Runwal Sanctuary - Mulund West, Mumbai
- Builder
- Runwal Realty
- Construction
- Completed
- Completion
- Jul, 2028
- Properties
- Apartments
- RERA
- P51800012621
Description
Reflects beauty in its true sense
Runwal Sanctuary by Runwal Realty at the very prime location of Mulund West in Mumbai offers residential project that host 2,3,4 and 5 bhk apartments in the size ranges in between 690 to 2060 sqft. The project host various amenities for the residents some of them are gym, swimming pool, indoor games etc. The project is strategically located and provides direct connectivity to nearly all other major points in and around Mumbai.
Amenities:
- Swimming Pool
- Restaurant
- Children Play Area
- Spa
- Gym
- Gated Community
- Badminton Court
- Sewage Treatment Plant
- Squash Court
- Internal Roads
- Community Hall
- Aerobics Room
Runwal Realty is one of Mumbai’s premier real estate developers, operating in the residential, commercial and organized retails verticals. With a robust track record of 51 delivered projects with over 20 thousand Happy families, it has continuously driven to keep the ‘customer’ as a focal point in the designing, planning and construction of all its projects.
Highlights
- Power Back-up
- Water Softner
- Maintenance Staff
- Water Supply / Storage
- Rain Water Harvesting
- Waste Disposal
- Centrally Air Conditioned
- Room AC
- Lifts
- High Speed Internet
- Wi-Fi
- RO System
- Balcony
- Reserved Parking
- Security Guards
- Fire Alarm
- Electronic Security
- Park Facing
- Woodwork
- Modular Kitchen
- Feng Shui / Vaastu Compliant
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
- ATM
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 2BHK Apartment | 690 SqFeet | Immediate/Ready to move | ₹ 1.45 crore |
| 3BHK Apartment | 77.11 SqMeters | Immediate/Ready to move | ₹ 2.15 crores |
| 3BHK Apartment | 86.4 SqMeters | Immediate/Ready to move | ₹ 2.15 crores |
| 3BHK Apartment | 1,030 SqFeet | Immediate/Ready to move | ₹ 2.25 crores |
| 3BHK Apartment | 148.32 SqMeters | Immediate/Ready to move | ₹ 2.19 crores |
| 4BHK Apartment | 1,380 SqFeet | Immediate/Ready to move | - |
| 5BHK Apartment | 2,060 SqFeet | Immediate/Ready to move | - |
RERA
P51800012621 The Sanctuary Completed
Confirmed with MahaRERA on 22 Sep 2026. Registered as "The Sanctuary".
- Promoter
- Runwal Construction Private Limited
- Registered on
- 6 Sep 2017
- Proposed completion
- Jul 2028
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- L B S Marg, Kurla, Kurla, Mumbai Suburban, 400080
- Land area
- 24,406 sq m (262,715 sq ft)
- Sanctioned built-up area
- 26,231 sq m (282,362 sq ft)
- Buildings
- Tower 1 (29 floors); Tower 2 (28 floors); Tower 3 (29 floors); Tower 4 (78 floors); Tower 5 (78 floors)
- Parking
- Open Space 0, Closed/Covered 1400
- Complaints on the portal
- 61
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Tower 1 | 3BHK | 98 sq m (1,058 sq ft) | 21 |
| Tower 1 | 2BHK | 71 sq m (768 sq ft) | 24 |
| Tower 1 | 3BHK | 78 sq m (839 sq ft) | 24 |
| Tower 1 | 3BHK | 77 sq m (830 sq ft) | 24 |
| Tower 1 | 1RK | 31 sq m (333 sq ft) | 1 |
| Tower 2 | 2 BHK | 65 sq m (695 sq ft) | 84 |
| Tower 2 | 2 BHK | 85 sq m (914 sq ft) | 1 |
| Tower 3 | 3BHK | 98 sq m (1,058 sq ft) | 21 |
| Tower 3 | 2BHK | 71 sq m (768 sq ft) | 24 |
| Tower 3 | 3BHK | 77 sq m (830 sq ft) | 24 |
| Tower 3 | 3BHK | 78 sq m (839 sq ft) | 24 |
| Tower 3 | 1RK | 31 sq m (333 sq ft) | 1 |
| Tower 4 | 2.5 BHK | 72 sq m (776 sq ft) | 138 |
| Tower 4 | 2 BHK | 55 sq m (595 sq ft) | 129 |
| Tower 4 | 2 BHK | 56 sq m (604 sq ft) | 129 |
| Tower 5 | 4 BHK | 133 sq m (1,426 sq ft) | 69 |
| Tower 5 | 3 BHK | 87 sq m (938 sq ft) | 69 |
| Tower 5 | 3 BHK | 86 sq m (930 sq ft) | 60 |
| Tower 5 | 2 BHK | 55 sq m (595 sq ft) | 69 |
| Tower 5 | 2 BHK | 56 sq m (604 sq ft) | 69 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
