Runwal Gardens - Dombivli East, Thane

Builder
Runwal Group
Construction
Partially Completed
Completion
Jun, 2025
Properties
Apartments
RERA
P51700022699, P51700024154

Description

a home with your dream

Runwal Gardens is located in Shil Road, Dombivli East offers 1,2&3 BHK apartments having different sizes ranging from 323-918 sqft. The project area spread over of 115 acres of land with lots of facilities. The project having 32 buildings with 1923 units. It has an 11 acres central park with 100+ amenities. thoughtfully built project has an expanse of lush green grass, over 1800 trees, and more than 14 breathtaking gardens; making joy truly evergreen.

Amenities:
  • Club House
  • Security
  • Park
  • Intercom Facility
  • Maintenance Staff
  • Indoor Games Room
  • Flower Gardens
  • Rain Water Harvesting
  • Water Storage
  • Indoor Squash & Badminton Courts
  • Vaastu Compliant
  • Waste Disposal
  • CCTV Camera
  • Fire Fighting Equipment
Runwal Group renowned for delivering projects with their signature attributes of clear marketable title, on-time delivery and highest quality standards has brought smiles to over 25,000 families till date. The group’s world-class project R-City mall is a landmark and is visited by millions of shoppers, every year. The group holds the distinction of being the first to build a mall in Mumbai and also introduce the concept of malls in the suburbs.

Highlights

  • Power Back-up
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • Lifts
  • High Speed Internet
  • Security Guards
  • Fire Alarm
  • Electronic Security
  • Balcony
  • Reserved Parking
  • Park Facing
  • Woodwork
  • Modular Kitchen
  • Feng Shui / Vaastu Compliant
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • Cafeteria / Food Court
  • Service / Goods Lift
  • High Speed Internet / Wi-Fi

Configurations

Type Area Possession Price *
1BHK Apartment347 SqFeetImmediate/Ready to move₹ 38.58 lakhs
1BHK Apartment454 SqFeetImmediate/Ready to move₹ 49.91 lakhs
1BHK Apartment550 SqFeetImmediate/Ready to move₹ 36 lakhs
2BHK Apartment505 SqFeetImmediate/Ready to move₹ 56.25 lakhs
2BHK Apartment612 SqFeetImmediate/Ready to move₹ 67.74 lakhs
2BHK Apartment674 SqFeetImmediate/Ready to move₹ 75.28 lakhs
3BHK Apartment724 SqFeetImmediate/Ready to move₹ 78 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51700022699 Runwal Gardens Phase I Lapsed 91% built

Confirmed with MahaRERA on 20 Sep 2026. Registered as "Runwal Gardens Phase I".

