Kohinoor Abhimaan Homes is a thoughtfully designed residential township located in Maval, Shirgaon, Pune, offering modern 1 and 2 BHK apartments ranging from 447 to 649 sqft. It is spread across 3.5 acres of land. The project comprises 5 residential towers with a total of 1,150 units. This project provides ample open space and a vibrant community atmosphere.Amenities
- Club House
- Power Back Up
- Swimming Pool
- Security
- Gymnasium
- Indoor Games Room
- Meditation Area
- Grand Entrance lobby
- Outdoor Tennis
Kohinoor Group has proudly stood tall as a leader in Pune's real estate development sector for over 30 years. When the group commenced operations in 1983 under the able leadership of its Chairman & Managing Director, Mr. Krishnakumar Goyal, they started a cement trading business.
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 1BHK Apartment | 447 SqFeet | Within 1 Year | ₹ 35.12 lakhs |
| 2BHK Apartment | 649 SqFeet | Within 1 Year | ₹ 52.74 lakhs |
RERA
P52100000285 ABHIMAAN HOMES PHASE II Completed
Confirmed with MahaRERA on 22 Jul 2026. Registered as "ABHIMAAN HOMES PHASE II".
- Promoter
- RISING PROPCON LLP
- Registered on
- 12 Jul 2017
- Proposed completion
- May 2022 (originally Dec 2019)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- GAT NO 8,12,16,18,19,20, Shirgaon, Mawal, Pune, 412402
- Land area
- 3,442 sq m (37,047 sq ft)
- Sanctioned built-up area
- 8,021 sq m (86,339 sq ft)
- Buildings
- E (14 floors); F (13 floors); G (13 floors)
- Parking
- Open Space 143, Closed/Covered 42
- Complaints on the portal
- 1
Construction progress as reported to the portal
E
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 95%
- Sanitary Fittings within the flats / premises: 65%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 90%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 10%
F
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
G
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 100% - Work in Process
- Water Supply: 100% - Work in Process
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - Work in Process
- Storm Water Drains: 100% - Work in Process
- Landscaping & Tree Planting: 100% - Work in Process
- Street Lighting: 100% - Work in Process
- Community Buildings: 100% - Work in Process
- Treatment And Disposal Of Sewage And Sullage Water: 100% - Work in Process
- Solid Waste Management And Disposal: 70% - Work in Process
- Water conservation /Rain water harvesting: 100% - Work in Process
- Energy managemcnt: 70% - Work in Process
- Fire protection and fire safety requirements: 75% - Work in Process
- Electrical meter room, sub-station, receiving station: 75% - Work in Process
- Aggregate area of recreational Open Space: 100% - Work in process
- Open Parking: 75% - Work in Process
P52100000339 ABHIMAAN HOMES PHASE I Completed
Confirmed with MahaRERA on 22 Jul 2026. Registered as "ABHIMAAN HOMES PHASE I".
- Promoter
- RISING PROPCON LLP
- Registered on
- 15 Jul 2017
- Proposed completion
- Dec 2019
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- GAT NO 8,12,16,18,19,20, Shirgaon, Mawal, Pune, 412402
- Land area
- 26,521 sq m (285,477 sq ft)
- Sanctioned built-up area
- 47,934 sq m (515,976 sq ft)
- Buildings
- A (15 floors); B (14 floors); C (14 floors); D (14 floors); H (13 floors); I (13 floors); K (15 floors); L (14 floors); M (14 floors); N (15 floors)
- Parking
- Open Space 493, Closed/Covered 206
- Complaints on the portal
- 1
Construction progress as reported to the portal
A
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
B
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
C
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
D
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
H
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
I
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
K
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
L
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
M
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
N
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 50%
Common areas and facilities
- Internal Roads & Footpaths: 100% - Work completed
- Water Supply: 100% - Work completed
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - Work completed
- Storm Water Drains: 100% - Work completed
- Landscaping & Tree Planting: 100% - Work completed
- Street Lighting: 100% - Work completed
- Community Buildings: 100% - Work completed
- Treatment And Disposal Of Sewage And Sullage Water: 100% - Work completed
- Solid Waste Management And Disposal: 100% - Work completed
- Water conservation /Rain water harvesting: 100% - Work completed
- Energy managemcnt: 100% - Work completed
- Fire protection and fire safety requirements: 100% - Work completed
- Electrical meter room, sub-station, receiving station: 100% - Work completed
- Aggregate area of recreational Open Space: 100% - Work in process
- Open Parking: 100% - Work completed
P52100032485 ABHIMAAN HOMES PHASE 3 Active 100% built
Confirmed with MahaRERA on 22 Jul 2026. Registered as "ABHIMAAN HOMES PHASE 3".
