Sky View
Elevation
Side View
 13

Kohinoor Sportsville - Hinjewadi Phase-1, Pune

Builder
Kohinoor Group
Construction
Under Construction
Completion
Dec, 2026
Properties
Apartments
RERA
P52100029650

Description

a life of bliss and divinity

Kohinoor Sportsville is located in the heart of Hinjewadi Phase-1, Pune offers 1,2&3 BHK apartments with different sizes ranging from 479-897 sqft. The project space is spread over an area of 5 acres of land. The project has 5 buildings with G+23 floors which is close proximity to Hinjewadi Rajiv Gandhi Infotech Park, it is also well connected to Mumbai Pune Expressway, making it an easy commute for residents.

Amenities
  • Clubhouse
  • Meditation Center
  • Indoor Games
  • Kids Play Area
  • Swimming Pool
  • Gym
  • Landscape Garden Park
  • Open Space
  • Intercom
  • Firefighting Equipment
  • Power Backup
  • Rain Water Harvesting
  • 24 Hour Water Supply
  • Car Parking
  • Vastu Compliant
  • Multipurpose Hall
  • Video Security
  • Sewage Treatment Plant
  • Lift
  • 24X7 Security
  • Basketball Court
  • Earthquake-Resistant
  • Jogging Track
  • Tennis Court
Kohinoor Group has proudly stood tall as a leader in Pune’s real estate sector for over three decades. When the group commenced operations in 1983 under the able leadership of its Chairman & Managing Director, Mr. Krishnakumar Goyal, they started a cement trading business. They have started construction and development only in 1989 under the name of Kohinoor Constructions.

Highlights

  • Power Back-up
  • Water Softner
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Centrally Air Conditioned
  • Lifts
  • Wi-Fi
  • RO System
  • Balcony
  • Reserved Parking
  • Security Guards
  • Fire Alarm
  • Electronic Security
  • Intercom Facility
  • Park Facing
  • Woodwork
  • Modular Kitchen
  • Feng Shui / Vaastu Compliant
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • Cafeteria / Food Court
  • Conference room
  • Club / Community Center
  • Adjacent to Main Road
  • Water Connection
  • Electric Connection
  • Close to Hospital
  • Close to School
  • Close to Shopping Center/Mall

Configurations

Type Area Possession Price *
1BHK Apartment479 SqFeetWithin 3 Months₹ 36 lakhs
2BHK Apartment693 SqFeetWithin 3 Months₹ 57 lakhs
3BHK Apartment797 SqFeetWithin 3 Months₹ 79 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52100029650 SPORTSVILLE Active 75% built

Confirmed with MahaRERA on 25 Sep 2026. Registered as "SPORTSVILLE".

Promoter
YELLOWSTONE SKYSCRAPERS LLP
Registered on
14 Jun 2021
Proposed completion
Dec 2026 (originally Dec 2025)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
S NO 47/1/A, VILLAGE MAAN TALUKA MULSHI DIST PUNE, Mulshi, Pune, 411057
Land area
19,856 sq m (213,737 sq ft)
Sanctioned built-up area
19,831 sq m (213,466 sq ft)
Buildings
TOWER 1 (28 floors) - 0 of 140 available; TOWER 2 (28 floors) - 0 of 138 available; TOWER 3 (28 floors) - 28 of 28 available; TOWER 4 (25 floors) - 0 of 153 available
Parking
Open Space 150, Closed/Covered 550
Complaints on the portal
25
BuildingUnit typeCarpet areaUnits
TOWER 12BHK 59 sq m (631 sq ft) 104
TOWER 13BHK 74 sq m (797 sq ft) 36
TOWER 23BHK 74 sq m (794 sq ft) 5
TOWER 22BHK 59 sq m (631 sq ft) 67
TOWER 23BHK 74 sq m (797 sq ft) 66
TOWER 31BHK 39 sq m (422 sq ft) 85
TOWER 32BHK 59 sq m (630 sq ft) 90
TOWER 41BHK 39 sq m (422 sq ft) 75
TOWER 42BHK 59 sq m (630 sq ft) 78
Quarterly returnFiledBuiltUnits booked
Q1 FY 2021-2022 20 Dec 2025 - -
Q2 FY 2021-2022 20 Dec 2025 - -
Q3 FY 2021-2022 20 Dec 2025 - -
Q4 FY 2021-2022 19 Dec 2025 - -
Q1 FY 2022-2023 19 Dec 2025 - -
Q2 FY 2022-2023 19 Dec 2025 - -
Q3 FY 2022-2023 19 Dec 2025 - -
Q4 FY 2022-2023 19 Dec 2025 - -
Q1 FY 2023-2024 19 Dec 2025 - -
Q2 FY 2023-2024 19 Dec 2025 - -
Q3 FY 2023-2024 19 Dec 2025 - -
Q4 FY 2023-2024 19 Dec 2025 - -
Q1 FY 2024-2025 19 Dec 2025 - -
Q2 FY 2024-2025 19 Dec 2025 - -
Q3 FY 2024-2025 19 Dec 2025 - -
Q4 FY 2024-2025 19 Dec 2025 - -
Q1 FY 2025-2026 2 Aug 2025 - -
Q2 FY 2025-2026 20 Oct 2025 - -
Q3 FY 2025-2026 13 Jan 2026 - -
Q4 FY 2025-2026 21 Apr 2026 - -
Q1 FY 2026-2027 19 Jul 2026 - -
Construction progress as reported to the portal

