Mirador Utsaav - Shahapur, Thane
- Builder
- Mirador Construction
- Construction
- Under Construction
- Completion
- Apr, 2030
- Properties
- Apartments
- RERA
- P51700012454
Description
The abode is aesthetically carved for the ultimate comfort.
Mirador Utsaav by Mirador Construction is located
at Shahapur in Maharashtra. The abode is aesthetically carved for the
ultimate comfort of the dweller. Each and every room of the abode is
breezy. The architects have made optimum utilization of space in the
apartments. The project offers very well designed 1& 2 Bhk with well
connected by various modes of transportation. The site is in close
proximity to all civic utilities. Being placed at a strategic location
all your day to day requirements are taken care of.
Amenities:
- Children's play area
- 24 X 7 Security
- Power Backup
- Landscaped Gardens
- Car Parking
- Lift Available
- Gymnasium
- Swimming Pool
- Club House
- Multipurpose Room
- Sports Facility
- Intercom
- Indoor Games
- Vaastu Compliant
Highlights
- Power Back-up
- Maintenance Staff
- Rain Water Harvesting
- Lifts
- High Speed Internet
- Security Guards
- Fire Alarm
- Electronic Security
- Balcony
- Reserved Parking
- Corner Location
- Modular Kitchen
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 1BHK Apartment | 226 SqFeet | Within 4 Years | ₹ 13.32 lakhs |
| 1BHK Apartment | 307 SqFeet | Within 4 Years | ₹ 18.15 lakhs |
| 1BHK Apartment | 416 SqFeet | Within 4 Years | ₹ 19.74 lakhs |
| 1BHK Apartment | 515 SqFeet | Within 4 Years | ₹ 16.56 lakhs |
| 1BHK Apartment | 625 SqFeet | Within 4 Years | ₹ 19.24 lakhs |
| 1BHK Apartment | 335 SqMeters | Within 4 Years | ₹ 16.59 lakhs |
| 2BHK Apartment | 494 SqFeet | Within 4 Years | ₹ 28.17 lakhs |
| 2BHK Apartment | 785 SqFeet | Within 4 Years | ₹ 25.85 lakhs |
| 2BHK Apartment | 917 SqFeet | Within 4 Years | ₹ 27.38 lakhs |
| 2BHK Apartment | 982 SqFeet | Within 4 Years | ₹ 29.56 lakhs |
RERA
P51700012454 MIRADOR UTSAV PHASE 1 Active 19% built
Confirmed with MahaRERA on 21 Sep 2026. Registered as "MIRADOR UTSAV PHASE 1".
- Promoter
- Mirador Dewellers Pvt Ltd
- Registered on
- 1 Sep 2017
- Proposed completion
- Apr 2030 (originally Dec 2021)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Shahapur, Vehloli Phata, Vehloli, Shahapur, Thane, 421601
- Land area
- 13,200 sq m (142,088 sq ft)
- Sanctioned built-up area
- 14,135 sq m (152,154 sq ft)
- Buildings
- A (5 floors) - 5 of 18 available; B (5 floors) - 0 of 18 available; D (5 floors) - 3 of 14 available; E (5 floors); H (5 floors); C (5 floors) - 3 of 18 available; F (1 floors); G (5 floors); I (5 floors) - 10 of 30 available; K (5 floors) - 16 of 22 available; L (5 floors) - 7 of 18 available; M (5 floors) - 9 of 19 available; N (9 floors) - 30 of 70 available
- Parking
- Open Space 46, Closed/Covered 10
- Complaints on the portal
- 23
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| A | 1 BHK | 31 sq m (331 sq ft) | 18 |
| B | 1BHK | 30 sq m (318 sq ft) | 5 |
| B | 1BHK | 29 sq m (317 sq ft) | 5 |
| B | 1BHK | 29 sq m (310 sq ft) | 4 |
| B | 1BHK | 29 sq m (316 sq ft) | 4 |
| D | 2BHK | 44 sq m (476 sq ft) | 5 |
| D | 1BHK | 33 sq m (357 sq ft) | 9 |
| E | 1 BHK | 31 sq m (335 sq ft) | 5 |
| E | 1 BHK | 30 sq m (325 sq ft) | 4 |
| E | 1BHK | 31 sq m (335 sq ft) | 4 |
| E | 1 BHK | 30 sq m (322 sq ft) | 5 |
| H | 1BHK | 30 sq m (324 sq ft) | 4 |
| H | 1BHK | 30 sq m (325 sq ft) | 4 |
| H | 1BHK | 42 sq m (457 sq ft) | 5 |
| C | 1BHK | 29 sq m (316 sq ft) | 4 |
| C | 1BHK | 29 sq m (316 sq ft) | 5 |
| C | 1BHK | 29 sq m (317 sq ft) | 4 |
| C | 1BHK | 30 sq m (319 sq ft) | 5 |
| F | 1BHK | 27 sq m (291 sq ft) | 4 |
| F | 1 BHK | 26 sq m (284 sq ft) | 4 |
| F | 1 BHK | 26 sq m (285 sq ft) | 5 |
| F | 1 BHK | 27 sq m (285 sq ft) | 5 |
| F | 1BHK | 27 sq m (288 sq ft) | 5 |
| F | 1BHK | 27 sq m (288 sq ft) | 4 |
| F | 1BHK | 27 sq m (288 sq ft) | 1 |
| G | 1BHK | 27 sq m (287 sq ft) | 5 |
| G | 1BHK | 27 sq m (287 sq ft) | 5 |
