Kalpataru Aria - Karjat, Raigad
- Builder
- Kalpataru Group
- Construction
- Partially Completed
- Completion
- Mar, 2027
- Properties
- Residential Lands
- RERA
- P52000047146, P52000050704, P52000051573
Description
80+ Acre Nature-Centric Township & Unique Nature-Inspired Space
Kalpataru Aria is a premium integrated township and plotted residential development located in the heart of Varne, Karjat, Raigarh, offering residential plots with sizes ranging from 1200 sq. ft. It spans approximately 88+ acres of land and 450 units. The project strategically designed an advanced lifestyle amid the sprawling hills, nature-inspired living, expansive green spaces, lifestyle amenities, excellent connectivity, gated community, modern infrastructure, and wellness-focused design.Amenities
- Grand Club Solace
- Gymnasium
- Yoga Room
- Indoor Games Room
- Banquet Hall & Multipurpose Hall
- Swimming Pool
- Multiple Sports Court
- Net Cricket
- Nature-Inspired Parks
- Miyawaki Forest
- Bird Feeder Area
- Community Farming Area
- Children's Play Mound
- Senior Citizen Pavilion
- Scenic Walking Trails
- Landscaped Green Spaces
- Internal Road Network
- 24×7 Security
- CCTV Surveillance
- Rainwater Harvesting
- Sewage Treatment System
Kalpataru Group is one of India's most respected and trusted real estate developers, with a legacy spanning over five decades. Established in 1969, the company has played a significant role in shaping the urban landscape across major Indian cities through its premium residential, commercial, retail, and integrated township developments. The company has earned multiple industry accolades for excellence in design, construction quality, and project delivery.
Highlights
- Grand Club Solace
- Gymnasium
- Yoga Room
- Indoor Games Room
- Banquet Hall & Multipurpose Hall
- Swimming Pool
- Multiple Sports Court
- Net Cricket
- Nature-Inspired Parks
- Miyawaki Forest
- Bird Feeder Area
- Community Farming Area
- Children's Play Mound
- Senior Citizen Pavilion
- Scenic Walking Trails
- Landscaped Green Spaces
- Internal Road Network
- 24×7 Security
- CCTV Surveillance
- Rainwater Harvesting
- Sewage Treatment System
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| Residential Land | 1,200 SqFeet | Within 6 Months | ₹ 75.6 lakhs |
RERA
P52000047146 Kalpataru Aria - Phase A Completed
Confirmed with MahaRERA on 21 Sep 2026. Registered as "Kalpataru Aria - Phase A".
- Promoter
- Arena Orchards Private Limited
- Registered on
- 10 Oct 2022
- Proposed completion
- Mar 2025 (originally Dec 2024)
- Project type
- Plotted
- Planning authority
- Others
- Address as filed
- Karjat Khopoli Highway - NH 548 A, Karjat, Varne, Karjat, Raigarh, 410201
- Land area
- 31,848 sq m (342,818 sq ft)
- Complaints on the portal
- 1
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
| Q4 FY 2024-2025 | not filed - in default | - | - |
Construction progress as reported to the portal
NA Plot Without Structure
Common areas and facilities
- Internal Roads & Footpaths: 100% - To be done before completion of Whole Project
- Water Supply: 100% - Provision of water supply up to your plot
- Sewerage (Chamber, Lines, Septic Tank , STP): 95% - Chamber Line and STP
- Storm Water Drains: 95% - To be done before completion of Whole Project
- Landscaping & Tree Planting: 95% - To be done before completion of Whole Project
- Street Lighting: 95% - To be done before completion of Whole Project
- Treatment And Disposal Of Sewage And Sullage Water: 65% - To be done before completion of Whole Project(STP)
- Solid Waste Management And Disposal: 20% - To be done before completion of Whole Project
- Electrical meter room, sub-station, receiving station: 95% - Electric Meter Room and Sub-Station Only
- Aggregate area of recreational Open Space: 95% - Common as per AFS
P52000050704 Kalpataru Aria - Phase B Active 56% built
Confirmed with MahaRERA on 21 Sep 2026. Registered as "Kalpataru Aria - Phase B".
