Partially Completed
Completion
Apr, 2027
Properties
Apartments
RERA
P52100000285, P52100000339, P52100032485

Description

World of amenities and facilities

Kohinoor Abhimaan Homes is a thoughtfully designed residential township located in Maval, Shirgaon, Pune, offering modern 1 and 2 BHK apartments ranging from 447 to 649 sqft. It is spread across 3.5 acres of land. The project comprises 5 residential towers with a total of 1,150 units. This project provides ample open space and a vibrant community atmosphere.

Amenities
  • Club House
  • Power Back Up
  • Swimming Pool
  • Security
  • Gymnasium
  • Indoor Games Room
  • Meditation Area
  • Grand Entrance lobby
  • Outdoor Tennis
Kohinoor Group has proudly stood tall as a leader in Pune's real estate development sector for over 30 years. When the group commenced operations in 1983 under the able leadership of its Chairman & Managing Director, Mr. Krishnakumar Goyal, they started a cement trading business.

Configurations

Type Area Possession Price *
1BHK Apartment447 SqFeetWithin 1 Year₹ 35.12 lakhs
2BHK Apartment649 SqFeetWithin 1 Year₹ 52.74 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52100000285 ABHIMAAN HOMES PHASE II Completed

Confirmed with MahaRERA on 22 Jul 2026. Registered as "ABHIMAAN HOMES PHASE II".

Promoter
RISING PROPCON LLP
Registered on
12 Jul 2017
Proposed completion
May 2022 (originally Dec 2019)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
GAT NO 8,12,16,18,19,20, Shirgaon, Mawal, Pune, 412402
Land area
3,442 sq m (37,047 sq ft)
Sanctioned built-up area
8,021 sq m (86,339 sq ft)
Buildings
E (14 floors); F (13 floors); G (13 floors)
Parking
Open Space 143, Closed/Covered 42
Complaints on the portal
1
Construction progress as reported to the portal

E

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 95%
  • Sanitary Fittings within the flats / premises: 65%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 75%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 90%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 10%

F

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

G

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - Work in Process
  • Water Supply: 100% - Work in Process
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - Work in Process
  • Storm Water Drains: 100% - Work in Process
  • Landscaping & Tree Planting: 100% - Work in Process
  • Street Lighting: 100% - Work in Process
  • Community Buildings: 100% - Work in Process
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - Work in Process
  • Solid Waste Management And Disposal: 70% - Work in Process
  • Water conservation /Rain water harvesting: 100% - Work in Process
  • Energy managemcnt: 70% - Work in Process
  • Fire protection and fire safety requirements: 75% - Work in Process
  • Electrical meter room, sub-station, receiving station: 75% - Work in Process
  • Aggregate area of recreational Open Space: 100% - Work in process
  • Open Parking: 75% - Work in Process

P52100000339 ABHIMAAN HOMES PHASE I Completed

Confirmed with MahaRERA on 22 Jul 2026. Registered as "ABHIMAAN HOMES PHASE I".

Promoter
RISING PROPCON LLP
Registered on
15 Jul 2017
Proposed completion
Dec 2019
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
GAT NO 8,12,16,18,19,20, Shirgaon, Mawal, Pune, 412402
Land area
26,521 sq m (285,477 sq ft)
Sanctioned built-up area
47,934 sq m (515,976 sq ft)
Buildings
A (15 floors); B (14 floors); C (14 floors); D (14 floors); H (13 floors); I (13 floors); K (15 floors); L (14 floors); M (14 floors); N (15 floors)
Parking
Open Space 493, Closed/Covered 206
Complaints on the portal
1
Construction progress as reported to the portal

