Front View
Kitchen
Balcony
 16

Mirador Utsaav - Shahapur, Thane

Builder
Mirador Construction
Construction
Under Construction
Completion
Apr, 2030
Properties
Apartments
RERA
P51700012454

Description

The abode is aesthetically carved for the ultimate comfort.

Mirador Utsaav by Mirador Construction is located at Shahapur in Maharashtra. The abode is aesthetically carved for the ultimate comfort of the dweller. Each and every room of the abode is breezy. The architects have made optimum utilization of space in the apartments. The project offers very well designed 1& 2 Bhk with well connected by various modes of transportation. The site is in close proximity to all civic utilities. Being placed at a strategic location all your day to day requirements are taken care of.

Amenities:
  • Children's play area
  • 24 X 7 Security
  • Power Backup
  • Landscaped Gardens
  • Car Parking
  • Lift Available
  • Gymnasium
  • Swimming Pool
  • Club House
  • Multipurpose Room
  • Sports Facility
  • Intercom
  • Indoor Games
  • Vaastu Compliant
Mirador Construction is committed to create business premises, residence, building and infrastructures that are known for their quality and distinct in design. They are focused in the determination to provide customers elegant, lavish and affordable homes that will redefine their way of living. They are committed to deliver the gracefully crafted homes with expected quality as promised.

Highlights

  • Power Back-up
  • Maintenance Staff
  • Rain Water Harvesting
  • Lifts
  • High Speed Internet
  • Security Guards
  • Fire Alarm
  • Electronic Security
  • Balcony
  • Reserved Parking
  • Corner Location
  • Modular Kitchen
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center

Configurations

Type Area Possession Price *
1BHK Apartment226 SqFeetWithin 4 Years₹ 13.32 lakhs
1BHK Apartment307 SqFeetWithin 4 Years₹ 18.15 lakhs
1BHK Apartment416 SqFeetWithin 4 Years₹ 19.74 lakhs
1BHK Apartment515 SqFeetWithin 4 Years₹ 16.56 lakhs
1BHK Apartment625 SqFeetWithin 4 Years₹ 19.24 lakhs
1BHK Apartment335 SqMetersWithin 4 Years₹ 16.59 lakhs
2BHK Apartment494 SqFeetWithin 4 Years₹ 28.17 lakhs
2BHK Apartment785 SqFeetWithin 4 Years₹ 25.85 lakhs
2BHK Apartment917 SqFeetWithin 4 Years₹ 27.38 lakhs
2BHK Apartment982 SqFeetWithin 4 Years₹ 29.56 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51700012454 MIRADOR UTSAV PHASE 1 Active 19% built

Confirmed with MahaRERA on 21 Sep 2026. Registered as "MIRADOR UTSAV PHASE 1".

