


Precious Majestic - Pushpak Nagar, Navi Mumbai
- Builder
- Precious Group
- Construction
- Under Construction
- Completion
- Dec, 2029
- Properties
- Apartments
- RERA
- P52000066571
Description
Two blocks offering exceptional amenities
Precious Majestic is a well-planned residential development located in the fast-growing locality of Bangarpada, Pushpak Nagar, Navi Mumbai. It is spread across 0.76 acres of premium land. The development features efficiently crafted 1 and 2 BHK ranging from 295 to 592 sqft. The project comprises 2 residential towers, each rising to G+10 storeys with lot of needful ameniteis.Amenities
- Roof Top Play Area
- CCTV Surveillance
- Fire Fighting System
- Kids Play Area
- Security Cabins
- Power Back Up
- High Speed Elevators
- 4 Levels of Parking
- Well-Equipped Gymnasium
Precious Group is a well-established real estate developer known for creating thoughtfully planned residential and commercial spaces across the Mumbai Metropolitan Region. Since its inception in 2005, the group has focused on delivering high-quality developments built on the principles of transparency, trust, and strong design.
Highlights
- Roof top Play Area
- CCTV Surveillance
- Fire Fighting System
- Kids Play Area
- Security Cabins
- Power Back Up
- High Speed Elevators
- 4 Levels of Parking
- Well-Equipped Gymnasium
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 1BHK Apartment | 295 SqFeet | Within 4 Years | ₹ 42.12 lakhs |
| 2BHK Apartment | 580 SqFeet | Within 4 Years | ₹ 76.5 lakhs |
RERA
P52000066571 PRECIOUS MAJESTIC Active 36% built
Confirmed with MahaRERA on 21 Sep 2026. Registered as "PRECIOUS MAJESTIC".
- Promoter
- HARSH CONSTRUCTIONS
- Registered on
- 11 Jun 2024
- Proposed completion
- Dec 2029
- Project type
- Others
- Planning authority
- Others
- Address as filed
- SECTOR-03, PUSHPAK NODE, Dapoli, Panvel, Raigarh, 410206
- Land area
- 3,090 sq m (33,256 sq ft)
- Sanctioned built-up area
- 9,913 sq m (106,710 sq ft)
- Buildings
- A - Wing (9 floors) - 81 of 105 available; B - Wing (9 floors) - 85 of 109 available
- Parking
- Open Space 0, Closed/Covered 239
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| A - Wing | Shop | 36 sq m (384 sq ft) | 2 |
| A - Wing | 1BHK | 29 sq m (311 sq ft) | 6 |
| A - Wing | 1BHK | 29 sq m (312 sq ft) | 8 |
| A - Wing | 2BHK | 54 sq m (577 sq ft) | 16 |
| A - Wing | 2BHK | 55 sq m (592 sq ft) | 16 |
| A - Wing | 1BHK | 30 sq m (320 sq ft) | 8 |
| A - Wing | Shop | 20 sq m (212 sq ft) | 6 |
| A - Wing | 1BHK | 30 sq m (322 sq ft) | 8 |
| A - Wing | 1BHK | 30 sq m (328 sq ft) | 8 |
| A - Wing | 1BHK | 32 sq m (340 sq ft) | 8 |
| A - Wing | Shop | 21 sq m (224 sq ft) | 2 |
| A - Wing | Shop | 20 sq m (219 sq ft) | 2 |
| A - Wing | 1BHK | 30 sq m (322 sq ft) | 16 |
| B - Wing | 1BHK | 30 sq m (322 sq ft) | 8 |
| B - Wing | 1BHK | 30 sq m (328 sq ft) | 8 |
| B - Wing | 1BHK | 31 sq m (332 sq ft) | 2 |
| B - Wing | 1BHK | 31 sq m (333 sq ft) | 14 |
| B - Wing | 1BHK | 32 sq m (340 sq ft) | 8 |
| B - Wing | 1BHK | 29 sq m (311 sq ft) | 14 |
| B - Wing | 1BHK | 29 sq m (307 sq ft) | 16 |
| B - Wing | 1BHK | 30 sq m (322 sq ft) | 16 |
| B - Wing | 1BHK | 29 sq m (312 sq ft) | 8 |
| B - Wing | 1BHK | 29 sq m (311 sq ft) | 6 |
| B - Wing | 1BHK | 30 sq m (320 sq ft) | 8 |
| B - Wing | 1BHK | 27 sq m (295 sq ft) | 2 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
| Q4 FY 2024-2025 | not filed - in default | - | - |
| Q1 FY 2025-2026 | 19 Jul 2025 | - | - |
