Guptari Galaxy City - Neral, Raigad

Builder
Guptari Group
Construction
Under Construction
Completion
Aug, 2028
Properties
Apartments
RERA
P52000016109

Description

Aesthetics of a perfectly harmonious space

Guptari Galaxy City, by Guptari Group is a sprawling luxury enclave of magnificent Apartments at Neral, Raigad, elevating the contemporary lifestyle. The project is equipped with key amenities including fire safety systems, gymnasium, clubhouse, children's play area etc. The project spread over 430 - 850 sq.ft. comprising of 1 RK, 1, 2 BHK & well connected with other parts of city and has all the basic utilities nearby.

Amenities:
  • Gymnasium
  • Swimming pool
  • Clubhouse
  • Jogging Track
  • Children’s Play Area
  • Indoor Games
  • Security Personal
  • Car Parking
  • Party Area
  • Rainwater Harvesting
  • Senior Citizen Park
Guptari Group stands tall and strong with years of experience, sound business principles and passion for giving value to our investors and retail clients.
We Offer Property Acquisition, Management, Valuation, Development And Consultancy Services For Both Commercial And Residential Property.

Highlights

  • Power Back-up
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Lifts
  • Security Guards
  • Fire Alarm
  • Balcony
  • Reserved Parking
  • Modular Kitchen
  • Feng Shui / Vaastu Compliant
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center

Configurations

Type Area Possession Price *
2BHK Apartment850 SqFeetWithin 2 Years-
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52000016109 GALAXY CITY Active 62% built

Confirmed with MahaRERA on 21 Sep 2026. Registered as "GALAXY CITY".

Promoter
GUPTARI INFRA PROJECTS
Registered on
17 Apr 2018
Proposed completion
Aug 2028 (originally Apr 2023)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
9 M WIDE ROAD, JITE VILLAGE, Jite, Karjat, Raigarh, 410201
Land area
7,500 sq m (80,732 sq ft)
Sanctioned built-up area
6,750 sq m (72,659 sq ft)
Buildings
BUILDING A (6 floors) - 29 of 29 available; BUILDING B (6 floors) - 26 of 27 available; BUILDING C (6 floors) - 30 of 32 available; BUILDING D (6 floors); BUILDING E (6 floors) - 0 of 16 available; BUILDING F (6 floors) - 0 of 16 available; BUILDING G (6 floors) - 0 of 16 available; BUILDING H (6 floors) - 0 of 16 available; BUILDING I (6 floors) - 0 of 8 available; BUILDING J (5 floors) - 0 of 8 available; BUILDING K (6 floors) - 1 of 14 available; BUILDING L (6 floors) - 1 of 14 available; BUILDING M (6 floors) - 1 of 14 available
Parking
Open Space 0, Closed/Covered 13
BuildingUnit typeCarpet areaUnits
BUILDING A1BHK 32 sq m (340 sq ft) 15
BUILDING AShop 11 sq m (116 sq ft) 1
BUILDING AShop 11 sq m (115 sq ft) 1
BUILDING A1BHK 35 sq m (372 sq ft) 12
BUILDING A1BHK 35 sq m (372 sq ft) 6
BUILDING B1BHK 35 sq m (372 sq ft) 6
BUILDING B1BHK 32 sq m (340 sq ft) 15
BUILDING B1BHK 35 sq m (372 sq ft) 12
BUILDING C1BHK 32 sq m (343 sq ft) 2
BUILDING C1BHK 35 sq m (372 sq ft) 22
BUILDING C1BHK 36 sq m (383 sq ft) 20
BUILDING E1BHK 27 sq m (287 sq ft) 6
BUILDING E1BHK 29 sq m (312 sq ft) 4
BUILDING E1BHK 27 sq m (287 sq ft) 6
BUILDING F1BHK 29 sq m (312 sq ft) 2
BUILDING F1BHK 29 sq m (312 sq ft) 2
BUILDING F1BHK 27 sq m (287 sq ft) 6
BUILDING F1BHK 27 sq m (287 sq ft) 6
BUILDING G1BHK 27 sq m (287 sq ft) 6
BUILDING G1BHK 27 sq m (287 sq ft) 6
BUILDING G1BHK 29 sq m (312 sq ft) 4
BUILDING H1BHK 29 sq m (312 sq ft) 2
BUILDING H1BHK 27 sq m (287 sq ft) 6
BUILDING H1BHK 29 sq m (312 sq ft) 2
BUILDING H1BHK 27 sq m (287 sq ft) 6
BUILDING I1BHK 29 sq m (312 sq ft) 2
BUILDING I1BHK 29 sq m (312 sq ft) 2
BUILDING I1BHK 27 sq m (287 sq ft) 6
BUILDING I1BHK 27 sq m (287 sq ft) 6
BUILDING J1RK 19 sq m (203 sq ft) 2
BUILDING J1RK 22 sq m (232 sq ft) 6
BUILDING J1RK 21 sq m (229 sq ft) 4
BUILDING K1RK 21 sq m (229 sq ft) 4
BUILDING K1RK 21 sq m (230 sq ft) 2
BUILDING K1RK 19 sq m (203 sq ft) 2
BUILDING K1RK 22 sq m (232 sq ft) 6
BUILDING L1RK 19 sq m (203 sq ft) 2
BUILDING L1RK 21 sq m (230 sq ft) 2
BUILDING L1RK 22 sq m (232 sq ft) 6
BUILDING L1RK 21 sq m (229 sq ft) 4
BUILDING M1RK 21 sq m (229 sq ft) 4
BUILDING M1RK 22 sq m (232 sq ft) 6
BUILDING M1RK 19 sq m (203 sq ft) 2
BUILDING M1RK 21 sq m (230 sq ft) 2
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 18 Jul 2025 - -
Q3 FY 2024-2025 17 Jul 2025 - -
Q4 FY 2024-2025 23 Sep 2025 - -
Q1 FY 2025-2026 not filed - in default - -
Q2 FY 2025-2026 not filed - in default - -
Q3 FY 2025-2026 not filed - in default - -
Q4 FY 2025-2026 not filed - in default - -
Q1 FY 2026-2027 not filed - in default - -
Construction progress as reported to the portal

