- Water conservation /Rain water harvesting: 100% - RWH drains & Chambers WIP
- Energy managemcnt: 50% - Solar panels provided as per MoEF
- Fire protection and fire safety requirements: 100% - Works at Podium & Ground in progress
- Electrical meter room, sub-station, receiving station: 100% - Meter room & Substation WIP
- Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be delivered with Wing I / J
- Mini theatre Air conditioned preview theatre for 12-16 seating.: 0% - Will be delivered with Wing I
- Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be delivered with Wing I
- Indoor Games zone Airconditioned space for pool, table tennis and board games like chess & carro: 30% - Will be delivered with Wing H
- Mini Golf Semiopen Golf practice area in buiding foot print: 30% - Will be delivered with Wing F
- Kid's play area Semi-Open Kids Play Area: 0% - Will be delivered with Wing J
- Leons world Enclosed Kids Activity Area: 0% - Will be delivered with Wing J
- Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
- Prefunction area Guests Welcome Lounge for party hall: 0% - Will be delivered with Wing I / J
- Business center / Meeting rooms (2 nos): 0% - Will be delivered with Wing K
- Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be delivered with Wing H
- Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be delivered with Wing G / H
- Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Will be delivered with Wing K
- Gymnasium Air conditioned work out area adm 222 sq. mtr. with cardio & strength equipments: 30% - Will be delivered with Wing F / G
- Changing rooms with Showers: 50% - Will be delivered with Wing H
P51700001021 Rustomjee Azziano Wing F Completed
Confirmed with MahaRERA on 15 Sep 2026. Registered as "Rustomjee Azziano Wing F".
- Promoter
- Kapstone Constructions Private Limited
- Registered on
- 25 Jul 2017
- Proposed completion
- Mar 2019
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- 49/1,2,3 , 50/1a,2,3 , 51/1,2,3,4 pt ,5 pt, 53/2/3,383pt, Thane (M Corp.), Thane, Thane, 400601
- Land area
- 568 sq m (6,117 sq ft)
- Sanctioned built-up area
- 13,581 sq m (146,190 sq ft)
- Buildings
- Rustomjee Azziano Wing F (36 floors)
- Parking
- Open Space 0, Closed/Covered 0
- Complaints on the portal
- 7
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Rustomjee Azziano Wing F | 2BHKTYPE4 | 65 sq m (696 sq ft) | 35 |
| Rustomjee Azziano Wing F | 2BHKTYPE3 | 66 sq m (715 sq ft) | 35 |
| Rustomjee Azziano Wing F | 2BHKTYPE6 | 65 sq m (700 sq ft) | 35 |
| Rustomjee Azziano Wing F | 2BHKTYPE5 | 60 sq m (647 sq ft) | 25 |
| Rustomjee Azziano Wing F | 2BHKTYPE2 | 60 sq m (647 sq ft) | 36 |
| Rustomjee Azziano Wing F | 2BHK TYPE 1 | 67 sq m (720 sq ft) | 35 |
Construction progress as reported to the portal
Rustomjee Azziano Wing F
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 95% - Fire tender & Other Drive ways
- Water Supply: 75% - Connection from ESR to UG Tank
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - STP Installation WIP
- Storm Water Drains: 100% - SWD RCC Work & Covers fixing
- Landscaping & Tree Planting: 80% - Tree Plantation on Podium & Ground level RG
- Street Lighting: 0% - Lights at Ground & Podium Level
- Treatment And Disposal Of Sewage And Sullage Water: 100% - STP work in progress.
- Solid Waste Management And Disposal: 50% - OWC Unit to be installed
- Water conservation /Rain water harvesting: 100% - RWH drains and chambers WIP
- Energy managemcnt: 50% - Solar Panels at terrace level as per MoEF
- Fire protection and fire safety requirements: 100% - Fire fighting works at Podium and Ground level
- Electrical meter room, sub-station, receiving station: 100% - Meter room & Substation WIP
- Aggregate area of recreational Open Space: 40% - Common for the Whole Project
- Gymnasium Air conditioned work out area adm 222 sq. mtr. with cardio & strength equipments: 30% - Will be delivered with Wing F / G
- Indoor game zone Airconditioned space for pool, table tennis and board games like chess & carrom: 30% - Will be delivered with Wing H
- Prefunction area Guests Welcome Lounge for party hall: 0% - Will be delivered with Wing I / J
- Business center / Meeting rooms (2 nos): 0% - Will be delivered with wing K
- Leons world Enclosed Kids Activity Area: 0% - Will be delivered with wing J
- Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Will be provided with Wing K
- Mini theatre Air conditioned preview theatre for 12-16 seating.: 0% - Will be delivered with wing I
- Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
- Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be delivered with wing H
- Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be delivered with Wing I / J
- Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be delivered with wing H
- Kid's play area Semi-Open Kids Play Area: 0% - Will be delivered with wing J
- Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be delivered with Wing I
- Changing rooms with Showers: 50% - Will be delivered with wing H
- Minigolf Semiopen golf practice area in buiding foot print: 30% - Will be delivered with wing F
P51700001060 Rustomjee Azziano Wing G Completed
Confirmed with MahaRERA on 15 Sep 2026. Registered as "Rustomjee Azziano Wing G".
