Gami Palm Amore - Seawoods, Navi Mumbai
- Builder
- Gami & NMS Group
- Construction
- Under Construction
- Completion
- Mar, 2031
- Properties
- Apartments
- RERA
- P51700052377
Description
wellness lawn and walkway loop for healthy lifestyle
Gami Palm Amore is located in the heart of Sector 46, Seawoods, Navi Mumbai offers 2,3,4&5 BHK apartments ranging from 856-2981 sqft. The project is spread over 5.68 acres of land. It consists of 14 towers with 15 floors and 774 units on offer. These apartments are spacious, airy, and well-lit and provide a pleasant living environment.Amenities
- Swimming Pool
- Walkway Loop
- Gymnasium
- Kid's Play Area
- Multi-use Lawn
- Skating Plaza
- Indoor Garden
- Yoga Lawn
- Squash Court
- Spa
- Banquet Hall
- Reading Room
Gami Group firmly believes in shaping lives through meaningful offerings, state-of-the-art spaces, and unmatched services. The company credentials reflect dedication to excellence and motivate us to achieve amazing achievements.
NMS Group has been shaping Navi Mumbai’s luxury and affordable housing and commercial space since 2001, delivering world-class residential, commercial, and leisure properties for sale.
Highlights
- Power Back-up
- Water Softner
- Visitor Parking
- Maintenance Staff
- Water Supply / Storage
- Rain Water Harvesting
- Waste Disposal
- Centrally Air Conditioned
- Lifts
- Security Guards
- Electronic Security
- Intercom Facility
- Balcony
- Woodwork
- Modular Kitchen
- Feng Shui / Vaastu Compliant
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 2BHK Apartment | 837 SqFeet | After 5 Years | ₹ 2.3 crores |
| 3BHK Apartment | 1,150 SqFeet | After 5 Years | ₹ 3.09 crores |
| 4BHK Apartment | 1,700 SqFeet | After 5 Years | ₹ 4.88 crores |
RERA
P51700052377 NMS Gami Palm Amore Active 29% built
Confirmed with MahaRERA on 20 Sep 2026. Registered as "NMS Gami Palm Amore".
- Promoter
- VISION INFRA LLP
- Registered on
- 21 Aug 2023
- Proposed completion
- Mar 2031
- Project type
- Others
- Planning authority
- Others
- Address as filed
- PLOT NO 5A SECTOR NO 46A, NERUL NAVI MUMBAI, Navi Mumbai (M Corp.), Thane, Thane, 400706
- Land area
- 22,999 sq m (247,568 sq ft)
- Sanctioned built-up area
- 129,339 sq m (1,392,236 sq ft)
- Buildings
- A-WING (20 floors) - 49 of 78 available; B-WING (20 floors) - 36 of 61 available; C WING (20 floors) - 53 of 69 available; D WING (20 floors) - 51 of 69 available; E WING (20 floors) - 24 of 38 available; F WING (20 floors) - 45 of 76 available; G WING (20 floors) - 18 of 60 available; H WING (20 floors) - 18 of 60 available; I WING (29 floors) - 31 of 53 available; J WING (20 floors) - 41 of 68 available; K WING (20 floors) - 34 of 53 available; L WING (20 floors) - 34 of 58 available; M WING (20 floors) - 32 of 58 available; N WING (20 floors) - 20 of 60 available
- Parking
- Open Space 0, Closed/Covered 1937
- Complaints on the portal
- 1
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| A-WING | Shop | 56 sq m (599 sq ft) | 1 |
| A-WING | 3BHK | 138 sq m (1,487 sq ft) | 15 |
| A-WING | Shop | 39 sq m (419 sq ft) | 1 |
| A-WING | Shop | 51 sq m (547 sq ft) | 1 |
| A-WING | Shop | 84 sq m (907 sq ft) | 1 |
| A-WING | Shop | 72 sq m (771 sq ft) | 1 |
| A-WING | Shop | 71 sq m (762 sq ft) | 1 |
| A-WING | Shop | 45 sq m (481 sq ft) | 1 |
| A-WING | Shop | 56 sq m (601 sq ft) | 1 |
| A-WING | 3BHK | 120 sq m (1,290 sq ft) | 30 |
| A-WING | 4BHK | 194 sq m (2,091 sq ft) | 2 |
| A-WING | 4BHK | 207 sq m (2,232 sq ft) | 13 |
