Front View
Night View
Birdseye View
 8

Millenium Shikhar Greens - Rasayani, Navi Mumbai

Builder
Millennium Group
Construction
New Launch
Completion
Jul, 2027
Properties
Apartments
RERA
P52000034020

Description

Beautifully designed internal street lights

Millenium Shikhar Greens is a thoughtfully designed residential project located in the serene locality of Rasayani, Navi Mumbai. The project is spanning 2.49 acres, the project comprises 7 towers that house a total of 334 thoughtfully planned apartments. The development offers a mix of 1 and 2 BHK homes with sizes ranging from 330 to 765 sqft. The project is designed to provide modern living with comfort and convenience.

Amenities
  • Swimming Pool
  • Gymnasium
  • Children’s Play Area
  • Indoor Games
  • Skating Rink
  • Jogging Track
  • 24x7 CCTV Surveillance
  • Fire Safety Systems
  • 24x7 Water Supply
  • Power Backup
  • Landscape Garden
  • Community Hall
  • Banquet Hall
  • Gazebo
Millennium Group is a well-established real estate developer based in Navi Mumbai, known for delivering quality residential and commercial projects with a focus on timely possession and customer satisfaction. With years of experience in the real estate sector, the group has carved a reputation for modern designs, reliable construction, and sustainable living spaces.

Highlights

  • Swimming Pool
  • Gymnasium
  • Children’s Play Area
  • Indoor Games
  • Skating Rink
  • Jogging Track
  • 24x7 CCTV Surveillance
  • Fire Safety Systems
  • 24x7 Water Supply
  • Power Backup
  • Landscape Garden
  • Community Hall
  • Banquet Hall
  • Gazebo

Configurations

Type Area Possession Price *
1BHK Apartment285 SqFeetWithin 1 Year₹ 29 lakhs
2BHK Apartment468 SqFeetWithin 1 Year₹ 47.62 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52000034020 Shikhar Greens Active 0% built

Confirmed with MahaRERA on 21 Sep 2026. Registered as "Shikhar Greens".

Promoter
Shikhar Realty
Registered on
17 Mar 2022
Proposed completion
Jul 2027 (originally Mar 2027)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Panvel, Panvel, Chawane, Panvel, Raigarh, 410207
Land area
10,100 sq m (108,719 sq ft)
Sanctioned built-up area
19,325 sq m (208,024 sq ft)
Buildings
Wing A (9 floors) - 29 of 35 available; Wing B (9 floors) - 3 of 44 available; Wing C (9 floors) - 3 of 52 available; Wing D (9 floors) - 18 of 38 available; Wing E (9 floors) - 36 of 60 available; Wing F (9 floors) - 5 of 60 available; Wing G (9 floors) - 18 of 45 available
Parking
Open Space 0, Closed/Covered 68
BuildingUnit typeCarpet areaUnits
Wing A2BHK 48 sq m (513 sq ft) 7
Wing A1BHK 31 sq m (333 sq ft) 7
Wing A2BHK 50 sq m (536 sq ft) 14
Wing A2BHK 50 sq m (537 sq ft) 7
Wing B1BHK 34 sq m (363 sq ft) 14
Wing B2BHK 40 sq m (429 sq ft) 1
Wing B2BHK 41 sq m (436 sq ft) 14
Wing B2BHK 50 sq m (534 sq ft) 15
Wing C1BHK 34 sq m (363 sq ft) 31
Wing C2BHK 41 sq m (436 sq ft) 7
Wing C2BHK 59 sq m (633 sq ft) 14
Wing D2BHK 41 sq m (436 sq ft) 21
Wing D2BHK 40 sq m (429 sq ft) 2
Wing D2BHK 48 sq m (516 sq ft) 7
Wing D1BHK 34 sq m (363 sq ft) 7
Wing D2BHK 47 sq m (508 sq ft) 1
Wing E2BHK 45 sq m (490 sq ft) 30
Wing E2BHK 48 sq m (518 sq ft) 16
Wing E1BHK 29 sq m (308 sq ft) 14
Wing F1BHK 30 sq m (325 sq ft) 16
Wing F1BHK 31 sq m (336 sq ft) 22
Wing F1BHK 31 sq m (336 sq ft) 8
Wing F1BHK 28 sq m (305 sq ft) 14
Wing G1BHK 31 sq m (336 sq ft) 30
Wing G1BHK 31 sq m (333 sq ft) 8
Wing G1BHK 29 sq m (308 sq ft) 7
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 not filed - in default - -
Q1 FY 2025-2026 25 Jul 2025 - -
Q2 FY 2025-2026 4 Nov 2025 - -
Q3 FY 2025-2026 5 Feb 2026 - -
Q4 FY 2025-2026 5 May 2026 - -
Q1 FY 2026-2027 6 Aug 2026 - -
Construction progress as reported to the portal