- Promoter
- Kapstone Constructions Private Limited
- Registered on
- 25 Jul 2017
- Proposed completion
- Mar 2019
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- 49/1,2,3 , 50/1a,2,3 , 51/1,2,3,4 pt ,5 pt, 53/2/3,383pt, Thane (M Corp.), Thane, Thane, 400601
- Land area
- 568 sq m (6,117 sq ft)
- Sanctioned built-up area
- 13,581 sq m (146,190 sq ft)
- Buildings
- Rustomjee Azziano Wing G (36 floors)
- Parking
- Open Space 0, Closed/Covered 0
- Complaints on the portal
- 4
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Rustomjee Azziano Wing G | 2BHKTYPE4 | 65 sq m (696 sq ft) | 35 |
| Rustomjee Azziano Wing G | 2BHKTYPE5 | 60 sq m (647 sq ft) | 25 |
| Rustomjee Azziano Wing G | 2BHKTYPE6 | 65 sq m (700 sq ft) | 35 |
| Rustomjee Azziano Wing G | 2BHKTYPE3 | 66 sq m (715 sq ft) | 35 |
| Rustomjee Azziano Wing G | 2BHKTYPE2 | 60 sq m (647 sq ft) | 36 |
| Rustomjee Azziano Wing G | 2BHKTYPE1 | 67 sq m (720 sq ft) | 35 |
Construction progress as reported to the portal
Rustomjee Azziano Wing G
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 95% - Fire tender & Other Drive ways
- Water Supply: 75% - Connection from ESR to UG Tank
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - STP Installation WIP
- Storm Water Drains: 100% - SWD RCC Work & Covers fixing
- Landscaping & Tree Planting: 80% - Tree Plantation on Podium & Ground RG
- Street Lighting: 0% - Lights to be provided at Ground & Podium
- Treatment And Disposal Of Sewage And Sullage Water: 100% - STP Installation WIP
- Solid Waste Management And Disposal: 50% - OWC Unit to be installed
- Water conservation /Rain water harvesting: 100% - RWH drains & Chambers WIP
- Energy managemcnt: 50% - Solar panels provided as per MoEF
- Fire protection and fire safety requirements: 100% - Works at Podium & Ground in progress
- Electrical meter room, sub-station, receiving station: 100% - Meter room & Substation WIP
- Gymnasium Air conditioned work out area adm 222 sq. mtr. with cardio & strength equipments: 30% - Will be delivered with Wing F / G
- Changing rooms with Showers: 50% - Will be delivered with wing H
- Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be delivered with Wing I / J
- Business center / Meeting rooms (2 nos): 0% - Will be delivered with wing K
- Leons world Enclosed Kids Activity Area: 0% - Will be delivered with wing J
- Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Will be delivered with wing K
- Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be delivered with Wing I
- Prefunction area Guests Welcome Lounge for party hall: 0% - Will be delivered with Wing I / J
- Mini theatre Air conditioned preview theatre for 12-16 seating.: 0% - Will be delivered with Wing I
- Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be delivered with wing H
- Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be delivered with wing H
- Kid's play area Semi-Open Kids Play Area: 0% - Will be delivered with Wing J
- Mini Golf Semiopen Golf practice area in buiding foot print: 30% - Will be delivered with Wing F
- Indoor game zone Airconditioned space for pool, table tennis and board games like chess & carrom: 30% - Will be delivered with wing H
- Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
P51700001093 Rustomjee Azziano Wing I Completed
Confirmed with MahaRERA on 15 Sep 2026. Registered as "Rustomjee Azziano Wing I".