A

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

C

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

D

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

H

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

I

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

K

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

L

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

M

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

N

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 50%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - Work completed
  • Water Supply: 100% - Work completed
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - Work completed
  • Storm Water Drains: 100% - Work completed
  • Landscaping & Tree Planting: 100% - Work completed
  • Street Lighting: 100% - Work completed
  • Community Buildings: 100% - Work completed
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - Work completed
  • Solid Waste Management And Disposal: 100% - Work completed
  • Water conservation /Rain water harvesting: 100% - Work completed
  • Energy managemcnt: 100% - Work completed
  • Fire protection and fire safety requirements: 100% - Work completed
  • Electrical meter room, sub-station, receiving station: 100% - Work completed
  • Aggregate area of recreational Open Space: 100% - Work in process
  • Open Parking: 100% - Work completed

P52100032485 ABHIMAAN HOMES PHASE 3 Active 100% built

Confirmed with MahaRERA on 22 Jul 2026. Registered as "ABHIMAAN HOMES PHASE 3".

Promoter
RISING PROPCON LLP
Registered on
10 Jan 2022
Proposed completion
Apr 2027 (originally Dec 2026)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
GAT NO 8 12 16 18 TO 20 AT POST SHIRGAON, OPP PRATI SHIRDI TEMPLE TAL MAVAL DIST PUNE, Shirgaon, Mawal, Pune, 410506
Land area
10,151 sq m (109,263 sq ft)
Sanctioned built-up area
14,999 sq m (161,448 sq ft)
Buildings
A1 (15 floors); A2 (14 floors); A3 (14 floors); B1 (15 floors); B2 (14 floors)
Parking
Open Space 100, Closed/Covered 275
Complaints on the portal
2
Construction progress as reported to the portal

A1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

A2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

A3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - WORK COMPLETED
  • Water Supply: 100% - WORK COMPLETED
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - WORK COMPLETED
  • Storm Water Drains: 100% - WORK COMPLETED
  • Landscaping & Tree Planting: 100% - WORK COMPLETED
  • Street Lighting: 100% - WORK COMPLETED
  • Community Buildings: 100% - WORK COMPLETED
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - WORK COMPLETED
  • Solid Waste Management And Disposal: 100% - WORK COMPLETED
  • Water conservation /Rain water harvesting: 100% - WORK COMPLETED
  • Energy managemcnt: 100% - WORK COMPLETED
  • Fire protection and fire safety requirements: 100% - WORK COMPLETED
  • Electrical meter room, sub-station, receiving station: 100% - WORK COMPLETED
  • Aggregate area of recreational Open Space: 100% - WORK COMPLETED
  • Open Parking: 0% - WORK YET TO START
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Kohinoor Abhimaan Homes and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Kohinoor Abhimaan Homes
Cons:
Enter some negative aspects of Kohinoor Abhimaan Homes

Location

Kohinoor Abhimaan Homes, Shirgaon, Maval, Pune - 410506 (Maharashtra)

* Location may be approximate

Landmarks

  • Hospitals & Healthcare

    • Ratnai Clinic (<0.5km)
    • Patil Hospital (<3km)
    • Patil Hospital-ER (<3km)
    • Bade Accident & Multispecialty Hospital-ER (<3km)
    • Bade Accident & Multispecialty Hospital (<3km)
    • Patil Laboratory (<3km)
  • Shopping

    • MMG Mart (<0.5km)
    • Vaishnavi Super Market (<0.5km)
    • Laxmi Super Market (<0.5km)
  • Transportation

    • Hindustan Petroleum (<0.5km)
    • Pathkar Naka Toll Plaza (<3km)
    • Pune Poultry Farm (<3km)
    • Somatane Toll Plaza (<3km)
    • Statiq (<3km)
    • Shelarwadi (<3km)
    • Indian Oil (<3km)
    • Shell Recharge (<3km)
    • Shell-Talegaon. (<3km)
    • Shankarwadi (<3km)
  • Education

