Aerial View
Side View
Master Plan
 5

Nandivardhan Monopoli - Dadar East, Mumbai

Builder
Nandivardhan Group
Construction
Under Construction
Completion
Apr, 2030
Properties
Apartments
RERA
P51900049902

Description

Iconic 41-storey high-rise offering premium skyline views

Nandivardhan Monopoli is a premium residential at Dadar East, Mumbai. It is spread across approximately 1 acre of land. The project features a single elegantly rising G+41-storey tower housing around 220 well-crafted residential units. The project’s strategic architecture, refined interiors, and well-planned layouts create an elevated urban lifestyle.

Amenities
  • Gymnasium
  • Cricket
  • 24*7 Water Supply
  • Kids' Play Areas / Sand Pits
  • Power Backup
  • Separate Entry/Exit Gates
  • Lift
  • Badminton Court(s)
  • Normal Park / Central Green
  • CCTV / Video Surveillance
  • Intercom Facility
  • Designer Entrance Lobby
Nandivardhan Group is a well-established real estate developer known for delivering high-quality residential and commercial projects across Mumbai. With decades of industry experience, the group has built a reputation for reliability, transparent dealings, and customer-centric project planning. Their developments are characterized by thoughtful architecture, efficient layouts, and meticulous attention to detail, ensuring long-term value for homebuyers.

Highlights

  • Gymnasium
  • Cricket
  • 24*7 Water Supply
  • Kids' Play Areas / Sand Pits
  • Power Backup
  • Separate Entry/Exit Gates
  • Lift
  • Badminton Court(s)
  • Normal Park / Central Green
  • CCTV / Video Surveillance
  • Intercom Facility
  • Designer Entrance Lobby

Configurations

Type Area Possession Price *
1BHK Apartment619 SqFeetWithin 4 Years₹ 1.99 crore
2BHK Apartment684 SqFeetWithin 4 Years₹ 2.87 crores
3BHK Apartment927 SqFeetWithin 4 Years₹ 3.7 crores
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51900049902 Monopoli Active 73% built

Confirmed with MahaRERA on 21 Sep 2026. Registered as "Monopoli".

Promoter
Mathuresh Infrapro Private Ltd
Registered on
6 Mar 2023
Proposed completion
Apr 2030 (originally Sep 2027)
Project type
Residential / Group Housing
Planning authority
MCGM
Address as filed
Dr. Babasaheb Ambedkar Road, Naigaon, Dadar East, VIMANNAGAR, Ward FSouth, Mumbai City, 400014
Land area
5,575 sq m (60,006 sq ft)
Sanctioned built-up area
34,751 sq m (374,064 sq ft)
Buildings
Wing- A (46 floors) - 72 of 125 available; Wing- B (46 floors) - 94 of 127 available; Wing- D (20 floors); Wing- E (20 floors); Wing- C (24 floors)
Parking
Open Space 0, Closed/Covered 392
BuildingUnit typeCarpet areaUnits
Wing- A2BHK 71 sq m (762 sq ft) 26
Wing- A2BHK 65 sq m (700 sq ft) 30
Wing- A1BHK 46 sq m (495 sq ft) 29
Wing- A2BHK 64 sq m (685 sq ft) 30
Wing- B2BHK 71 sq m (763 sq ft) 26
Wing- B2BHK 66 sq m (710 sq ft) 29
Wing- B2BHK 64 sq m (684 sq ft) 30
Wing- B1BHK 46 sq m (493 sq ft) 30
Wing- D1BHK 43 sq m (466 sq ft) 64
Wing- D1RK 26 sq m (280 sq ft) 1
Wing- E1BHK 47 sq m (504 sq ft) 16
Wing- E1BHK 58 sq m (619 sq ft) 1
Wing- E1BHK 49 sq m (527 sq ft) 2
Wing- E1BHK 46 sq m (499 sq ft) 33
Wing- E1BHK 45 sq m (484 sq ft) 2
Wing- E1BHK 43 sq m (466 sq ft) 14
Wing- C2BHK 67 sq m (720 sq ft) 18
Wing- C1BHK 41 sq m (445 sq ft) 1
Wing- C4BHK 124 sq m (1,332 sq ft) 1
Wing- C2BHK 72 sq m (774 sq ft) 16
Wing- C3BHK 96 sq m (1,036 sq ft) 2
Wing- C3BHK 89 sq m (954 sq ft) 16
Wing- C3BHK 86 sq m (927 sq ft) 14
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 5 Jul 2025 - -
Q1 FY 2025-2026 18 Jul 2025 - -
Q2 FY 2025-2026 24 Oct 2025 - -
Q3 FY 2025-2026 19 Jan 2026 - -
Q4 FY 2025-2026 18 Apr 2026 - -
Q1 FY 2026-2027 16 Jul 2026 - -
Construction progress as reported to the portal

