Aerial View
Side View
Master Plan
 8

Omkar Signet - Malad East, Mumbai

Builder
Omkar Realtors & Developers
Construction
Under Construction
Completion
Dec, 2027
Properties
Apartments
RERA
P51800010463

Description

Sprawling luxury enclave of magnificent apartments

Omkar Signet by Omkar Realtors & Developers located at Malad East, Mumbai is a well-appointed 1 & 2 bedroom boutique residences with the carpet area 333 - 484 sq.ft. The project is equipped with key amenities including fire safety systems, gymnasium, clubhouse etc. & well connected with other parts of city and has all the basic utilities.

Amenities:
  • Fitness Center
  • Swimming Pool
  • Laundromat
  • Kis's Play Area
  • Gymnasium
  • Accu Pressure Therapy Walkway
Established in 2003, Omkar Realtors & Developers are renowned creators of opulent spaces. Backed by a strong legacy that spans over a decade, Omkar Realtors is managed by second generation entrepreneurs who have carved a niche for themselves in the world of real estate. The board combines a seasoned team of professionals with expertise in real estate, infrastructure, steel manufacturing, oil exploration, shipping and construction.

Highlights

  • Power Back-up
  • Reserved Parking
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • Water Connection
  • Electric Connection
  • Close to Hospital
  • Close to School
  • Close to Shopping Center/Mall

Configurations

Type Area Possession Price *
1BHK Apartment484 SqFeetWithin 2 Years-
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51800010463 Alta Monte and Signet Active 95% built

Confirmed with MahaRERA on 22 Sep 2026. Registered as "Alta Monte and Signet".

