Birdseye View
Elevation
Road View
 10

Delta Palm Beach - Nerul, Navi Mumbai

Builder
Delta Group
Construction
Under Construction
Completion
Oct, 2031
Properties
Apartments, Independent Houses
RERA
P51700052109

Description

offers spacious beautifully designed homes

Delta Palm Beach is located in the heart of Nerul, Navi Mumbai offers 2,3&4 BHK apartments ranging from 892-2642 sqft. The project is spread over 6 acres of land. It consists of 14 towers with 16 floors and 733 units on offer. The project features elegant interiors and a sophisticated exterior, creating a captivating living space.

Amenities
  • Children's Play Area
  • Recreation Facilities
  • Fire Sprinklers
  • Lift(s)
  • Landscaping & Tree Planting
  • Water Conservation, Rainwater Harvesting
  • Gymnasium
  • Electrification(Transformer, Solar Energy etc)
  • 24X7 Water Supply
  • Closed Car Parking
  • Basketball Court
  • Gated Community
  • Storm Water Drains
  • 24x7 Security
  • Energy management
  • Sewage Treatment
Delta Group's values are crucial to its success. Quality and innovation are at the core of every project. Timely completion and early possession prioritize customer satisfaction. Amenities and facilities reflect a commitment to aesthetics and lifestyle. Developments are a symbol of trust.

Highlights

  • Power Back-up
  • Water Softner
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • Centrally Air Conditioned
  • Lifts
  • Security Guards
  • Electronic Security
  • Intercom Facility
  • Balcony
  • Woodwork
  • Modular Kitchen
  • Feng Shui / Vaastu Compliant
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center

Configurations

Type Area Possession Price *
3BHK Apartment1,258 SqFeetWithin 4 Years₹ 3.52 crores
4 Bedroom Independent House107,642 SqFeetWithin 4 Years₹ 3 crores
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51700052109 DELTA PALMBEACH Active 22% built

Confirmed with MahaRERA on 20 Sep 2026. Registered as "DELTA PALMBEACH".

Promoter
BALAJI CORPORATION
Registered on
24 Jul 2023
Proposed completion
Oct 2031 (originally Jun 2031)
Project type
Others
Planning authority
Others
Address as filed
Sector 46A, Palm Beach Road, Nerul, Navi Mumbai (M Corp.), Thane, Thane, 400706
Land area
24,000 sq m (258,342 sq ft)
Sanctioned built-up area
134,779 sq m (1,450,798 sq ft)
Buildings
A- Wing (19 floors) - 55 of 64 available; B- Wing (19 floors) - 58 of 74 available; C- Wing (19 floors) - 41 of 66 available; D- Wing (19 floors) - 39 of 67 available; E- Wing (19 floors) - 55 of 60 available; F- Wing (17 floors) - 29 of 50 available; G- Wing (17 floors) - 36 of 50 available; H- Wing (18 floors) - 56 of 73 available; I- Wing (18 floors) - 35 of 62 available; J- Wing (18 floors) - 37 of 62 available; K- Wing (18 floors) - 52 of 66 available; L- Wing (17 floors) - 38 of 50 available; M- Wing (17 floors) - 41 of 59 available
Parking
Open Space 0, Closed/Covered 1676
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 not filed - in default - -
Q1 FY 2025-2026 24 Jul 2025 - -
Q2 FY 2025-2026 13 Jan 2026 - -
Q3 FY 2025-2026 25 Apr 2026 - -
Q4 FY 2025-2026 27 Apr 2026 - -
Q1 FY 2026-2027 not filed - in default - -
Construction progress as reported to the portal

A- Wing

  • Excavation: 100%
  • Basement (if any): 90%
  • Podiums (if any): 0%
  • Plinth: 90%
  • Stilt Floor: 90%
  • Slabs of Super Structure: 38%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 15%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

B- Wing

  • Excavation: 100%
  • Basement (if any): 90%
  • Podiums (if any): 0%
  • Plinth: 90%
  • Stilt Floor: 90%
  • Slabs of Super Structure: 38%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 20%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

C- Wing

  • Excavation: 100%
  • Basement (if any): 90%
  • Podiums (if any): 0%
  • Plinth: 90%
  • Stilt Floor: 90%
  • Slabs of Super Structure: 69%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 25%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 35%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