Promoter
Mirador Dewellers Pvt Ltd
Registered on
1 Sep 2017
Proposed completion
Apr 2030 (originally Dec 2021)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Shahapur, Vehloli Phata, Vehloli, Shahapur, Thane, 421601
Land area
13,200 sq m (142,088 sq ft)
Sanctioned built-up area
14,135 sq m (152,154 sq ft)
Buildings
A (5 floors) - 5 of 18 available; B (5 floors) - 0 of 18 available; D (5 floors) - 3 of 14 available; E (5 floors); H (5 floors); C (5 floors) - 3 of 18 available; F (1 floors); G (5 floors); I (5 floors) - 10 of 30 available; K (5 floors) - 16 of 22 available; L (5 floors) - 7 of 18 available; M (5 floors) - 9 of 19 available; N (9 floors) - 30 of 70 available
Parking
Open Space 46, Closed/Covered 10
Complaints on the portal
23
BuildingUnit typeCarpet areaUnits
A1 BHK 31 sq m (331 sq ft) 18
B1BHK 30 sq m (318 sq ft) 5
B1BHK 29 sq m (317 sq ft) 5
B1BHK 29 sq m (310 sq ft) 4
B1BHK 29 sq m (316 sq ft) 4
D2BHK 44 sq m (476 sq ft) 5
D1BHK 33 sq m (357 sq ft) 9
E1 BHK 31 sq m (335 sq ft) 5
E1 BHK 30 sq m (325 sq ft) 4
E1BHK 31 sq m (335 sq ft) 4
E1 BHK 30 sq m (322 sq ft) 5
H1BHK 30 sq m (324 sq ft) 4
H1BHK 30 sq m (325 sq ft) 4
H1BHK 42 sq m (457 sq ft) 5
C1BHK 29 sq m (316 sq ft) 4
C1BHK 29 sq m (316 sq ft) 5
C1BHK 29 sq m (317 sq ft) 4
C1BHK 30 sq m (319 sq ft) 5
F1BHK 27 sq m (291 sq ft) 4
F1 BHK 26 sq m (284 sq ft) 4
F1 BHK 26 sq m (285 sq ft) 5
F1 BHK 27 sq m (285 sq ft) 5
F1BHK 27 sq m (288 sq ft) 5
F1BHK 27 sq m (288 sq ft) 4
F1BHK 27 sq m (288 sq ft) 1
G1BHK 27 sq m (287 sq ft) 5
G1BHK 27 sq m (287 sq ft) 5
G1BHK 27 sq m (286 sq ft) 4
G1 BHK 27 sq m (285 sq ft) 5
G1 BHK 26 sq m (285 sq ft) 4
G1 BHK 26 sq m (285 sq ft) 5
IShop 16 sq m (173 sq ft) 1
IShop 12 sq m (127 sq ft) 1
IShop 12 sq m (130 sq ft) 1
I1BHK 33 sq m (350 sq ft) 17
IShop 16 sq m (170 sq ft) 1
I1BHK 21 sq m (226 sq ft) 9
K1BHK 31 sq m (338 sq ft) 17
KShop 10 sq m (111 sq ft) 1
KShop 11 sq m (121 sq ft) 2
KShop 16 sq m (167 sq ft) 2
L1BHK 30 sq m (327 sq ft) 5
L1BHK 31 sq m (336 sq ft) 13
M1BHK 33 sq m (352 sq ft) 10
M1BHK 32 sq m (349 sq ft) 9
N1BHK 32 sq m (348 sq ft) 7
N1BHK 32 sq m (346 sq ft) 7
N1BHK 33 sq m (356 sq ft) 7
N1BHK 33 sq m (358 sq ft) 7
N1BHK 36 sq m (384 sq ft) 7
N1BHK 42 sq m (456 sq ft) 14
N2BHK 46 sq m (495 sq ft) 7
N2BHK 46 sq m (498 sq ft) 7
N2BHK 50 sq m (540 sq ft) 7
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 not filed - in default - -
Q1 FY 2025-2026 13 Feb 2026 - -
Q2 FY 2025-2026 16 Feb 2026 - -
Q3 FY 2025-2026 17 Feb 2026 - -
Q4 FY 2025-2026 not filed - in default - -
Q1 FY 2026-2027 not filed - in default - -
Construction progress as reported to the portal

A

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

B

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

D

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

E

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

H

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

C

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

F

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

G

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

I

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

K

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

L

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

M

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

N

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 20%
  • Water Supply: 20%
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0%
  • Landscaping & Tree Planting: 20%
  • Street Lighting: 20%
  • Water conservation /Rain water harvesting: 0%
  • Electrical meter room, sub-station, receiving station: 0%
  • Aggregate area of recreational Open Space: 0%
  • Open Parking: 0%
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Mirador Utsaav and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Mirador Utsaav
Cons:
Enter some negative aspects of Mirador Utsaav

Location

Mirador Utsaav,Mirador Utsaav, Survey No. 128/3, Vehloli Phata, Asangaon,, Shahapur, Thane - 421603 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Hindustan Petroleum (~2 km)
    • Asangaon (~4 km)
    • Vasind (~4 km)
    • Atgaon (~14 km)
    • Navi Mumbai International Airport (~75 km)
    • Chhatrapati Shivaji Maharaj International Airport (~81 km)
  • Shopping & Dining

    • Barista (~2 km)
    • Diamond Foodway (~3 km)
    • Hotel Foodmax / Nandi Residency Lodgiing & Boarding (~3 km)
    • Cafe Double Seat (~4 km)
    • Cafe Coffee Day (~4 km)
    • Shubh Sagar (~4 km)
  • Healthcare

    • Dr. Tayde Clinic (~4 km)
    • Shree Sharda Clinic (~4 km)
    • Government Hospital (~4 km)
    • Sai Sharadha Hospital (~4 km)
    • Ashirwad Nursing Home (~4 km)
    • SDH Shahapur (~7 km)
  • Leisure & Entertainment

    • Mahuli Fort (~13 km)
    • Shangrila Water Resort (~27 km)
    • Sangam (~31 km)
  • Services

    • HDFC Bank ATM (~3 km)
    • Bank of Maharashtra (~4 km)
  • Business & Hospitality

    • Global (~20 km)
    • MIDC (~28 km)
    • Century Rayon (~33 km)
    • Lalit Pipe (~33 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J662119025
Updated
Searches
6722
Views
1949