Description

offers more than 75 lifestyle amenities

Kohinoor Satori is located in the heart of Mahalunge, Pune West offers 3&4 BHK apartments ranging from 1100-2300 sqft. The project is spread over 8 acres of land. It consists of 7 towers with 15 floors and 492 units on offer. They are all designed to ensure optimization of available space and geared towards ensuring that light from the sun is adequately admitted into the heart of each individual apartment.

Amenities
  • Swimming Pool
  • Table Tennis
  • Yoga Room
  • Net Cricket Pitch
  • CCTV Camera
  • Gymnasium
  • Entrance Lobby
  • Pleasure Pool
  • Children’s Play Area
  • Sand pit
  • Landscape garden
  • Senior citizen sit out
Kohinoor Group has been a leader in Pune's real estate development. They started as a cement trading business in 1983 and began construction in 1989 as Kohinoor Constructions. They have delivered over 9 million sq. ft and have 11 million sq. ft under development. The group also has interests in Manufacturing, Logistics, and Services.

Highlights

  • Power Back-up
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • Centrally Air Conditioned
  • Lifts
  • High Speed Internet
  • RO System
  • Balcony
  • Security Guards
  • Electronic Security
  • Intercom Facility
  • Modular Kitchen
  • Feng Shui / Vaastu Compliant
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center

Configurations

Type Area Possession Price *
3BHK Apartment1,100 SqFeetWithin 4 Years₹ 1.58 crore
4BHK Apartment1,600 SqFeetWithin 4 Years₹ 2.35 crores
4BHK Apartment2,200 SqFeetWithin 4 Years₹ 3.23 crores
4BHK Apartment2,820 SqFeetWithin 4 Years₹ 2.75 crores
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52100066472 Kohinoor Satori Mahalunge Active 2% built

Confirmed with MahaRERA on 20 Sep 2026. Registered as "Kohinoor Satori Mahalunge".

Promoter
INTOFINITY PROMOTERS PRIVATE LIMITED
Registered on
11 Jun 2024
Proposed completion
Apr 2030 (originally Dec 2028)
Project type
Others
Planning authority
Others
Address as filed
Mhalunge, Mhalunge, Man, Mulshi, Pune, 411045
Land area
24,437 sq m (263,046 sq ft)
Sanctioned built-up area
60,794 sq m (654,400 sq ft)
Buildings
TOWER A1 (12 floors) - 46 of 47 available; TOWER B1 (23 floors) - 57 of 94 available; TOWER B2 (23 floors) - 32 of 95 available; TOWER B3 (23 floors) - 47 of 95 available; TOWER A2 (23 floors) - 50 of 101 available; TOWER F (19 floors) - 16 of 16 available
Parking
Open Space 1609, Closed/Covered 1620
BuildingUnit typeCarpet areaUnits
TOWER A1Shop 61 sq m (659 sq ft) 3
TOWER A14.5 BHK 188 sq m (2,020 sq ft) 14
TOWER A1Shop 66 sq m (715 sq ft) 6
TOWER A1Shop 39 sq m (424 sq ft) 3
TOWER A1Shop 69 sq m (742 sq ft) 3
TOWER A13BHK 109 sq m (1,178 sq ft) 12
TOWER A1Shop 62 sq m (666 sq ft) 6
TOWER B13BHK 109 sq m (1,178 sq ft) 17
TOWER B13BHK 92 sq m (987 sq ft) 17
TOWER B1Shop 59 sq m (638 sq ft) 3
TOWER B1Shop 56 sq m (598 sq ft) 3
TOWER B1Shop 49 sq m (523 sq ft) 3
TOWER B14BHK 135 sq m (1,458 sq ft) 15
TOWER B14BHK 170 sq m (1,833 sq ft) 18
TOWER B13BHK 117 sq m (1,264 sq ft) 3
TOWER B1Shop 44 sq m (472 sq ft) 3
TOWER B1Shop 43 sq m (464 sq ft) 3
TOWER B1Shop 39 sq m (422 sq ft) 3
TOWER B1Shop 35 sq m (378 sq ft) 3
TOWER B1Shop 64 sq m (689 sq ft) 3
TOWER B2Shop 49 sq m (523 sq ft) 3
TOWER B2Shop 59 sq m (638 sq ft) 3
TOWER B2Shop 44 sq m (472 sq ft) 3
TOWER B2Shop 43 sq m (464 sq ft) 3
TOWER B2Shop 39 sq m (422 sq ft) 3
TOWER B2Shop 64 sq m (689 sq ft) 3
TOWER B24BHK 135 sq m (1,458 sq ft) 16
TOWER B23BHK 117 sq m (1,264 sq ft) 3
TOWER B23BHK 109 sq m (1,178 sq ft) 18
TOWER B23BHK 92 sq m (987 sq ft) 18
TOWER B24BHK 170 sq m (1,833 sq ft) 19
TOWER B2Shop 53 sq m (573 sq ft) 3
TOWER B3Shop 49 sq m (523 sq ft) 3
TOWER B3Shop 43 sq m (464 sq ft) 3
TOWER B3Shop 39 sq m (422 sq ft) 3
TOWER B3Shop 35 sq m (378 sq ft) 3
TOWER B33BHK 117 sq m (1,264 sq ft) 3
TOWER B33BHK 109 sq m (1,178 sq ft) 18
TOWER B33BHK 92 sq m (987 sq ft) 18
TOWER B34BHK 170 sq m (1,833 sq ft) 19
TOWER B34BHK 135 sq m (1,458 sq ft) 16
TOWER B3Shop 64 sq m (689 sq ft) 3
TOWER B3Shop 59 sq m (638 sq ft) 3
TOWER B3Shop 56 sq m (598 sq ft) 3
TOWER A24.5BHK 190 sq m (2,046 sq ft) 35
TOWER A24.5BHK 171 sq m (1,843 sq ft) 1
TOWER A23BHK 109 sq m (1,178 sq ft) 39
TOWER A2Shop 39 sq m (422 sq ft) 3
TOWER A23.5BHK 171 sq m (1,843 sq ft) 2
TOWER A2Shop 70 sq m (757 sq ft) 3
TOWER A2Shop 69 sq m (742 sq ft) 6
TOWER A2Shop 69 sq m (739 sq ft) 3
TOWER A2Shop 66 sq m (715 sq ft) 6
TOWER A2Shop 45 sq m (481 sq ft) 3
TOWER FShop 59 sq m (640 sq ft) 1
TOWER FShop 58 sq m (622 sq ft) 2
TOWER FShop 56 sq m (603 sq ft) 1
TOWER FShop 51 sq m (546 sq ft) 1
TOWER F2BHK 68 sq m (737 sq ft) 60
TOWER F2BHK 61 sq m (655 sq ft) 60
TOWER FShop 84 sq m (905 sq ft) 1
TOWER FShop 127 sq m (1,368 sq ft) 1
TOWER FShop 119 sq m (1,281 sq ft) 1
TOWER FShop 112 sq m (1,206 sq ft) 1
TOWER FShop 96 sq m (1,037 sq ft) 1
TOWER FShop 95 sq m (1,026 sq ft) 1
TOWER FShop 89 sq m (961 sq ft) 1
TOWER FShop 87 sq m (933 sq ft) 1
TOWER FShop 87 sq m (933 sq ft) 9
TOWER FShop 76 sq m (819 sq ft) 1
TOWER FShop 64 sq m (684 sq ft) 2
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 not filed - in default - -
Q1 FY 2025-2026 11 Aug 2025 - -
Q2 FY 2025-2026 10 Jun 2026 - -
Q3 FY 2025-2026 10 Jun 2026 - -
Q4 FY 2025-2026 10 Jun 2026 - -
Q1 FY 2026-2027 20 Jul 2026 - -
Construction progress as reported to the portal