| A-WING | Shop | 45 sq m (488 sq ft) | 1 |
| B-WING | Shop | 40 sq m (429 sq ft) | 1 |
| B-WING | Shop | 66 sq m (708 sq ft) | 1 |
| B-WING | Shop | 40 sq m (436 sq ft) | 1 |
| B-WING | 4BHK | 166 sq m (1,787 sq ft) | 30 |
| B-WING | 3BHK | 103 sq m (1,112 sq ft) | 2 |
| B-WING | Shop | 52 sq m (560 sq ft) | 1 |
| B-WING | Shop | 45 sq m (481 sq ft) | 1 |
| B-WING | Shop | 65 sq m (702 sq ft) | 1 |
| B-WING | Shop | 47 sq m (505 sq ft) | 1 |
| B-WING | Shop | 52 sq m (557 sq ft) | 1 |
| B-WING | Shop | 50 sq m (534 sq ft) | 1 |
| B-WING | Shop | 44 sq m (475 sq ft) | 1 |
| B-WING | 3BHK | 118 sq m (1,269 sq ft) | 28 |
| C WING | 4BHK | 166 sq m (1,787 sq ft) | 30 |
| C WING | Shop | 67 sq m (721 sq ft) | 1 |
| C WING | Shop | 41 sq m (441 sq ft) | 1 |
| C WING | Shop | 41 sq m (440 sq ft) | 1 |
| C WING | Shop | 45 sq m (480 sq ft) | 1 |
| C WING | Shop | 47 sq m (503 sq ft) | 1 |
| C WING | Shop | 54 sq m (577 sq ft) | 1 |
| C WING | Shop | 47 sq m (507 sq ft) | 1 |
| C WING | Shop | 53 sq m (575 sq ft) | 1 |
| C WING | Shop | 66 sq m (713 sq ft) | 1 |
| C WING | Shop | 51 sq m (551 sq ft) | 1 |
| C WING | 3BHK | 118 sq m (1,269 sq ft) | 28 |
| C WING | 3BHK | 103 sq m (1,112 sq ft) | 2 |
| D WING | Shop | 45 sq m (484 sq ft) | 1 |
| D WING | Shop | 52 sq m (556 sq ft) | 1 |
| D WING | Shop | 40 sq m (429 sq ft) | 1 |
| D WING | Shop | 65 sq m (705 sq ft) | 1 |
| D WING | Shop | 46 sq m (495 sq ft) | 1 |
| D WING | Shop | 53 sq m (574 sq ft) | 1 |
| D WING | 3BHK | 103 sq m (1,112 sq ft) | 2 |
| D WING | Shop | 67 sq m (725 sq ft) | 1 |
| D WING | Shop | 41 sq m (445 sq ft) | 1 |
| D WING | Shop | 45 sq m (482 sq ft) | 1 |
| D WING | Shop | 46 sq m (491 sq ft) | 1 |
| D WING | 3BHK | 118 sq m (1,269 sq ft) | 28 |
| D WING | 4BHK | 166 sq m (1,787 sq ft) | 30 |
| E WING | 5BHK & more | 234 sq m (2,516 sq ft) | 30 |
| E WING | Shop | 46 sq m (500 sq ft) | 1 |
| E WING | Shop | 77 sq m (830 sq ft) | 1 |
| E WING | Shop | 59 sq m (633 sq ft) | 1 |
| E WING | Shop | 59 sq m (636 sq ft) | 1 |
| E WING | Shop | 48 sq m (519 sq ft) | 1 |
| E WING | Shop | 48 sq m (521 sq ft) | 1 |
| E WING | Shop | 45 sq m (482 sq ft) | 1 |
| E WING | Shop | 78 sq m (843 sq ft) | 1 |
| F WING | Shop | 62 sq m (665 sq ft) | 1 |
| F WING | Shop | 49 sq m (527 sq ft) | 1 |
| F WING | Shop | 48 sq m (514 sq ft) | 1 |
| F WING | Shop | 64 sq m (686 sq ft) | 1 |
| F WING | Shop | 39 sq m (424 sq ft) | 1 |
| F WING | Shop | 44 sq m (476 sq ft) | 1 |
| F WING | Shop | 56 sq m (603 sq ft) | 1 |
| F WING | Shop | 61 sq m (656 sq ft) | 1 |
| F WING | 4BHK | 142 sq m (1,527 sq ft) | 26 |
| F WING | 3BHK | 142 sq m (1,527 sq ft) | 2 |
| F WING | Shop | 49 sq m (530 sq ft) | 1 |
| F WING | Shop | 51 sq m (545 sq ft) | 1 |
| F WING | 3BHK | 130 sq m (1,405 sq ft) | 2 |
| F WING | Shop | 47 sq m (509 sq ft) | 1 |
| F WING | Shop | 81 sq m (867 sq ft) | 1 |
| F WING | Shop | 62 sq m (672 sq ft) | 1 |
| F WING | Shop | 65 sq m (705 sq ft) | 1 |
| F WING | 4BHK | 201 sq m (2,166 sq ft) | 30 |
| F WING | Shop | 91 sq m (981 sq ft) | 1 |
| F WING | Shop | 116 sq m (1,247 sq ft) | 1 |
| G WING | 3BHK | 114 sq m (1,225 sq ft) | 30 |
| G WING | 3BHK | 101 sq m (1,083 sq ft) | 28 |
| G WING | 2BHK | 78 sq m (838 sq ft) | 2 |
| H WING | 2BHK | 78 sq m (838 sq ft) | 2 |
| H WING | 3BHK | 101 sq m (1,083 sq ft) | 28 |
| H WING | 3BHK | 114 sq m (1,225 sq ft) | 30 |
| I WING | 3BHK | 105 sq m (1,129 sq ft) | 2 |
| I WING | 3BHK | 114 sq m (1,230 sq ft) | 28 |
