Elevation
Living Room
Bedroom
 8

Chandak Vansham - Vile Parle West, Mumbai

Builder
Chandak Group
Construction
Under Construction
Completion
Apr, 2032
Properties
Apartments
RERA
P51800080145

Description

One of Vile Parle's grandest luxury developments

Chandak Vansham is a luxury residential project located in Vile Parle West, Mumbai. Spread across 3.4 acres, the development comprises multiple towers designed with spacious layouts and modern architecture. The project offers premium 2, 3, and 4 BHK residences ranging from 1085 to 2500 sqft. Each tower rises with configurations of basements, ground, and up to 14 floors.

Amenities
  • Swimming pool
  • Gymnasium
  • Landscaped gardens
  • Children’s play area
  • Senior citizen zone
  • Indoor games
  • Multipurpose hall
Chandak Group is a renowned real estate developer in Mumbai with over 35 years of experience in delivering quality residential and commercial projects. Headquartered in Andheri East, the group has successfully developed more than 12 million sq. ft. across the city, completing over 30 projects and providing homes to 10,000+ families.

Highlights

  • Swimming pool
  • Gymnasium
  • Landscaped gardens
  • Children’s play area
  • Senior citizen zone
  • Indoor games
  • Multipurpose hall

Configurations

Type Area Possession Price *
3BHK Apartment933 SqFeetWithin 4 Years₹ 4.85 crores
4BHK Apartment1,650 SqFeetWithin 4 Years₹ 87.4 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51800080145 CHANDAK VANSHAM Active 8% built

Confirmed with MahaRERA on 21 Sep 2026. Registered as "CHANDAK VANSHAM".

