Majestique Signature Towers - Baner, Pune
- Builder
- Majestique Landmarks
- Construction
- Partially Completed
- Completion
- Dec, 2031
- Properties
- Apartments
- RERA
- P52100017133, P52100020721
Description
A destination for the city
Majestique Signature Towers by Majestique Landmarks located at Baner, Pune presenting palatial 2 & 3 BHK homes which is spread over 627 - 724 sq ft for those who seek nothing but the finest. A place that defines ‘vibe’ even better than all the dictionaries in the world. The project is equipped with key amenities including swimming pool, children's play area, gymnasium, indoor games etc & well connected with other parts of city and has all the basic utilities nearby.
Amenities:
- Multipurpose hall
- Club House
- Fully equipped Gymnasium
- Swimming Pool
- Jogging Track
- Garden
Majestique Landmarks began its existence as a textile company. Eventually the business grew to include production facilities at Surat, Varanasi, Bengaluru and Mumbai, and 30 retail outlets – collectively measuring over 3 lakh sq. ft. – in all the major cities of Maharashtra. In 2007, the company diversified into the real estate sector, with residential projects in Pune, at Hadapsar and Market Yard. The success of the projects prompted a full scale thrust into construction through a variety of residential developments across the city, each aimed at a specific demographic.
Highlights
- Power Back-up
- Visitor Parking
- Maintenance Staff
- Rain Water Harvesting
- Lifts
- Reserved Parking
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
- Water Connection
- Close to Hospital
- Close to School
- Close to Shopping Center/Mall
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 3BHK Apartment | 724 SqFeet | Within 4 Years | ₹ 79 lakhs |
RERA
P52100017133 MAJESTIQUE SIGNATURE TOWERS PHASE 1 Completed
Confirmed with MahaRERA on 16 Sep 2026. Registered as "MAJESTIQUE SIGNATURE TOWERS PHASE 1".
- Promoter
- MAJESTIQUE HOMES LLP
- Registered on
- 16 Jul 2018
- Proposed completion
- Sep 2024
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- BANER BALEWADI HIGH STREET ROAD, BALEWADI, Pune (M Corp.), Haveli, Pune, 411045
- Land area
- 3,435 sq m (36,971 sq ft)
- Sanctioned built-up area
- 15,055 sq m (162,056 sq ft)
- Buildings
- Building D (19 floors)
- Parking
- Open Space 0, Closed/Covered 100
- Complaints on the portal
- 2
Construction progress as reported to the portal
Building D
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 100% - Completed
- Water Supply: 100% - Completed
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - Completed
- Storm Water Drains: 100% - Completed
- Landscaping & Tree Planting: 80% - Work in progress
- Street Lighting: 100% - Completed
- Community Buildings: 90% - Work in progress
- Treatment And Disposal Of Sewage And Sullage Water: 100% - Completed
- Solid Waste Management And Disposal: 100% - Completed
- Water conservation /Rain water harvesting: 100% - Completed
- Energy managemcnt: 100% - Completed
- Fire protection and fire safety requirements: 100% - Completed
- Electrical meter room, sub-station, receiving station: 100% - Completed
- Aggregate area of recreational Open Space: 100% - Completed
- Open Parking: 60% - Work in progress
P52100020721 SIGNATURE TOWER PHASE 2 Abeyance 2% built
Confirmed with MahaRERA on 18 Jul 2026. Registered as "SIGNATURE TOWER PHASE 2".
MahaRERA says: This Project is kept in Abeyance, bank account of this project is frozen, and promoter is prohibited to execute agreement for sale/sale deed with buyers, till further compliances done by the promoter.