Promoter
Runwal Residency Private Limited
Registered on
12 Oct 2019
Proposed completion
Jun 2025 (originally Jun 2024)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Village Gharivali usarghar and Sagoan, Dombivli, DOMBIVLI, Kalyan, Thane, 421204
Land area
10,674 sq m (114,900 sq ft)
Sanctioned built-up area
112,014 sq m (1,205,747 sq ft)
Buildings
Building No 2 (25 floors) - 10 of 134 available; Building No 3 (25 floors) - 0 of 179 available; Building No 4 (25 floors) - 9 of 134 available; Building No 5 (25 floors) - 4 of 179 available; Building No 6 (25 floors) - 1 of 179 available; Building No 7 (25 floors) - 3 of 179 available; Building No 8 (25 floors) - 6 of 134 available; Building No 9 (25 floors) - 0 of 179 available; Building No 10 (25 floors) - 13 of 134 available; Building No 11 (25 floors) - 4 of 179 available; Building No 12 (25 floors) - 2 of 134 available; Commercial Building MLCP 1 (22 floors) - 2 of 14 available; Building No 1 (25 floors) - 2 of 179 available
Parking
Open Space 0, Closed/Covered 0
Complaints on the portal
12
BuildingUnit typeCarpet areaUnits
Building No 21BHK 41 sq m (438 sq ft) 10
Building No 22BHK 57 sq m (619 sq ft) 39
Building No 21.5 BHK 46 sq m (491 sq ft) 23
Building No 22BHK 58 sq m (622 sq ft) 23
Building No 21BHK 41 sq m (442 sq ft) 12
Building No 22BHK 63 sq m (679 sq ft) 1
Building No 21BHK 44 sq m (473 sq ft) 2
Building No 23BHK 84 sq m (904 sq ft) 1
Building No 23BHK 80 sq m (856 sq ft) 23
Building No 31BHK 33 sq m (353 sq ft) 92
Building No 31BHK 41 sq m (442 sq ft) 22
Building No 31BHK 41 sq m (438 sq ft) 21
Building No 31.5 BHK 46 sq m (495 sq ft) 44
Building No 41BHK 41 sq m (438 sq ft) 10
Building No 41BHK 44 sq m (473 sq ft) 2
Building No 41BHK 41 sq m (442 sq ft) 12
Building No 43BHK 84 sq m (904 sq ft) 1
Building No 42BHK 63 sq m (679 sq ft) 1
Building No 41.5 BHK 46 sq m (491 sq ft) 23
Building No 42BHK 57 sq m (619 sq ft) 39
Building No 51BHK 40 sq m (429 sq ft) 10
Building No 51BHK 40 sq m (435 sq ft) 12
Building No 51.5 BHK 46 sq m (491 sq ft) 22
Building No 52BHK 56 sq m (606 sq ft) 37
Building No 51BHK 41 sq m (438 sq ft) 22
Building No 51BHK 41 sq m (442 sq ft) 24
Building No 52BHK 63 sq m (679 sq ft) 2
Building No 53BHK 80 sq m (856 sq ft) 23
Building No 51BHK 44 sq m (476 sq ft) 2
Building No 52BHK 58 sq m (622 sq ft) 23
Building No 52BHK 57 sq m (619 sq ft) 39
Building No 61BHK 41 sq m (438 sq ft) 21
Building No 61BHK 41 sq m (442 sq ft) 22
Building No 61.5 BHK 46 sq m (495 sq ft) 44
Building No 61BHK 33 sq m (353 sq ft) 92
Building No 72BHK 58 sq m (622 sq ft) 23
Building No 71.5 BHK 46 sq m (491 sq ft) 22
Building No 71BHK 40 sq m (429 sq ft) 10
Building No 71BHK 44 sq m (473 sq ft) 2
Building No 71BHK 41 sq m (438 sq ft) 22
Building No 72BHK 63 sq m (679 sq ft) 2
Building No 71BHK 41 sq m (442 sq ft) 24
Building No 72BHK 57 sq m (619 sq ft) 39
Building No 73BHK 80 sq m (856 sq ft) 23
Building No 71BHK 40 sq m (435 sq ft) 12
Building No 81BHK 44 sq m (473 sq ft) 2
Building No 81BHK 41 sq m (438 sq ft) 10
Building No 81.5 BHK 46 sq m (491 sq ft) 23
Building No 83BHK 84 sq m (904 sq ft) 1
Building No 81BHK 41 sq m (442 sq ft) 12
Building No 82BHK 58 sq m (622 sq ft) 23
Building No 82BHK 63 sq m (679 sq ft) 1
Building No 83BHK 80 sq m (856 sq ft) 23
Building No 82BHK 57 sq m (619 sq ft) 39
Building No 91BHK 41 sq m (442 sq ft) 22
Building No 91BHK 33 sq m (353 sq ft) 92
Building No 91BHK 41 sq m (438 sq ft) 21
Building No 91.5 BHK 46 sq m (495 sq ft) 44
Building No 103BHK 84 sq m (904 sq ft) 1
Building No 101BHK 41 sq m (442 sq ft) 12
Building No 101BHK 41 sq m (438 sq ft) 10
Building No 101BHK 44 sq m (473 sq ft) 2
Building No 102BHK 63 sq m (679 sq ft) 1
Building No 101.5 BHK 46 sq m (491 sq ft) 23
Building No 102BHK 58 sq m (622 sq ft) 23
Building No 103BHK 80 sq m (856 sq ft) 23
Building No 102BHK 57 sq m (619 sq ft) 39
Building No 111BHK 44 sq m (473 sq ft) 2
Building No 111.5 BHK 46 sq m (491 sq ft) 22
Building No 111BHK 40 sq m (429 sq ft) 10
Building No 111BHK 40 sq m (435 sq ft) 12
Building No 112BHK 63 sq m (679 sq ft) 2
Building No 111BHK 41 sq m (442 sq ft) 24
Building No 112BHK 57 sq m (619 sq ft) 39
Building No 112BHK 58 sq m (622 sq ft) 23
Building No 113BHK 80 sq m (856 sq ft) 23
Building No 111BHK 41 sq m (438 sq ft) 22
Building No 121BHK 41 sq m (439 sq ft) 10
Building No 121BHK 41 sq m (436 sq ft) 10
Building No 121.5 BHK 46 sq m (491 sq ft) 22
Building No 121BHK 33 sq m (353 sq ft) 46
Building No 123BHK 79 sq m (856 sq ft) 23
Building No 122BHK 58 sq m (620 sq ft) 23
Commercial Building MLCP 1Shop 27 sq m (295 sq ft) 2
Commercial Building MLCP 1Shop 40 sq m (429 sq ft) 1
Commercial Building MLCP 1Shop 20 sq m (210 sq ft) 1
Commercial Building MLCP 1Shop 33 sq m (357 sq ft) 1
Commercial Building MLCP 1Shop 18 sq m (193 sq ft) 1
Commercial Building MLCP 1Shop 29 sq m (309 sq ft) 2
Commercial Building MLCP 1Shop 21 sq m (221 sq ft) 6
Building No 11BHK 40 sq m (435 sq ft) 21
Building No 12BHK 56 sq m (607 sq ft) 39
Building No 11BHK 41 sq m (443 sq ft) 44
Building No 11BHK 40 sq m (429 sq ft) 1
Building No 11BHK 41 sq m (438 sq ft) 2
Building No 11BHK 44 sq m (476 sq ft) 2
Building No 12BHK 58 sq m (622 sq ft) 23
Building No 12BHK 62 sq m (667 sq ft) 2
Building No 11.5bhk 45 sq m (481 sq ft) 1
Building No 11.5bhk 45 sq m (486 sq ft) 21
Building No 13BHK 80 sq m (856 sq ft) 23
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 not filed - in default - -
Q1 FY 2025-2026 12 Aug 2025 - -
Construction progress as reported to the portal

