Lakhanis Empire Towers - Teen Haath Naka, Thane

Builder
Lakhanis Builders & Developers
Construction
Completed
Completion
Mar, 2026
Properties
Apartments
RERA
P51700005215

Description

Obscenely awesome apartments

Lakhanis Empire Towers by Lakhanis Builders at the very prime location of Dharamveer Nagar, Teen Hath Naka in Thane offers residential project that host 2,3 and 4 bhk apartments in the size ranges in between 696 to 2200 sqft.The project aims to offer a comfortable living condition to the residents by encompassing Library, Landscaped Garden, Fire Fighting Systems, Power Backup and Cycling & Jogging Track, adding to its existing many facilities. The neighborhood has all the necessary destinations like school, hospital, metro station, petrol pump, hospital, bank, ATM, market, bus stand, park, etc.


Amenities :-
  • Children's Play Area
  • Indoor Games
  • Landscaping & Tree Planting
  • Multipurpose Room
  • Power Backup
  • Lift(s)
  • 24x7 Security
  • Gymnasium
  • Swimming Pool
Lakhani Builders , is into the real estate business from the last 20 years, and has played a pivotal role in the development of Navi Mumbai. Since its inception, the company has developed more than 40 commercial and residential projects, which include a top-end 5 star hotel, and educational institutions. The company is driven by a vision of simplifying and enriching the lives of their customers. Its constructions have excellent architectural characteristics, design, aesthetics, and rich specifications.

Highlights

  • Power Back-up
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Lifts
  • High Speed Internet
  • Security Guards
  • Balcony
  • Reserved Parking
  • Swimming Pool
  • Park
  • Fitness Centre / GYM

Configurations

Type Area Possession Price *
2BHK Apartment696 SqFeetImmediate/Ready to move₹ 1.75 crore
2BHK Apartment763 SqFeetImmediate/Ready to move₹ 1.7 crore
3BHK Apartment931 SqFeetImmediate/Ready to move₹ 2.04 crores
4BHK Apartment2,200 SqFeetImmediate/Ready to move₹ 4.04 crores
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51700005215 EMPIRE TOWERS Completed

Confirmed with MahaRERA on 22 Sep 2026. Registered as "EMPIRE TOWERS".