- Promoter
- Samarth Builders
- Registered on
- 6 May 2019
- Proposed completion
- Dec 2031
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- BANER BALEWADI HIGH STREET, BALEWADI, Pune (M Corp.), Pune City, Pune, 411045
- Land area
- 6,958 sq m (74,898 sq ft)
- Sanctioned built-up area
- 7,312 sq m (78,708 sq ft)
- Buildings
- BUILDING C2 (21 floors); BUILDING C3 (21 floors); BUILDING C1 (21 floors); BUILDING C4 (21 floors); BUILDING C5 (21 floors)
- Parking
- Open Space 0, Closed/Covered 160
Construction progress as reported to the portal
BUILDING C2
- Excavation: 90%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
BUILDING C3
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
BUILDING C1
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
BUILDING C4
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
BUILDING C5
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
Common areas and facilities
- Internal Roads & Footpaths: 0% - -
- Water Supply: 0% - -
- Sewerage (Chamber, Lines, Septic Tank , STP): 0% - -
- Storm Water Drains: 0% - -
- Landscaping & Tree Planting: 0% - -
- Street Lighting: 0% - -
- Community Buildings: 0% - -
- Treatment And Disposal Of Sewage And Sullage Water: 0% - -
- Solid Waste Management And Disposal: 0% - -
- Water conservation /Rain water harvesting: 0% - -
- Energy managemcnt: 0% - -
- Fire protection and fire safety requirements: 0% - -
- Electrical meter room, sub-station, receiving station: 0% - -
- Aggregate area of recreational Open Space: 0% - -
- Open Parking: 0% - -
Reviews
Write a review
Be the first to write a review of Majestique Signature Towers and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Majestique Signature Towers
Enter some positive aspects of Majestique Signature Towers
Cons:
Enter some negative aspects of Majestique Signature Towers
Enter some negative aspects of Majestique Signature Towers
Location
Majestique Signature Towers, Baner, Pune - 411045 (Maharashtra)
Landmarks
Hotel
- The Orchid Hotel-Balewadi (<2km)
- Pancard Clubs (<2km)
- Lemon Tree Farms (<6km)
- Sadanad Resorts (<1km)
- Hotel Ginger-Pimpri (<10km)
- Hotel Shivar Garden (<4km)
- Hotel Green Park-Baner (<5km)
- Ambience Hotel (<11km)
- Seasons Hotel-Aundh (<5km)
- The Coronet Hotel (<13km)
- Ginger-Wakad (<7km)
- Hotel Shreyas (<13km)
- Keys Select Pimpri - by Lemon Tree Hotels (<10km)
- Collection O 30016 Citiotel Shivajinagar (<13km)
- Holiday Inn-Pune Hinjewadi (<3km)
- Jw Marriott-Senapati Bapat Road (<10km)
- Tarawade Clarks Inn - Pune (<13km)
- Hotel Sheetal (<12km)
- Best Western Hotel Pune (<12km)
- Pancard Clubs-Balewadi Phata (<3km)
- Rajwada (<5km)
- Deccan Rendezvous (<12km)
- Pune Marriott Hotel (<10km)
- The Oakwood (<13km)
- Hotel Orchard (<13km)
- Aundh Retreat (<5km)
- COURTYARD by Marriott Pune Hinjewadi (<5km)
- Oxford Golf Resort-Lavale (<8km)
- Orritel Hotel-Hinjewadi (<7km)
Recreation
- Balewadi Stadium (<2km)
- E Square (<10km)
- E-Square Vishal (<10km)
- Baneshwar (<3km)
- Bal Gandharva Rang Mandir (<13km)
Restaurant & Shops
- D Mart (<1km)
- Reliance SMART (<5km)
- Crossword Aundh (<5km)
- Fabindia (<6km)
- Big Bazaar (<3km)
- The Great Punjab (<3km)
- Jagtap Dairy (<4km)
- Pagdandi Books Chai Cafe (<4km)
- CROMA (<5km)
- Cascade (<7km)
- Food Bazaar (<3km)
Building
- Comfort Zone (<1km)
- Beverly Hills (<2km)
- 24k Glitterati (<2km)
- Revati Arcade (<3km)
- Kalpataru Splendor (<4km)
- National Co-op Housing Society (<6km)
- Treasure Island (<6km)
- Ajintha (<1km)
- Orchid Towers (<1km)
- Akashganga CHS (<5km)
- Solitaire Paradise (<5km)
- DSK Rannwara. डीएसके रणवारा (<8km)
- Malpani Greens (<4km)
- Park Street (<4km)
- Kakde Park (<9km)
- Sakal Nagar 2 (<7km)
- Olive Green (<2km)
- Empire Estate (<11km)
- Holiday Inn-Balewadi (<3km)
- Ivana (<6km)
- Wakade Centre (<7km)
- Kaasp County CHS (<4km)
- Yashada (<4km)
- Nakhate Nagar (<7km)
- Queenstown (<11km)
- Kubera Bahar (<4km)
Hospitals & Clinics
- Kotbagi Hospital (<5km)
- Medipoint Hospital (<4km)
- Aditya Birla Memorial Hospital (<9km)
- Swabhaval Homoeopathy (<5km)
- Deenanath Mangeshkar Hospital and Research Centre (<13km)
Petrol Station
- Indian Oil (<4km)
- Hindustan Petroleum (<10km)
Public Transport
- Kasarwadi Railway Station (<9km)
- Khadki Railway Station (<10km)
- Chinchwad Railway Station-Entrance 1 (<11km)
- Kothrud Depot (<10km)
- Shivajinagar Station (<13km)
- Akurdi Railway Station (<12km)
- Pimple Gurav (<8km)
- Dapodi (<9km)
ATM/Bank/Exchange
- HDFC Bank ATM (<6km)
- State Bank of India-Dange Chowk (<7km)
- Canara Bank-Nasik Phata Pimpri (<9km)
- ICICI Bank (<3km)
- Idbi Bank-Baner (<3km)
- ICICI Bank-Pune Sus Pashan Road (<4km)
Shopping Centre
- Runwal Platinum (<7km)
- Pune Central (<11km)
- Regent Plaza Mall (<4km)
Landmark/Attraction
- Mulshi Dam (<12km)
Business & Services
- Symantec Software India (<4km)
- Project ID
- J696118964
- Updated
- Searches
- 17437
- Views
- 1267