Building No 2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 4

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 5

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 6

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 7

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 8

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 9

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 10

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 11

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 12

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Commercial Building MLCP 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - For all Residential Buildings in the project
  • Water Supply: 100% - For all Residential Buildings in the project
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - For all Residential Buildings in the project
  • Storm Water Drains: 100% - For all Residential Buildings in the project
  • Landscaping & Tree Planting: 100% - For all Residential Buildings in the project
  • Street Lighting: 100% - For all Residential Buildings in the project
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - For all Residential Buildings in the project
  • Solid Waste Management And Disposal: 100% - For all Residential Buildings in the project
  • Water conservation /Rain water harvesting: 100% - For all Residential Buildings in the project
  • Energy managemcnt: 100% - For all Residential Buildings in the project
  • Fire protection and fire safety requirements: 100% - For all Residential Buildings in the project
  • Electrical meter room, sub-station, receiving station: 100% - For all Residential Buildings in the project`
  • Aggregate area of recreational Open Space: 0% - For all Residential Buildings in the project
  • Open Parking: 100% - For all Residential Buildings in the project
  • Yoga zone: 100% - For Phase I and Phase II
  • Amphitheatre: 100% - For Phase I and Phase II
  • Basketball court: 100% - For Phase I and Phase II
  • Common Parking: 100% - Common at Commercial Building for Phase I&Phase II
  • DG backup for common area: 100% - For Phase I and Phase II
  • Double height entrance lobby: 100% - For Phase I and Phase II
  • Temple: 100% - For Phase I and Phase II
  • Senior citizen sitting area: 100% - For Phase I and Phase II
  • Outdoor gym: 100% - For Phase I and Phase II
  • Multipurpose court: 100% - For Phase I and Phase II
  • Kids play area: 100% - For Phase I and Phase II
  • Jogging track: 100% - For Phase I and Phase II
  • Herb garden: 100% - For Phase I and Phase II
  • Hammock garden: 100% - For Phase I and Phase II
  • Elevators of reputed brand: 100% - For Phase I and Phase II

P51700024154 Runwal Gardens Phase 2 Bldg no 18-23 Completed

Confirmed with MahaRERA on 20 Sep 2026. Registered as "Runwal Gardens Phase 2 Bldg no 18-23".