TOWER A1

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER B1

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER B2

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER B3

  • Excavation: 50%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER A2

  • Excavation: 50%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER F

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - WORK NOT STARTED
  • Water Supply: 0% - WORK NOT STARTED
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - WORK NOT STARTED
  • Storm Water Drains: 0% - WORK NOT STARTED
  • Landscaping & Tree Planting: 0% - WORK NOT STARTED
  • Street Lighting: 0% - WORK NOT STARTED
  • Community Buildings: 0% - WORK NOT STARTED
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - WORK NOT STARTED
  • Solid Waste Management And Disposal: 0% - WORK NOT STARTED
  • Water conservation /Rain water harvesting: 0% - WORK NOT STARTED
  • Energy managemcnt: 0% - WORK NOT STARTED
  • Fire protection and fire safety requirements: 0% - WORK NOT STARTED
  • Electrical meter room, sub-station, receiving station: 0% - WORK NOT STARTED
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Kohinoor Satori and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Kohinoor Satori
Cons:
Enter some negative aspects of Kohinoor Satori

Location

Kohinoor Satori, Mahalunge, Pune - 411045 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Hindustan Petroleum (~3 km)
    • Sutarwadi Bus Terminus (~6 km)
    • Dapodi (~12 km)
    • Pune Junction (~19 km)
    • Pune International Airport (~25 km)
    • Navi Mumbai International Airport (~121 km)
  • Shopping & Dining

    • DMart (~3 km)
    • Bird Valley Hijewadi (~3 km)
    • Tim Hortons (~3 km)
    • Grand Highstreet (~6 km)
    • M&S Outlet (~8 km)
    • Laxman Jagtap Vegetable Market (~10 km)
  • Healthcare

    • Healing Hands Clinic - Baner, Pune (~2 km)
    • Manipal Hospital (~3 km)
    • Wellness Forever (~3 km)
    • Wellwish Chemist (~3 km)
    • Ishanvi Mother & Child Clinic (~3 km)
    • Healing Hands Clinic - Hinjewadi, Pune (~4 km)
  • Education

    • Blue Ridge Public School (~2 km)
    • National Insurance Academy (~2 km)
    • MIS International School (~2 km)
    • Genba Sopanrao Moze College of Engineering (~3 km)
    • international institute of information technology (~3 km)
    • I2IT library (~3 km)
  • Leisure & Entertainment

    • Shree Shiv Chhatrapati Sports Complex Stadium (~2 km)
    • Shree Shivchhatrapati Kridanagari (~2 km)
    • Blue Ridge Golf Course (~2 km)
    • Moze College Open park (~3 km)
    • E-Square Multiplex (~8 km)
    • Japalouppe (~23 km)
  • Services

    • Bank of Maharashtra (~2 km)
    • National Insurance Academy (NIA) (~2 km)
    • Hinjawadi Fire Station - Phase 1 (~4 km)
    • Hinjawadi Sub Post Office (~4 km)
    • Hinjawadi police station (~4 km)
    • Pune District Court (~17 km)
  • Religious Places

    • Bhairavnath Temple (~2 km)
    • Hanuman Temple (~2 km)
    • Balewadi Masjid (~2 km)
    • T2 (~4 km)
    • T3 (~4 km)
    • Alamgheer Masjid (~4 km)
  • Business & Hospitality

    • Rajiv Gandhi Infotech Park (~3 km)
    • Embassy Qubix IT Park (~3 km)
    • Courtyard Marriott Hinjawadi (~4 km)
    • Courtyard by Marriott Pune Hinjewadi (~4 km)
    • Automotive Research Association of India (ARAI) (~12 km)
    • Tata Motors (~12 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J586111926
Updated
Searches
1251
Views
949