    • Shirgaon Zilla Parishad School (<1km)
    • Zilla Parishad School (<1km)
    • Prajnanabodhini English Medium School (<1km)
    • Disha Coaching Classes (<2km)
    • Podar Jumbo Kids Pre School (<2km)
    • BK Birla Centre for Education (<2km)
    • Little Genius School (<2km)
    • Hobby Classes (<2km)
    • Old ZP School (<2km)
    • Bright Stars Preschool (<3km)
    • Challenger Coaching Classes (<3km)
    • ZP School (<3km)
    • High Vision English Medium School (<3km)
    • Guru Dronacharya Academy (<3km)
  • Religious Places

    • Prati Shirdi Shirgaon (<1km)
    • Gorakhanath Mandir (<2km)
    • Birla Ganesh Temple (<2km)
    • Shri Kalubai Mandir (<3km)
    • Dera Baba Bedi Sahib Guru Darbar (<3km)
    • Kalash Mandir Talegaon Dhabhade (<3km)
    • Punya Shanti Vihar Dham (<3km)
    • Om Sai Marble & Mandir Art (<3km)
    • Ghoradeshwar Temple (<3km)
    • Shri Datta Mandir (<3km)
  • Restaurants & Cafes

    • Sai Shradha Snacks Center (<1km)
    • Hotelmalhargad (<2km)
    • Sai Hotel (<2km)
    • Caketown Treats (<2km)
    • Gavkari Amrutulya & Mattha House (<2km)
    • Hotelmadhira Classic Resto & Bar (<3km)
    • Bhajan Singh (<3km)
    • Urban SpiceMulti Cuisine Restaurant (<3km)
    • Rajwardhan Wada (<3km)
    • Oyo 22066 Hotel Mayur (<3km)
    • Gaurav Dhaba (<3km)
    • Maharashtra Hotel (<3km)
    • Maharashtra Restaurant (<3km)
    • Black Stallion (<3km)
    • K.G.N Chicken Soup (<3km)
    • Oscarwadi Misal (<3km)
    • Hotel Annapurna Pure Veg (<3km)
    • Bholenath Garden Dhaba (<3km)
    • Indrayani Garden Dhaba (<3km)
    • Angan Family Garden Restro Bar (<3km)
    • Joshi Wadewale (<3km)
    • Sai Sagar Pure Veg & Special Misal House (<3km)
    • Hotelpunesh (<3km)
    • Hotelanand (<3km)
    • Hotelsuvarna Family Resto and Bar (<3km)
    • Jay Ganesh Pure Veg (<3km)
  • Banks & ATMs

    • Bank of Baroda (<1km)
    • State Bank of India (<2km)
    • Hdfc Bank ATM (<2km)
    • Axis Bank (<2km)
    • Bank Of Maharashtra (<2km)
    • Pune District Central Co-Operative Bank-Somatane Phata (<3km)
    • HDFC Bank (<3km)
    • Pavana Sahakari Bank (<3km)
    • Pavana Sahakari Bank-Talegaon Dabhade (<3km)
  • Offices

    • India Post-Dhamane (<2km)
    • Post Office-Dhamane (<2km)
    • Ramchandra Mangal Karyalaya (<2km)
    • India Post-Salumbre (<3km)
    • Parvati Lawns (<3km)
    • Omkar Banquet Hall (<3km)
  • Hotels & Guest Houses

    • Oyo 23383 Sai Holiday Resorts (<3km)
    • Somton Motel Fine Dine (<3km)
    • Hotel Mayur (<3km)
    • Oyo 48837 Hotelsuvarna (<3km)
    • Fabhotel Brown Inn - Hotelnear Talegaon Dabhade (<3km)
    • Suvarna Family Restaurant & Lodging (<3km)
  • Entertainment

    • Ghorawadi Caves (<3km)
    • Hotelsuvarna Family Resto and Bar (<3km)
    • Statue of Shivaji Maharaj. (<3km)
  • Leisure and Outdoor

    • Mca Pune International Cricket Center (<3km)
    • Fitness Zone (<3km)
    • Japalouppe Equestrian Centre Pvt. Limited (<3km)
Project ID
J119237881
Updated
Searches
2842
Views
1768