- Promoter
- Kapstone Constructions Private Limited
- Registered on
- 26 Jul 2017
- Proposed completion
- Dec 2020
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- 49/1,2,3 , 50/1a,2,3 , 51/1,2,3,4 pt ,5 pt, 53/2/3,383pt, Thane (M Corp.), Thane, Thane, 400601
- Land area
- 642 sq m (6,905 sq ft)
- Sanctioned built-up area
- 15,235 sq m (163,995 sq ft)
- Buildings
- Rustomjee Azziano Wing I (36 floors)
- Parking
- Open Space 0, Closed/Covered 0
- Complaints on the portal
- 1
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Rustomjee Azziano Wing I | 3BHKTYPE1 | 98 sq m (1,052 sq ft) | 35 |
| Rustomjee Azziano Wing I | 3BHKTYPE2 | 94 sq m (1,011 sq ft) | 36 |
| Rustomjee Azziano Wing I | 2BHKTYPE1 | 58 sq m (623 sq ft) | 35 |
| Rustomjee Azziano Wing I | 2BHKTYPE2 | 58 sq m (620 sq ft) | 24 |
| Rustomjee Azziano Wing I | 2BHKTYPE3 | 60 sq m (647 sq ft) | 35 |
| Rustomjee Azziano Wing I | 2BHKTYPE4 | 59 sq m (638 sq ft) | 36 |
Construction progress as reported to the portal
Rustomjee Azziano Wing I
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 69%
- Sanitary Fittings within the flats / premises: 39%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 97%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 77%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 52%
Common areas and facilities
- Internal Roads & Footpaths: 95% - Fire tender & Other Drive ways
- Water Supply: 75% - Connection from ESR to UG Tank
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - STP completed
- Storm Water Drains: 90% - SWD RCC Work & Covers fixing
- Landscaping & Tree Planting: 80% - Tree Plantation on Podium & Ground RG
- Street Lighting: 0% - Lights to be provided at Ground & Podium
- Treatment And Disposal Of Sewage And Sullage Water: 90% - STP work in progress
- Solid Waste Management And Disposal: 50% - OWC unit to be Installed
- Water conservation /Rain water harvesting: 90% - RWH drains & Chambers WIP
- Energy managemcnt: 0% - Solar Panels at terrace level as per MoEF
- Fire protection and fire safety requirements: 100% - Works at Podium & Ground in progresso
- Electrical meter room, sub-station, receiving station: 100% - Meter room & Substation WIP
- Aggregate area of recreational Open Space: 0% - Yet to commence
- Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be Provided with Wing H
- Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be delivered with wing I
- Resting cabanas Outdoor furniture for resting & relaxation: 0% - Will be delivered with Wing I
- Prefunction area Guests Welcome Lounge for party hall: 0% - Will be delivered with Wing I / J
- Swimming pool 49 x 11.3 m swimming pool, 1.2 m deep: 85% - Will be delivered with Wing I
- Alfresco dining Out door dining area for informal get together.: 0% - Will be delivered with WIng I
- Business center / Meeting rooms (2 nos): 0% - Will be provided with Wing K
- Party Spill out area Capacity 100 to 120 pax open to sky: 0% - Will be delivered with Wing I
- Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be Provided with Wing H
- Changing rooms with Showers: 50% - Will be Provided with Wing H
- Cooling mist pod Located near ramp: 0% - Will be delived with Wing I
- Dry fountain Fun activity .: 0% - Will be delivered with Wing I
- Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
- Gymnasium Air conditioned work out area adm 222 sq. mtr. with cardio & strength equipments: 30% - Will be provided with Wing F / G
- Indoor Games zone Airconditioned space for pool, table tennis and board games like chess & carrom: 30% - Will be Provided with Wing H
- Kid's play area Semi-Open Kids Play Area: 0% - Will be provided with Wing J
- Kid's pool Shallow pool 600mm depth: 80% - Will be delivered with Wing I
- Leons world Enclosed Kids Activity Area: 0% - Will be provided with Wing J
- Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Will be provided with Wing K
- Mini Golf Semiopen Golf practice area in buiding foot print: 30% - Will be provided with Wing F
- Mini theatre Air conditioned preview theatre for 12-16 seating: 0% - Will be delivered with wing I
- Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be delivered with Wing I / J
P51700001453 Rustomjee Azziano Wing H Completed
Confirmed with MahaRERA on 15 Sep 2026. Registered as "Rustomjee Azziano Wing H".
