Elevation
Main Entrance
Side View
 9

Kohinoor Sapphire 3 - Tathawade, Pune

Builder
Kohinoor Group
Construction
Completed
Completion
Feb, 2026
Properties
Apartments
RERA
P52100033835

Description

We believe in making your home-buying experience worth every penny.

Kohinoor Sapphire 3 by Kohinoor Group is offering spacious 2 and 3 bhk apartments in the size ranges in between 732 to 1049 sqft.The project comes with various amenities which are required for a comfortable living. Some of the amenities are lift, security, play area etc. The project is well-connected to other parts of city by road, which passes through the heart of this suburb. Prominent shopping malls, movie theatres, school, and hospitals are present in proximity of this residential project.

Amenities :
  • Swimming Pool
  • CCTV Camera Security
  • 24x7 Security
  • Club House
  • Gymnasium
  • 24/7 Water Supply
  • Children's Play Area
  • Lift(s)
  • Car Parking
Established by Mr. Krishnakumar Goyal Kohinoor Group has created a significant wave in the real estate sector with its landmark projects. Although the group commenced its operations in 1983, it began construction and development under the name of Kohinoor Constructions in 1989. The company has built a thriving relationship with its customers based on the solid foundation of trust, integrity, and transparency.

Highlights

  • Power Back-up
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Lifts
  • High Speed Internet
  • Electronic Security
  • Balcony
  • Reserved Parking
  • Swimming Pool
  • Park
  • Fitness Centre / GYM

Configurations

Type Area Possession Price *
2BHK Apartment732 SqFeetImmediate/Ready to move₹ 66.5 lakhs
3BHK Apartment1,049 SqFeetImmediate/Ready to move₹ 95 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52100033835 Kohinoor Sapphire III Completed

Confirmed with MahaRERA on 24 Sep 2026. Registered as "Kohinoor Sapphire III".

Promoter
RISING ASSOCIATES
Registered on
8 Mar 2022
Proposed completion
Feb 2026
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
S No 41/2 and S No 27/1A/16, Tathwade, Mulshi, Pune, 411033
Land area
13,000 sq m (139,935 sq ft)
Sanctioned built-up area
51,413 sq m (553,427 sq ft)
Buildings
Tower C (23 floors) - 1 of 100 available; Tower D (23 floors) - 3 of 120 available; Tower A (23 floors) - 14 of 160 available; Tower B (23 floors) - 0 of 100 available
Parking
Open Space 0, Closed/Covered 874
Complaints on the portal
1
BuildingUnit typeCarpet areaUnits
Tower C2BHK 69 sq m (744 sq ft) 3
Tower C3BHK 87 sq m (934 sq ft) 37
Tower C3BHK 84 sq m (906 sq ft) 40
Tower C2BHK 63 sq m (681 sq ft) 20
Tower D2BHK 63 sq m (676 sq ft) 37
Tower D2.5BHK 73 sq m (786 sq ft) 40
Tower D2BHK 60 sq m (651 sq ft) 20
Tower D1BHK 46 sq m (492 sq ft) 3
Tower D2BHK 63 sq m (681 sq ft) 20
Tower A2BHK 43 sq m (467 sq ft) 3
Tower A2BHK 63 sq m (681 sq ft) 32
Tower A2BHK 60 sq m (651 sq ft) 31
Tower A2.5BHK 73 sq m (781 sq ft) 34
Tower A2BHK 63 sq m (676 sq ft) 32
Tower B3BHK 87 sq m (934 sq ft) 37
Tower B3BHK 84 sq m (906 sq ft) 40
Tower B2BHK 63 sq m (681 sq ft) 20
Tower B2BHK 69 sq m (744 sq ft) 3
Quarterly returnFiledBuiltUnits booked
Q4 FY 2021-2022 17 Dec 2025 - -
Q1 FY 2022-2023 16 Dec 2025 - -
Q2 FY 2022-2023 20 Dec 2025 - -
Q3 FY 2022-2023 17 Dec 2025 - -
Q4 FY 2022-2023 17 Dec 2025 - -
Q1 FY 2023-2024 16 Dec 2025 - -
Q2 FY 2023-2024 16 Dec 2025 - -
Q3 FY 2023-2024 16 Dec 2025 - -
Q4 FY 2023-2024 16 Dec 2025 - -
Q1 FY 2024-2025 16 Dec 2025 - -
Q2 FY 2024-2025 16 Dec 2025 - -
Q3 FY 2024-2025 16 Dec 2025 - -
Q4 FY 2024-2025 16 Dec 2025 - -
Q1 FY 2025-2026 25 Jul 2025 - -
Q2 FY 2025-2026 20 Oct 2025 - -
Q3 FY 2025-2026 20 Jan 2026 - -
Q4 FY 2025-2026 21 Apr 2026 - -
Construction progress as reported to the portal

