Elevation
Aerial View
Floor Plan
 8

Krushna Kunj - Kharghar, Navi Mumbai

Builder
Krushna Dham Builders & Developers
Construction
Under Construction
Completion
Dec, 2025
Properties
Apartments
RERA
P52000017765

Description

Key To Open the Door for a Bright Future.

Krushna Kunj Project at Kharghar by Krushna Dham Builders is offering spacious 1 and 2 bhk apartments in the size ranges in between 382 to 646 sqft spread over an area of 2.75 acres of land provided with various amenities for a comfortable life of the residents. Krushna Kunj is located at a prime location of Taloja such that it provides easy connectivity through wide roads to all other major parts of the city, Navi Mumbai.
Amenities :
  • Swimming Pool
  • Indoor Games
  • CCTV
  • Club House
  • 24/7 Power Backup
  • Gymnasium
  • 24/7 Water Supply
  • Landscape Garden
  • Children's Play Area
  • Lift
  • Car Parking
  • Intercom
Krushna Dham Builders aims to redefine Mumbai’s real estate industry by developing and delivering state of the art projects. It is committed to providing quality spaces that enrich today and envisage tomorrow. It strives to make its presence felt by developing high-quality projects that provide value for money and the highest customer satisfaction. The company leaves no stone unturned in ensuring that the property-related needs and expectations of the customers are met.

Highlights

  • Power Back-up
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Lifts
  • High Speed Internet
  • Security Guards
  • Intercom Facility
  • Balcony
  • Reserved Parking
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center

Configurations

Type Area Possession Price *
1BHK Apartment382 SqFeetImmediate/Ready to move₹ 27.5 lakhs
1BHK Apartment580 SqFeetImmediate/Ready to move₹ 28 lakhs
2BHK Apartment646 SqFeetImmediate/Ready to move₹ 46.51 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52000017765 KRUSHNA KUNJ Lapsed 78% built

Confirmed with MahaRERA on 17 Sep 2026. Registered as "KRUSHNA KUNJ".

Promoter
KRUSHNA DHAM BUILDERS & DEVELOPERS GHOT
Registered on
11 Sep 2018
Proposed completion
Dec 2025
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
GHOT, PANVEL, Ghot, Panvel, Raigarh, 410210
Land area
11,130 sq m (119,806 sq ft)
Sanctioned built-up area
16,655 sq m (179,279 sq ft)
Buildings
BUILDING NO 1 AND 2 SHOPS (8 floors); BUILDING NO 1 AND 2 FLATS (8 floors); BUILDING NO 3 (5 floors); BUILDING NO 4 (5 floors); BUILDING NO 5 (5 floors); BUILDING NO 6 (5 floors); BUILDING NO 7 (9 floors); BUILDING NO 8 (5 floors)
Parking
Open Space 0, Closed/Covered 30
Construction progress as reported to the portal

BUILDING NO 1 AND 2 SHOPS

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING NO 1 AND 2 FLATS

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING NO 3

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING NO 4

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING NO 5

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING NO 6

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING NO 7

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING NO 8

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100%
  • Water Supply: 100%
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100%
  • Storm Water Drains: 100%
  • Landscaping & Tree Planting: 100%
  • Street Lighting: 100%
  • Community Buildings: 100%
  • Water conservation /Rain water harvesting: 100%
  • Electrical meter room, sub-station, receiving station: 100%
  • Aggregate area of recreational Open Space: 0%
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Krushna Kunj and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Krushna Kunj
Cons:
Enter some negative aspects of Krushna Kunj

Location

Krushna Kunj, Kharghar, Navi Mumbai - 410208 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Taloje Panchanand (~4 km)
    • Sector-34 (~5 km)
    • Asudgaon Bus Depot (~11 km)
    • Sarovar Vihar (CBD Belapur) (~15 km)
    • Navi Mumbai International Airport (~16 km)
    • Chhatrapati Shivaji Maharaj International Airport (~37 km)
  • Shopping & Dining

    • Domino's Pizza | Taloja, Navi Mumbai (~3 km)
    • Spice Club Fine Dine (~3 km)
    • Ly's Cafe (~3 km)
    • Kitchen Wold (~10 km)
    • Little World Mall (~11 km)
    • Glomax Mall (~11 km)
  • Healthcare

    • Sai Clinic (<1 km)
    • Zeelab Pharmacy (~2 km)
    • Sri Sai Clinic (~3 km)
    • Taloja Multispeciality Hospital (~3 km)
    • Jeevandeep Hospital (~4 km)
    • Apex Multispeciality Hospital (~4 km)
  • Education

    • Ramsheth Thakur Public School (~8 km)
    • Vibgyor High School (~8 km)
    • Casa Rio Gold Library (~11 km)
    • Bharathi Vidyapeeth (~13 km)
    • Society for Applied Microwave Electronics Engineering & Research - Mumbai (~13 km)
    • T.S. Chanakya Maritime University (~19 km)
  • Leisure & Entertainment

    • Central Park (~8 km)
    • Maxus Cinema Hall (~9 km)
    • Kharghar Valley Golf Course (~9 km)
    • boby art (~11 km)
    • Butterfly Park (~14 km)
    • Dr. DY Patil Sports Stadium (~15 km)
  • Services

    • IndusInd Bank (~3 km)
    • HDFC Bank ATM (~3 km)
    • Tawa Delight (~7 km)
    • chaitra cafe (~8 km)
    • Panvel Muni Corp. Ward A Office (Kharghar Gram Panchayat) (~9 km)
    • Kharghar Post Office (~11 km)
  • Religious Places

    • Shri Swami Samartha math yogiraj yashwant maharaj (~2 km)
  • Business & Hospitality

    • Maharashtra Industrial Development Centre - MIDC Taloja (~2 km)
    • Aditya Birla Science and Technology Company (~4 km)
    • Le Meridien Navi Mumbai (~13 km)
    • Navi Mumbai Marriott Hotel (~14 km)
    • Millennium Business Park, Mahape Village (~15 km)
    • Reliance Corporate Park (~17 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J289867011
Updated
Searches
6817
Views
1396