Elevation
Aerial View
Master Plan
 7

Kohinoor Central Park - Hinjewadi Phase-2, Pune

Builder
Kohinoor Group
Construction
Under Construction
Completion
Feb, 2030
Properties
Apartments
RERA
P52100056358, P52100078767

Description

2.5-Acre Central Park-Inspired Green Space

Kohinoor Central Park is an expansive residential development located in the heart of Hinjewadi Phase 2, Pune. It spans 13.5 acres of land. The project comprises 10 premium high-rise towers with well-planned 2, 3, and 3 BHK duplex apartments, ranging from 725 to 1,087 sqft. At its core lies a beautifully crafted 2.5-acre central green park, inspired by New York City’s Central Park.

Amenities
  • Advanced Security
  • Banquet Hall
  • Grand Clubhouse
  • Gym
  • Indoor Games
  • Jogging Track
  • Kids Play Area
  • Multiplay Court
Kohinoor Group With a legacy of 39 years, the group is a leading real estate developer in Pune. Founded in 1983, it has taken inspiration from Japanese construction practices to develop good commercial and residential projects. The firm has delivered around 39 projects in Pune, with homes delivered to 6.5 thousand families.

Highlights

  • Advanced Security
  • Banquet Hall
  • Grand Clubhouse
  • Gym
  • Indoor Games
  • Jogging Track
  • Kids Play Area
  • Multiplay Court

Configurations

Type Area Possession Price *
2BHK Apartment725 SqFeetWithin 4 Years₹ 78 lakhs
2BHK Apartment894 SqFeetWithin 4 Years₹ 95 lakhs
3BHK Apartment1,087 SqFeetWithin 4 Years₹ 1.33 crore
3BHK Apartment1,276 SqFeetWithin 4 Years₹ 1.48 crore
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52100056358 Kohinoor Central Park - Phase 1 Active 28% built

Confirmed with MahaRERA on 20 Sep 2026. Registered as "Kohinoor Central Park - Phase 1".

