Arihant Anaika - Taloja, Navi Mumbai

Builder
Arihant Superstructures Ltd
Construction
Completed
Completion
Dec, 2018
Properties
Apartments
RERA
P52000001869

Description

Built to match your inimitable style.

Arihant Anaika by Arihant Superstructures Ltd at the very prime location of Taloja in Navi Mumbai offers residential project that host 1,2 and 3 bhk apartments in the size ranges in between 320 to 542 sqft. There are amenities galore such as a landscaped garden, health club and gymnasium, swimming pool, indoor games area and children's play area. There are banks, schools, hospitals, parks, grocery shops, chemist shops and restaurants within a 9-kilometre radius. It is well-connected to other parts of the city by a network local trains and buses.

Amenities:
  • 24x7 Security
  • Intercom
  • CCTV
  • 24X7 Water Supply
  • Car Parking
  • Amphitheatre
  • Lift(s)
  • Visitor Parking
  • Rain Water Harvesting
  • Power Backup
  • Indoor Games
  • Maintenance Staff
  • Gymnasium
  • Swimming Pool
Arihant Superstructures is a premier real estate company headquartered in Navi Mumbai. It is focused on making quality lifestyles affordable for its esteemed customers. With its exemplary projects, the company has introduced a new way of thinking and a new way of embracing the future - Changing Lifestyle. It is listed on eminent stock exchanges like the NSE, BSE, and Bloomberg.

Highlights

  • Power Back-up
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Lifts
  • High Speed Internet
  • Security Guards
  • Intercom Facility
  • Balcony
  • Reserved Parking
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center

Configurations

Type Area Possession Price *
1BHK Apartment320 SqFeetImmediate/Ready to move-
1BHK Apartment583 SqFeetImmediate/Ready to move₹ 37 lakhs
1BHK Apartment658 SqFeetImmediate/Ready to move₹ 39 lakhs
2BHK Apartment542 SqFeetImmediate/Ready to move-
2BHK Apartment942 SqFeetImmediate/Ready to move₹ 53 lakhs
3BHK Apartment774 SqFeetImmediate/Ready to move-
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52000001869 ARIHANT ANAIKA PHASE I Completed

Confirmed with MahaRERA on 22 Sep 2026. Registered as "ARIHANT ANAIKA PHASE I".

Promoter
ARIHANT VATIKA REALTY PRIVATE LIMITED
Registered on
29 Jul 2017
Proposed completion
Dec 2018
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Taloja, Panvel, Koyana Velhe, Panvel, Raigarh, 410208
Land area
11,726 sq m (126,226 sq ft)
Sanctioned built-up area
10,166 sq m (109,428 sq ft)
Buildings
A1 (5 floors); A2 (5 floors); B1 (5 floors); B2 (5 floors); B3 (5 floors); E1 (5 floors); E2 (5 floors); F1 (5 floors); F2 (5 floors); F3 (5 floors); F4 (5 floors); F5 (5 floors)
Parking
Open Space 0, Closed/Covered 12
Complaints on the portal
1
BuildingUnit typeCarpet areaUnits
A12 BHK 48 sq m (515 sq ft) 8
A13 BHK 72 sq m (774 sq ft) 8
A22 BHK 48 sq m (515 sq ft) 8
A23 BHK 72 sq m (774 sq ft) 8
B12 BHK 48 sq m (517 sq ft) 16
B22 BHK 48 sq m (517 sq ft) 16
B32 BHK 48 sq m (517 sq ft) 16
E12 BHK 49 sq m (530 sq ft) 16
E22 BHK 49 sq m (530 sq ft) 16
F11 BHK 30 sq m (318 sq ft) 8
F12 BHK 49 sq m (529 sq ft) 8
F22 BHK 49 sq m (529 sq ft) 8
F21 BHK 30 sq m (318 sq ft) 8
F32 BHK 49 sq m (529 sq ft) 8
F31 BHK 30 sq m (318 sq ft) 8
F41 BHK 30 sq m (318 sq ft) 8
F42 BHK 49 sq m (529 sq ft) 8
F51 BHK 29 sq m (312 sq ft) 8
F52 BHK 43 sq m (460 sq ft) 4
Construction progress as reported to the portal

