Aerial View
Elevation
Elevation
 15

Runwal The Central Park - Pimpri Chinchwad, Pune

Builder
Runwal Group
Construction
Under Construction
Completion
Oct, 2027
Properties
Apartments
RERA
P52100025260, P52100030291, P52100032101

Description

where bliss greets you

Runwal The Central Park is located in Pimpri-Chinchwad, Pune offers 2,3&4 BHK apartments with different size ranges of 671 - 1935 sqft. spread over a total area of 20 acres of land with lots of amenities. The clubhouse is approximately 40000 sq ft. having 11 buildings with 21 floors and it has 1245 units. the project has an open green space of around 5 Acres.

Amenities:
  • Jacuzzi
  • Steam Room
  • Sauna Bath
  • Health Facilities
  • Tennis Court
  • Restaurants/ Cafeterias
  • Cigar Lounge
  • Sun Deck
  • Party Lawn
  • Gazebo
  • Cycling & Jogging Track
  • Multi-Level Parking
  • Multipurpose Hall
  • Lawn Tennis Court
  • Garbage Disposal
  • Entrance Lobby
  • Paved Compound
  • Flower Garden
  • Senior Citizen Siteout
  • Waiting Lounge
  • Billiards/Snooker Table
  • 24X7 Water Supply
  • Car Parking
  • Intercom
  • Club House
  • CCTV
  • Storm Water Drains
  • Landscaping & Tree Planting
  • Closed Car Parking
  • Visitor Parking
  • Reserved Parking
  • 24x7 Security
  • Internal Roads
  • Yoga/Meditation Area
  • Gymnasium
  • Lift(s)
  • Rain Water Harvesting
  • Sewage Treatment Plant
  • Fire Fighting System
  • Children's Play Area
  • Badminton Court
  • Gated Community
  • Basketball Court
  • Party Hall
  • Fire Sprinklers
  • Power Backup
  • Swimming Pool
  • Skating Rink
Runwal Group was established in 1978. Runwal Group is India’s premier and leading real estate developer operating in residential, commercial, and organized retail verticals. Over 51 landmark projects delivered in the last 4 decades with over 2.7 M sq. mt of development. The group has brought smiles to more than 20,000 happy families across Mumbai.

Highlights

  • Power Back-up
  • Water Softner
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • Centrally Air Conditioned
  • Room AC
  • Lifts
  • High Speed Internet
  • Wi-Fi
  • RO System
  • Balcony
  • Reserved Parking
  • Security Guards
  • Fire Alarm
  • Electronic Security
  • Intercom Facility
  • Park Facing
  • Woodwork
  • Modular Kitchen
  • Feng Shui / Vaastu Compliant
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • ATM

Configurations

Type Area Possession Price *
2BHK Apartment611 SqFeetWithin 2 Years₹ 84 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52100025260 THE CENTRAL PARK PHASE -I Active 100% built

Confirmed with MahaRERA on 20 Sep 2026. Registered as "THE CENTRAL PARK PHASE -I".

Promoter
R RETAIL VENTURES PRIVATE LIMITED
Registered on
27 Mar 2020
Proposed completion
Apr 2027 (originally Dec 2026)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
NH4 OLD MUMBAI PUNE HIGHWAY, Chinchwad, Pimpri Chinchawad (M Corp.), Haveli, Pune, 411019
Land area
2,831 sq m (30,472 sq ft)
Sanctioned built-up area
81,370 sq m (875,892 sq ft)
Buildings
C1 (41 floors); C2 (41 floors); C3 (41 floors); B1 (41 floors); B2 (41 floors)
Parking
Open Space 0, Closed/Covered 608
Complaints on the portal
6
Construction progress as reported to the portal

C1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

C2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

C3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100%
  • Water Supply: 100%
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100%
  • Storm Water Drains: 100%
  • Landscaping & Tree Planting: 100%
  • Street Lighting: 100%
  • Treatment And Disposal Of Sewage And Sullage Water: 100%
  • Solid Waste Management And Disposal: 100%
  • Water conservation /Rain water harvesting: 100%
  • Energy managemcnt: 100%
  • Fire protection and fire safety requirements: 100%
  • Electrical meter room, sub-station, receiving station: 100%
  • Aggregate area of recreational Open Space: 0%

P52100030291 THE CENTRAL PARK PHASE - II Active 77% built

Confirmed with MahaRERA on 20 Sep 2026. Registered as "THE CENTRAL PARK PHASE - II".