- Promoter
- RISING PROPCON LLP
- Registered on
- 10 Jan 2022
- Proposed completion
- Apr 2027 (originally Dec 2026)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- GAT NO 8 12 16 18 TO 20 AT POST SHIRGAON, OPP PRATI SHIRDI TEMPLE TAL MAVAL DIST PUNE, Shirgaon, Mawal, Pune, 410506
- Land area
- 10,151 sq m (109,263 sq ft)
- Sanctioned built-up area
- 14,999 sq m (161,448 sq ft)
- Buildings
- A1 (15 floors); A2 (14 floors); A3 (14 floors); B1 (15 floors); B2 (14 floors)
- Parking
- Open Space 100, Closed/Covered 275
- Complaints on the portal
- 2
Construction progress as reported to the portal
A1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
A2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
A3
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
B1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
B2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 100% - WORK COMPLETED
- Water Supply: 100% - WORK COMPLETED
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - WORK COMPLETED
- Storm Water Drains: 100% - WORK COMPLETED
- Landscaping & Tree Planting: 100% - WORK COMPLETED
- Street Lighting: 100% - WORK COMPLETED
- Community Buildings: 100% - WORK COMPLETED
- Treatment And Disposal Of Sewage And Sullage Water: 100% - WORK COMPLETED
- Solid Waste Management And Disposal: 100% - WORK COMPLETED
- Water conservation /Rain water harvesting: 100% - WORK COMPLETED
- Energy managemcnt: 100% - WORK COMPLETED
- Fire protection and fire safety requirements: 100% - WORK COMPLETED
- Electrical meter room, sub-station, receiving station: 100% - WORK COMPLETED
- Aggregate area of recreational Open Space: 100% - WORK COMPLETED
- Open Parking: 0% - WORK YET TO START
Reviews
Write a review
Be the first to write a review of Kohinoor Abhimaan Homes and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Kohinoor Abhimaan Homes
Enter some positive aspects of Kohinoor Abhimaan Homes
Cons:
Enter some negative aspects of Kohinoor Abhimaan Homes
Enter some negative aspects of Kohinoor Abhimaan Homes
Location
Kohinoor Abhimaan Homes, Shirgaon, Maval, Pune - 410506 (Maharashtra)
Landmarks
Hospitals & Healthcare
- Ratnai Clinic (<0.5km)
- Patil Hospital (<3km)
- Patil Hospital-ER (<3km)
- Bade Accident & Multispecialty Hospital-ER (<3km)
- Bade Accident & Multispecialty Hospital (<3km)
- Patil Laboratory (<3km)
Shopping
- MMG Mart (<0.5km)
- Vaishnavi Super Market (<0.5km)
- Laxmi Super Market (<0.5km)
Transportation
- Hindustan Petroleum (<0.5km)
- Pathkar Naka Toll Plaza (<3km)
- Pune Poultry Farm (<3km)
- Somatane Toll Plaza (<3km)
- Statiq (<3km)
- Shelarwadi (<3km)
- Indian Oil (<3km)
- Shell Recharge (<3km)
- Shell-Talegaon. (<3km)
- Shankarwadi (<3km)
