Kalpataru Advay - Borivali West, Mumbai
- Builder
- Kalpataru Group
- Construction
- Under Construction
- Completion
- Oct, 2030
- Properties
- Apartments
- RERA
- P51800077381
Description
spacious apartments with large deck
Kalpataru Advay is located in the heart of Borivali (W), Mumbai offers 2,3 & 4 Bhk apartments ranging from 781-1835 sqft. The project is spread over 6.12 acres of land. It consists of 3 towers with 40 floors and 650 units on offer. Each apartment is meticulously designed to maximize space and comfort, providing residents with a serene sanctuary to call home.Amenities
- Swimming Pool
- Club House
- Kids Play Area
- Jogging Track
- Senior Citizen Area
- Seating Area
- Indoor games
- Gymnasium
- Walking Track
Kalpataru Group is a Mumbai based real estate development company established in 1969. The company has developed many residential, commercial and retail projects in Mumbai and its suburbs. Some of their well-known projects include Kalpataru Blend in Andheri East, Kalpataru Residency in Goregaon East and KalpataruImmensa in Thane West.
Highlights
- Power Back-up
- Water Softner
- Visitor Parking
- Maintenance Staff
- Water Supply / Storage
- Rain Water Harvesting
- Waste Disposal
- Centrally Air Conditioned
- Lifts
- Security Guards
- Electronic Security
- Intercom Facility
- Balcony
- Woodwork
- Modular Kitchen
- Feng Shui / Vaastu Compliant
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 2BHK Apartment | 781 SqFeet | Within 4 Years | ₹ 2.59 crores |
| 3BHK Apartment | 1,150 SqFeet | Within 4 Years | ₹ 3.7 crores |
| 4BHK Apartment | 1,830 SqFeet | Within 4 Years | ₹ 6 crores |
RERA
P51800077381 Kalpataru Advay Active 52% built
Confirmed with MahaRERA on 20 Sep 2026. Registered as "Kalpataru Advay".
- Promoter
- Kalpataru Limited
- Registered on
- 12 Aug 2024
- Proposed completion
- Oct 2030 (originally Jun 2030)
- Project type
- Residential / Group Housing
- Planning authority
- MCGM
- Address as filed
- L T Road, Vajira Naka Borivali, Eksar, Borivali, Mumbai Suburban, 400091
- Land area
- 23,828 sq m (256,496 sq ft)
- Sanctioned built-up area
- 73,892 sq m (795,396 sq ft)
- Buildings
- Wing A (39 floors) - 0 of 33 available; Wing B (49 floors) - 95 of 254 available; Wing C (39 floors) - 4 of 44 available
- Parking
- Open Space 0, Closed/Covered 1201
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| Wing A | 2BHK | 2,294 sq m (24,688 sq ft) | 33 |
| Wing A | 1 BHK Member | 315 sq m (3,396 sq ft) | 7 |
| Wing A | 2 BHK Member | 11,094 sq m (119,419 sq ft) | 184 |
| Wing A | 2.5 BHK Member | 2,526 sq m (27,186 sq ft) | 37 |
| Wing B | 3BHK | 14,026 sq m (150,983 sq ft) | 126 |
| Wing B | 4BHK | 8,866 sq m (95,441 sq ft) | 56 |
| Wing C | 2BHK | 2,615 sq m (28,146 sq ft) | 38 |
| Wing C | 2 BHK Member | 9,130 sq m (98,273 sq ft) | 154 |
| Wing C | 2.5 BHK Member | 4,180 sq m (44,995 sq ft) | 63 |
| Wing C | 2.5 BHK | 382 sq m (4,110 sq ft) | 6 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
| Q4 FY 2024-2025 | not filed - in default | - | - |
| Q1 FY 2025-2026 | 22 Jul 2025 | - | - |
| Q2 FY 2025-2026 | 20 Oct 2025 | - | - |
| Q3 FY 2025-2026 | 20 Jan 2026 | - | - |
| Q4 FY 2025-2026 | 20 Apr 2026 | - | - |
| Q1 FY 2026-2027 | 20 Jul 2026 | - | - |
Construction progress as reported to the portal
Wing A
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 50%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 21%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
Wing B
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 46%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 14%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
Wing C
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 53%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 19%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