Promoter
ERA REALTORS PRIVATE LIMITED
Registered on
27 Aug 2017
Proposed completion
Dec 2027 (originally Dec 2024)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Shantaram Talao, Siddheshwar Nagar, Kokanipada, Malad East, Borivali, Borivali, Mumbai Suburban, 400097
Land area
11,011 sq m (118,528 sq ft)
Sanctioned built-up area
111,324 sq m (1,198,322 sq ft)
Buildings
Alta Monte Tower B (59 floors) - 27 of 519 available; Alta Monte Tower D North, West and South (61 floors) - 3 of 232 available; Alta Monte Tower D3-12, 17-20, 25-27, 41-50 Floor East Wing (36 floors) - 1 of 27 available; Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors (31 floors) - 0 of 51 available; Signet (45 floors) - 8 of 633 available
Parking
Open Space 0, Closed/Covered 853
Complaints on the portal
253
BuildingUnit typeCarpet areaUnits
Alta Monte Tower B2BHK 79 sq m (852 sq ft) 11
Alta Monte Tower B2BHK 80 sq m (857 sq ft) 16
Alta Monte Tower B2BHK 80 sq m (861 sq ft) 11
Alta Monte Tower B3BHK 103 sq m (1,105 sq ft) 16
Alta Monte Tower B3BHK 103 sq m (1,109 sq ft) 28
Alta Monte Tower B3BHK 103 sq m (1,111 sq ft) 8
Alta Monte Tower B3BHK 104 sq m (1,120 sq ft) 16
Alta Monte Tower B3BHK 108 sq m (1,164 sq ft) 6
Alta Monte Tower B2BHK 79 sq m (848 sq ft) 13
Alta Monte Tower B2BHK 67 sq m (718 sq ft) 55
Alta Monte Tower B2BHK 68 sq m (736 sq ft) 12
Alta Monte Tower B2BHK 69 sq m (742 sq ft) 16
Alta Monte Tower B2BHK 72 sq m (778 sq ft) 124
Alta Monte Tower B2BHK 76 sq m (820 sq ft) 13
Alta Monte Tower B2BHK 79 sq m (848 sq ft) 5
Alta Monte Tower B2BHK 82 sq m (882 sq ft) 5
Alta Monte Tower B2BHK 82 sq m (886 sq ft) 8
Alta Monte Tower B2BHK 83 sq m (891 sq ft) 64
Alta Monte Tower B2BHK 81 sq m (868 sq ft) 2
Alta Monte Tower B2BHK 81 sq m (872 sq ft) 5
Alta Monte Tower B2BHK 81 sq m (877 sq ft) 16
Alta Monte Tower B2BHK 81 sq m (877 sq ft) 16
Alta Monte Tower B3BHK 101 sq m (1,083 sq ft) 17
Alta Monte Tower B3BHK 109 sq m (1,172 sq ft) 10
Alta Monte Tower B3BHK 117 sq m (1,255 sq ft) 2
Alta Monte Tower B3BHK 117 sq m (1,265 sq ft) 24
Alta Monte Tower D North, West and South3RHK 74 sq m (802 sq ft) 60
Alta Monte Tower D North, West and South3RHK 75 sq m (805 sq ft) 11
Alta Monte Tower D North, West and South3RHK 88 sq m (950 sq ft) 12
Alta Monte Tower D North, West and South3RHK 127 sq m (1,371 sq ft) 4
Alta Monte Tower D North, West and South5RHK 172 sq m (1,847 sq ft) 10
Alta Monte Tower D North, West and South4RHK 88 sq m (950 sq ft) 13
Alta Monte Tower D North, West and South5RHK 52 sq m (558 sq ft) 4
Alta Monte Tower D North, West and South5RHK 53 sq m (570 sq ft) 3
Alta Monte Tower D North, West and South5RHK 171 sq m (1,838 sq ft) 4
Alta Monte Tower D North, West and SouthDUPLEX 165 sq m (1,777 sq ft) 1
Alta Monte Tower D North, West and South4RHK 125 sq m (1,349 sq ft) 1
Alta Monte Tower D North, West and South5RHK 53 sq m (573 sq ft) 5
Alta Monte Tower D North, West and South5RHK 53 sq m (573 sq ft) 1
Alta Monte Tower D North, West and South5RHK 78 sq m (835 sq ft) 7
Alta Monte Tower D North, West and South5RHK 170 sq m (1,826 sq ft) 15
Alta Monte Tower D North, West and South3.5RHK 83 sq m (890 sq ft) 1
Alta Monte Tower D North, West and South3RHK 74 sq m (801 sq ft) 80
Alta Monte Tower D3-12, 17-20, 25-27, 41-50 Floor East Wing4RHK 127 sq m (1,368 sq ft) 4
Alta Monte Tower D3-12, 17-20, 25-27, 41-50 Floor East Wing4RHK 127 sq m (1,371 sq ft) 7
Alta Monte Tower D3-12, 17-20, 25-27, 41-50 Floor East Wing3RHK 75 sq m (805 sq ft) 1
Alta Monte Tower D3-12, 17-20, 25-27, 41-50 Floor East Wing4RHK 88 sq m (950 sq ft) 1
Alta Monte Tower D3-12, 17-20, 25-27, 41-50 Floor East Wing4RHK 125 sq m (1,349 sq ft) 14
Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors2BHK 55 sq m (593 sq ft) 11
Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors3.5 RHK 79 sq m (854 sq ft) 3
Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors3.5RHK 80 sq m (862 sq ft) 3
Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors3.5RHK 80 sq m (864 sq ft) 5
Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors3.5RHK 82 sq m (883 sq ft) 1
Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors4RHK 125 sq m (1,349 sq ft) 8
Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors4RHK 127 sq m (1,368 sq ft) 12
Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors4RHK 127 sq m (1,368 sq ft) 1
Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors5RHK 101 sq m (1,088 sq ft) 7
Signet2BHK 45 sq m (484 sq ft) 32
SignetOffice space 23 sq m (246 sq ft) 1
SignetOffice space 20 sq m (215 sq ft) 1
SignetOffice space 27 sq m (286 sq ft) 1
SignetOffice space 13 sq m (140 sq ft) 1
Signet2BHK 47 sq m (503 sq ft) 32
SignetOffice space 13 sq m (141 sq ft) 1
Signet1BHK 31 sq m (333 sq ft) 113
SignetOffice space 14 sq m (150 sq ft) 1
SignetShop 20 sq m (220 sq ft) 1
SignetShop 19 sq m (205 sq ft) 1
Signet2BHK 45 sq m (481 sq ft) 9
SignetShop 20 sq m (212 sq ft) 1
SignetShop 20 sq m (219 sq ft) 1
SignetOffice space 17 sq m (185 sq ft) 1
SignetOffice space 20 sq m (213 sq ft) 1
SignetShop 20 sq m (217 sq ft) 1
SignetShop 56 sq m (606 sq ft) 1
SignetShop 33 sq m (352 sq ft) 1
SignetShop 30 sq m (321 sq ft) 1
SignetShop 20 sq m (214 sq ft) 3
SignetOffice space 27 sq m (287 sq ft) 1
Signet2BHK 45 sq m (481 sq ft) 151
SignetOffice space 59 sq m (636 sq ft) 1
Signet1BHK 31 sq m (333 sq ft) 75
SignetShop 20 sq m (218 sq ft) 2
SignetOffice space 25 sq m (267 sq ft) 1
SignetShop 21 sq m (228 sq ft) 1
SignetOffice space 19 sq m (209 sq ft) 1
SignetOffice space 13 sq m (137 sq ft) 1
SignetShop 21 sq m (222 sq ft) 1
SignetOffice space 17 sq m (182 sq ft) 1
SignetOffice space 15 sq m (157 sq ft) 1
SignetOffice space 14 sq m (149 sq ft) 1
SignetShop 69 sq m (738 sq ft) 1
SignetShop 21 sq m (226 sq ft) 1
SignetShop 21 sq m (224 sq ft) 1
SignetShop 21 sq m (224 sq ft) 1
SignetOffice space 20 sq m (212 sq ft) 1
SignetOffice space 23 sq m (251 sq ft) 1
SignetOffice space 20 sq m (215 sq ft) 1
Signet1BHK 31 sq m (334 sq ft) 144
SignetShop 20 sq m (217 sq ft) 1
SignetShop 23 sq m (250 sq ft) 1
SignetOffice space 14 sq m (148 sq ft) 1
SignetShop 21 sq m (222 sq ft) 1
SignetOffice space 31 sq m (334 sq ft) 1
Signet2BHK 45 sq m (482 sq ft) 32
SignetOffice space 34 sq m (370 sq ft) 1
SignetOffice space 13 sq m (142 sq ft) 1
Quarterly returnFiledBuiltUnits booked
Q2 FY 2017-2018 13 Mar 2026 - -
Q3 FY 2017-2018 13 Mar 2026 - -
Q4 FY 2017-2018 13 Mar 2026 - -
Q1 FY 2018-2019 13 Mar 2026 - -
Q2 FY 2018-2019 13 Mar 2026 - -
Q3 FY 2018-2019 13 Mar 2026 - -
Q4 FY 2018-2019 13 Mar 2026 - -
Q1 FY 2019-2020 13 Mar 2026 - -
Q2 FY 2019-2020 13 Mar 2026 - -
Q3 FY 2019-2020 13 Mar 2026 - -
Q4 FY 2019-2020 13 Mar 2026 - -
Q1 FY 2020-2021 13 Mar 2026 - -
Q2 FY 2020-2021 13 Mar 2026 - -
Q3 FY 2020-2021 13 Mar 2026 - -
Q4 FY 2020-2021 13 Mar 2026 - -
Q1 FY 2021-2022 13 Mar 2026 - -
Q2 FY 2021-2022 13 Mar 2026 - -
Q3 FY 2021-2022 13 Mar 2026 - -
Q4 FY 2021-2022 13 Mar 2026 - -
Q1 FY 2022-2023 13 Mar 2026 - -
Q2 FY 2022-2023 13 Mar 2026 - -
Q3 FY 2022-2023 13 Mar 2026 - -
Q4 FY 2022-2023 9 Feb 2026 - -
Q1 FY 2023-2024 9 Feb 2026 - -
Q2 FY 2023-2024 9 Feb 2026 - -
Q3 FY 2023-2024 9 Feb 2026 - -
Q4 FY 2023-2024 9 Feb 2026 - -
Q1 FY 2024-2025 9 Feb 2026 - -
Q2 FY 2024-2025 9 Feb 2026 - -
Q3 FY 2024-2025 9 Feb 2026 - -
Q4 FY 2024-2025 1 Apr 2026 - -
Q1 FY 2025-2026 1 Apr 2026 - -
Q2 FY 2025-2026 1 Apr 2026 - -
Q3 FY 2025-2026 1 Apr 2026 - -
Q4 FY 2025-2026 29 Jun 2026 - -
Q1 FY 2026-2027 not filed - in default - -
Construction progress as reported to the portal

