Arihant Anaika - Taloja, Navi Mumbai
- Builder
- Arihant Superstructures Ltd
- Construction
- Completed
- Completion
- Dec, 2018
- Properties
- Apartments
- RERA
- P52000001869
Description
Built to match your inimitable style.
Arihant Anaika by Arihant Superstructures Ltd at the very prime location of Taloja in Navi Mumbai offers residential project that host 1,2 and 3 bhk apartments in the size ranges in between 320 to 542 sqft. There are amenities galore such as a landscaped garden, health club and gymnasium, swimming pool, indoor games area and children's play area. There are banks, schools, hospitals, parks, grocery shops, chemist shops and restaurants within a 9-kilometre radius. It is well-connected to other parts of the city by a network local trains and buses. Amenities:
- 24x7 Security
- Intercom
- CCTV
- 24X7 Water Supply
- Car Parking
- Amphitheatre
- Lift(s)
- Visitor Parking
- Rain Water Harvesting
- Power Backup
- Indoor Games
- Maintenance Staff
- Gymnasium
- Swimming Pool
Arihant Superstructures is a premier real estate company headquartered in Navi Mumbai. It is focused on making quality lifestyles affordable for its esteemed customers. With its exemplary projects, the company has introduced a new way of thinking and a new way of embracing the future - Changing Lifestyle. It is listed on eminent stock exchanges like the NSE, BSE, and Bloomberg.
Highlights
- Power Back-up
- Visitor Parking
- Maintenance Staff
- Water Supply / Storage
- Rain Water Harvesting
- Lifts
- High Speed Internet
- Security Guards
- Intercom Facility
- Balcony
- Reserved Parking
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 1BHK Apartment | 320 SqFeet | Immediate/Ready to move | - |
| 1BHK Apartment | 583 SqFeet | Immediate/Ready to move | ₹ 37 lakhs |
| 1BHK Apartment | 658 SqFeet | Immediate/Ready to move | ₹ 39 lakhs |
| 2BHK Apartment | 542 SqFeet | Immediate/Ready to move | - |
| 2BHK Apartment | 942 SqFeet | Immediate/Ready to move | ₹ 53 lakhs |
| 3BHK Apartment | 774 SqFeet | Immediate/Ready to move | - |
RERA
P52000001869 ARIHANT ANAIKA PHASE I Completed
Confirmed with MahaRERA on 22 Sep 2026. Registered as "ARIHANT ANAIKA PHASE I".
- Promoter
- ARIHANT VATIKA REALTY PRIVATE LIMITED
- Registered on
- 29 Jul 2017
- Proposed completion
- Dec 2018
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Taloja, Panvel, Koyana Velhe, Panvel, Raigarh, 410208
- Land area
- 11,726 sq m (126,226 sq ft)
- Sanctioned built-up area
- 10,166 sq m (109,428 sq ft)
- Buildings
- A1 (5 floors); A2 (5 floors); B1 (5 floors); B2 (5 floors); B3 (5 floors); E1 (5 floors); E2 (5 floors); F1 (5 floors); F2 (5 floors); F3 (5 floors); F4 (5 floors); F5 (5 floors)
- Parking
- Open Space 0, Closed/Covered 12
- Complaints on the portal
- 1
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| A1 | 2 BHK | 48 sq m (515 sq ft) | 8 |
| A1 | 3 BHK | 72 sq m (774 sq ft) | 8 |
| A2 | 2 BHK | 48 sq m (515 sq ft) | 8 |
| A2 | 3 BHK | 72 sq m (774 sq ft) | 8 |
| B1 | 2 BHK | 48 sq m (517 sq ft) | 16 |
| B2 | 2 BHK | 48 sq m (517 sq ft) | 16 |
| B3 | 2 BHK | 48 sq m (517 sq ft) | 16 |
| E1 | 2 BHK | 49 sq m (530 sq ft) | 16 |
| E2 | 2 BHK | 49 sq m (530 sq ft) | 16 |
| F1 | 1 BHK | 30 sq m (318 sq ft) | 8 |
| F1 | 2 BHK | 49 sq m (529 sq ft) | 8 |
| F2 | 2 BHK | 49 sq m (529 sq ft) | 8 |
| F2 | 1 BHK | 30 sq m (318 sq ft) | 8 |
| F3 | 2 BHK | 49 sq m (529 sq ft) | 8 |
| F3 | 1 BHK | 30 sq m (318 sq ft) | 8 |
| F4 | 1 BHK | 30 sq m (318 sq ft) | 8 |
| F4 | 2 BHK | 49 sq m (529 sq ft) | 8 |