| I WING | Shop | 47 sq m (505 sq ft) | 2 |
| I WING | Shop | 33 sq m (353 sq ft) | 2 |
| I WING | Shop | 35 sq m (374 sq ft) | 2 |
| I WING | 3BHK | 100 sq m (1,076 sq ft) | 15 |
| I WING | Shop | 42 sq m (452 sq ft) | 2 |
| J WING | Shop | 47 sq m (505 sq ft) | 2 |
| J WING | Shop | 35 sq m (374 sq ft) | 2 |
| J WING | Shop | 33 sq m (353 sq ft) | 2 |
| J WING | 2BHK | 82 sq m (887 sq ft) | 2 |
| J WING | Shop | 42 sq m (452 sq ft) | 2 |
| J WING | 3BHK | 101 sq m (1,085 sq ft) | 28 |
| J WING | 3BHK | 114 sq m (1,230 sq ft) | 30 |
| K WING | 3BHK | 114 sq m (1,230 sq ft) | 28 |
| K WING | Shop | 35 sq m (374 sq ft) | 2 |
| K WING | Shop | 33 sq m (353 sq ft) | 2 |
| K WING | Shop | 42 sq m (452 sq ft) | 2 |
| K WING | Shop | 47 sq m (505 sq ft) | 2 |
| K WING | 2BHK | 75 sq m (811 sq ft) | 15 |
| K WING | 3BHK | 105 sq m (1,131 sq ft) | 2 |
| L WING | 2BHK | 76 sq m (815 sq ft) | 28 |
| L WING | 3BHK | 130 sq m (1,401 sq ft) | 2 |
| L WING | 2BHK | 76 sq m (813 sq ft) | 28 |
| M WING | 2BHK | 76 sq m (815 sq ft) | 28 |
| M WING | 3BHK | 130 sq m (1,401 sq ft) | 2 |
| M WING | 2BHK | 76 sq m (813 sq ft) | 28 |
| N WING | 2BHK | 76 sq m (813 sq ft) | 28 |
| N WING | 2BHK | 76 sq m (815 sq ft) | 28 |
| N WING | 3BHK | 130 sq m (1,401 sq ft) | 2 |
| Quarterly return | Filed | Built | Units booked |
|---|---|---|---|
| Q2 FY 2024-2025 | not filed - in default | - | - |
| Q3 FY 2024-2025 | not filed - in default | - | - |
| Q4 FY 2024-2025 | not filed - in default | - | - |
| Q1 FY 2025-2026 | 14 Feb 2026 | - | - |
| Q2 FY 2025-2026 | 14 Feb 2026 | - | - |
| Q3 FY 2025-2026 | 14 Feb 2026 | - | - |
| Q4 FY 2025-2026 | 28 May 2026 | - | - |
| Q1 FY 2026-2027 | 23 Jul 2026 | - | - |
Construction progress as reported to the portal
A-WING
- Excavation: 100%
- Basement (if any): 90%
- Podiums (if any): 0%
- Plinth: 90%
- Stilt Floor: 90%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 52%
- Sanitary Fittings within the flats / premises: 15%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 65%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
B-WING
- Excavation: 100%
- Basement (if any): 90%
- Podiums (if any): 0%
- Plinth: 90%
- Stilt Floor: 90%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 54%
- Sanitary Fittings within the flats / premises: 23%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 65%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
C WING
- Excavation: 100%
- Basement (if any): 90%
- Podiums (if any): 0%
- Plinth: 90%
- Stilt Floor: 90%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 52%
- Sanitary Fittings within the flats / premises: 25%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 60%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
D WING
- Excavation: 100%
- Basement (if any): 90%
- Podiums (if any): 0%
- Plinth: 90%
- Stilt Floor: 0%
- Slabs of Super Structure: 94%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 30%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 25%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
E WING
- Excavation: 100%
- Basement (if any): 90%
- Podiums (if any): 0%
- Plinth: 90%
- Stilt Floor: 90%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 34%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 45%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
F WING
- Excavation: 100%
- Basement (if any): 90%
- Podiums (if any): 0%
- Plinth: 90%