| Q4 FY 2024-2025 | not filed - in default | - | - |
| Q1 FY 2025-2026 | 8 Aug 2025 | - | - |
| Q2 FY 2025-2026 | 4 May 2026 | - | - |
| Q3 FY 2025-2026 | 5 May 2026 | - | - |
| Q4 FY 2025-2026 | 4 May 2026 | - | - |
| Q1 FY 2026-2027 | not filed - in default | - | - |
Construction progress as reported to the portal
Tower 1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Tower 2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 89%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 69%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 68%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 10%
Tower 3
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Tower 4
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 97%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 55%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 30%
Tower 5
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 65%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 30%
Common areas and facilities
- Internal Roads & Footpaths: 0% - NO FOOTPATH
- Water Supply: 25% - WATER LINE
- Sewerage (Chamber, Lines, Septic Tank , STP): 30% - WIP
- Storm Water Drains: 15% - WIP
- Landscaping & Tree Planting: 5% - WIP
- Street Lighting: 0% - WIP
- Community Buildings: 0% - WIP
- Treatment And Disposal Of Sewage And Sullage Water: 0% - STP
- Solid Waste Management And Disposal: 0% - WIP
- Water conservation /Rain water harvesting: 10% - WIP
- Energy managemcnt: 0% - WIP
- Fire protection and fire safety requirements: 0% - WIP
- Electrical meter room, sub-station, receiving station: 20% - WIP
- Aggregate area of recreational Open Space: 0% - 8154.50 sq.mt
Reviews
Write a review
Be the first to write a review of Runwal Sanctuary and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Runwal Sanctuary
Enter some positive aspects of Runwal Sanctuary
Cons:
Enter some negative aspects of Runwal Sanctuary
Enter some negative aspects of Runwal Sanctuary
Location
Runwal Sanctuary, Mulund West, Mumbai - 400082 (Maharashtra)
Nearby
-
Transport
- Zojwala Petroleum (~2 km)
- Mulund (~3 km)
- MHADA Bus Station (~4 km)
- Aarey JVLR (~10 km)
- Chhatrapati Shivaji Maharaj International Airport (~17 km)
- Navi Mumbai International Airport (~34 km)
-
Shopping & Dining
- Main Bazaar (<1 km)
- Love and Latte (<1 km)
- The Food Town (<1 km)
- DMart (~1 km)
- Korum Mall (~6 km)
- Shoppers Stop (~7 km)
-
Healthcare
- Upasani Super Speciality Hospital (<1 km)
- CGHS Dispensary No.19, Mulund (<1 km)
- Apollo Pharmacy Mulund West Subhash Road (~1 km)
- ESIS Hospital (~1 km)
- Zeelab Pharmacy (~2 km)
- Dr. Kaushal Malhan (~2 km)
-
Education
- veena nagar bmc school (~2 km)
- Sheth Karamshi Kanji English School (~2 km)
- Mulund College of Commerce - MCC (~3 km)
- Read And Share Library (~3 km)
- National Institute of Industrial Engineering (~8 km)
- Indian Institute of Technology Bombay (~8 km)
-
Leisure & Entertainment
- Sardar Pratap Singh Manoranjan Maidan (~1 km)
- Kalidas Sports Complex (~1 km)
- Mehul Cinema (~2 km)
- Dadoji Konddev Stadium (~7 km)
- Kharghar Valley Golf Course (~25 km)
- Veermata Jijabai Bhosale Zoo & Botanical Garden (~34 km)
-
Services
- Mulund Branch ATM (<1 km)
- Bank of Maharashtra (<1 km)
- Mulund Fire Brigade (<1 km)
- T Ward Office (~2 km)
- Mulund Police Station (~2 km)
- Nehru Road Sub Post Office (~2 km)
-
Religious Places
- Arya Samaj Mandir Mulund Colony (<1 km)
- Kalgidhar Sakchand Darbar Sahib (<1 km)
- Sai Baba Mandir (<1 km)
- Saint Pius X Church (~2 km)
- Dargah Qutbul-u-Auliya (~2 km)
- Jain Derasar (~2 km)
-
Business & Hospitality
- Avior Corporate Park (<1 km)
- Johnson & Johnson (<1 km)
- CEAT Tyre (~3 km)
- Ashar IT Park (~5 km)
- IBIS (~7 km)
- ibis Thane (~7 km)
- Project ID
- J289514211
- Updated
- Searches
- 10333
- Views
- 1861