Promoter
INTOFINITY PROMOTERS PRIVATE LIMITED
Registered on
29 May 2024
Proposed completion
Apr 2029 (originally Dec 2028)
Project type
Others
Planning authority
Others
Address as filed
Village Maan, Village Maan, Man, Mulshi, Pune, 411057
Land area
53,707 sq m (578,117 sq ft)
Sanctioned built-up area
63,642 sq m (685,060 sq ft)
Buildings
TOWER 1 (23 floors) - 41 of 172 available; TOWER 2 (23 floors) - 39 of 172 available; TOWER 3 (23 floors) - 45 of 176 available; TOWER 4 (23 floors) - 31 of 173 available; COMMERCIAL (1 floors) - 56 of 56 available; TOWER 5 (23 floors) - 21 of 173 available; TOWER 6 (23 floors) - 53 of 173 available
Parking
Open Space 54, Closed/Covered 1250
Complaints on the portal
5
BuildingUnit typeCarpet areaUnits
TOWER 13BHK 76 sq m (822 sq ft) 43
TOWER 13BHK 89 sq m (956 sq ft) 40
TOWER 12BHK 70 sq m (753 sq ft) 3
TOWER 12BHK 60 sq m (645 sq ft) 44
TOWER 12BHK 60 sq m (643 sq ft) 42
TOWER 23BHK 89 sq m (956 sq ft) 40
TOWER 22BHK 70 sq m (753 sq ft) 3
TOWER 22BHK 60 sq m (645 sq ft) 44
TOWER 22BHK 60 sq m (643 sq ft) 42
TOWER 23BHK 76 sq m (822 sq ft) 43
TOWER 32BHK 70 sq m (753 sq ft) 3
TOWER 33BHK 89 sq m (956 sq ft) 41
TOWER 32BHK 60 sq m (645 sq ft) 88
TOWER 33BHK 76 sq m (822 sq ft) 44
TOWER 43BHK 74 sq m (797 sq ft) 88
TOWER 42BHK 59 sq m (631 sq ft) 85
COMMERCIALShop 28 sq m (300 sq ft) 1
COMMERCIALShop 28 sq m (300 sq ft) 4
COMMERCIALShop 33 sq m (355 sq ft) 1
COMMERCIALShop 32 sq m (341 sq ft) 1
COMMERCIALShop 31 sq m (339 sq ft) 1
COMMERCIALShop 31 sq m (338 sq ft) 1
COMMERCIALShop 32 sq m (343 sq ft) 1
COMMERCIALShop 32 sq m (342 sq ft) 1
COMMERCIALShop 24 sq m (261 sq ft) 1
COMMERCIALShop 28 sq m (303 sq ft) 1
COMMERCIALShop 28 sq m (298 sq ft) 1
COMMERCIALShop 27 sq m (294 sq ft) 1
COMMERCIALShop 27 sq m (293 sq ft) 1
COMMERCIALShop 26 sq m (275 sq ft) 1
COMMERCIALShop 24 sq m (263 sq ft) 1
COMMERCIALShop 25 sq m (273 sq ft) 1
COMMERCIALShop 25 sq m (270 sq ft) 1
COMMERCIALShop 31 sq m (336 sq ft) 1
COMMERCIALShop 29 sq m (308 sq ft) 1
COMMERCIALShop 29 sq m (313 sq ft) 1
COMMERCIALShop 29 sq m (317 sq ft) 1
COMMERCIALShop 30 sq m (318 sq ft) 1
COMMERCIALShop 30 sq m (323 sq ft) 8
COMMERCIALShop 30 sq m (327 sq ft) 1
COMMERCIALShop 26 sq m (276 sq ft) 1
COMMERCIALShop 26 sq m (284 sq ft) 1
COMMERCIALShop 26 sq m (285 sq ft) 1
COMMERCIALShop 27 sq m (289 sq ft) 1
COMMERCIALShop 23 sq m (249 sq ft) 1
COMMERCIALShop 23 sq m (249 sq ft) 1
COMMERCIALShop 23 sq m (251 sq ft) 1
COMMERCIALShop 24 sq m (257 sq ft) 1
COMMERCIALShop 25 sq m (265 sq ft) 1
COMMERCIALShop 25 sq m (267 sq ft) 1
COMMERCIALShop 25 sq m (268 sq ft) 1
COMMERCIALShop 25 sq m (269 sq ft) 1
COMMERCIALShop 378 sq m (4,073 sq ft) 1
COMMERCIALShop 21 sq m (228 sq ft) 1
COMMERCIALShop 22 sq m (233 sq ft) 1
COMMERCIALShop 22 sq m (234 sq ft) 1
COMMERCIALShop 22 sq m (237 sq ft) 1
COMMERCIALShop 22 sq m (242 sq ft) 1
COMMERCIALShop 23 sq m (247 sq ft) 1
COMMERCIALShop 56 sq m (603 sq ft) 1
COMMERCIALShop 34 sq m (362 sq ft) 1
COMMERCIALShop 31 sq m (331 sq ft) 1
TOWER 52BHK 59 sq m (631 sq ft) 85
TOWER 53BHK 74 sq m (797 sq ft) 88
TOWER 62BHK 60 sq m (645 sq ft) 173
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 not filed - in default - -
Q1 FY 2025-2026 5 Aug 2025 - -
Q2 FY 2025-2026 20 Oct 2025 - -
Q3 FY 2025-2026 21 Jan 2026 - -
Q4 FY 2025-2026 17 Apr 2026 - -
Q1 FY 2026-2027 20 Jul 2026 - -
Construction progress as reported to the portal

TOWER 1

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 70%
  • Slabs of Super Structure: 25%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 5%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 2

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 68%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 10%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 3

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 75%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 10%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 4

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 60%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 10%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

COMMERCIAL

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 5

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 90%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 10%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 6