TOWER 1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 95%

TOWER 2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 95%

TOWER 3

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 4

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 95%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - WORK COMPLETED
  • Water Supply: 100% - WORK COMPLETED
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - WORK COMPLETED
  • Storm Water Drains: 100% - WORK COMPLETED
  • Landscaping & Tree Planting: 100% - WORK COMPLETED
  • Street Lighting: 100% - WORK COMPLETED
  • Community Buildings: 100% - WORK COMPLETED
  • Treatment And Disposal Of Sewage And Sullage Water: 98% - WORK IN PROGRESS
  • Solid Waste Management And Disposal: 95% - WORK IN PROGRESS
  • Water conservation /Rain water harvesting: 95% - WORK IN PROGRESS
  • Energy managemcnt: 95% - WORK IN PROGRESS
  • Fire protection and fire safety requirements: 95% - WORK IN PROGRESS
  • Electrical meter room, sub-station, receiving station: 95% - WORK IN PROGRESS
  • Aggregate area of recreational Open Space: 0% - WORK YET TO START
  • Open Parking: 0% - WORK IN PROGRESS
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Kohinoor Sportsville and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Kohinoor Sportsville
Cons:
Enter some negative aspects of Kohinoor Sportsville

Location

Kohinoor Sportsville, Hinjewadi Phase-1, Pune - 411057 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Hindustan Petroleum (<1 km)
    • Sutarwadi Bus Terminus (~10 km)
    • Akurdi (~13 km)
    • Pune Junction (~24 km)
    • Pune International Airport (~29 km)
    • Navi Mumbai International Airport (~117 km)
  • Shopping & Dining

    • Joy Mart (<1 km)
    • Bird Valley Hijewadi (~2 km)
    • The Chai Bar Cafe (~2 km)
    • Grand Highstreet (~3 km)
    • M&S Outlet (~13 km)
    • Laxman Jagtap Vegetable Market (~14 km)
  • Healthcare

    • Wellness Forever (~2 km)
    • Wellwish Chemist (~2 km)
    • Ruby Hall Clinic Hinjawadi (~3 km)
    • Healing Hands Clinic - Hinjewadi, Pune (~3 km)
    • Orthos Orthopedic and Spine Centre (~3 km)
    • Dr.Ranjeet Hospital (~3 km)
  • Education

    • I2IT library (~3 km)
    • international institute of information technology (~3 km)
    • Mahindra International School (~3 km)
    • Blue Ridge Public School (~3 km)
    • International School of Business and Media (~5 km)
    • Indira Group of Institute (IGI) (~7 km)
  • Leisure & Entertainment

    • Blue Ridge Golf Course (~3 km)
    • E-Square Multiplex (~4 km)
    • Shree Shivchhatrapati Kridanagari (~6 km)
    • Shree Shiv Chhatrapati Sports Complex Stadium (~6 km)
    • Shri Sant Savatamali Udyan Wakad (~6 km)
    • Japalouppe (~20 km)
  • Services

    • HDFC Bank (~2 km)
    • Axis Bank (~2 km)
    • Hinjawadi Fire Station - Phase 1 (~2 km)
    • Hinjawadi police station (~3 km)
    • Hinjawadi Sub Post Office (~3 km)
    • Hinjawadi Gram Panchayat (~4 km)
  • Religious Places

    • Maandevi Temple (~2 km)
    • Swami Samarth Datta Mandir (~2 km)
    • Shri Swami Samarth Mandir, Hinjawadi (~3 km)
    • Ganesh Temple (~4 km)
    • Tinsel Town Temple (~4 km)
    • Bhavani Temple (~4 km)
  • Business & Hospitality

    • Embassy Qubix IT Park (~2 km)
    • Hyatt Palace (~3 km)
    • Rajiv Gandhi Infotech Park (~3 km)
    • Hyatt Place Pune/Hinjawadi (~3 km)
    • Tata Motors (~13 km)
    • Automotive Research Association of India (ARAI) (~16 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J289699611
Updated
Searches
2726
Views
1312