Front View
Elevation
Aerial View
 11

Runwal Eirene - Balkum, Thane

Builder
Runwal Realty
Construction
Completed
Completion
Jun, 2025
Properties
Apartments
RERA
P51700004574

Description

Serene view of hills

Runwal Eirene is a new upcoming residential project by Runwal Realty located at Balkum, Thane With seren view of hills and Ulhas river, this project offers 1,2 & 3 Bhk apartments ranging between 423-957 sq.ft. which is spread over the total area of 6.2 acre of land. Nestled amidst greenery yet bustling with city life are the ideal spaces this project provides to its residents.
Amenities
  • Lift(s)
  • 24/7 Water Supply
  • 24/7 Power Backup
  • Fire Fighting Systems
  • InterCom
  • Car Parking
  • Gymnasium
  • Club House
  • Children's Play Area
  • Jogging Track
  • Swimming Pool
Runwal Realty, established in the year 1978, is a leading real estate developer based in Mumbai. Mr. Subhash Runwal is the Chairman of the company and Sandeep Runwal and Subodh Runwal are the Directors. The primary business of the firm involves development of properties for residential and retail sectors. The company has developed more than 65 residential projects in the suburbs of Mumbai like Thane, Chembur, Mulund and Ghatkopar.

Highlights

  • Security Guards
  • Fire Alarm
  • Electronic Security
  • Intercom Facility
  • Balcony
  • Reserved Parking
  • Feng Shui / Vaastu Compliant
  • Marble Flooring
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Boring / Tube-well
  • Rain Water Harvesting
  • Waste Disposal
  • Power Back-up
  • Servant Quarter
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • Centrally Air Conditioned
  • Lifts

Configurations

Type Area Possession Price *
1BHK Apartment36.4 SqMetersImmediate/Ready to move₹ 65.9 lakhs
1BHK Apartment422 SqFeetImmediate/Ready to move₹ 63.5 lakhs
1BHK Apartment46.45 SqMetersImmediate/Ready to move₹ 76 lakhs
1BHK Apartment55.74 SqMetersImmediate/Ready to move₹ 65 lakhs
2BHK Apartment48.87 SqMetersImmediate/Ready to move₹ 81.9 lakhs
2BHK Apartment710 SqFeetImmediate/Ready to move₹ 94 lakhs
2BHK Apartment74.32 SqMetersImmediate/Ready to move₹ 96 lakhs
3BHK Apartment980 SqFeetImmediate/Ready to move₹ 1.62 crore
3BHK Apartment1,275 SqFeetImmediate/Ready to move₹ 1.8 crore
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51700004574 RUNWAL EIRENE - PART I Completed

Confirmed with MahaRERA on 15 Sep 2026. Registered as "RUNWAL EIRENE - PART I".

Promoter
RUNWAL DEVELOPERS LIMITED
Registered on
9 Aug 2017
Proposed completion
Jun 2025
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Thane, Thane, Thane (M Corp.), Thane, Thane, 400608
Land area
25,096 sq m (270,135 sq ft)
Sanctioned built-up area
48,934 sq m (526,733 sq ft)
Buildings
6A (46 floors); 6B (46 floors); 6C (46 floors); 6D (46 floors); 7 (39 floors); 8 (39 floors); 9 (39 floors); 10 (39 floors); 11 (39 floors); 12 (39 floors); 13 (39 floors)
Parking
Open Space 0, Closed/Covered 968
Complaints on the portal
47
Construction progress as reported to the portal

6A

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

6B

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

6C

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 95%

6D

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 95%
  • Sanitary Fittings within the flats / premises: 80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 98%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 90%

7

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

8

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

9

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

10

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

11

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

12

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

13

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - Completed
  • Water Supply: 100% - Completed
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - Completed
  • Storm Water Drains: 100% - Completed
  • Landscaping & Tree Planting: 100% - Completed
  • Street Lighting: 100% - Completed
  • Community Buildings: 50% - Work in Progress
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - Completed
  • Solid Waste Management And Disposal: 100% - Completed
  • Water conservation /Rain water harvesting: 100% - Completed
  • Energy managemcnt: 0% - YET TO BE STARTED
  • Fire protection and fire safety requirements: 100% - Completed
  • Electrical meter room, sub-station, receiving station: 100% - Completed
  • Aggregate area of recreational Open Space: 0% - YET TO BE STARTED
  • Open Parking: 0% - YET TO BE STARTED
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Good view from the flats, undisturbed view looking up to Nashik Bypass highway.Nice atmosphere and a well-planned town-like society.Many amenities provided ... best place to live.

Pros
  • best location for living
Runwal Eirene Thane is rated 9 out of 10 based on 1 user reviews.
Disclaimer: The reviews are opinions of PropertyWala.com members, and not of PropertyWala.com.
Write a review of Runwal Eirene and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Runwal Eirene
Cons:
Enter some negative aspects of Runwal Eirene

News

Runwal Eirene lift lacked government approval

Mid Day · · Residential

Probe findings say the lift in the under-construction Runwal Eirene tower in Thane had only a private licence, not approval from the state electrical inspector.

Key facts
  • The chief electrical inspector of lifts in Chembur had not granted approval to the lift in the 40-storey Runwal Eirene building.
  • The building is under construction in Thane.
  • The lift crash on September 11 killed seven labourers.
  • A report will be submitted to the Kapurbawdi police station in the coming days.
  • An FIR was registered against unidentified individuals under relevant sections of the Indian Penal Code.
  • The probe says the lift had a private licence and not one from the government department.
News items are reports published elsewhere, condensed; follow the link for the full report. PropertyWala.com is not their source.

Location

Runwal Eirene, Thane West, Balkum, Thane - 400601 (Maharashtra)

* Location may be approximate
Project ID
J919028351
Updated
Searches
8871
Views
2015