Alta Monte Tower B

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 98%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 99%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 60%
  • Sanitary Fittings within the flats / premises: 10%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 84%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 40%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 40%

Alta Monte Tower D North, West and South

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Alta Monte Tower D3-12, 17-20, 25-27, 41-50 Floor East Wing

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Signet

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 98%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 99%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 99%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 99%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 99%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - Alta Monte ABCD
  • Water Supply: 100% - Alta Monte ABCD
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - Alta Monte ABCD
  • Storm Water Drains: 100% - Alta Monte ABCD
  • Landscaping & Tree Planting: 100% - Alta Monte ABCD
  • Street Lighting: 100% - Alta Monte ABCD
  • Community Buildings: 100% - Alta Monte ABCD
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - Alta Monte ABCD
  • Solid Waste Management And Disposal: 50% - Alta Monte ABCD
  • Water conservation /Rain water harvesting: 50% - Alta Monte ABCD
  • Fire protection and fire safety requirements: 33% - Alta Monte ABCD
  • Electrical meter room, sub-station, receiving station: 33% - Alta Monte ABCD
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Omkar Signet and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Omkar Signet
Cons:
Enter some negative aspects of Omkar Signet

Location

Omkar Signet, Malad East, Mumbai - 400097 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Dindoshi (~2 km)
    • Malad (~2 km)
    • Aarey (~2 km)
    • Bharat Petroleum (~3 km)
    • Chhatrapati Shivaji Maharaj International Airport (~14 km)
    • Navi Mumbai International Airport (~43 km)
  • Shopping & Dining

    • Noorani Restaurant (<1 km)
    • Oberoi Mall (~2 km)
    • Cafe Coffee Day (~2 km)
    • Albino Lifestyle (~2 km)
    • Borivali Municpal Market (~7 km)
    • Shoppers Stop (~11 km)
  • Healthcare

    • Wellness Forever Pharmacy - Vaishno Neelkanth Apartment, Malad East (<1 km)
    • Ashoka General Hospital I.C.C.U and Maternity Home (<1 km)
    • Zeelab Pharmacy (~1 km)
    • Shukla Diagnostic and Healthcare Centre (~1 km)
    • Krishna Eye Care Centre (~1 km)
    • Dr.Shyam Agrawal (~2 km)
  • Education

    • Children's Academy (<1 km)
    • Aspee Nutan English Medium School (~2 km)
    • KES College Ground (~3 km)
    • Indira Gandhi Institute of Development Research (~4 km)
    • Indian Institute of Technology Bombay (~11 km)
    • IIT Bombay Central Library (~11 km)
  • Leisure & Entertainment

    • Baba Shaheb Bhimrao Ambedkar Park (<1 km)
    • PVR Milap (~3 km)
    • Goregaon Sport Complex (~4 km)
    • Mumbai Football Arena (~9 km)
    • Veermata Jijabai Bhosale Zoo & Botanical Garden (~32 km)
    • Willingdon Sports Club (~33 km)
  • Services

    • ICICI Bank (<1 km)
    • Passport Seva Kendra (<1 km)
    • HDFC Bank (<1 km)
    • Kandivali Fire Station (~4 km)
    • Bangur Nagar Link Road Police Station (~4 km)
    • Motilal Nagar (~5 km)
  • Religious Places

    • Om Pimpleshwar Mahadev Mandir (<1 km)
    • indravan mandir (~1 km)
    • BAPS Swaminarayan Temple (~1 km)
    • St. Thomas Church (~3 km)
    • Our Lady of Lourdes Church, Orlem (~4 km)
    • Mosque (~4 km)
  • Business & Hospitality

    • Water Reservoir (~2 km)
    • The Westin Mumbai Garden City (~2 km)
    • Mahindra & Mahindra (~3 km)
    • Grand Hometel (~4 km)
    • Nirlon Knowledge Park (~4 km)
    • Nesco IT Park (~5 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J546811896
Updated
Searches
3884
Views
1296