Promoter
R RETAIL VENTURES PRIVATE LIMITED
Registered on
15 Aug 2021
Proposed completion
Oct 2027 (originally Jun 2027)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
NH4 Old Mumbai Pune Highway, Chichwad, Pimpri Chinchawad (M Corp.), Haveli, Pune, 411019
Land area
2,339 sq m (25,173 sq ft)
Sanctioned built-up area
48,064 sq m (517,372 sq ft)
Buildings
A1 (45 floors); A2 (45 floors); B3 (45 floors); B4 (45 floors)
Parking
Open Space 0, Closed/Covered 636
Complaints on the portal
5
Construction progress as reported to the portal

A1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 62%
  • Sanitary Fittings within the flats / premises: 10%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 52%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 35%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%

A2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 55%
  • Sanitary Fittings within the flats / premises: 10%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 45%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 35%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%

B3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 87%
  • Sanitary Fittings within the flats / premises: 12%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 67%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 68%

B4

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 85%
  • Sanitary Fittings within the flats / premises: 12%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 65%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 68%

Common areas and facilities

  • Internal Roads & Footpaths: 15%
  • Water Supply: 0%
  • Sewerage (Chamber, Lines, Septic Tank , STP): 50%
  • Storm Water Drains: 15%
  • Landscaping & Tree Planting: 25%
  • Street Lighting: 5%
  • Community Buildings: 90%
  • Treatment And Disposal Of Sewage And Sullage Water: 10%
  • Solid Waste Management And Disposal: 50%
  • Water conservation /Rain water harvesting: 0%
  • Energy managemcnt: 0%
  • Fire protection and fire safety requirements: 15%
  • Electrical meter room, sub-station, receiving station: 10%

P52100032101 THE CENTRAL PARK PHASE - III Active 67% built

Confirmed with MahaRERA on 20 Sep 2026. Registered as "THE CENTRAL PARK PHASE - III".

Promoter
R RETAIL VENTURES PRIVATE LIMITED
Registered on
6 Dec 2021
Proposed completion
Oct 2027 (originally Jun 2027)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
NH4 Old Mumbai Pune Highway, Chinchwad, Pimpri Chinchawad (M Corp.), Haveli, Pune, 411019
Land area
758 sq m (8,156 sq ft)
Sanctioned built-up area
15,343 sq m (165,157 sq ft)
Buildings
Tower A3 (45 floors)
Parking
Open Space 0, Closed/Covered 329
Construction progress as reported to the portal

Tower A3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 45%
  • Sanitary Fittings within the flats / premises: 10%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 35%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 28%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 18%

Common areas and facilities

  • Internal Roads & Footpaths: 0%
  • Water Supply: 0%
  • Sewerage (Chamber, Lines, Septic Tank , STP): 35%
  • Storm Water Drains: 0%
  • Landscaping & Tree Planting: 3%
  • Street Lighting: 0%
  • Community Buildings: 90%
  • Treatment And Disposal Of Sewage And Sullage Water: 0%
  • Solid Waste Management And Disposal: 0%
  • Water conservation /Rain water harvesting: 0%
  • Energy managemcnt: 0%
  • Fire protection and fire safety requirements: 0%
  • Electrical meter room, sub-station, receiving station: 5%
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Runwal The Central Park and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Runwal The Central Park
Cons:
Enter some negative aspects of Runwal The Central Park

Location

Runwal The Central Park, Pimpri Chinchwad, Pune - 411019 (Maharashtra)

* Location may be approximate

Landmarks

  • ATM/Bank/Exchange

    • Au Small Finance Bank (<0.5km)
    • Cosmos Bank-Chinchwad (<0.5km)
    • Federal Bank-Pimpri-Chinchwad (<0.5km)
    • Icici Bank (<0.5km)
    • State Bank of India (<0.5km)
    • HSBC (<0.5km)
    • Saraswat Bank-Chichawad (<0.5km)
    • Saraswat Bank Atm (<0.5km)
    • Yes Bank (<0.5km)
    • Bharat Co-op Bank-Pimpri Chinchwad (<0.5km)
    • Hdfc Bank (<0.5km)
    • Indusind Bank (<0.5km)
  • Hospitals & Clinics