- Stilt Floor: 90%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 45%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 53%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
G WING
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
H WING
- Excavation: 80%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
I WING
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
J WING
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
K WING
- Excavation: 25%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
L WING
- Excavation: 100%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
M WING
- Excavation: 100%
- Basement (if any): 90%
- Podiums (if any): 0%
- Plinth: 90%
- Stilt Floor: 90%
- Slabs of Super Structure: 12%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
N WING
- Excavation: 100%
- Basement (if any): 90%
- Podiums (if any): 0%
- Plinth: 90%
- Stilt Floor: 90%
- Slabs of Super Structure: 25%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
Common areas and facilities
- Water Supply: 0% - TEMPORARY FROM NMMC
- Sewerage (Chamber, Lines, Septic Tank , STP): 0%
- Storm Water Drains: 0%
- Landscaping & Tree Planting: 0%
- Solid Waste Management And Disposal: 0%
- Water conservation /Rain water harvesting: 0%
- Fire protection and fire safety requirements: 0%
- Electrical meter room, sub-station, receiving station: 0%
Reviews
Write a review
Be the first to write a review of Gami Palm Amore and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Gami Palm Amore
Enter some positive aspects of Gami Palm Amore
Cons:
Enter some negative aspects of Gami Palm Amore
Enter some negative aspects of Gami Palm Amore
Location
Gami Palm Amore, Sector 46, Seawoods, Navi Mumbai - 400706 (Maharashtra)
Nearby
-
Transport
- Hindustan Petroleum (<1 km)
- Seawoods Bus Station (<1 km)
- Seawoods (~2 km)
- Navi Mumbai International Airport (~8 km)
- Mansarovar (~10 km)
- Chhatrapati Shivaji Maharaj International Airport (~25 km)
-
Shopping & Dining
- Olde Baileys Cafe (<1 km)
- Domino's Pizza (<1 km)
- Sector-48 Market (<1 km)
- DMart (~1 km)
- Seawoods Grand Central Mall (~2 km)
- Kitchen Wold (~10 km)
-
Healthcare
- Seawoods Hospital (<1 km)
- NMMC Hospital (<1 km)
- Healing Hands Clinic - Seawoods, Navi Mumbai (<1 km)
- Zeelab Pharmacy (~1 km)
- Bansal Specialty Clinic (~3 km)
- Apollo Pharmacy (~4 km)
-
Education
- NMMC School - Seawoods (<1 km)
- D.A.V Public School - Nerul (<1 km)
- S.S High School & RV Patel Degree College (<1 km)
- T.S. Chanakya Maritime University (~2 km)
- S.I.E.S College (~5 km)
- Cht.Sahu Maharaj Vachnalaya (~11 km)
-
Leisure & Entertainment
- Seawoods Theme Park (<1 km)
- Cinepolis - Seawoods (~2 km)
- Butterfly Park (~5 km)
- Dr. DY Patil Sports Complex (~5 km)
- Dr. DY Patil Sports Stadium (~5 km)
- Kharghar Valley Golf Course (~10 km)
-
Services
- Sector-48 Post Office (<1 km)
- Seawoods Branch ATM (<1 km)
- Punjab National Bank (<1 km)
- Gaimukh Chowk Police Station (<1 km)
- NMMC Headquarters (~2 km)
- Nerul Fire Station (~3 km)
-
Religious Places
- Shri Vitthal Mandir (<1 km)
- Ayyappa Mandir (<1 km)
- Sai Baba Mandir (<1 km)
- The Mosque (~1 km)
- Seawood Dargah & Sunni Masjid (~3 km)
- Little Flower Church (~3 km)
-
Business & Hospitality
- Courtyard by Marriott Navi Mumbai (~6 km)
- Navi Mumbai Marriott Hotel (~9 km)
- Bhabha Atomic Research Centre - BARC (~12 km)
- Jawaharlal Nehru Port (~14 km)
- Millennium Business Park, Mahape Village (~15 km)
- Reliance Corporate Park (~18 km)
- Project ID
- J326850119
- Updated
- Searches
- 1185
- Views
- 1015