Elevation
Aerial View
Side View
 7

Olympeo Riverside - Neral, Raigad

Builder
Olympeo Infrastructure Pvt. Ltd.
Construction
Completed
Completion
Jun, 2018
Properties
Apartments
RERA
P52000002351

Description

A promising lifestyle

Olympeo Riverside is a residential project by Olympeo Infrastructure Pvt. Ltd. located at Neral, Raigad. This project offers 1, 2 & 3 Bhk apartments ranging between 491-698 sq.ft. which is spread over the total area of 40 acre of land. Draped in greenery, this project is well equipped with modern amenities and hi-end utilities which provide with luxurious and spacious homes to its residents.
Amenities
  • Gymnasium
  • Club House
  • Lifts
  • Children's Play Area
  • Power Backup
  • Swimming Pool
  • 24*7 Water Backup
  • Landscaped Garden
Olympeo, it’s our endeavor to build meaningful lifestyle for modern India. Olympeo is committed to develop large integrated townships inspiring active and healthy living. These townships shall offer modern day convenience and comforts at affordable terms, which until now, were reserved for the privileged few. Olympeo Infrastructure Pvt Ltd. promises to create lively and recreational spaces that scale new heights of comfort, style and conveniences in living spaces.

Highlights

  • Power Back-up
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • Lifts
  • Security Guards
  • Fire Alarm
  • Balcony
  • Reserved Parking
  • Basement
  • Park Facing
  • Modular Kitchen
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • Cafeteria / Food Court
  • Service / Goods Lift
  • Club / Community Center
  • Water Connection
  • Electric Connection
  • Close to Hospital
  • Close to School
  • Close to Shopping Center/Mall

Configurations

Type Area Possession Price *
1BHK Apartment491 SqFeetImmediate/Ready to move₹ 25.29 lakhs
2BHK Apartment562 SqFeetImmediate/Ready to move₹ 32.45 lakhs
3BHK Apartment698 SqFeetImmediate/Ready to move₹ 39.91 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52000002351 Olympeo Riverside - Phase 1 Completed

Confirmed with MahaRERA on 21 Sep 2026. Registered as "Olympeo Riverside - Phase 1".

Promoter
Olympeo Riverside Projects LLP
Registered on
31 Jul 2017
Proposed completion
Jun 2018
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Awsare, Neral, awsare, Karjat, Raigarh, 410101
Land area
29,090 sq m (313,132 sq ft)
Sanctioned built-up area
13,059 sq m (140,572 sq ft)
Buildings
A1 (5 floors); A2 (5 floors); A3 (5 floors); A4 (5 floors); B1 (5 floors); B2 (5 floors); B3 (5 floors)
Parking
Open Space 0, Closed/Covered 0
BuildingUnit typeCarpet areaUnits
A12BHK LB 44 sq m (478 sq ft) 20
A12BHK SB 44 sq m (478 sq ft) 18
A11BHK 37 sq m (395 sq ft) 2
A22BHK LB 44 sq m (478 sq ft) 20
A21BHK 37 sq m (395 sq ft) 2
A22BHK SB 44 sq m (478 sq ft) 18
A32BHK LB 44 sq m (478 sq ft) 20
A31BHK 37 sq m (395 sq ft) 2
A32BHK SB 44 sq m (478 sq ft) 18
A42BHK LB 44 sq m (478 sq ft) 20
A42BHK SB 44 sq m (478 sq ft) 18
A41BHK 37 sq m (395 sq ft) 2
B11BHK SB 29 sq m (312 sq ft) 20
B11BHK LB 29 sq m (312 sq ft) 20
B21BHK SB 29 sq m (312 sq ft) 20
B21BHK LB 29 sq m (312 sq ft) 20
B31BHK SB 29 sq m (312 sq ft) 20
B31BHK LB 29 sq m (312 sq ft) 20
Construction progress as reported to the portal

A1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

A2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

A3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

A4

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - Phase 1 Complete
  • Water Supply: 100% - Phase 1 Complete
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - Phase 1 Complete
  • Storm Water Drains: 100% - Phase 1 Complete
  • Landscaping & Tree Planting: 100% - Phase 1 Complete
  • Street Lighting: 100% - Phase 1 Complete
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - Phase 1 Complete
  • Solid Waste Management And Disposal: 100% - Phase 1 Complete
  • Water conservation /Rain water harvesting: 100% - Phase 1 Complete
  • Electrical meter room, sub-station, receiving station: 100% - Phase 1 Complete
  • Aggregate area of recreational Open Space: 100% - Phase 1 Complete
  • Open Parking: 100% - Phase 1 Complete
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Olympeo Riverside and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Olympeo Riverside
Cons:
Enter some negative aspects of Olympeo Riverside

Location

Olympeo Riverside, Neral, Raigad - 400041 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Shelu (~2 km)
    • Vangani (~5 km)
    • Neral NG (~7 km)
    • Matheran (~16 km)
    • Navi Mumbai International Airport (~41 km)
    • Chhatrapati Shivaji Maharaj International Airport (~68 km)
  • Healthcare

    • Aayush Nursing Home (~7 km)
    • patel hospital (~7 km)
    • Sai Hospital (~7 km)
    • Government Hospital, Sugave (~13 km)
  • Leisure & Entertainment

    • Shivaji Maidan (~8 km)
    • Visnubaug (~13 km)
    • Prabalgad Fort (~21 km)
    • Malanggad (~23 km)
    • Padargad Fort (~29 km)
    • Kothaligad (~30 km)
  • Services

    • Bank of Baroda (~2 km)
    • Ambarnath Taluka Court (~26 km)
  • Business & Hospitality

    • Badlapur MIDC (~18 km)
    • Additional Industrial Area (~27 km)
    • Maharashtra Industrial Development Centre - MIDC Taloja (~30 km)
    • MIDC (~31 km)
    • Radisson Blu Resort and Spa (~31 km)
    • Central Warehousing Corporation - Kalamboli (~33 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J651119027
Updated
Searches
3995
Views
1152