Raise the overall quality of your life
Runwal My City by Runwal Developers offers spacious 1, 2 and 3 bhk apartments in the size ranges in between 406 to 760 sqft. spread over an area of 65 acre of land.The project comes with various amenities which gives the residents a comfortable life. The project is located strategically and is connected with other parts of the city with various modes of transportation.Amenities :
- 24x7 Security
- Intercom
- Indoor Games
- Club House
- 24X7 Water Supply
- Car Parking
- Security Guards
- Shopping Mall
- Gymnasium
- Swimming Pool
- Lift(s)
- Children's Play Area
- Power Backup
Established in 1978, Runwal is one of Mumbai’s premier real estate developers, operating in the residential, commercial and organized retails verticals. With a robust track record of 51 delivered projects with over 20 thousand Happy families, it has continuously driven to keep the ‘customer’ as a focal point in the designing, planning and construction of all its projects.
Highlights
- Power Back-up
- Water Softner
- Visitor Parking
- Maintenance Staff
- Water Supply / Storage
- Rain Water Harvesting
- Waste Disposal
- Centrally Air Conditioned
- Lifts
- High Speed Internet
- RO System
- Balcony
- Security Guards
- Electronic Security
- Intercom Facility
- Woodwork
- Modular Kitchen
- Feng Shui / Vaastu Compliant
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 1BHK Apartment | 337 SqFeet | Immediate/Ready to move | ₹ 37.9 lakhs |
| 1BHK Apartment | 406 SqFeet | Immediate/Ready to move | ₹ 35 lakhs |
| 1BHK Apartment | 406 SqFeet | Immediate/Ready to move | ₹ 50.24 lakhs |
| 1BHK Apartment | 406 SqFeet | Immediate/Ready to move | ₹ 42.75 lakhs |
| 1BHK Apartment | 59.83 SqMeters | Immediate/Ready to move | ₹ 39 lakhs |
| 2BHK Apartment | 43.98 SqMeters | Immediate/Ready to move | ₹ 45 lakhs |
| 2BHK Apartment | 524 SqFeet | Immediate/Ready to move | ₹ 54.03 lakhs |
| 2BHK Apartment | 525 SqFeet | Immediate/Ready to move | ₹ 62.77 lakhs |
| 2BHK Apartment | 580 SqFeet | Immediate/Ready to move | ₹ 39.9 lakhs |
| 2BHK Apartment | 79.9 SqMeters | Immediate/Ready to move | ₹ 70 lakhs |
| 3BHK Apartment | 70.6 SqMeters | Immediate/Ready to move | ₹ 69.07 lakhs |
| 3BHK Apartment | 760 SqFeet | Immediate/Ready to move | ₹ 87.9 lakhs |
| 3BHK Apartment | 760 SqFeet | Immediate/Ready to move | ₹ 76.25 lakhs |
RERA
P51700000528 MY CITY - PHASE I - PART I Completed
Confirmed with MahaRERA on 22 Sep 2026. Registered as "MY CITY - PHASE I - PART I".