Tower C

  • Excavation: 100%
  • Basement (if any): 88%
  • Podiums (if any): 88%
  • Plinth: 100%
  • Stilt Floor: 80%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 85%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 78%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 70%

Tower D

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 85%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 92%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 78%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 70%

Tower A

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 85%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 75%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 92%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 65%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 65%

Tower B

  • Excavation: 100%
  • Basement (if any): 88%
  • Podiums (if any): 88%
  • Plinth: 100%
  • Stilt Floor: 85%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 60%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 83%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 35%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 65%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - WORK YET TO BE STARTED
  • Water Supply: 30% - WORK YET TO BE STARTED
  • Sewerage (Chamber, Lines, Septic Tank , STP): 80% - WORK YET TO BE STARTED
  • Storm Water Drains: 75% - WORK YET TO BE STARTED
  • Landscaping & Tree Planting: 0% - WORK YET TO BE STARTED
  • Street Lighting: 0% - WORK YET TO BE STARTED
  • Community Buildings: 55% - -
  • Treatment And Disposal Of Sewage And Sullage Water: 80% - WORK YET TO BE STARTED
  • Solid Waste Management And Disposal: 0% - WORK YET TO BE STARTED
  • Water conservation /Rain water harvesting: 80% - WORK YET TO BE STARTED
  • Energy managemcnt: 0% - WORK YET TO BE STARTED
  • Fire protection and fire safety requirements: 45% - WORK YET TO BE STARTED
  • Electrical meter room, sub-station, receiving station: 30% - WORK YET TO BE STARTED
  • Aggregate area of recreational Open Space: 0% - WORK YET TO BE STARTED
  • Open Parking: 0% - WORK YET TO BE STARTED
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Kohinoor Sapphire 3 and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Kohinoor Sapphire 3
Cons:
Enter some negative aspects of Kohinoor Sapphire 3

Location

Kohinoor Sapphire 3, Tathawade, Pune - 411033 (Maharashtra)

* Location may be approximate

Landmarks

  • ATM/Bank/Exchange

    • State Bank of India Atm (<0.5km)
    • Bank of Maharashtra (<0.5km)
    • Idbi Bank (<0.5km)
    • Bank of India (<0.5km)
    • State Bank of India (<1km)
    • HDFC Bank (<1km)
    • Lokmangal Multistate Co Operative Society-Dange Chowk (<1km)
    • Union Bank of India (<1km)
    • Pune Jilla Madhyavarti Sahakari Bank (<1km)
    • Pune District Central Co-Operative Bank-Thergaon (<1km)
    • Axis Bank (<1km)
    • ICICI Bank-Wakad (<1km)
    • State Bank of India-Tathawade (<1km)
    • Lokmangal Multistate Cooperative Society-Dange Chowk (<1km)
    • Bank of Maharashtra-Thergaon (<1km)
    • Bank of Maharashtra Atm (<1km)
    • Thane Janata Sahakari Bank (<1km)
    • Shri Satguru Jangal Maharaj Sahakari Bank (<1km)
  • Shopping Centre