| F5 | 1 BHK | 29 sq m (312 sq ft) | 8 |
| F5 | 2 BHK | 43 sq m (460 sq ft) | 4 |
Construction progress as reported to the portal
A1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
A2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
B1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
B2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
B3
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
E1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
E2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
F1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
F2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
F3
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
F4
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
F5
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 100% - CC WITH TREMIX
- Water Supply: 100% - WATER LINE
- Sewerage (Chamber, Lines, Septic Tank , STP): 95% - STP
- Storm Water Drains: 100% - COMPLETED
- Landscaping & Tree Planting: 20% - WIP
- Street Lighting: 50% - WIP
- Treatment And Disposal Of Sewage And Sullage Water: 95% - WIP
- Solid Waste Management And Disposal: 100% - COMPLETED
- Water conservation /Rain water harvesting: 100% - COMPLETED
- Energy managemcnt: 100% - COMPLETED
- Electrical meter room, sub-station, receiving station: 100% - COMPLETED
- Aggregate area of recreational Open Space: 20% - WIP
Reviews
Write a review
Be the first to write a review of Arihant Anaika and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Arihant Anaika
Enter some positive aspects of Arihant Anaika
Cons:
Enter some negative aspects of Arihant Anaika
Enter some negative aspects of Arihant Anaika
Location
Arihant Anaika, Taloja, Navi Mumbai - 410208 (Maharashtra)
Nearby
-
Transport
- Taloje Panchanand (~3 km)
- Sector-34 (~4 km)
- Asudgaon Bus Depot (~11 km)
- Sarovar Vihar (CBD Belapur) (~15 km)
- Navi Mumbai International Airport (~16 km)
- Chhatrapati Shivaji Maharaj International Airport (~36 km)
-
Shopping & Dining
- Domino's Pizza | Taloja, Navi Mumbai (~2 km)
- Ly's Cafe (~3 km)
- Spice Club Fine Dine (~3 km)
- Kitchen Wold (~9 km)
- Little World Mall (~10 km)
- Glomax Mall (~10 km)
-
Healthcare
- Sai Clinic (~1 km)
- Zeelab Pharmacy (~2 km)
- Sri Sai Clinic (~3 km)
- Taloja Multispeciality Hospital (~3 km)
- Jeevandeep Hospital (~3 km)
- Apex Multispeciality Hospital (~3 km)
-
Education
- Ramsheth Thakur Public School (~7 km)
- Vibgyor High School (~8 km)
- Casa Rio Gold Library (~11 km)
- Bharathi Vidyapeeth (~12 km)
- Society for Applied Microwave Electronics Engineering & Research - Mumbai (~12 km)
- T.S. Chanakya Maritime University (~18 km)
-
Leisure & Entertainment
- Central Park (~7 km)
- Maxus Cinema Hall (~8 km)
- Kharghar Valley Golf Course (~9 km)
- Butterfly Park (~14 km)
- Dr. DY Patil Sports Stadium (~14 km)
- Dr. DY Patil Sports Complex (~14 km)
-
Services
- HDFC Bank ATM (~3 km)
- Bank of Baroda (~3 km)
- Tawa Delight (~7 km)
- chaitra cafe (~8 km)
- Panvel Muni Corp. Ward A Office (Kharghar Gram Panchayat) (~8 km)
- Kharghar Post Office (~10 km)
-
Religious Places
- Shri Swami Samartha math yogiraj yashwant maharaj (~2 km)
-
Business & Hospitality
- Maharashtra Industrial Development Centre - MIDC Taloja (~2 km)
- Aditya Birla Science and Technology Company (~4 km)
- Navi Mumbai Marriott Hotel (~14 km)
- Courtyard by Marriott Navi Mumbai (~14 km)
- Millennium Business Park, Mahape Village (~14 km)
- Reliance Corporate Park (~16 km)
- Project ID
- J918955811
- Updated
- Searches
- 9206
- Views
- 1482