A1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

A2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

E1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

E2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

F1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

F2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

F3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

F4

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

F5

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - CC WITH TREMIX
  • Water Supply: 100% - WATER LINE
  • Sewerage (Chamber, Lines, Septic Tank , STP): 95% - STP
  • Storm Water Drains: 100% - COMPLETED
  • Landscaping & Tree Planting: 20% - WIP
  • Street Lighting: 50% - WIP
  • Treatment And Disposal Of Sewage And Sullage Water: 95% - WIP
  • Solid Waste Management And Disposal: 100% - COMPLETED
  • Water conservation /Rain water harvesting: 100% - COMPLETED
  • Energy managemcnt: 100% - COMPLETED
  • Electrical meter room, sub-station, receiving station: 100% - COMPLETED
  • Aggregate area of recreational Open Space: 20% - WIP
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Arihant Anaika and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Arihant Anaika
Cons:
Enter some negative aspects of Arihant Anaika

Location

Arihant Anaika, Taloja, Navi Mumbai - 410208 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Taloje Panchanand (~3 km)
    • Sector-34 (~4 km)
    • Asudgaon Bus Depot (~11 km)
    • Sarovar Vihar (CBD Belapur) (~15 km)
    • Navi Mumbai International Airport (~16 km)
    • Chhatrapati Shivaji Maharaj International Airport (~36 km)
  • Shopping & Dining

    • Domino's Pizza | Taloja, Navi Mumbai (~2 km)
    • Ly's Cafe (~3 km)
    • Spice Club Fine Dine (~3 km)
    • Kitchen Wold (~9 km)
    • Little World Mall (~10 km)
    • Glomax Mall (~10 km)
  • Healthcare

    • Sai Clinic (~1 km)
    • Zeelab Pharmacy (~2 km)
    • Sri Sai Clinic (~3 km)
    • Taloja Multispeciality Hospital (~3 km)
    • Jeevandeep Hospital (~3 km)
    • Apex Multispeciality Hospital (~3 km)
  • Education

    • Ramsheth Thakur Public School (~7 km)
    • Vibgyor High School (~8 km)
    • Casa Rio Gold Library (~11 km)
    • Bharathi Vidyapeeth (~12 km)
    • Society for Applied Microwave Electronics Engineering & Research - Mumbai (~12 km)
    • T.S. Chanakya Maritime University (~18 km)
  • Leisure & Entertainment

    • Central Park (~7 km)
    • Maxus Cinema Hall (~8 km)
    • Kharghar Valley Golf Course (~9 km)
    • Butterfly Park (~14 km)
    • Dr. DY Patil Sports Stadium (~14 km)
    • Dr. DY Patil Sports Complex (~14 km)
  • Services

    • HDFC Bank ATM (~3 km)
    • Bank of Baroda (~3 km)
    • Tawa Delight (~7 km)
    • chaitra cafe (~8 km)
    • Panvel Muni Corp. Ward A Office (Kharghar Gram Panchayat) (~8 km)
    • Kharghar Post Office (~10 km)
  • Religious Places

    • Shri Swami Samartha math yogiraj yashwant maharaj (~2 km)
  • Business & Hospitality

    • Maharashtra Industrial Development Centre - MIDC Taloja (~2 km)
    • Aditya Birla Science and Technology Company (~4 km)
    • Navi Mumbai Marriott Hotel (~14 km)
    • Courtyard by Marriott Navi Mumbai (~14 km)
    • Millennium Business Park, Mahape Village (~14 km)
    • Reliance Corporate Park (~16 km)