    • Go Colors-Elpro City Mall (<0.5km)
    • Laxmitara Market (<1km)
    • Shivaji Maharaj Market (<1km)
  • Petrol Station

    • Bharat Petroleum Corporation (<1km)
    • Hindustan Petroleum (<1km)
  • Restaurant & Shops

    • Maharashtra Super Shoppee (<1km)
    • Creations Arts (<1km)
    • New Choice Tailors (<1km)
    • Mahalaxmi Super Market (<1km)
    • Chamunda Super Market (<1km)
    • Om Super Shoppee (<1km)
    • Gurukrupa Gift House & Novelties (<1km)
    • Shivshakti Super Market (<1km)
    • Bhavana Super Market (<1km)
    • Arihant Collections (<1km)
    • Shri Samartha Tailors (<1km)
    • Ramdev Traders (<1km)
    • Hanuman Trading (<1km)
    • Raja Stores (<1km)
    • Raj Mens Wear & Collection (<1km)
    • Shiv Collection (<1km)
    • Ramesh Mini Market (<1km)
    • SK NK Yoyr Choice General Stores (<1km)
    • Ganesh Mens Wear (<1km)
    • Shree Gajanan Savai Trading Company (<1km)
    • Akash Electronics (<1km)
    • Choice Mens Parlour (<1km)
    • Hanes (<1km)
    • Vijaysuper Market (<1km)
    • Ganesh Collection (<1km)
    • Rassion Club (<1km)
    • Komal Footwear (<1km)
    • Shri Jagdamba Trading Company (<1km)
    • Jay Shri Super Market (<1km)
  • Hotel

    • Hotel Sai (<1km)
    • Om Sai Hotel (<1km)
    • Capital O 37456 Arusai (<1km)
    • Fabhotel Stay Inn (<1km)
    • OYO Townhouse-Wakad (<1km)
    • Hotel Pioneer (<1km)
  • Hostel

    • Raviraj Heights (<1km)
    • Eon the Ecotel Hostel (<1km)
    • Oxford Boys Hostel (<1km)
    • Sayadri Boys Hostel (<1km)
    • P.n.hostel (<1km)
    • Sant Tukaram Hostel (<1km)
  • Hospitals & Clinics

    • Dawakhana (<1km)
    • Sanjeevani Clinic (<1km)
    • Shivshree Clinic (<1km)
    • Dr Jon Laboratory (<1km)
    • Ashwini Nursing Home & Laparoscopy Center-ER (<1km)
    • Ashwini Nursing Home & Laparoscopy Center (<1km)
    • Pargaonkar Clinic (<1km)
    • Rigved Clinic (<1km)
    • Pulse Hospital (<1km)
    • Pulse Hospital-ER (<1km)
    • Peals Multispecialty Hospital-ER (<1km)
    • Peals Multispecialty Hospital (<1km)
    • Aarohi Clinic (<1km)
    • Pearly White Dental Clinic (<1km)
    • Sushrut Clinic (<1km)
    • Om Clinic (<1km)
    • Shri Sai Polyclinic (<1km)
    • Morya Pathology Laboratory (<1km)
    • Shri Ent Clinic (<1km)
    • Saijyoti Hospital & Icu (<1km)
    • Saijyoti Hospital & Icu-ER (<1km)
    • Samruddhi Ayurvedic Clinic (<1km)
    • Shri Ent & Womens Clinic (<1km)
    • Dr. Lad Children Clinic (<1km)
    • Krishna Datacha Dawakhana (<1km)
    • Sai Taraksh Physiotherapy Clinic (<1km)
  • Public Transport

    • Dairy Farm (<1km)
    • Tathwade (<1km)
    • Ganesh Nagar (Wakad) (<1km)
    • Shirole Petrol Pump (<1km)
  • Landmark/Attraction

    • Xperience Spa & Salon (<1km)
    • Pune (<1km)
  • Recreation

    • Lucky Fish Corner (<1km)
  • Accommodation

    • Sarja Lodge (<1km)
Project ID
J811898856
Updated
Searches
3116
Views
999