- Promoter
- HORIZON PROJECTS PVT LTD
- Registered on
- 18 Jul 2017
- Proposed completion
- Dec 2022 (originally Jun 2021)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Diva-Manpada Road, Betavade, DOMBIVLI, Kalyan, Thane, 400612
- Land area
- 17,789 sq m (191,486 sq ft)
- Sanctioned built-up area
- 22,882 sq m (246,307 sq ft)
- Buildings
- A3 (31 floors); A4 (31 floors); B2 (31 floors); C3 (31 floors); C4 (23 floors)
- Parking
- Open Space 134, Closed/Covered 490
- Complaints on the portal
- 24
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| A3 | 2BHK | 49 sq m (526 sq ft) | 15 |
| A3 | 1BHK | 35 sq m (379 sq ft) | 11 |
| A3 | 1BHK | 37 sq m (403 sq ft) | 12 |
| A3 | 1BHK | 37 sq m (401 sq ft) | 38 |
| A3 | 2BHK | 51 sq m (550 sq ft) | 61 |
| A3 | 1BHK | 35 sq m (377 sq ft) | 16 |
| A3 | 2BHK | 49 sq m (526 sq ft) | 1 |
| A3 | 1BHK | 35 sq m (379 sq ft) | 1 |
| A4 | 1BHK | 35 sq m (379 sq ft) | 22 |
| A4 | 1BHK | 35 sq m (379 sq ft) | 1 |
| A4 | 2BHK | 51 sq m (550 sq ft) | 3 |
| A4 | SH5 | 10 sq m (107 sq ft) | 1 |
| A4 | 1BHK | 35 sq m (377 sq ft) | 54 |
| A4 | SH4 | 19 sq m (202 sq ft) | 1 |
| A4 | SH6 | 11 sq m (114 sq ft) | 1 |
| A4 | SH3 | 9 sq m (100 sq ft) | 1 |
| A4 | 2BHK | 49 sq m (526 sq ft) | 2 |
| A4 | SH1 | 14 sq m (147 sq ft) | 1 |
| A4 | SH2 | 10 sq m (107 sq ft) | 1 |
| A4 | 2BHK | 49 sq m (526 sq ft) | 74 |
| B2 | 2BHK | 48 sq m (512 sq ft) | 4 |
| B2 | 2BHK | 48 sq m (512 sq ft) | 25 |
| B2 | 2BHK | 50 sq m (541 sq ft) | 78 |
| C3 | 2BHK | 50 sq m (541 sq ft) | 14 |
| C3 | 2BHK | 46 sq m (498 sq ft) | 23 |
| C3 | 3BHK | 65 sq m (705 sq ft) | 18 |
| C3 | 2BHK | 47 sq m (509 sq ft) | 8 |
| C3 | 3BHK | 63 sq m (677 sq ft) | 9 |
| C3 | 2BHK | 49 sq m (527 sq ft) | 31 |
| C4 | SH8 | 11 sq m (119 sq ft) | 1 |
| C4 | SH7 | 16 sq m (175 sq ft) | 1 |
| C4 | 2BHK | 46 sq m (498 sq ft) | 1 |
| C4 | Shop | 23 sq m (246 sq ft) | 1 |
| C4 | 2BHK | 47 sq m (509 sq ft) | 17 |
| C4 | 2BHK | 46 sq m (498 sq ft) | 37 |
| C4 | 3BHK | 63 sq m (677 sq ft) | 19 |
| C4 | 2BHK | 47 sq m (509 sq ft) | 1 |
Construction progress as reported to the portal
A3
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
A4
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
B2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
C3
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
C4
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 100% - COMPLETED
- Water Supply: 100% - COMPLETED
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - COMPLETED
- Storm Water Drains: 100% - COMPLETED
- Landscaping & Tree Planting: 100% - COMPLETED
- Street Lighting: 100% - COMPLETED
- Community Buildings: 100% - COMPLETED
- Treatment And Disposal Of Sewage And Sullage Water: 100% - COMPLETED
- Solid Waste Management And Disposal: 100% - COMPLETED
- Water conservation /Rain water harvesting: 100% - COMPLETED
- Energy managemcnt: 90% - wip
- Fire protection and fire safety requirements: 100% - COMPLETED
- Electrical meter room, sub-station, receiving station: 100% - COMPLETED
- Aggregate area of recreational Open Space: 100% - COMPLETED
- Open Parking: 0% - wip
P51700005477 MY CITY - PHASE I - PART III Lapsed 2% built
Confirmed with MahaRERA on 22 Sep 2026. Registered as "MY CITY - PHASE I - PART III".