- Promoter
- Kapstone Constructions Private Limited
- Registered on
- 28 Jul 2017
- Proposed completion
- May 2019
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- 49/1,2,3 , 50/1a,2,3 , 51/1,2,3,4 pt ,5 pt, 53/2/3,383pt, Thane (M Corp.), Thane, Thane, 400601
- Land area
- 568 sq m (6,117 sq ft)
- Sanctioned built-up area
- 13,716 sq m (147,644 sq ft)
- Buildings
- Rustomjee Azziano Wing H (36 floors)
- Parking
- Open Space 0, Closed/Covered 0
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Rustomjee Azziano Wing H | 2BHKTYPE1 | 66 sq m (715 sq ft) | 35 |
| Rustomjee Azziano Wing H | 2BHKTYPE2 | 60 sq m (647 sq ft) | 36 |
| Rustomjee Azziano Wing H | 2BHKTYPE3 | 67 sq m (720 sq ft) | 36 |
| Rustomjee Azziano Wing H | 2BHKTYPE4 | 65 sq m (700 sq ft) | 36 |
| Rustomjee Azziano Wing H | 2BHKTYPE5 | 60 sq m (647 sq ft) | 25 |
| Rustomjee Azziano Wing H | 2BHKTYPE6 | 65 sq m (696 sq ft) | 35 |
Construction progress as reported to the portal
Rustomjee Azziano Wing H
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 99%
- Sanitary Fittings within the flats / premises: 81%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 95% - Fire tender & Other Drive ways
- Water Supply: 75% - Connection from ESR to UG Tank
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - STP Installation WIP
- Storm Water Drains: 100% - SWD RCC Work & Covers fixing
- Landscaping & Tree Planting: 80% - Tree Plantation on Podium & Ground RG
- Street Lighting: 0% - Provided on Podium & Ground RG
- Treatment And Disposal Of Sewage And Sullage Water: 100% - STP work in progress
- Solid Waste Management And Disposal: 50% - OWC installation WIP
- Water conservation /Rain water harvesting: 100% - RWH drains & Chambers WIP
- Energy managemcnt: 50% - Solar Panels as per MoEF Requirement
- Fire protection and fire safety requirements: 100% - Works at Podium & Ground in progress
- Electrical meter room, sub-station, receiving station: 100% - Meter room & Substation WIP
- Aggregate area of recreational Open Space: 0% - Yet to commence
- Kid's play area Semi-Open Kids Play Area: 0% - Will be provided with Wing J
- Prefunction area Guests Welcome Lounge for party hall: 0% - Will be delivered with Wing I / J
- Business center / Meeting rooms (2 nos): 0% - Will be delivered with Wing K
- Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Will be delivered with Wing K
- Mini Golf Semiopen Golf practice area in buiding foot print: 30% - Will be provided with Wing F
- Leons world Enclosed Kids Activity Area: 0% - Will be provided with Wing J
- Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be delivered with wing H
- Indoor game zone Airconditioned space for pool, table tennis and board games like chess & carrom: 30% - Will be delivered with wing H
- Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be delivered with Wing I / J
- Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
- Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be delivered with Wing H
- Changing rooms with Showers: 50% - Will be delivered with wing H
- Gymnasium Air conditioned work out area adm 222 sq. mtr. with cardio & strength equipments: 30% - Will be provided with F / G
- Mini theatre Air conditioned preview theatre for 12-16 seating.: 0% - Will be delivered with wing I
- Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be delivered with Wing I
P51700013649 Rustomjee Azziano Wing K Completed
Confirmed with MahaRERA on 15 Sep 2026. Registered as "Rustomjee Azziano Wing K".
- Promoter
- Kapstone Constructions Private Limited
- Registered on
- 16 Oct 2017
- Proposed completion
- Sep 2022
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- 49/1,2,3 , 50/1a,2,3 , 51/1,2,3,4 pt ,5 pt, 53/2/3,383pt, Thane (M Corp.), Thane, Thane, 400601
- Land area
- 647 sq m (6,960 sq ft)
- Sanctioned built-up area
- 16,247 sq m (174,887 sq ft)
- Buildings
- Rustomjee Azziano Wing K (36 floors)
- Parking
- Open Space 0, Closed/Covered 0
- Complaints on the portal
- 1
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Rustomjee Azziano Wing K | 2 BHK Type 10 | 61 sq m (657 sq ft) | 4 |
| Rustomjee Azziano Wing K | 2 BHK Type 11 | 60 sq m (651 sq ft) | 4 |
| Rustomjee Azziano Wing K | 2 BHK Type 12 | 61 sq m (653 sq ft) | 3 |