D- Wing

  • Excavation: 100%
  • Basement (if any): 90%
  • Podiums (if any): 0%
  • Plinth: 90%
  • Stilt Floor: 90%
  • Slabs of Super Structure: 69%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 25%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 35%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

E- Wing

  • Excavation: 100%
  • Basement (if any): 90%
  • Podiums (if any): 0%
  • Plinth: 90%
  • Stilt Floor: 90%
  • Slabs of Super Structure: 88%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 28%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

F- Wing

  • Excavation: 100%
  • Basement (if any): 90%
  • Podiums (if any): 0%
  • Plinth: 90%
  • Stilt Floor: 90%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

G- Wing

  • Excavation: 100%
  • Basement (if any): 90%
  • Podiums (if any): 0%
  • Plinth: 90%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

H- Wing

  • Excavation: 70%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

I- Wing

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

J- Wing

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

K- Wing

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

L- Wing

  • Excavation: 50%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

M- Wing

  • Excavation: 50%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Water Supply: 0% - Connection from NMMC after completion
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - Septic Tank
  • Storm Water Drains: 0% - As per approved plan
  • Landscaping & Tree Planting: 0% - 240 Nos of trees to be planted
  • Water conservation /Rain water harvesting: 0% - Rain Water Harvesting Tank
  • Energy managemcnt: 0% - Solar Panel Provided
  • Fire protection and fire safety requirements: 0% - As per Fire Noc
  • Electrical meter room, sub-station, receiving station: 0% - Electrical Meter Room and Substation
  • Aggregate area of recreational Open Space: 0% - As per approved plan
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Delta Palm Beach and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Delta Palm Beach
Cons:
Enter some negative aspects of Delta Palm Beach

Location

Delta Palm Beach, Sector 46 A, Nerul, Navi Mumbai - 400706 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Hindustan Petroleum (<1 km)
    • Seawoods Bus Station (<1 km)
    • Seawoods (~2 km)
    • Navi Mumbai International Airport (~8 km)
    • Mansarovar (~10 km)
    • Chhatrapati Shivaji Maharaj International Airport (~25 km)
  • Shopping & Dining

    • Olde Baileys Cafe (<1 km)
    • Domino's Pizza (<1 km)
    • Sector-48 Market (<1 km)
    • DMart (~1 km)
    • Seawoods Grand Central Mall (~2 km)
    • Kitchen Wold (~10 km)
  • Healthcare

    • Healing Hands Clinic - Seawoods, Navi Mumbai (<1 km)
    • Seawoods Hospital (<1 km)
    • NMMC Hospital (<1 km)
    • Zeelab Pharmacy (<1 km)
    • Bansal Specialty Clinic (~3 km)
    • Apollo Pharmacy (~4 km)
  • Education

    • D.A.V Public School - Nerul (<1 km)
    • NMMC School - Seawoods (<1 km)
    • S.S High School & RV Patel Degree College (<1 km)
    • T.S. Chanakya Maritime University (~2 km)
    • S.I.E.S College (~5 km)
    • Cht.Sahu Maharaj Vachnalaya (~11 km)
  • Leisure & Entertainment

    • Seawoods Theme Park (<1 km)
    • Cinepolis - Seawoods (~2 km)
    • Butterfly Park (~5 km)
    • Dr. DY Patil Sports Complex (~5 km)
    • Dr. DY Patil Sports Stadium (~5 km)
    • Kharghar Valley Golf Course (~10 km)
  • Services

    • Sector-48 Post Office (<1 km)
    • Punjab National Bank (<1 km)
    • Seawoods Branch ATM (<1 km)
    • Gaimukh Chowk Police Station (<1 km)
    • NMMC Headquarters (~2 km)
    • Nerul Fire Station (~3 km)
  • Religious Places

    • Sai Baba Mandir (<1 km)
    • Shri Vitthal Mandir (<1 km)
    • Ayyappa Mandir (<1 km)
    • The Mosque (~2 km)
    • Seawood Dargah & Sunni Masjid (~3 km)
    • Little Flower Church (~3 km)
  • Business & Hospitality

    • Courtyard by Marriott Navi Mumbai (~6 km)
    • Navi Mumbai Marriott Hotel (~9 km)
    • Bhabha Atomic Research Centre - BARC (~12 km)
    • Jawaharlal Nehru Port (~14 km)
    • Millennium Business Park, Mahape Village (~15 km)
    • Reliance Corporate Park (~18 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J653119268
Updated
Searches
1255
Views
1066