| G | 1BHK | 27 sq m (286 sq ft) | 4 |
| G | 1 BHK | 27 sq m (285 sq ft) | 5 |
| G | 1 BHK | 26 sq m (285 sq ft) | 4 |
| G | 1 BHK | 26 sq m (285 sq ft) | 5 |
| I | Shop | 16 sq m (173 sq ft) | 1 |
| I | Shop | 12 sq m (127 sq ft) | 1 |
| I | Shop | 12 sq m (130 sq ft) | 1 |
| I | 1BHK | 33 sq m (350 sq ft) | 17 |
| I | Shop | 16 sq m (170 sq ft) | 1 |
| I | 1BHK | 21 sq m (226 sq ft) | 9 |
| K | 1BHK | 31 sq m (338 sq ft) | 17 |
| K | Shop | 10 sq m (111 sq ft) | 1 |
| K | Shop | 11 sq m (121 sq ft) | 2 |
| K | Shop | 16 sq m (167 sq ft) | 2 |
| L | 1BHK | 30 sq m (327 sq ft) | 5 |
| L | 1BHK | 31 sq m (336 sq ft) | 13 |
| M | 1BHK | 33 sq m (352 sq ft) | 10 |
| M | 1BHK | 32 sq m (349 sq ft) | 9 |
| N | 1BHK | 32 sq m (348 sq ft) | 7 |
| N | 1BHK | 32 sq m (346 sq ft) | 7 |
| N | 1BHK | 33 sq m (356 sq ft) | 7 |
| N | 1BHK | 33 sq m (358 sq ft) | 7 |
| N | 1BHK | 36 sq m (384 sq ft) | 7 |
| N | 1BHK | 42 sq m (456 sq ft) | 14 |
| N | 2BHK | 46 sq m (495 sq ft) | 7 |
| N | 2BHK | 46 sq m (498 sq ft) | 7 |
| N | 2BHK | 50 sq m (540 sq ft) | 7 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
| Q4 FY 2024-2025 | not filed - in default | - | - |
| Q1 FY 2025-2026 | 13 Feb 2026 | - | - |
| Q2 FY 2025-2026 | 16 Feb 2026 | - | - |
| Q3 FY 2025-2026 | 17 Feb 2026 | - | - |
| Q4 FY 2025-2026 | not filed - in default | - | - |
| Q1 FY 2026-2027 | not filed - in default | - | - |
Construction progress as reported to the portal
A
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
B
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
D
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
E
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
H
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
C
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 70%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
F
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
G
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
I
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
K
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
L
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
M
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
N
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
Common areas and facilities
- Internal Roads & Footpaths: 20%
- Water Supply: 20%
- Sewerage (Chamber, Lines, Septic Tank , STP): 0%
- Landscaping & Tree Planting: 20%
- Street Lighting: 20%
- Water conservation /Rain water harvesting: 0%
- Electrical meter room, sub-station, receiving station: 0%
- Aggregate area of recreational Open Space: 0%
- Open Parking: 0%
Reviews
Write a review
Be the first to write a review of Mirador Utsaav and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Mirador Utsaav
Enter some positive aspects of Mirador Utsaav
Cons:
Enter some negative aspects of Mirador Utsaav
Enter some negative aspects of Mirador Utsaav
Location
Mirador Utsaav,Mirador Utsaav, Survey No. 128/3, Vehloli Phata, Asangaon,, Shahapur, Thane - 421603 (Maharashtra)
Nearby
-
Transport
- Hindustan Petroleum (~2 km)
- Asangaon (~4 km)
- Vasind (~4 km)
- Atgaon (~14 km)
- Navi Mumbai International Airport (~75 km)
- Chhatrapati Shivaji Maharaj International Airport (~81 km)
-
Shopping & Dining
- Barista (~2 km)
- Diamond Foodway (~3 km)
- Hotel Foodmax / Nandi Residency Lodgiing & Boarding (~3 km)
- Cafe Double Seat (~4 km)
- Cafe Coffee Day (~4 km)
- Shubh Sagar (~4 km)
-
Healthcare
- Dr. Tayde Clinic (~4 km)
- Shree Sharda Clinic (~4 km)
- Government Hospital (~4 km)
- Sai Sharadha Hospital (~4 km)
- Ashirwad Nursing Home (~4 km)
- SDH Shahapur (~7 km)
-
Leisure & Entertainment
- Mahuli Fort (~13 km)
- Shangrila Water Resort (~27 km)
- Sangam (~31 km)
-
Services
- HDFC Bank ATM (~3 km)
- Bank of Maharashtra (~4 km)
-
Business & Hospitality
- Global (~20 km)
- MIDC (~28 km)
- Century Rayon (~33 km)
- Lalit Pipe (~33 km)
- Project ID
- J662119025
- Updated
- Searches
- 6722
- Views
- 1949