Education
- Shirgaon Zilla Parishad School (<1km)
- Zilla Parishad School (<1km)
- Prajnanabodhini English Medium School (<1km)
- Disha Coaching Classes (<2km)
- Podar Jumbo Kids Pre School (<2km)
- BK Birla Centre for Education (<2km)
- Little Genius School (<2km)
- Hobby Classes (<2km)
- Old ZP School (<2km)
- Bright Stars Preschool (<3km)
- Challenger Coaching Classes (<3km)
- ZP School (<3km)
- High Vision English Medium School (<3km)
- Guru Dronacharya Academy (<3km)
Religious Places
- Prati Shirdi Shirgaon (<1km)
- Gorakhanath Mandir (<2km)
- Birla Ganesh Temple (<2km)
- Shri Kalubai Mandir (<3km)
- Dera Baba Bedi Sahib Guru Darbar (<3km)
- Kalash Mandir Talegaon Dhabhade (<3km)
- Punya Shanti Vihar Dham (<3km)
- Om Sai Marble & Mandir Art (<3km)
- Ghoradeshwar Temple (<3km)
- Shri Datta Mandir (<3km)
Restaurants & Cafes
- Sai Shradha Snacks Center (<1km)
- Hotelmalhargad (<2km)
- Sai Hotel (<2km)
- Caketown Treats (<2km)
- Gavkari Amrutulya & Mattha House (<2km)
- Hotelmadhira Classic Resto & Bar (<3km)
- Bhajan Singh (<3km)
- Urban SpiceMulti Cuisine Restaurant (<3km)
- Rajwardhan Wada (<3km)
- Oyo 22066 Hotel Mayur (<3km)
- Gaurav Dhaba (<3km)
- Maharashtra Hotel (<3km)
- Maharashtra Restaurant (<3km)
- Black Stallion (<3km)
- K.G.N Chicken Soup (<3km)
- Oscarwadi Misal (<3km)
- Hotel Annapurna Pure Veg (<3km)
- Bholenath Garden Dhaba (<3km)
- Indrayani Garden Dhaba (<3km)
- Angan Family Garden Restro Bar (<3km)
- Joshi Wadewale (<3km)
- Sai Sagar Pure Veg & Special Misal House (<3km)
- Hotelpunesh (<3km)
- Hotelanand (<3km)
- Hotelsuvarna Family Resto and Bar (<3km)
- Jay Ganesh Pure Veg (<3km)
Banks & ATMs
- Bank of Baroda (<1km)
- State Bank of India (<2km)
- Hdfc Bank ATM (<2km)
- Axis Bank (<2km)
- Bank Of Maharashtra (<2km)
- Pune District Central Co-Operative Bank-Somatane Phata (<3km)
- HDFC Bank (<3km)
- Pavana Sahakari Bank (<3km)
- Pavana Sahakari Bank-Talegaon Dabhade (<3km)
Offices
- India Post-Dhamane (<2km)
- Post Office-Dhamane (<2km)
- Ramchandra Mangal Karyalaya (<2km)
- India Post-Salumbre (<3km)
- Parvati Lawns (<3km)
- Omkar Banquet Hall (<3km)
Hotels & Guest Houses
- Oyo 23383 Sai Holiday Resorts (<3km)
- Somton Motel Fine Dine (<3km)
- Hotel Mayur (<3km)
- Oyo 48837 Hotelsuvarna (<3km)
- Fabhotel Brown Inn - Hotelnear Talegaon Dabhade (<3km)
- Suvarna Family Restaurant & Lodging (<3km)
Entertainment
- Ghorawadi Caves (<3km)
- Hotelsuvarna Family Resto and Bar (<3km)
- Statue of Shivaji Maharaj. (<3km)
Leisure and Outdoor
- Mca Pune International Cricket Center (<3km)
- Fitness Zone (<3km)
- Japalouppe Equestrian Centre Pvt. Limited (<3km)
- Project ID
- J119237881
- Updated
- Searches
- 2842
- Views
- 1768