Prahladpura, Jaipur

Reviews

Be the first to write a review of Prahladpura and become a Locality expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Prahladpura
Cons:
Enter some negative aspects of Prahladpura

News

PM Modi Launches Jaipur Metro Phase 2, 41-km Prahladpura-Todi Corridor

Swarajya · · Infrastructure

Prime Minister Modi laid foundation stone for Jaipur Metro Phase 2, a 41-km corridor from Prahladpura to Todi costing Rs 13,000 crore with 36 stations.

Key facts

Phase 2 corridor runs from Prahladpura to Todi on Sikar Road, estimated cost Rs 13,000 crore, targeted for completion in 5.5 years. Project split into five zones. First detailed project report prepared in 2011, revised five times over 15 years, cleared by Chief Minister Bhajan Lal Sharma's government 1.5 years ago. Foundation stone laid 4 July 2026.

36 stations will come up along the corridor. Zone 1: 12 km from Prahladpura to Pinjrapol Goshala, cost Rs 918 crore, work begun. Zone 2: 3 km underground stretch to airport with two stations, cost Rs 1,160 crore, tender due 22 July. Khasa Kothi to be new interchange hub linking Phase 1 and Phase 2 through 150-metre foot overbridge.

Jaipur Metro Rail Corporation Limited FY 2023-24 revenue: Rs 33.52 crore, up from Rs 25.45 crore FY 2022-23 (31.7% increase). Total income including grants: Rs 129.84 crore FY 2023-24.

Jaipur Metro Phase II groundwork begins at Prahladpura

Indiatimes · · Infrastructure

Preparatory work for Jaipur Metro Phase II has begun at the proposed Prahladpura station site, with soil testing and ground levelling underway before full-scale construction.

Key facts

The Rajasthan Metro Railway Corporation (RMRC) has initiated pre-construction activities at the proposed Prahladpura metro station site for Jaipur Metro Phase II. The turnkey contractor is executing pre-construction tasks including soil testing and ground levelling to prepare the corridor site. Full-scale construction will start once the official foundation stone laying ceremony takes place. Early field activity has begun as the project awaits final clearances.

Jaipur Metro Phase-2 Approved: 41-km Corridor with 36 Stations

CNN-News18 · · Infrastructure

Union cabinet approves Rs 13,037 crore Jaipur Metro Phase-2 project running 41 km from Prahladpura to Todi Mor with 36 stations and airport link.

Key facts

Jaipur Metro Phase-2 spans 41 km from Prahladpura to Todi Mor with 36 stations covering Sitapura Industrial Area, VKIA, Tonk Road, SMS Hospital, Stadium, Ambabadi, and Vidyadhar Nagar. Project cost: Rs 13,037.66 crore, funded equally by central and state governments, executed by Rajasthan Metro Rail Corporation Limited. Underground stations planned near Jaipur International Airport for direct metro link. Phase-2 will integrate with existing Phase-1 Metro system via interchange with dedicated feeder system for last-mile connectivity.

Centre approves Jaipur Metro Phase-2 costing 13000 crore

thehindu · · Infrastructure

Union Cabinet approved Jaipur Metro Phase-2, a 41-km North-South corridor with 36 stations from Prahladpura to Todi Mod costing ₹13,037.66 crore.

Key facts

Union Cabinet approved Jaipur Metro Phase-2 on April 8, 2026. North-South corridor: Prahladpura to Todi Mod, 41 km, 36 stations, cost ₹13,037.66 crore. Implemented by Rajasthan Metro Rail Corporation Limited (50:50 joint venture of Government of India and Rajasthan). Phase-2 will connect: Sitapura Industrial Area, VKIA, Jaipur Airport, Tonk Road, SMS Hospital and Stadium, Ambabari, Vidhyadhar Nagar. Includes underground stations in airport area; will integrate with operational Phase-1 through interchanges and feeder systems. Economic Internal Rate of Return exceeds 14% threshold. Funding: equity from both governments, subordinate debt, multilateral financing. Completion targeted: September 2031. Phase-1 (operational): East-West corridor Mansarovar to Badi Chaupar, 11.64 km, 11 stations, average daily ridership 60,000 passengers. Phase-2 expected to significantly increase ridership, reduce traffic congestion and vehicular emissions, enhance public transport share.

Union Cabinet approves Jaipur Metro Phase-2 Prahladpura to Todi Mod

MSN · · Infrastructure

Union Cabinet approved Jaipur Metro Phase-2 from Prahladpura to Todi Mod with investment of Rs 13,038 crore to improve urban mobility.

Key facts

Union Cabinet approved Jaipur Metro Phase-2 project connecting Prahladpura to Todi Mod. Project cost: Rs 13,038 crore. Aim: improve urban mobility.

News items are reports published elsewhere, condensed; follow the link for the full report. PropertyWala.com is not their source.

Sale Properties

Price Trends

Also known as: Prahladpura Ricco Industrial Area
Locality ID
A512111208
PinCode
302022