    • Apoorva Skin And Laser Clinic (<0.5km)
    • Aditya Birla Health Store (<0.5km)
    • Innova Dentech (<0.5km)
    • London Joint Clinic (<0.5km)
    • Asian Optics (<0.5km)
    • Aditya Birla Health Clinic (<0.5km)
    • Dr Bhushan Chaudhari (<0.5km)
    • Naina Optic Empire (<0.5km)
    • Healing Hands Clinic (<0.5km)
    • Panache Cosmetic Clinic (<0.5km)
    • Cosmo Dent (<0.5km)
    • Sabka Dentist (<0.5km)
    • The Power of Laser (<0.5km)
  • Hotel

    • Tanishka Hotel (<0.5km)
    • Supreme Hotel (<0.5km)
    • Planet 10 Hotel (<0.5km)
    • Fabhotel Suryakiran Chinchwad (<0.5km)
    • Hotel Plaza Palace-Chinchwad (<0.5km)
    • Krishna Hotel (<0.5km)
    • Sama Hotel (<0.5km)
  • Restaurant & Shops

    • Hastakala (<0.5km)
    • Bombay Sale (<0.5km)
    • Metro (<0.5km)
    • Bata (<0.5km)
    • The Raymond Shop (<0.5km)
    • Lenskart. Com (<0.5km)
    • Real (<0.5km)
    • Route 96 (<0.5km)
    • People (<0.5km)
    • Studio 9 (<0.5km)
    • Raiyan Collections (<0.5km)
    • Pavitra Dryfruits (<0.5km)
    • Kamlesh Super Shoppes (<0.5km)
    • Cottonking (<0.5km)
    • The Clover Bar and Kitchen (<0.5km)
    • Big Bazar (<0.5km)
    • Liberty (<0.5km)
    • Redtaps (<0.5km)
    • Mega Sales (<0.5km)
    • Redtape Online Outlet (<0.5km)
    • MSL Shoes (<0.5km)
    • JOHN PLAYERS (<0.5km)
    • Regal Shoes (<0.5km)
    • Mynik (<0.5km)
    • Pantaloon (<0.5km)
    • Blackberrys (<0.5km)
    • U N Dress (<0.5km)
    • Ayush Enterprises (<0.5km)
    • Peter England (<0.5km)
    • Fbb (<0.5km)
    • Archies (<0.5km)
    • W (<0.5km)
    • RAYMOND (<0.5km)
    • Reebok (<0.5km)
    • Ashwini Enterprises (<0.5km)
    • Jaihind (<0.5km)
    • PLANET FASHION (<0.5km)
    • Spykar (<0.5km)
    • lenskart.com (<0.5km)
    • Karim General Store (<0.5km)
    • Belmonte (<0.5km)
    • Shoexpress (<0.5km)
    • Red Tape (<0.5km)
    • Provogue (<0.5km)
    • Foothold Shoes (<0.5km)
    • Crossword (<0.5km)
    • New Vision Optical (<0.5km)
    • Jockey (<0.5km)
  • Public Transport

    • Empire Estate (<0.5km)
  • Recreation

    • Adlabs Cinema Hall (<0.5km)
    • Kiddy Garden (<0.5km)
    • Big Cinemas (<0.5km)
    • adidas (<0.5km)
    • Pimpri Chinchwad Science Park (<0.5km)
    • Carnival Cinemas (<0.5km)
  • Shopping Centre

    • Loot Mart (<0.5km)
    • Premier Plaza Mall (<0.5km)
    • Just in Time (<0.5km)
    • Brand Factory (<0.5km)
  • Taxi Stand

    • Ola Pickup-Premier Plaza Mall (<0.5km)
    • Uber Pickup-Premier Plaza Mall (<0.5km)
    • Uber Drop Off-Premier Plaza Mall (<0.5km)
    • Ola Drop Off-Premier Plaza Mall (<0.5km)
Project ID
J119239411
Updated
Searches
5310
Views
1247