BUILDING A

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

BUILDING B

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

BUILDING C

  • Excavation: 100%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

BUILDING D

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

BUILDING E

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING F

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING G

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING H

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING I

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING J

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING K

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING L

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUILDING M

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Water Supply: 100% - AS PER PLAN
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - AS PER PLAN
  • Storm Water Drains: 100% - AS PER PLAN
  • Landscaping & Tree Planting: 100% - AS PER PLAN
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - STP installed
  • Solid Waste Management And Disposal: 100% - AS PER PLAN
  • Electrical meter room, sub-station, receiving station: 100% - AS PER PLAN
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Guptari Galaxy City and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Guptari Galaxy City
Cons:
Enter some negative aspects of Guptari Galaxy City

Location

Guptari Galaxy City, Neral, Raigad - 410201 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Hindustan Petroleum (~3 km)
    • Neral NG (~4 km)
    • Bhivpuri Road (~6 km)
    • Matheran (~10 km)
    • Navi Mumbai International Airport (~40 km)
    • Chhatrapati Shivaji Maharaj International Airport (~70 km)
  • Shopping & Dining

    • Pahunchar Family Restaurant (~2 km)
    • Surabhi Snacks (~4 km)
  • Healthcare

    • Sai Hospital (~3 km)
    • Sugwekar Clinic (~4 km)
    • patel hospital (~4 km)
    • Aayush Nursing Home (~4 km)
    • Raigad Hospital & Research Centre (~6 km)
    • Government Hospital, Sugave (~11 km)
  • Education

    • Tennis Courts (~9 km)
    • Soccer Field (~9 km)
    • Karsandas Mulji Municipal Library (~10 km)
    • St. Xavier's School (~12 km)
  • Leisure & Entertainment

    • Shivaji Maidan (~4 km)
    • Paymaster Park (~10 km)
    • Prabalgad Fort (~17 km)
    • Visnubaug (~21 km)
    • Kothaligad (~26 km)
    • Kondana Caves (~27 km)
  • Services

    • Bank of Baroda (~4 km)
    • HDFC Bank ATM (~4 km)
    • ICICI Bank (~4 km)
    • Matheran Sub Post Office (~10 km)
    • Matheran Police Station (~11 km)
    • Ambarnath Taluka Court (~34 km)
  • Religious Places

    • Ganesh Mandir (~4 km)
  • Business & Hospitality

    • Radisson Blu Resort and Spa (~21 km)
    • Badlapur MIDC (~26 km)
    • Maharashtra Industrial Development Centre - MIDC Taloja (~33 km)
    • Central Warehousing Corporation - Kalamboli (~33 km)
    • India Steel Ltd (~34 km)
    • Additional Industrial Area (~34 km)