- Promoter
- Arena Orchards Private Limited
- Registered on
- 28 Apr 2023
- Proposed completion
- Mar 2027 (originally Mar 2026)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Karjat Khopoli Highway NH 548A, Karjat, Varne, Karjat, Raigarh, 410201
- Land area
- 3,101 sq m (33,385 sq ft)
- Sanctioned built-up area
- 1,916 sq m (20,629 sq ft)
- Buildings
- Row House A1 (2 floors) - 0 of 1 available; Row House A2 (2 floors) - 0 of 1 available; Row House A3 (2 floors) - 0 of 1 available; Row House A4 (2 floors) - 0 of 1 available; Row House A5 (2 floors) - 1 of 1 available; Row House A6 (2 floors) - 0 of 1 available; Row House A7 (2 floors) - 0 of 1 available; Row House A8 (2 floors) - 0 of 1 available; Row House A9 (2 floors) - 0 of 1 available; Row House B19 (2 floors) - 0 of 1 available; Row House B20 (2 floors) - 0 of 1 available; Row House B21 (2 floors) - 0 of 1 available; Row House B22 (2 floors) - 0 of 1 available; Row House B23 (2 floors) - 0 of 1 available; Row House B24 (2 floors) - 0 of 1 available; Row House B25 (2 floors) - 0 of 1 available; Row House B26 (2 floors) - 1 of 1 available; Row House B27 (2 floors) - 0 of 1 available
- Parking
- Open Space 0, Closed/Covered 0
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Row House A1 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House A2 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House A3 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House A4 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House A5 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House A6 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House A7 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House A8 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House A9 | Row House | 150 sq m (1,611 sq ft) | 1 |
| Row House B19 | Row House | 141 sq m (1,519 sq ft) | 1 |
| Row House B20 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House B21 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House B22 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House B23 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House B24 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House B25 | Rowe House | 140 sq m (1,504 sq ft) | 1 |
| Row House B26 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Row House B27 | Row House | 140 sq m (1,504 sq ft) | 1 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
| Q4 FY 2024-2025 | not filed - in default | - | - |
| Q1 FY 2025-2026 | 20 Jul 2025 | - | - |
| Q2 FY 2025-2026 | 20 Oct 2025 | - | - |
| Q3 FY 2025-2026 | 21 Jan 2026 | - | - |
| Q4 FY 2025-2026 | 21 Apr 2026 | - | - |
| Q1 FY 2026-2027 | 18 Jul 2026 | - | - |
Construction progress as reported to the portal
Row House A1
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House A2
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House A3
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House A4
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House A5
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House A6
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House A7
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House A8
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House A9
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House B19
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House B20
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House B21
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House B22
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House B23
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House B24
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House B25
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House B26
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Row House B27
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 25%
Common areas and facilities
- Internal Roads & Footpaths: 100% - To be done before completion of Whole Project
- Water Supply: 100% - Water Supply from Local Authority
- Sewerage (Chamber, Lines, Septic Tank , STP): 95% - STP Only
- Storm Water Drains: 95% - To be done before completion of Whole Project
- Landscaping & Tree Planting: 95% - To be done before completion of Whole Project
- Street Lighting: 95% - To be done before completion of Whole Project
- Treatment And Disposal Of Sewage And Sullage Water: 65% - To be done before completion of Whole Project
- Solid Waste Management And Disposal: 50% - To be done before completion of Whole Project
- Electrical meter room, sub-station, receiving station: 95% - Sub-Station Only
- Aggregate area of recreational Open Space: 95% - Common area as per AFS
P52000051573 Kalpataru Aria - Phase C Completed
Confirmed with MahaRERA on 21 Sep 2026. Registered as "Kalpataru Aria - Phase C".
- Promoter
- Arena Orchards Private Limited
- Registered on
- 27 Jun 2023
- Proposed completion
- Dec 2025
- Project type
- Plotted
- Planning authority
- Others
- Address as filed
- Karjat khopoli Highway - NH 548A, Karjat, Varne, Karjat, Raigarh, 410201
- Land area