Promoter
CHANDAK REALTORS PRIVATE LIMITED
Registered on
30 Apr 2025
Proposed completion
Apr 2032 (originally Dec 2031)
Project type
Residential / Group Housing
Planning authority
MCGM
Address as filed
Swami Vivekanand Road, Vile Parle West, Vileparle, Andheri, Mumbai Suburban, 400056
Land area
5,150 sq m (55,437 sq ft)
Sanctioned built-up area
60,283 sq m (648,900 sq ft)
Buildings
PLOT A Tower 1 (26 floors) - 21 of 21 available; PLOT A Tower 2 (26 floors) - 16 of 16 available; PLOT A Tower 3 (26 floors) - 16 of 16 available; PLOT A Tower 4 (26 floors) - 38 of 38 available; PLOT A Tower 5 (26 floors) - 5 of 5 available; PLOT B Tower 1 (22 floors) - 7 of 19 available; PLOT B Tower 2 (22 floors) - 3 of 12 available; PLOT B Tower 3 (22 floors) - 13 of 19 available; PLOT B Tower 4 (22 floors) - 16 of 23 available; PLOT B Tower 5 (22 floors) - 15 of 18 available; PLOT B Tower 6 (22 floors) - 11 of 20 available; PLOT B Tower 7 (22 floors) - 12 of 20 available; PLOT B Tower 8A (22 floors) - 0 of 12 available; PLOT B Tower 8B (22 floors) - 7 of 13 available
Parking
Open Space 0, Closed/Covered 907
Complaints on the portal
1
BuildingUnit typeCarpet areaUnits
PLOT A Tower 12BHK Rehab 47 sq m (502 sq ft) 12
PLOT A Tower 13BHK 95 sq m (1,019 sq ft) 19
PLOT A Tower 13BHK Rehab 95 sq m (1,019 sq ft) 6
PLOT A Tower 13BHK Rehab 88 sq m (949 sq ft) 2
PLOT A Tower 13BHK Rehab 87 sq m (941 sq ft) 1
PLOT A Tower 12BHK 47 sq m (502 sq ft) 2
PLOT A Tower 22BHK Rehab 45 sq m (479 sq ft) 12
PLOT A Tower 24BHK 160 sq m (1,721 sq ft) 13
PLOT A Tower 22BHK 111 sq m (1,194 sq ft) 1
PLOT A Tower 22BHK 45 sq m (479 sq ft) 2
PLOT A Tower 32BHK 97 sq m (1,044 sq ft) 1
PLOT A Tower 34BHK 160 sq m (1,721 sq ft) 13
PLOT A Tower 32BHK 45 sq m (479 sq ft) 2
PLOT A Tower 32BHK Rehab 45 sq m (479 sq ft) 12
PLOT A Tower 43BHK 97 sq m (1,040 sq ft) 6
PLOT A Tower 43BHK Rehab 95 sq m (1,018 sq ft) 5
PLOT A Tower 43BHK Rehab 88 sq m (950 sq ft) 2
PLOT A Tower 42BHK Rehab 47 sq m (502 sq ft) 7
PLOT A Tower 43BHK Rehab 88 sq m (942 sq ft) 1
PLOT A Tower 42BHK 71 sq m (767 sq ft) 14
PLOT A Tower 42BHK 71 sq m (760 sq ft) 14
PLOT A Tower 42BHK 47 sq m (502 sq ft) 4
PLOT A Tower 42BHK Rehab 44 sq m (476 sq ft) 3
PLOT A Tower 52BHK Rehab 69 sq m (746 sq ft) 10
PLOT A Tower 52BHK 69 sq m (747 sq ft) 5
PLOT A Tower 52BHK Rehab 69 sq m (738 sq ft) 10
PLOT A Tower 52BHK Rehab 112 sq m (1,207 sq ft) 3
PLOT A Tower 52BHK Rehab 55 sq m (595 sq ft) 4
PLOT A Tower 52BHK Rehab 49 sq m (532 sq ft) 18
PLOT A Tower 52BHK Rehab 69 sq m (747 sq ft) 2
PLOT B Tower 13BHK 115 sq m (1,238 sq ft) 18
PLOT B Tower 13BHK 110 sq m (1,188 sq ft) 1
PLOT B Tower 13BHK Rehab 110 sq m (1,188 sq ft) 9
PLOT B Tower 23BHK Rehab 96 sq m (1,032 sq ft) 4
PLOT B Tower 23BHK Rehab 96 sq m (1,037 sq ft) 9
PLOT B Tower 24BHK Rehab 153 sq m (1,650 sq ft) 2
PLOT B Tower 24BHK 153 sq m (1,650 sq ft) 12
PLOT B Tower 32BHK Rehab 75 sq m (807 sq ft) 5
PLOT B Tower 32BHK 75 sq m (808 sq ft) 5
PLOT B Tower 32BHK Rehab 75 sq m (808 sq ft) 4
PLOT B Tower 33BHK 111 sq m (1,200 sq ft) 14
PLOT B Tower 43BHK Rehab 87 sq m (939 sq ft) 5
PLOT B Tower 43BHK 87 sq m (933 sq ft) 1
PLOT B Tower 43BHK Rehab 87 sq m (933 sq ft) 10
PLOT B Tower 43BHK 112 sq m (1,209 sq ft) 11
PLOT B Tower 43BHK Rehab 112 sq m (1,209 sq ft) 2
PLOT B Tower 43BHK 110 sq m (1,183 sq ft) 1
PLOT B Tower 43BHK Rehab 110 sq m (1,183 sq ft) 14
PLOT B Tower 43BHK 93 sq m (1,004 sq ft) 10
PLOT B Tower 43BHK Rehab 93 sq m (1,004 sq ft) 2
PLOT B Tower 52BHK 75 sq m (807 sq ft) 1
PLOT B Tower 53BHK Rehab 111 sq m (1,200 sq ft) 1
PLOT B Tower 53BHK 111 sq m (1,200 sq ft) 13
PLOT B Tower 52BHK Rehab 75 sq m (807 sq ft) 4
PLOT B Tower 52BHK 75 sq m (808 sq ft) 4
PLOT B Tower 52BHK Rehab 75 sq m (808 sq ft) 5
PLOT B Tower 63BHK 97 sq m (1,039 sq ft) 5
PLOT B Tower 63BHK Rehab 97 sq m (1,039 sq ft) 8
PLOT B Tower 64BHK 154 sq m (1,662 sq ft) 13
PLOT B Tower 62BHK 78 sq m (836 sq ft) 1
PLOT B Tower 62BHK 100 sq m (1,074 sq ft) 1
PLOT B Tower 73BHK 97 sq m (1,041 sq ft) 4
PLOT B Tower 74BHK 154 sq m (1,661 sq ft) 14
PLOT B Tower 73BHK Rehab 97 sq m (1,041 sq ft) 10
PLOT B Tower 72BHK Rehab 70 sq m (753 sq ft) 11
PLOT B Tower 72BHK 70 sq m (753 sq ft) 2
PLOT B Tower 8AResidential Store Ro 20 sq m (210 sq ft) 1
PLOT B Tower 8A3BHK 97 sq m (1,047 sq ft) 1
PLOT B Tower 8A3BHK Rehab 97 sq m (1,047 sq ft) 13
PLOT B Tower 8A3BHK Rehab 115 sq m (1,237 sq ft) 3
PLOT B Tower 8A3BHK 115 sq m (1,237 sq ft) 10
PLOT B Tower 8A3BHK Rehab 110 sq m (1,187 sq ft) 14
PLOT B Tower 8B3BHK 97 sq m (1,047 sq ft) 2
PLOT B Tower 8B3BHK Rehab 97 sq m (1,047 sq ft) 11
PLOT B Tower 8B3BHK 110 sq m (1,187 sq ft) 1
PLOT B Tower 8B3BHK Rehab 110 sq m (1,187 sq ft) 15
PLOT B Tower 8B3BHK 115 sq m (1,237 sq ft) 10
PLOT B Tower 8B3BHK Rehab 115 sq m (1,237 sq ft) 2
Quarterly returnFiledBuiltUnits booked
Q1 FY 2025-2026 20 Jul 2025 - -
Q2 FY 2025-2026 17 Oct 2025 - -
Q3 FY 2025-2026 21 Jan 2026 - -
Q4 FY 2025-2026 25 Apr 2026 - -
Q1 FY 2026-2027 20 Jul 2026 - -
Construction progress as reported to the portal