Wing- A

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 50%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 20%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Wing- B

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 50%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 20%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Wing- D

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Wing- E

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Wing- C

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 40% - To be completed before OC
  • Water Supply: 10% - To be completed before OC
  • Sewerage (Chamber, Lines, Septic Tank , STP): 85% - To be completed before OC
  • Storm Water Drains: 100% - Done
  • Landscaping & Tree Planting: 100% - Done
  • Treatment And Disposal Of Sewage And Sullage Water: 75% - To be completed before OC
  • Solid Waste Management And Disposal: 50% - To be completed before OC
  • Water conservation /Rain water harvesting: 70% - To be completed before OC
  • Energy managemcnt: 50% - To be completed before OC
  • Fire protection and fire safety requirements: 60% - To be completed before OC
  • Electrical meter room, sub-station, receiving station: 60% - To be completed before OC
  • Aggregate area of recreational Open Space: 30% - To be completed before OC
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Nandivardhan Monopoli and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Nandivardhan Monopoli
Cons:
Enter some negative aspects of Nandivardhan Monopoli

Location

Nandivardhan Monopoli, Dadar East, Mumbai - 400014 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Naigaon (<1 km)
    • Asiad MSRTC Stand (<1 km)
    • Dadar (<1 km)
    • Satguru Automobiles (~1 km)
    • Chhatrapati Shivaji Maharaj International Airport (~13 km)
    • Navi Mumbai International Airport (~33 km)
  • Shopping & Dining

    • Chaos Control Cafe (<1 km)
    • Cafe Muttuswami (<1 km)
    • Dadar Flower Market (<1 km)
    • Nakshatra Mall (~1 km)
    • Reliance Smart Superstore (~2 km)
    • Paisely (~3 km)
  • Healthcare

    • MAHALAXMI MEDICAL AND GENERAL STORES (<1 km)
    • Suprabha Surgicare (<1 km)
    • Tata Memorial Cancer Hospital (<1 km)
    • Zeelab Pharmacy (~2 km)
    • Dr. Akash Dhuru - Cancer Specialist Surgeon (~2 km)
    • UBM Institute (~2 km)
  • Education

    • St. Pauls Convent (<1 km)
    • Dadar Athornan Institute (~2 km)
    • Welingkar Institute of Management Development & Research (~2 km)
    • Veermata Jijabhai Technological Institute (VJTI) (~2 km)
    • Institute of Chemical Technology (~3 km)
    • The Asiatic Society of Mumbai (~12 km)
  • Leisure & Entertainment

    • Purandare Stadium (<1 km)
    • Kamgar Stadium (~1 km)
    • Deepak Talkies (~2 km)
    • Shivaji Park (~3 km)
    • Veermata Jijabai Bhosale Zoo & Botanical Garden (~5 km)
    • Willingdon Sports Club (~7 km)
  • Services

    • HDFC Bank ATM (<1 km)
    • Dadar Fire Brigade (<1 km)
    • State Bank of India (<1 km)
    • Dadar Police Station (~1 km)
    • Matunga Post Office (~3 km)
    • Bahmandai Municipal Corporat (~4 km)
  • Religious Places

    • Vyghreshwar Mandir (<1 km)
    • St. Mary's Orthodox Cathedral. (<1 km)
    • Naigaonchya Vighnaharta (<1 km)
    • Pir Baghdadi Masjid (~1 km)
    • Rustam Faramna Agiary (~2 km)
    • Matunga Khalsa Sabha (~3 km)
  • Business & Hospitality

    • Dadar BEST Workshop (~1 km)
    • Western Railway Carriage Repair Workshop (~2 km)
    • ITC Grand Central (~2 km)
    • Peninsula Business Park (~3 km)
    • Grand Hyatt Mumbai Hotel & Residences (~10 km)
    • Equinox Business Park (~11 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J690119258
Updated
Searches
507
Views
507