| Rustomjee Azziano Wing K | 2 BHK Type 13 | 61 sq m (653 sq ft) | 4 |
| Rustomjee Azziano Wing K | 2 BHK Type 1 | 58 sq m (620 sq ft) | 32 |
| Rustomjee Azziano Wing K | 2 BHK Type 9 | 62 sq m (671 sq ft) | 4 |
| Rustomjee Azziano Wing K | 2 BHK Type 8 | 58 sq m (620 sq ft) | 32 |
| Rustomjee Azziano Wing K | 2 BHK Type 7 | 56 sq m (601 sq ft) | 31 |
| Rustomjee Azziano Wing K | 2 BHK Type 15 | 61 sq m (651 sq ft) | 4 |
| Rustomjee Azziano Wing K | 2 BHK Type 16 | 62 sq m (671 sq ft) | 4 |
| Rustomjee Azziano Wing K | 2 BHK Type 6 | 56 sq m (600 sq ft) | 31 |
| Rustomjee Azziano Wing K | 2 BHK Type 5 | 56 sq m (603 sq ft) | 32 |
| Rustomjee Azziano Wing K | 2 BHK Type 14 | 60 sq m (651 sq ft) | 4 |
| Rustomjee Azziano Wing K | 2 BHK Type 4 | 56 sq m (603 sq ft) | 22 |
| Rustomjee Azziano Wing K | 2 BHK Type 3 | 56 sq m (600 sq ft) | 31 |
| Rustomjee Azziano Wing K | 2 BHK Type 2 | 56 sq m (606 sq ft) | 31 |
Construction progress as reported to the portal
Rustomjee Azziano Wing K
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 99%
- Sanitary Fittings within the flats / premises: 90%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 99%
Common areas and facilities
- Internal Roads & Footpaths: 50% - Fire tender & Other Drive ways
- Water Supply: 60% - Connection from ESR to UG Tank
- Sewerage (Chamber, Lines, Septic Tank , STP): 33% - STP RCC work commenced
- Storm Water Drains: 50% - RCC Work of SWD Cover fixing WIP
- Landscaping & Tree Planting: 0% - Yet to commence
- Street Lighting: 0% - Yet to commence
- Treatment And Disposal Of Sewage And Sullage Water: 33% - STP work in progress.
- Solid Waste Management And Disposal: 0% - OWC Unit to be installed
- Water conservation /Rain water harvesting: 0% - RWH Drains and Chambers WIP
- Energy managemcnt: 0% - Solar Panels at terrace level as per MoEF
- Fire protection and fire safety requirements: 0% - Fire fighting works at Podium and Ground level WIP
- Electrical meter room, sub-station, receiving station: 0% - Yet to commence
- Box Cricket / Basket ball Court 14.5 x15.5 m designed for multisport activities.: 0% - Will be delivered with Wing K
- Tennis court: 0% - Will be delivered with Wing K
- Party Spill out area Capacity 100 to 120 pax open to sky: 0% - Will be provided with Wing I
- Alfresco dining Out door dining area for informal get together.: 0% - Will be provided with Wing I
- Resting cabanas Outdoor furniture for resting & relaxation: 0% - Will be provided with Wing I
- Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be provided with Wing I
- Prefunction area Guests Welcome Lounge for party hall: 0% - Will be provided with Wing I / J
- Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be provided with Wing I / J
- Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be Provided with Wing H
- Cooling mist pod Located near ramp: 0% - Will be provided with Wing I
- Dry fountain Fun activity .: 0% - Will be provided with Wing I
- Mini theatre Air conditioned preview theatre for 12-16 seating.: 0% - Will be provided with Wing I
- Changing rooms with Showers: 50% - Will be Provided with Wing H
- Business center / Meeting rooms (2 nos): 0% - Will be delivered with Wing K
- Swimming pool 49 x 11.3 m x 1.2 m deep: 85% - Will be provided with WIng I
- Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Will be delivered with Wing K
- Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be Provided with Wing H
- Mini Golf Semiopen Golf practice area in buiding foot print: 30% - Will be provided with Wing F
- Gymnasium Air conditioned work out area adm 222 sq. mtr. with cardio & strength equipments: 30% - Will be provided with Wing F / G
- Kid's play area Semi-Open Kids Play Area: 0% - Will be provided with Wing J
- Indoor Games zone Airconditioned space for pool, table tennis and board games like chess & carro: 30% - Will be Provided with Wing H
- Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
- Kid's pool Shallow pool 600mm depth: 80% - will be provided with Wing I
- Leons world Enclosed Kids Activity Area: 0% - Will be provided with Wing J
P51700015260 RUSTOMJEE AZZIANO WING E Completed
Confirmed with MahaRERA on 15 Sep 2026. Registered as "RUSTOMJEE AZZIANO WING E".