Common areas and facilities
- Internal Roads & Footpaths: 0% - To be done before completion of Project
- Water Supply: 0% - Water Supply from Local Authority
- Sewerage (Chamber, Lines, Septic Tank , STP): 0% - STP Only
- Storm Water Drains: 0% - To be done before completion of Project
- Landscaping & Tree Planting: 0% - To be done before completion of Project
- Street Lighting: 0% - To be done before completion of Project
- Treatment And Disposal Of Sewage And Sullage Water: 0% - To be done before completion of Project
- Solid Waste Management And Disposal: 0% - To be done before completion of Project
- Water conservation /Rain water harvesting: 0% - To be done before completion of Project
- Energy managemcnt: 0% - To be done before completion of Project
- Fire protection and fire safety requirements: 0% - To be done before completion of Project
- Electrical meter room, sub-station, receiving station: 0% - Electrical Meter Room and Sub-Station Only
- Aggregate area of recreational Open Space: 0% - Common RG as per AFS
- Open Parking: 0% - To be done before completion of Project
Reviews
Write a review
Be the first to write a review of Kalpataru Advay and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Kalpataru Advay
Enter some positive aspects of Kalpataru Advay
Cons:
Enter some negative aspects of Kalpataru Advay
Enter some negative aspects of Kalpataru Advay
News
Mumbai Redevelopment to Add 44,277 Homes Worth ₹1.30 Lakh Crore by 2030: Knight Frank
PropertyWala ·
Knight Frank India says society redevelopment in Mumbai will add 44,277 free-sale homes worth ₹1.30 lakh crore by 2030, bringing in ₹7,830 crore in stamp duty and ₹6,525 crore in GST.
Location
Kalpataru Advay, Borivali West, Mumbai - 400091 (Maharashtra)
Nearby
-
Transport
- Borivali (West) (<1 km)
- Borivali (~2 km)
- Prabhodankar Thakre Charkop Bus Station (~3 km)
- Bharat Petroleum Corporation ltd (~3 km)
- Chhatrapati Shivaji Maharaj International Airport (~22 km)
- Navi Mumbai International Airport (~50 km)
-
Shopping & Dining
- Gangar Supermarket (<1 km)
- VEG TREAT ROYAL (<1 km)
- dinshas (~1 km)
- Borivali Municpal Market (~2 km)
- Raghuleela Mega Mall (~3 km)
- Nataraj Market (~7 km)
-
Healthcare
- Zeelab Pharmacy (<1 km)
- Sailee Hospital and Diagnostic Center (<1 km)
- Borivali West (<1 km)
- Kiara's Neurology, Rheumatology and Arthritis Clinic (~2 km)
- Netra Jyoti Eye Care Center (~2 km)
- Cambay Medical Stores (~2 km)
-
Education
- Don Bosco School (<1 km)
- The BMS BRIO INTERNATIONAL SCHOOL (CBSE) (<1 km)
- Samaj Kalyan Mandir Reading Room (~3 km)
- KES College Ground (~5 km)
- Indira Gandhi Institute of Development Research (~11 km)
- Indian Institute of Technology Bombay (~18 km)
-
Leisure & Entertainment
- Mhb Ground (<1 km)
- BMC Sadguru Shree Wamanrao Pai Manoranjan Udyan Kastur Park (~1 km)
- Tiger & Lion Safari (~5 km)
- Inox Movie (~5 km)
- Mumbai Football Arena (~16 km)
- Bombay Presidency Golf Club (~30 km)
-
Services
- Borivli HO Post Office (<1 km)
- Borivali Firestation (<1 km)
- Mumbai - Borivali(Yogi Nagar) (<1 km)
- Navi Mumbai - Kharghar Sector 20 Offsite ATM (~1 km)
- Borivali Police Station (~2 km)
- Electoral Registration Officer (~5 km)
-
Religious Places
- Don Bosco Church (<1 km)
- Mahisha Mardini Temple (<1 km)
- Gaon Devi temple (~1 km)
- OUR LADY OF REMEDY CHURCH (~3 km)
- spa in andheri west | spa in juhu - yuanthaispa (~3 km)
- Madina Masjid (~3 km)
-
Business & Hospitality
- FCI (~3 km)
- Industrial Estate (~4 km)
- Grand Hometel (~9 km)
- Radisson Hotel Mumbai Goregaon (~9 km)
- Nirlon Knowledge Park (~12 km)
- Nesco IT Park (~12 km)
- Project ID
- J680119268
- Updated
- Searches
- 1141
- Views
- 937