Wing A

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Wing B

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Wing C

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Wing D

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Wing E

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Wing F

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Wing G

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - NA
  • Water Supply: 0% - Will be provided by MIDC
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - As per approved plan and specifiaction
  • Storm Water Drains: 0% - As per approved plan and specifiaction
  • Landscaping & Tree Planting: 0% - As per approved plan and specifiaction
  • Street Lighting: 0% - NA
  • Community Buildings: 0% - NA
  • Water conservation /Rain water harvesting: 0% - Will be prepared as per norms
  • Fire protection and fire safety requirements: 0% - Will be prepared as per norms
  • Electrical meter room, sub-station, receiving station: 0% - Electric Meter room as per norms
  • Aggregate area of recreational Open Space: 0% - As per approved plan and specifiaction
  • Open Parking: 0% - As per approved plan and specifiaction
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Millenium Shikhar Greens and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Millenium Shikhar Greens
Cons:
Enter some negative aspects of Millenium Shikhar Greens

Location

Millenium Shikhar Greens, Rasayani, Navi Mumbai - 410207 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Apta (~1 km)
    • Panvel (Suburban) (~21 km)
    • Navi Mumbai International Airport (~25 km)
    • Belapur Jetty (~29 km)
    • Sarovar Vihar (CBD Belapur) (~29 km)
    • Chhatrapati Shivaji Maharaj International Airport (~56 km)
  • Healthcare

    • Pulse Multispeciality Hospital (~6 km)
    • Sampoorna Rege Hospital and Polyclinic (~7 km)
    • Good Health Hospital (~7 km)
    • Kalpataru Mother and Child Hospital (~7 km)
    • Dhirubhai Ambani Hospital (~10 km)
    • Jite Civil Hospital (~12 km)
  • Education

    • Pillai HOC College Of Engineering & Technology (~5 km)
    • National Institute of Securities Markets (~8 km)
    • Bharati Vidyapeeth (~31 km)
    • Saraswati College of Engineering, Kharghar (~31 km)
    • T.S. Chanakya Maritime University (~33 km)
    • DY Patil University (~35 km)
  • Leisure & Entertainment

    • Karnala Fort (कर्णाळा किल्ला) (~7 km)
    • Hakone Fortune Karting Raceway (~10 km)
    • Imagica (~23 km)
    • Butterfly Park (~32 km)
    • Kharghar Valley Golf Course (~34 km)
    • Dr. DY Patil Sports Stadium (~34 km)
  • Services

    • Rasayani Fire Station (~4 km)
    • Rasayani Policce Station (~4 km)
    • Belapur Court (~29 km)
    • Navi Mumbai Civil & Criminal Court (~30 km)
  • Business & Hospitality

    • Uttam Galva Steels (~20 km)
    • Novotel Imagica Khopoli (~23 km)
    • Uran (~28 km)
    • Radisson Blu Resort and Spa (~30 km)
    • India Steel Ltd (~30 km)
    • Jawaharlal Nehru Port (~34 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J582611925
Updated
Searches
475
Views
471