- Promoter
- Kapstone Constructions Private Limited
- Registered on
- 12 Feb 2018
- Proposed completion
- Feb 2023
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- 49/1,2,3 50/1A,2,3 51/1,2,3,4PT,5PT 53/2/3 383PT, Thane (M Corp.), Thane, Thane, 400601
- Land area
- 568 sq m (6,117 sq ft)
- Sanctioned built-up area
- 13,698 sq m (147,449 sq ft)
- Buildings
- RUSTOMJEE AZZINO WING E (36 floors)
- Parking
- Open Space 0, Closed/Covered 0
- Complaints on the portal
- 1
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| RUSTOMJEE AZZINO WING E | 2BHK TYPE 6 | 65 sq m (698 sq ft) | 35 |
| RUSTOMJEE AZZINO WING E | 2 BHK TYPE 5 | 60 sq m (647 sq ft) | 25 |
| RUSTOMJEE AZZINO WING E | 2BHK TYPE 4 | 65 sq m (696 sq ft) | 35 |
| RUSTOMJEE AZZINO WING E | 2BHK TYPE 3 | 66 sq m (715 sq ft) | 35 |
| RUSTOMJEE AZZINO WING E | 2 BHK TYPE1 | 67 sq m (720 sq ft) | 36 |
| RUSTOMJEE AZZINO WING E | 2BHK TYPE 2 | 60 sq m (647 sq ft) | 35 |
Construction progress as reported to the portal
RUSTOMJEE AZZINO WING E
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 99%
- Sanitary Fittings within the flats / premises: 91%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 35% - FIRE TENDER AND OTHER DRIVE WAYS
- Water Supply: 60% - CONNECTION FROM ESR TO UGT
- Sewerage (Chamber, Lines, Septic Tank , STP): 22% - STP RCC WORKS COMMENCED
- Storm Water Drains: 50% - SWD RCC Work & Covers fixing
- Landscaping & Tree Planting: 0% - ON PODIUM AND GROUND RG
- Street Lighting: 0% - LIGHTS AT GROUND AND PODIUM
- Treatment And Disposal Of Sewage And Sullage Water: 0% - STP Installation WIP
- Solid Waste Management And Disposal: 0% - OWC Unit installed
- Water conservation /Rain water harvesting: 0% - RWH Drains and Chambers WIP
- Energy managemcnt: 0% - SOLAR PANELS AT TERRACE
- Fire protection and fire safety requirements: 0% - FIRE FIGHTING WORKS AT PODIUM
- Electrical meter room, sub-station, receiving station: 0% - METER ROOM AND SUBSTATION WIP
- Aggregate area of recreational Open Space: 0% - Common for the Whole Project
- Café Airconditioned cafe for 20 to 25 seating , with a service pantry.: 30% - Will be Delivered with Wing H
- kids Pool Shallow Pool for Kids 600 mm deepth: 80% - Will be Delivered with Wing I
- Dry fountain Fun activity .: 80% - Will be Delivered with Wing I
- Box Cricket / Basket ball Court 14.5 x15.5 m designed for multisport activities.: 0% - Common Amenity will be Delivered with Wing K
- Leons World Enclosed Kids Activity Area: 0% - Will be Delivered Wing J
- Senior citizens relaxation area Semi Covered with resting benches / recliners: 0% - Will be Delivered with Wing I
- Barbeque Corner Open Air Barbeque Pod: 0% - Common Amenity will be Delivered with Wing E
- Business center / Meeting rooms (2 nos): 0% - Common Amenity will be Delivered with Wing K
- Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangement: 0% - Will be Delivered Wing J
- Jumping Garden Varing Level Lawn Patches for Kids to enjoy Jumping: 0% - Common Amenity will be Delivered with Wing E
- Changing rooms with Showers: 50% - Will be Delivered with Wing H
- Feature Deck Pavilion Landscape Feature with Outdoor Seating: 0% - Common Amenity will be Delivered with Wing E
- Hammocks Pavilion Hammocks places below Tree Shade: 0% - Common Amenity will be Delivered with Wing E
- Puzzle Path Puzzle Pathway created with Shrubs: 0% - Common Amenity will be Delivered with Wing E
- Meditation POD Deck Area in Building Footprint for Meditation: 0% - Common Amenity will be Delivered with Wing E
- Climbing wall Deigned in Building Footprint: 0% - Common Amenity will be Delivered with Wing E