Promoter
Runwal Residency Private Limited
Registered on
23 Jan 2020
Proposed completion
Dec 2024
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Village Gharivali usarghar and Sagoan, Dombivli, DOMBIVLI, Kalyan, Thane, 421204
Land area
2,464 sq m (26,525 sq ft)
Sanctioned built-up area
45,906 sq m (494,144 sq ft)
Buildings
Building No 18 (25 floors); Building No 19 (25 floors); Building No 20 (25 floors); Building No 21 (25 floors); Building No 22 (25 floors); Building No 23 (25 floors)
Parking
Open Space 0, Closed/Covered 0
Complaints on the portal
5
BuildingUnit typeCarpet areaUnits
Building No 181BHK 33 sq m (352 sq ft) 44
Building No 183BHK 81 sq m (867 sq ft) 23
Building No 181.5 BHK 46 sq m (491 sq ft) 22
Building No 182BHK 58 sq m (622 sq ft) 23
Building No 181RK 24 sq m (261 sq ft) 2
Building No 181BHK 41 sq m (442 sq ft) 20
Building No 191BHK 33 sq m (353 sq ft) 92
Building No 191BHK 45 sq m (484 sq ft) 45
Building No 191BHK 41 sq m (438 sq ft) 43
Building No 201BHK 33 sq m (352 sq ft) 44
Building No 201BHK 41 sq m (442 sq ft) 20
Building No 201RK 24 sq m (261 sq ft) 2
Building No 203BHK 81 sq m (867 sq ft) 23
Building No 201.5 BHK 46 sq m (491 sq ft) 22
Building No 202BHK 58 sq m (622 sq ft) 23
Building No 211.5 BHK 46 sq m (491 sq ft) 23
Building No 211BHK 41 sq m (442 sq ft) 19
Building No 211BHK 33 sq m (352 sq ft) 44
Building No 212BHK 58 sq m (625 sq ft) 23
Building No 212BHK 53 sq m (566 sq ft) 23
Building No 211RK 24 sq m (261 sq ft) 2
Building No 221BHK 33 sq m (353 sq ft) 89
Building No 221BHK 41 sq m (444 sq ft) 23
Building No 221.5 BHK 45 sq m (484 sq ft) 22
Building No 232BHK 58 sq m (625 sq ft) 43
Building No 232BHK 53 sq m (565 sq ft) 46
Building No 231BHK 41 sq m (437 sq ft) 45
Building No 231BHK 41 sq m (442 sq ft) 46
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Construction progress as reported to the portal

Building No 18

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 19

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 20

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 21

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 22

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Building No 23

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 80% - For all Residential Buildings in the project
  • Water Supply: 70% - For all Residential Buildings in the project
  • Sewerage (Chamber, Lines, Septic Tank , STP): 70% - For all Residential Buildings in the project
  • Storm Water Drains: 70% - For all Residential Buildings in the project
  • Landscaping & Tree Planting: 70% - For all Residential Buildings in the project
  • Street Lighting: 80% - For all Residential Buildings in the project
  • Treatment And Disposal Of Sewage And Sullage Water: 70% - For all Residential Buildings in the project
  • Solid Waste Management And Disposal: 70% - For all Residential Buildings in the project
  • Water conservation /Rain water harvesting: 70% - For all Residential Buildings in the project
  • Energy managemcnt: 70% - For all Residential Buildings in the project
  • Fire protection and fire safety requirements: 70% - For all Residential Buildings in the project
  • Electrical meter room, sub-station, receiving station: 70% - For all Residential Buildings in the project
  • Aggregate area of recreational Open Space: 0% - For all Residential Buildings in the project
  • Open Parking: 60% - For all Residential Buildings in the project
  • Yoga Zone: 60% - For Phase I and Phase II
  • Amphitheater: 60% - For Phase I and Phase II
  • Basketball court: 0% - For Phase I and Phase II
  • Common Parking: 60% - Common at MLCP Building for Phase I and Phase II
  • DG Backupfor common area: 60% - For Phase I and Phase II
  • Doodle Corner: 0% - For Phase I and Phase II
  • Double height entrance lobby: 60% - For Phase I and Phase II
  • Temple: 60% - For Phase I and Phase II
  • Senior citizen sitting area: 60% - For Phase I and Phase II
  • Outdoor gym: 60% - For Phase I and Phase II
  • Multipurpose Court: 60% - For Phase I and Phase II
  • Kids play area: 60% - For Phase I and Phase II
  • JOGGING TRACK: 60% - For Phase I and Phase II
  • Herb garden: 60% - For Phase I and Phase II
  • Hammock Garden: 60% - For Phase I and Phase II
  • Elevators of reputed brand: 60% - For Phase I and Phase II
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Runwal Gardens and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Runwal Gardens
Cons:
Enter some negative aspects of Runwal Gardens

News

Runwal Gardens Dombivali offers luxury apartments with multiple amenities

Indiatimes · · New Launches

Runwal Gardens in Dombivali offers 1,923 flats of 1-3 BHK units priced from ₹34.56 lakh to ₹1.08 crore, with possession from December 2023.