PLOT A Tower 1

  • Excavation: 15%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT A Tower 2

  • Excavation: 15%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT A Tower 3

  • Excavation: 90%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT A Tower 4

  • Excavation: 90%
  • Basement (if any): 10%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT A Tower 5

  • Excavation: 90%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT B Tower 1

  • Excavation: 100%
  • Basement (if any): 90%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT B Tower 2

  • Excavation: 100%
  • Basement (if any): 90%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT B Tower 3

  • Excavation: 15%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT B Tower 4

  • Excavation: 15%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT B Tower 5

  • Excavation: 15%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT B Tower 6

  • Excavation: 90%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT B Tower 7

  • Excavation: 90%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT B Tower 8A

  • Excavation: 90%
  • Basement (if any): 60%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

PLOT B Tower 8B

  • Excavation: 90%
  • Basement (if any): 60%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - As per Approval
  • Water Supply: 0% - As per Approval
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - As per Approval
  • Storm Water Drains: 0% - As per Approval
  • Landscaping & Tree Planting: 0% - As per Approval
  • Street Lighting: 0% - As per Approval
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - As per Approval
  • Solid Waste Management And Disposal: 0% - As per Approval
  • Water conservation /Rain water harvesting: 0% - As per Approval
  • Fire protection and fire safety requirements: 0% - As per Approval
  • Electrical meter room, sub-station, receiving station: 0% - As per Approval
  • Aggregate area of recreational Open Space: 0% - As per Approval
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Chandak Vansham and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Chandak Vansham
Cons:
Enter some negative aspects of Chandak Vansham

News

Chandak Vansham Launches Month-Long Outdoor Campaign Across Mumbai

media4growth · · Residential

Chandak Group is running a month-long campaign across 15 Mumbai billboard sites for Chandak Vansham, a Vile Parle West project offering 3- and 4-BHK homes.

Key facts

Chandak Group’s month-long outdoor campaign for Chandak Vansham covers 15 premium billboard sites across Mumbai. Executed by Media Buying House, it includes a 3D hoarding with a real swing installation depicting a couple against a home backdrop and the tagline “Celebrate Your Legacy.”

The project is in Vile Parle (West), spans 3.4 acres and offers 3- and 4-BHK residences starting at ₹5.33 crore.

News items from other publishers are their reports, condensed; follow the link for the full report. PropertyWala.com is not their source.

Location

Chandak Vansham, Vile Parle West, Mumbai - 400056 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Hindustan Petroleum (<1 km)
    • Vile Parle (~2 km)
    • JVPD Bus Station (~2 km)
    • D. N. Nagar (~3 km)
    • Chhatrapati Shivaji Maharaj International Airport (~5 km)
    • Navi Mumbai International Airport (~38 km)
  • Shopping & Dining

    • The J (<1 km)
    • Aharveda (<1 km)
    • Shoppers Stop (<1 km)
    • Andheri Market (~2 km)
    • Nature's Basket (~2 km)
    • Citi Mall (~5 km)
  • Healthcare

    • hehehe (<1 km)
    • Noble Plus (<1 km)
    • New Empire Chemists (<1 km)
    • Auro Skin Clinic (<1 km)
    • Anuvansh Fertility & Women's Clinic (~1 km)
    • Dr Jignesh Manshibhai Gala Eye Clinic (~1 km)
  • Education

    • Chatrabhuj Narsee Monjee School (<1 km)
    • SVKM (<1 km)
    • Mithibai College of Arts and Jitendra Chauhan College of Science (~1 km)
    • Narsee Monjee Institute Of Management Studies (~1 km)
    • Jamnabai Narsee School (~2 km)
    • Bhavan's library (~2 km)
  • Leisure & Entertainment

    • Vallabhai park (<1 km)
    • Millenium Club (<1 km)
    • PVR Juhu (~2 km)
    • Mumbai Football Arena (~3 km)
    • Bombay Presidency Golf Club (~13 km)
    • Veermata Jijabai Bhosale Zoo & Botanical Garden (~21 km)
  • Services

    • Andheri Fire Station (<1 km)
    • ICICI Bank (<1 km)
    • HDFC Bank ATM (~1 km)
    • Muktidham Hall (~2 km)
    • Versova Police station (D.N.Nagar) (~3 km)
    • DTDC (~6 km)
  • Religious Places

    • Sai Baba Temple (~2 km)
    • Parle Jin Mandir (~2 km)
    • ISKCON Juhu Temple (~2 km)
    • St. Joseph's Church (~2 km)
    • Eidgah Masjid (~3 km)
    • Sher-e-Punjab Gurudwara (~4 km)
  • Business & Hospitality

    • Ginger Mumbai, Andheri East (~2 km)
    • Taj Santacruz (~3 km)
    • MIDC Industrial Estate (~3 km)
    • Technopolis Knowledge Park (~3 km)
    • DN Nagar Metro Depot (~4 km)
    • Nesco IT Park (~7 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J119258131
Updated
Searches
596
Views
596