- Squash Court Standard Size Squash Court: 0% - Common Amenity will be Delivered with Wing E
- Guest Rooms Twin Sharing Guest Rooms 6 nos: 0% - Common Amenity will be Delivered with Wing E
- Amphitheatre Designed Space for 20 25 pax gatherings: 0% - Common Amenity will be Delivered with Wing E
- Childrens Play Area Kids play activity zone.: 0% - Common Amenity will be Delivered with Wing E
- Kid's play area Semi-Open Kids Play Area: 0% - Will be Delivered Wing J
- Prefunction area Guests Welcome Lounge for party hall: 0% - Will be Delivered Wing J
- Spa Air conditioned spa with two treatment rooms and attached restroom.: 25% - Will be Delivered with Wing H
- Festive Plaza and Multiputpose Play Ground: 100% - Common for the Whole Project
- Indoor Games zone Airconditioned space for pool, table tennis and board games like chess & carro: 0% - Will be Delivered with Wing H
- Mini Golf Semiopen Golf practice area in buiding foot print: 0% - Will be Delivered with Wing F & G
- Tennis court Flood Lit size 24 X 11 mts: 0% - Common Amenity will be Delivered with Wing K
- Mini theatre Air conditioned preview theatre for 12-16 seating.: 0% - Will be Delivered with Wing I
- Yoga Hall Deck Air Conditioned Space for Yoga Activity: 0% - Common Amenity will be Delivered with Wing E
- Resting cabanas Outdoor furniture for resting & relaxation: 0% - Will be Delivered with Wing I
- Prefunction area Guests Welcome Lounge for party hall: 0% - Will be Delivered with Wing I
- Alfresco dining Out door dining area for informal get together.: 0% - Will be Delivered with Wing I
- Library / Reading Room Airconditioned space provided for reading & interaction .: 0% - Common Amenity will be Delivered with Wing K
- Swimming pool 49 x 11.3 m x 1.2 m deep: 85% - Will be Delivered with Wing I
- Party Spill out area Capacity 100 to 120 pax open to sky: 0% - Will be Delivered with Wing I
- Cooling mist pod Located near ramp: 0% - Will be Delivered with Wing I
- Gymnasium Air conditioned work out space with cardio & strength equipments: 0% - Will be Delivered with Wing F & G
Reviews
Be the first to write a review of Rustomjee Urbania Azziano and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Enter some positive aspects of Rustomjee Urbania Azziano
Enter some negative aspects of Rustomjee Urbania Azziano
Location
Rustomjee Urbania Azziano, Thane West, Thane - 401208 (Maharashtra)
Landmarks
Shopping
- Patanjali Megastore Dr.Vig Medicaments (<3km)
- Chenna Ram General Stores (<3km)
- Shree Gopal Corner (<4km)
- Shraddha Services (<4km)
- 9 Nine Convenience Store (<7km)
- Life Style Family Shop (<12km)
- Shreeji Supermarket (<13km)
- Geeta Supermarket (<13km)
Transportation
- Hawre Helipad (<8km)
- Reliance Corporate Park Helipad No. 1 (<13km)
- Reliance Corporate Park Helipad No.2 (<13km)
- Reliance Corporate Park Helipad No.3 (<13km)
- Hiranandani Helipad (<5km)
- Reliance Corporate Park - Helipad (<13km)
Offices
- Martand Hall (<2km)
- Sanjay Teli (<6km)
- Lorbrulgrad (<7km)
Hotels & Guest Houses
- Hotel Satkar Residency (<3km)
- Hotel Tip Top Plaza (<6km)
- OYO Rooms Thane West (<5km)
- Hotel Ratna Palace Residency (<3km)
- Hotel Royal Park Residency (<4km)
- Hotel Vinyasa (<5km)
- Vista Rooms @ Thane West (<6km)
- Mango Hotels Navi Mumbai Airoli (<7km)
- Hotel Jalaja Heritage (<7km)
- STARiHOTELS Thane West (<3km)
- OYO 8899 Invitado Inc (<10km)
- Executive Flamingo - 3 BHK Apt Thane (<6km)
- Hotel Alka Residency (<4km)
- Treebo Archana Residency (<6km)
- HOTEL SHAMBUJI (<8km)
- Royal Service Apartment Malad (<7km)
- Sky water twin Villa & lifestyle (<11km)