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 7%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - WORK NOT STARTED
  • Water Supply: 0% - WORK NOT STARTED
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - WORK NOT STARTED
  • Storm Water Drains: 0% - WORK NOT STARTED
  • Landscaping & Tree Planting: 0% - WORK NOT STARTED
  • Street Lighting: 0% - WORK NOT STARTED
  • Community Buildings: 0% - WORK NOT STARTED
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - WORK NOT STARTED
  • Solid Waste Management And Disposal: 0% - WORK NOT STARTED
  • Water conservation /Rain water harvesting: 0% - WORK NOT STARTED
  • Energy managemcnt: 0% - WORK NOT STARTED
  • Fire protection and fire safety requirements: 0% - WORK NOT STARTED
  • Electrical meter room, sub-station, receiving station: 0% - WORK NOT STARTED

P52100078767 Kohinoor Central Park - Phase II Active 8% built

Confirmed with MahaRERA on 20 Sep 2026. Registered as "Kohinoor Central Park - Phase II".

Promoter
INTOFINITY PROMOTERS PRIVATE LIMITED
Registered on
13 Jan 2025
Proposed completion
Feb 2030 (originally Oct 2029)
Project type
Others
Planning authority
Others
Address as filed
MAAN, MAAN, Man, Mulshi, Pune, 411057
Land area
53,707 sq m (578,117 sq ft)
Sanctioned built-up area
61,186 sq m (658,624 sq ft)
Buildings
TOWER 9 (23 floors) - 69 of 161 available; TOWER 10 (23 floors) - 18 of 161 available; TOWER 11 (23 floors) - 19 of 161 available; TOWER 12 (18 floors) - 33 of 70 available
Parking
Open Space 0, Closed/Covered 820
BuildingUnit typeCarpet areaUnits
TOWER 92BHK 60 sq m (645 sq ft) 196
TOWER 102BHK 59 sq m (631 sq ft) 100
TOWER 103BHK 74 sq m (797 sq ft) 104
TOWER 112BHK 59 sq m (631 sq ft) 102
TOWER 113BHK 74 sq m (797 sq ft) 106
TOWER 122BHK 60 sq m (645 sq ft) 106
TOWER 122BHK 66 sq m (713 sq ft) 4
TOWER 123BHK 73 sq m (781 sq ft) 53
TOWER 123BHK 85 sq m (915 sq ft) 49
Quarterly returnFiledBuiltUnits booked
Q4 FY 2024-2025 8 Jul 2025 - -
Q1 FY 2025-2026 5 Aug 2025 - -
Q2 FY 2025-2026 20 Oct 2025 - -
Q3 FY 2025-2026 21 Jan 2026 - -
Q4 FY 2025-2026 20 Apr 2026 - -
Q1 FY 2026-2027 19 Jul 2026 - -
Construction progress as reported to the portal

TOWER 9

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 10

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 11

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 70%
  • Stilt Floor: 70%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

TOWER 12

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - WORK NOT STARTED
  • Water Supply: 0% - WORK NOT STARTED
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - WORK NOT STARTED
  • Storm Water Drains: 0% - WORK NOT STARTED
  • Landscaping & Tree Planting: 0% - WORK NOT STARTED
  • Street Lighting: 0% - WORK NOT STARTED
  • Community Buildings: 0% - WORK NOT STARTED
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - WORK NOT STARTED
  • Solid Waste Management And Disposal: 0% - WORK NOT STARTED
  • Water conservation /Rain water harvesting: 0% - WORK NOT STARTED
  • Energy managemcnt: 0% - WORK NOT STARTED
  • Fire protection and fire safety requirements: 0% - WORK NOT STARTED
  • Electrical meter room, sub-station, receiving station: 0% - WORK NOT STARTED
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Kohinoor Central Park and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Kohinoor Central Park
Cons:
Enter some negative aspects of Kohinoor Central Park

Location

Kohinoor Central Park, Hinjewadi Phase-2, Pune - 411057 (Maharashtra)

* Location may be approximate

Landmarks

  • Transportation

    • EV Charging Station (<0.5km)
    • D Holer (<1km)
    • Shell-Hinjewadi Ph 2 (<1km)
    • TATA Motors (It Park) (<1km)
    • Jio-BP (<1km)
    • Quadron Phase-2 Bus Station (<1km)
    • Jio-bp pulse (<2km)
    • Infosys Phase 2 (<2km)
  • Restaurants & Cafes