Promoter
LAKHANI REALTY LLP
Registered on
10 Aug 2017
Proposed completion
Mar 2026 (originally Jul 2024)
Project type
Others
Planning authority
Others
Address as filed
Panchpakhdi, Naupada Thane, Thane (M Corp.), Thane, Thane, 400602
Land area
6,985 sq m (75,193 sq ft)
Sanctioned built-up area
7,928 sq m (85,335 sq ft)
Buildings
LEGEND (37 floors) - 19 of 84 available; LEGACY (37 floors) - 15 of 75 available; COMMERCIAL (3 floors) - 5 of 29 available; COMMERCIAL PROP; LEGACY PROPOSED; LEGEND PROPOSED
Parking
Open Space 0, Closed/Covered 344
Complaints on the portal
2
BuildingUnit typeCarpet areaUnits
LEGEND2.5 BHK 90 sq m (974 sq ft) 1
LEGEND3BHK 81 sq m (872 sq ft) 1
LEGEND2BHK 74 sq m (797 sq ft) 30
LEGEND5BHK & more 207 sq m (2,229 sq ft) 7
LEGEND4BHK 188 sq m (2,024 sq ft) 1
LEGEND3BHK 102 sq m (1,094 sq ft) 36
LEGEND3BHK 85 sq m (920 sq ft) 8
LEGACY3BHK 100 sq m (1,079 sq ft) 1
LEGACY3BHK 102 sq m (1,094 sq ft) 34
LEGACY4BHK 179 sq m (1,930 sq ft) 1
LEGACY5BHK & more 207 sq m (2,232 sq ft) 5
LEGACY2BHK 57 sq m (613 sq ft) 1
LEGACY2BHK 62 sq m (672 sq ft) 22
LEGACY3BHK 81 sq m (873 sq ft) 1
LEGACY3BHK 85 sq m (920 sq ft) 11
COMMERCIALSHOP 08 42 sq m (448 sq ft) 1
COMMERCIALOFFICE 1 1ST FLOOR 138 sq m (1,489 sq ft) 1
COMMERCIALSHOP 09 B 35 sq m (379 sq ft) 1
COMMERCIALSHOP 10 28 sq m (304 sq ft) 1
COMMERCIALSHOP 11 35 sq m (379 sq ft) 1
COMMERCIALOFFICE 2 1ST FLOOR 105 sq m (1,133 sq ft) 1
COMMERCIALSHOP 17 A 8 sq m (84 sq ft) 1
COMMERCIALSHOP 18 34 sq m (368 sq ft) 1
COMMERCIALSHOP 09 A 35 sq m (379 sq ft) 1
COMMERCIALSHOP 20 31 sq m (329 sq ft) 1
COMMERCIALSHOP 4 1ST FLOOR 42 sq m (454 sq ft) 1
COMMERCIALSHOP 3 1ST FLOOR 72 sq m (776 sq ft) 1
COMMERCIALSHOP 19 30 sq m (322 sq ft) 1
COMMERCIALSHOP 05 54 sq m (586 sq ft) 1
COMMERCIALSHOP 06 54 sq m (578 sq ft) 1
COMMERCIALSHOP 07 55 sq m (587 sq ft) 1
COMMERCIALShop 04 42 sq m (448 sq ft) 1
COMMERCIALSHOP 9B 1ST FLOOR 73 sq m (782 sq ft) 1
COMMERCIALSHOP 01 73 sq m (781 sq ft) 1
COMMERCIALSHOP 02 28 sq m (304 sq ft) 1
COMMERCIALSHOP 03 73 sq m (782 sq ft) 1
COMMERCIALOFFICE 3 1ST FLOOR 143 sq m (1,535 sq ft) 1
COMMERCIALSHOP 13 42 sq m (448 sq ft) 1
COMMERCIALSHOP 16 58 sq m (627 sq ft) 1
COMMERCIALSHOP 12 35 sq m (379 sq ft) 1
COMMERCIALSHOP 15 56 sq m (608 sq ft) 1
COMMERCIALSHOP 14 56 sq m (606 sq ft) 1
COMMERCIALOFFICE 4 1ST FLOOR 422 sq m (4,540 sq ft) 1
LEGACY PROPOSED3BHK 102 sq m (1,094 sq ft) 0
LEGACY PROPOSED2BHK 62 sq m (672 sq ft) 0
LEGACY PROPOSED4BHK 207 sq m (2,232 sq ft) 0
LEGEND PROPOSED2BHK 74 sq m (797 sq ft) 2
LEGEND PROPOSED4BHK 207 sq m (2,229 sq ft) 1
LEGEND PROPOSED3BHK 102 sq m (1,094 sq ft) 2
Quarterly returnFiledBuiltUnits booked
Q2 FY 2017-2018 21 Aug 2025 - -
Q3 FY 2017-2018 21 Aug 2025 - -
Q4 FY 2017-2018 21 Aug 2025 - -
Q1 FY 2018-2019 21 Aug 2025 - -
Q2 FY 2018-2019 21 Aug 2025 - -
Q3 FY 2018-2019 21 Aug 2025 - -
Q4 FY 2018-2019 21 Aug 2025 - -
Q1 FY 2019-2020 21 Aug 2025 - -
Q2 FY 2019-2020 22 Aug 2025 - -
Q3 FY 2019-2020 22 Aug 2025 - -
Q4 FY 2019-2020 22 Aug 2025 - -
Q1 FY 2020-2021 22 Aug 2025 - -
Q2 FY 2020-2021 22 Aug 2025 - -
Q3 FY 2020-2021 22 Aug 2025 - -
Q4 FY 2020-2021 22 Aug 2025 - -
Q1 FY 2021-2022 22 Aug 2025 - -
Q2 FY 2021-2022 22 Aug 2025 - -
Q3 FY 2021-2022 22 Aug 2025 - -
Q4 FY 2021-2022 22 Aug 2025 - -
Q1 FY 2022-2023 22 Aug 2025 - -
Q2 FY 2022-2023 22 Aug 2025 - -
Q3 FY 2022-2023 22 Aug 2025 - -
Q4 FY 2022-2023 21 Aug 2025 - -
Q1 FY 2023-2024 21 Aug 2025 - -
Q2 FY 2023-2024 20 Aug 2025 - -
Q3 FY 2023-2024 20 Aug 2025 - -
Q4 FY 2023-2024 20 Aug 2025 - -
Q1 FY 2024-2025 5 Aug 2025 - -
Q2 FY 2024-2025 5 Aug 2025 - -
Q3 FY 2024-2025 5 Aug 2025 - -
Q4 FY 2024-2025 20 Aug 2025 - -
Q1 FY 2025-2026 27 Aug 2025 - -
Q2 FY 2025-2026 27 Aug 2025 - -
Q3 FY 2025-2026 not filed - in default - -
Q4 FY 2025-2026 not filed - in default - -
Construction progress as reported to the portal