- Hotel Dwaraka Residency (<6km)
- Hotel Lerida (<2km)
- OYO 7154 Hotel Highland Residency (<3km)
Recreation
- INOX Korum (<3km)
- Cinemax (<5km)
- R Adlabs (<7km)
- Gold Cinema Thane (<3km)
- Cinépolis (<14km)
- Cinema star. (<2km)
- Cinemax WonderMall (<2km)
- Cinépolis (<2km)
- Davakhar Infrastructure Pvt. Ltd. (<3km)
- PVR Cinemas (<10km)
- Carnival Cinemas (<12km)
- Lance Vision Group (<13km)
- Ganesh Theatre (<3km)
- Anand Cinemas (<4km)
- Ashok Cinema (<4km)
- Vandana Theatre (<3km)
- Jawahar Talkies (<7km)
- Vandana Cinema Hall (<2km)
- Prabhat Plaza Private Limited (<3km)
- P P Manglas Chambers (<4km)
Education
- Smt. Sulochanadevi Singhania School (<3km)
- Transcendental Meditation Center (<3km)
- Vidya Prasarak Mandal School (<9km)
- Pawar Public School (<12km)
- DAV Public School (<10km)
- Little Flower High School (<4km)
- DAV International School (<8km)
- Universal High School (<6km)
- New Horizon Scholars School and Neo kids (<9km)
- Euro Kids (<2km)
- Sri Sri Ravishankar Vidya Mandir Mulund
- Kidzee (<5km)
- Sheth Karamshi Kanji English School (<8km)
- EuroKids (<8km)
- Brahmakumaris (<4km)
- Guitar Grund (<2km)
- Sharon English High School (<8km)
- Saraswati Vidyalaya High School & Junior College (<9km)
- Hiranandani Foundation School (<7km)
- Balloon Kids Pre School (<3km)
Other Features
- Mumbai (<9km)
- ATM (<8km)
Religious Places
- Our Lady Of Mercy Church (<4km)
- Methodist Tamil Church Thane (<3km)
- Our Lady of Fatima Church (<1km)
- Covenant Blessings Church - Thane (<5km)
- St Stephens Orthodox Church (<3km)
- Springs of Life Ministries Church (<8km)
- St. Pius X Church (<9km)
- PRC Thane (<1km)
- Mar Thoma Syrian Church Thane (<1km)
- Indian Pentecostal Church of God (IPC Thane) (<3km)
- IPC Gerizim Church (<3km)
- St. Thomas Church (<4km)
- St. Thomas Malankara Catholic Church Thane (<4km)
- Bethesda Hall (<4km)
- Amala Matha Church (<8km)
- Mother Of Victory Church Tikujiniwadi (<5km)
- St Joseph Church (<7km)
- Bethesda Church (<7km)
- Divine life AG church (<8km)
Hospitals & Healthcare
- Access Dental (<4km)
- Trisa Dental Solutions (<8km)
- Dr Thakkers Total Dental Care (<7km)
- Dr. Vora
- Dentall Solutions - Dr. Pai
- Dr. Karve
- dr gogri
- Vyughadhanth (Dr.Rajesh Iyer
- Shaligram Ajit - Dr Shaligram Avinash (<3km)
- goodhealthclinic (<8km)
- Dental Concepts™ Thane (<5km)
- Smile Speak Dental Clinic (<9km)
- Dr. Amol
- Dentist Dr. Karve (<4km)
- Friendly Smile Dental Clinic (<1km)
- Chaudhari
Restaurants & Clubs
- Monginis Cake Shop (<3km)
- Monginis Cake Shop (<5km)
- Ribbons and Balloons (<7km)
- Monginis Cake Shop (<7km)
- Chandu Halwai Airoli c/o DMart (<10km)
- HangOut Cakes & More (<4km)
- St. Anthony
- Monginis Cake Shop (<4km)
- Banglore Iyangar Bakery (<2km)
- Monginis Cake Shop (<9km)
- Monginis Cake Shop (<2km)
- Ganesh Bakery (<5km)
- Oven Hot (<4km)
- nandira cakes (<3km)
- Gaurav Sweets And Namkeen (<4km)
- Venus Cold Corner (<1km)
- Maharaja bakery and cake shop (<1km)
Banks & ATMs
- Dena Bank ATM (<7km)
- Abhyudaya Co-Operative Bank Limited (<5km)
- IDBI Bank ATM Mulund West (<8km)
- Bank of Baroda ATM (<10km)
- Canara Bank (<9km)
- Axis Bank ATM (<8km)
- Axis Bank ATM (<10km)
- Kotak Mahindra Bank ATM (<4km)
- State Bank Of India ATM (<1km)
- HDFC Bank ATM (<11km)
- Indian Overseas Bank ATM (<4km)
- Catholic Syrian Bank Atm (<7km)
- Punjab National Bank ATM (<4km)
- IDBI Apna Bazar Branch
- Axis Bank ATM (<7km)
- CITI Bank ATM (<4km)
- State Bank Of India ATM (<4km)
- SBI ATM (<7km)
- Axis Bank ATM (<2km)
- Citibank ATM (<4km)
- Project ID
- J421821190
- Updated
- Searches
- 10518
- Views
- 2085