    • Kannu Ki Chai (<0.5km)
    • Hotel Mahadev Snacks Center (<0.5km)
    • Sanica Restaurant (<1km)
    • Karolbaug The Dhaba (<1km)
    • Swig (<1km)
    • Shivshakti Punjabi Dhaba (<1km)
    • Gurukrupa Bhojnalaya (<1km)
    • Vinayak's Amrutham Mahabhojanam (<1km)
    • Mankudam Hotelphase 2 (<1km)
    • Theobroma (<1km)
    • Joshi Wadevale (<1km)
    • Starbucks-Vj Happiness Street (<1km)
    • SUBWAY (<1km)
    • Wow! Momos Pune (<1km)
    • Wow China (<1km)
    • Chai Point (<1km)
    • MC Cafe (<1km)
    • Pind Punjab (<1km)
    • Mad over Donuts (<1km)
    • Cafe Coffee Day (<1km)
    • Domino's (<1km)
    • Karim's Cafe (<1km)
    • Food Paradise (<1km)
    • Shree Ganesh Hotel (<2km)
    • Kumaon Rassoi (<2km)
    • Howzzat Sports Lounge-Le Royale (<2km)
    • Teapost Pune Hinjewadi (<2km)
    • South Indian Snacks Center (<2km)
    • Intactu Fine Cocktails & Cuisine (<2km)
    • Fusion Spice (<2km)
  • Hospitals & Healthcare

    • A J Medical Center (<0.5km)
    • Apollo Clinic (<0.5km)
    • Vedanth Clinic (<1km)
    • Shri Sai Bike Point (<1km)
    • Ashraya (<2km)
    • Siddhivinayak Clinic (<2km)
    • Shri Broadband Internet Servicevic (<2km)
  • Entertainment

    • The Crown Greens (<0.5km)
  • Hotels & Guest Houses

    • Bluemont Stay (<0.5km)
    • Grand Tamanna Hotelhinjawadi (<1km)
    • Stanza Living Marseille House (<1km)
    • Advantage 2u Hospitality Management (<1km)
    • Infosys Guest House (<1km)
    • Maan Farm Resort (<2km)
    • Hyatt Place Pune/Hinjawadi (<2km)
    • Stanza Living Blackburn House (<2km)
    • ibis (<2km)
    • St Laurn Entry Gate (<2km)
  • Education

    • Sunbeam Infotech (<0.5km)
    • Infosys Phase 2 Training Center (<1km)
    • International Institute of Information and Technology (<2km)
    • Pumpkin Patch School (<2km)
    • Avulze School Management (<2km)
    • Maths Tuition Classes - Cuemath (<2km)
    • Academy Trainings Department (<2km)
    • Indira School of Career Studies (<2km)
    • Academy Building (<2km)
  • Leisure and Outdoor

    • Multifit (<1km)
    • Infosys Swimming Pool (<1km)
    • Adda Cafe (<1km)
    • Table Tennis Court (<2km)
    • Info Park Pune (<2km)
    • Shito Ryu Seiko Kai Karate Coaching Classes (<2km)
  • Banks & ATMs

    • HDFC Bank (<1km)
    • Icici Bank (<1km)
    • Axis Bank (<1km)
    • State Bank of India-Midc (<1km)
    • Icici Bank-Infosys Phase-1-Pune (<2km)
    • Rudra Water ATM (<2km)
    • Indian Overseas Bank-Hinjewadi (<2km)
    • Indian Overseas Bank (<2km)
    • Icici Bank-Pune Hingwadi (<2km)
    • Bank of Baroda-Mann (<2km)
    • Axis Bank ATM (<2km)
    • Csb Bank (<2km)
    • Indian Bank-Hinjewadi (<2km)
    • Central Bank of India-Hinjewadi (<2km)
    • Bank of Baroda (<2km)
  • Religious Places

    • Maandevi Mandir (<2km)
    • Chouduba Mandir (<2km)
    • Kalubai Mata Mandir (<2km)
    • Shri Hanuman Mandir (<2km)
Project ID
J119270821
Updated
Searches
933
Views
931