- 44,705 sq m (481,219 sq ft)
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
| Q4 FY 2024-2025 | not filed - in default | - | - |
| Q1 FY 2025-2026 | 20 Jul 2025 | - | - |
| Q2 FY 2025-2026 | 20 Oct 2025 | - | - |
| Q3 FY 2025-2026 | 21 Jan 2026 | - | - |
Construction progress as reported to the portal
NA Plot Without Structure
Common areas and facilities
- Internal Roads & Footpaths: 0% - To be done before completion of Whole Project
- Water Supply: 0% - Water Supply from Local Authority
- Sewerage (Chamber, Lines, Septic Tank , STP): 0% - STP Only
- Storm Water Drains: 0% - Up to plot before completion of the whole project
- Landscaping & Tree Planting: 0% - To be done before completion of Whole Project
- Street Lighting: 0% - To be done before completion of Whole Project
- Treatment And Disposal Of Sewage And Sullage Water: 0% - To be done before completion of Whole Project
- Solid Waste Management And Disposal: 0% - Up to plot before completion of the whole project
- Electrical meter room, sub-station, receiving station: 0% - Electric Meter Room and Sub-Station Only
- Aggregate area of recreational Open Space: 0% - Common as per AFS
Reviews
Write a review
Be the first to write a review of Kalpataru Aria and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Kalpataru Aria
Enter some positive aspects of Kalpataru Aria
Cons:
Enter some negative aspects of Kalpataru Aria
Enter some negative aspects of Kalpataru Aria
Location
Kalpataru Aria, Varne, Karjat, Raigad - 410201 (Maharashtra)
Landmarks
Religious Places
- Shri Shankar Mandir (<1km)
- Shri Datta Mandir (<1km)
- Shri Hanuman Mandir Tighar (<1km)
- Iyyanar Mandir Karjat Khopoli Marg (<1km)
- Shri Hanuman Mandir (<2km)
- Mariaai Mata Mandir (<2km)
- Budhha Vihar (<2km)
- Hanuman Mandir Shirshe (<3km)
- Palasdevi Temple (<3km)
- Hanuman Temple (<3km)
- Gaondevi Mandir (<3km)
- Shri Radha Krishna Mandir (<3km)
- Shri Shani Maharaj Devsthan (<3km)
- Ayyanar Mandir Shirshe (<3km)
- Mahavir Mandir (<3km)
- Hanuman Mandir (<3km)
- Hunuman Mandir (<3km)
- Shri Sai Mandir (<3km)
Hotels & Guest Houses
- Shravani Lodge (<1km)
- Lake View Farm (<2km)
- River Side Resort (<3km)
- Hotel Annapurna and Permit Room (<3km)
- Hotel Ramdev (<3km)
- Laxmi Chatravas (<3km)
- Amreena Farmhouse (<3km)
Offices
- Maharashtra Jivan Pradhikaran Pump House Office (<1km)
- Group Gram Panchayat Palasdari (<3km)
- Van Vibhag Alibag van Parimandal Oddice Vavarle (<3km)
- Senior Section Engineer Railway Way Karjat Office (<3km)
- Panchayat Samiti Karyalaya (<3km)
Education
- Ekatmik Bal Vikas Seva Yojana Prakalp 1 Karjat Aanganwadi No 22 (<1km)
- Raigad Jilha Parishad Prathamik School Tighar (<1km)
- Zilla Parishad Primary School Varne (<2km)
- Prathamik Shala (<2km)
- Praman Coaching Classes (<2km)
- Good Shepherd Convent School (<3km)
- Chhatrapati Shivaji Maharaj Sarvajanik Vachnalay (<3km)
- Anganwadi Kendra (<3km)
- Ganesh Computer Typing Institute (<3km)
- Raigad Zilla Parishad Pradhamik Shala (<3km)
- Eminent Coaching Classes (<3km)
- Samarth Play Group and Nursery (<3km)
- Talent Classes (<3km)
- Jay Ambe Bhavani Sec.School Bhisegaon (<3km)
- Janmadhana Academy (<3km)
- Subodh Shikshan Prasarak Sanstha (<3km)
- Perfect Tailoring Classes (<3km)
- Sai Institute (<3km)
- S.R Rout Commerce Classes (<3km)
- Shri Ganesh Commerce Classes (<3km)
- Bright Academy (<3km)
- Shri Chhatrapati Shivaji Mandal Vachanalay (<3km)
- Real Academy (<3km)
- Pradhan Mantri Kaushalya Vikas Yojana Centre (<3km)
Transportation
- Palasdari Railway Station (<2km)
- Palasdari Bus Stop (<3km)
- Karjat Junction-Karjat (<3km)
- Karjat Old Bus Station (<3km)
- St. Bus Depot (<3km)
Leisure and Outdoor
- Club House (<2km)
- New Yuva Gym (<3km)
- Kakas Fitness Center (<3km)
Hospitals & Healthcare
- Dhanwantari Health Clinic (<3km)
- Rajendra Medical And General Store (<3km)
- Sanskruti Clinic (<3km)
- Vaikalpik Aarogya Kendra (<3km)
- Das Footwear (<3km)
- Om Medical And General Store (<3km)
- Pankaj Dental And Polyclinic (<3km)
- Mangal Murti Dental Clinic (<3km)
- Parshwa Clinic Dr Manish Jain (<3km)
- Priya Medico (<3km)
- Clinic Doctor Jaya Redekar (<3km)
- Dr. Patil (<3km)
- Doctor Shri Pradhan Clinic (<3km)
- Parmar Medical And General Stores (<3km)
- Clinic Doctor Devarshi D Mhatre (<3km)
- Doctor Appas Maternity Nursing Home (<3km)
- Sadhbhavan Clinic (<3km)
Restaurants & Cafes
- Hotelsantosh Permit Room & Bar (<3km)
- Sunny Restaurant (<3km)
- Sani Chinese Center (<3km)
- Thakare Hotel (<3km)
- Mauli Snacks Center and Lunch Home (<3km)
- Hotel Dagade (<3km)
- Ganesh Tea House (<3km)
- Sorat Vada Pav & Tea Stall (<3km)
- KK'z Biryani Junction (<3km)
- Jai Ambe Vadapav Stall (<3km)
- Puneri Tea House (<3km)
Entertainment
- Dhatri Group (<3km)
Banks & ATMs
- Bank of Maharashtra (<3km)
- State Bank of India (<3km)
- Axis Bank (<3km)
- Annasaheb Sawant Cooperative Urban Bank (<3km)
- Dnyandeep (<3km)
- Bank Of India (<3km)
- Alibag Co-Operative Urban Bank (<3km)
- Bandhan Bank (<3km)
- Idbi Bank-Aamrai (<3km)
- Project ID
- J456091192
- Updated
- Searches
- 145
- Views
- 143