| Q2 FY 2025-2026 | 20 Oct 2025 | - | - |
| Q3 FY 2025-2026 | 20 Jan 2026 | - | - |
| Q4 FY 2025-2026 | 20 Apr 2026 | - | - |
| Q1 FY 2026-2027 | 20 Jul 2026 | - | - |
Construction progress as reported to the portal
A - Wing
- Excavation: 100%
- Basement (if any): 60%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 50%
- Slabs of Super Structure: 54%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 19%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 9%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 4%
B - Wing
- Excavation: 100%
- Basement (if any): 60%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 50%
- Slabs of Super Structure: 54%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 19%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 9%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 4%
Common areas and facilities
- Water Supply: 0% - Provide up to site by CIDCO
- Sewerage (Chamber, Lines, Septic Tank , STP): 0% - Chamber, Lines, Septic Tank to be provided
- Landscaping & Tree Planting: 0% - 31 No. of Trees
- Water conservation /Rain water harvesting: 0% - RWH Tank will be provided
- Fire protection and fire safety requirements: 0% - Provided as per Provisional fire NOC
- Electrical meter room, sub-station, receiving station: 0% - Electrical Meter room will be Provide
- Open Parking: 0% - NA
Reviews
Write a review
Be the first to write a review of Precious Majestic and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Precious Majestic
Enter some positive aspects of Precious Majestic
Cons:
Enter some negative aspects of Precious Majestic
Enter some negative aspects of Precious Majestic
Location
Precious Majestic, Bangarpada, Pushpak Nagar, Navi Mumbai - 410206 (Maharashtra)
Nearby
-
Transport
- Navi Mumbai International Airport (~3 km)
- Khandeshwar (~6 km)
- Panvel Bus Station (~6 km)
- Panvel (Suburban) (~7 km)
- Sarovar Vihar (CBD Belapur) (~8 km)
- Chhatrapati Shivaji Maharaj International Airport (~36 km)
-
Shopping & Dining
- Tim Hortons (~4 km)
- Domino's Pizza | Vinayak Shraddha, Karanjade, Raigad, Navi Mumbai, Maharashtra (~4 km)
- Orion Mall (~6 km)
- Glomax Mall (~9 km)
- Kitchen Wold (~9 km)
- Sector-48 Market (~11 km)
-
Healthcare
- Guardian Pharmacy (~4 km)
- Sukam Hospital (~6 km)
- Gandhi Hospital (~6 km)
- Chirayu Hospital;hospital kamothe (~7 km)
- Veer Hospital & ICU (~7 km)
- om sai (~7 km)
-
Education
- Government College Of Education Panvel (~6 km)
- Dr. K. M. Vasudevan Pillai's College (~8 km)
- Vibgyor High School (~10 km)
- D.A.V Public School - Nerul (~11 km)
- T.S. Chanakya Maritime University (~12 km)
- DY Patil University (~13 km)
-
Leisure & Entertainment
- Mangrove Park (~8 km)
- Butterfly Park (~10 km)
- Cinepolis - Seawoods (~11 km)
- Dr. DY Patil Sports Complex (~12 km)
- Dr. DY Patil Sports Stadium (~13 km)
- Kharghar Valley Golf Course (~13 km)
-
Services
- YES Bank (~2 km)
- Dinkar Balu Patil Navi Mumbai International Airport Fire Station (~2 km)
- HDFC Bank ATM (~3 km)
- ONGC Post Office (~7 km)
- NMMC Headquarters (~9 km)
- CBD Belapur Police Station (~9 km)
-
Religious Places
- Laksmi Narayan Temple (~3 km)
-
Business & Hospitality
- Central Warehousing Corporation - Kalamboli (~9 km)
- Courtyard by Marriott Navi Mumbai (~13 km)
- Navi Mumbai Marriott Hotel (~17 km)
- Jawaharlal Nehru Port (~19 km)
- Millennium Business Park, Mahape Village (~22 km)
- Reliance Corporate Park (~25 km)
- Project ID
- J458881192
- Updated
- Searches
- 427
- Views
- 426