LEGEND

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 80%
  • Sanitary Fittings within the flats / premises: 70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 45%

LEGACY

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 72%
  • Sanitary Fittings within the flats / premises: 55%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 68%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 40%

COMMERCIAL

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 90%
  • Sanitary Fittings within the flats / premises: 90%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 90%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

COMMERCIAL PROP

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

LEGACY PROPOSED

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

LEGEND PROPOSED

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 65% - WILL BE DONE PRIOR TO OC
  • Water Supply: 50% - WILL BE DONE PRIOR TO OC
  • Sewerage (Chamber, Lines, Septic Tank , STP): 70% - WILL BE DONE PRIOR TO OC
  • Storm Water Drains: 50% - WILL BE DONE PRIOR TO OC
  • Landscaping & Tree Planting: 25% - WILL BE DONE PRIOR TO OC
  • Street Lighting: 25% - WILL BE DONE PRIOR TO OC
  • Treatment And Disposal Of Sewage And Sullage Water: 50% - WILL BE DONE PRIOR TO OC
  • Solid Waste Management And Disposal: 0% - WILL BE DONE PRIOR TO OC
  • Water conservation /Rain water harvesting: 80% - WILL BE DONE PRIOR TO OC
  • Energy managemcnt: 0% - WILL BE DONE PRIOR TO OC
  • Fire protection and fire safety requirements: 60% - WILL BE DONE PRIOR TO OC
  • Electrical meter room, sub-station, receiving station: 60% - WILL BE DONE PRIOR TO OC
  • Aggregate area of recreational Open Space: 25% - WILL BE DONE PRIOR TO OC
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Lakhanis Empire Towers and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Lakhanis Empire Towers
Cons:
Enter some negative aspects of Lakhanis Empire Towers

Location

Lakhanis Empire Towers, Dharamveer Nagar, Teen Haath Naka, Thane - 400602 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Thane Station (W) (~2 km)
    • Thane (~2 km)
    • Zojwala Petroleum (~2 km)
    • Azad Nagar Bus Stop (~8 km)
    • Chhatrapati Shivaji Maharaj International Airport (~21 km)
    • Navi Mumbai International Airport (~34 km)
  • Shopping & Dining

    • Love & Latte (<1 km)
    • The Food Town (<1 km)
    • Niti General Stores (<1 km)
    • Korum Mall (~2 km)
    • Sant Jalaram Bappa Market (~3 km)
    • Shoppers Stop (~3 km)
  • Healthcare

    • Highway Hospital (<1 km)
    • Zeelab Pharmacy (<1 km)
    • OrthoSpine Clinic (<1 km)
    • Shatayushi Generic Medico (~1 km)
    • Mental Hospital (~1 km)
    • TMC C R Wadia Dispensary (~2 km)
  • Education

    • S.E.S. High School and Junior College (<1 km)
    • Industrial Training Institute (ITI) (~2 km)
    • Mulund College of Commerce - MCC (~2 km)
    • Vidya Prasarak Mandal Polytechnic (~2 km)
    • Smt. Sulochanadevi Singhania School (~3 km)
    • Mulund Abhyasika (~3 km)
  • Leisure & Entertainment

    • hospital ground (~1 km)
    • Inox (~2 km)
    • Dadoji Konddev Stadium (~2 km)
    • Dosti Clubhouse (~3 km)
    • Kharghar Valley Golf Course (~25 km)
    • Butterfly Park (~27 km)
  • Services

    • HDFC Bank ATM (<1 km)
    • Axis Bank (<1 km)
    • Naupada Police Station (<1 km)
    • New RTO (THANE) (<1 km)
    • Dhanamabhuvan Post Office (~3 km)
    • Mulund Fire Brigade (~4 km)
  • Religious Places

    • Gurudwara (<1 km)
    • Ghantali Devi (~1 km)
    • Nuri Baba Darga (~2 km)
    • Saint John the Baptist Church (~2 km)
    • Balrajeshwar Mahadev Prasanna Mandir (~2 km)
    • Babaji ki Jhopdi (~3 km)
  • Business & Hospitality

    • Ashar IT Park (~2 km)
    • IBIS (~3 km)
    • ibis Thane (~3 km)
    • Raymond Mills (~3 km)
    • Mukund Steel (~5 km)
    • Reliance Corporate Park (~12 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J669118955
Updated
Searches
2226
Views
1224