Key facts

Runwal Gardens is a residential project in Dombivali with 1,923 flat units offering 1, 2, and 3 BHK apartments. Flat sizes range from 352 to 918 sq ft. Prices start from ₹7.69K per sq ft, with flats priced between ₹34.56 lakh and ₹1.08 crore. Project launched October 2019; possession began December 2023. Registered with MahaRERA.

Amenities include 115-acre land parcel, 10 lakh sq ft mall, 11-acre central park, 100+ amenities, 14+ gardens, 2 clubhouses, school, hospital, fire brigade, 32-storey towers, MLCP parking. Designed by Hafeez Contractor using Mivan construction technology.

Location: Dombivali on Central Line with seamless Mumbai local connectivity. Nearby: Blue Birds High School, Guardian School, NES International School, R Galleria mall, Tanish Shopping Mall, LODHA XPeria Mall, Jupiter Hospital, Om Hospital, BAJ RR Hospital.

Average property rate in Dombivali ₹6,909 per sq ft with 14% annual rise. Connected to highways and accessible via cabs, BEST buses, Mumbai locals.

News items from other publishers are their reports, condensed; follow the link for the full report. PropertyWala.com is not their source.

Location

Runwal Gardens, Kalyan Shilphata Rd, Dombivli East, Thane - 421204 (Maharashtra)

* Location is approximate

Nearby

  • Transport

    • Dombivali MSRTC Bus Terminal (~2 km)
    • Hindustan Petroleum (~2 km)
    • Dombivli (~2 km)
    • Sarovar Vihar (CBD Belapur) (~30 km)
    • Navi Mumbai International Airport (~33 km)
    • Chhatrapati Shivaji Maharaj International Airport (~38 km)
  • Shopping & Dining

    • Domino's Pizza | Gajbandhan Patharli (Kalyan) (<1 km)
    • SAI VADA PAV (~1 km)
    • D'Mart (~2 km)
    • Rmall (~3 km)
    • RK BAZZAR (~4 km)
    • Sarvoday mall (~6 km)
  • Healthcare

    • Jay Maharashtra Medical (<1 km)
    • Shree Ashirwad Hospital, Dombivli (<1 km)
    • Wellness Forever Pharmacy - Manpada Road (<1 km)
    • Sai Jyot hospital (~2 km)
    • Omega Clinic (~3 km)
    • BARC CHSS Dispensary, Dombivali, Thakurwadi (~4 km)
  • Education

    • Dnc Ground (~1 km)
    • SK patil junior Collage (~2 km)
    • Greens English School (~2 km)
    • Casa Rio Gold Library (~9 km)
    • Smt. Chandibai Himathmal Mansukhani College (~11 km)
    • Indian Institute of Technology Bombay (~29 km)
  • Leisure & Entertainment

    • DOMBIVALI GYMKHANA SPORTS COMPLEX (~2 km)
    • KDMC sports complex (~2 km)
    • Tilak Movie Theater (~2 km)
    • Cinemax (~11 km)
    • Kharghar Valley Golf Course (~24 km)
    • Butterfly Park (~28 km)
  • Services

    • Mumbai - Dombivali Manpada Road Offsite ATM (<1 km)
    • Bank of Baroda (<1 km)
    • Vishnunagar Police Station (~3 km)
    • R.T.O. Kalyan (~6 km)
    • Kalyan RS Sub Post Office (~8 km)
    • Kalyan Fire Station (~8 km)
  • Religious Places

    • P&T Colony Hanuman Templw (<1 km)
    • Swami Samarth Math (<1 km)
    • Shree Gaondevi Mandir (~1 km)
    • Ayre road cha maharaja (~2 km)
    • Datta Mandir (~2 km)
    • Derasar (~2 km)
  • Business & Hospitality

    • Electric/Diesel Locomotive Shed Kalyan (~9 km)
    • Additional Industrial Area (~14 km)
    • Reliance Corporate Park (~17 km)
    • ibis Thane (~19 km)
    • Ashar IT Park (~21 km)
    • Navi Mumbai Marriott Hotel (~24 km)
Places © OpenStreetMap contributors, Overture Maps Foundation * Distances from the centre of Dombivli East
Project ID
J694119236
Updated
Searches
4299
Views
1848