- Promoter
- HORIZON PROJECTS PVT LTD
- Registered on
- 11 Aug 2017
- Proposed completion
- Dec 2023
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Diva - Manpada Road, Betavade, DOMBIVLI, Kalyan, Thane, 400612
- Land area
- 14,414 sq m (155,161 sq ft)
- Sanctioned built-up area
- 11,990 sq m (129,064 sq ft)
- Buildings
- A5 (34 floors); B3 (34 floors); C5 (34 floors); A6 (33 floors)
- Parking
- Open Space 328, Closed/Covered 184
- Complaints on the portal
- 5
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| A5 | 2BHK | 49 sq m (523 sq ft) | 91 |
| A5 | 1BHK | 35 sq m (373 sq ft) | 27 |
| A5 | 1BHK | 35 sq m (377 sq ft) | 62 |
| B3 | 2BHK | 48 sq m (512 sq ft) | 121 |
| C5 | 2BHK | 47 sq m (509 sq ft) | 27 |
| C5 | 2BHK | 46 sq m (498 sq ft) | 64 |
| C5 | 3BHK | 63 sq m (677 sq ft) | 32 |
| A6 | 1BHK | 35 sq m (377 sq ft) | 62 |
| A6 | 1BHK | 35 sq m (373 sq ft) | 27 |
| A6 | 2BHK | 49 sq m (523 sq ft) | 88 |
Construction progress as reported to the portal
A5
- Excavation: 50%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
B3
- Excavation: 50%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
C5
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
A6
- Excavation: 0%
- Basement (if any): 0%
- Podiums (if any): 0%
- Plinth: 0%
- Stilt Floor: 0%
- Slabs of Super Structure: 0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
Common areas and facilities
- Internal Roads & Footpaths: 0% - YET TO BE STARTED
- Water Supply: 0% - YET TO BE STARTED
- Sewerage (Chamber, Lines, Septic Tank , STP): 0% - YET TO BE STARTED
- Storm Water Drains: 0% - YET TO BE STARTED
- Landscaping & Tree Planting: 0% - YET TO BE STARTED
- Street Lighting: 0% - YET TO BE STARTED
- Treatment And Disposal Of Sewage And Sullage Water: 0% - YET TO BE STARTED
- Solid Waste Management And Disposal: 0% - YET TO BE STARTED
- Water conservation /Rain water harvesting: 0% - YET TO BE STARTED
- Energy managemcnt: 0% - YET TO BE STARTED
- Fire protection and fire safety requirements: 0% - YET TO BE STARTED
- Electrical meter room, sub-station, receiving station: 0% - YET TO BE STARTED
- Aggregate area of recreational Open Space: 0% - YET TO BE STARTED
- Open Parking: 0% - YET TO BE STARTED
P51700009168 MY CITY - PHASE I - PART II Completed
Confirmed with MahaRERA on 22 Sep 2026. Registered as "MY CITY - PHASE I - PART II".
- Promoter
- HORIZON PROJECTS PVT LTD
- Registered on
- 19 Aug 2017
- Proposed completion
- Dec 2019 (originally Dec 2018)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- Diva-Manpada Road, Betavade, DOMBIVLI, Kalyan, Thane, 400612
- Land area
- 17,789 sq m (191,486 sq ft)
- Sanctioned built-up area
- 30,181 sq m (324,874 sq ft)
- Buildings
- A1 (31 floors); A2 (31 floors); B1 (30 floors); C1 (31 floors); C2 (31 floors)
- Parking
- Open Space 152, Closed/Covered 441
- Complaints on the portal
- 3
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| A1 | 2BHK | 44 sq m (474 sq ft) | 22 |
| A1 | 1BHK | 35 sq m (377 sq ft) | 19 |
| A1 | 1BHK | 36 sq m (384 sq ft) | 24 |
| A1 | 2BHK | 46 sq m (491 sq ft) | 28 |
| A1 | 1 BHK | 37 sq m (401 sq ft) | 35 |
| A1 | 1 BHK | 37 sq m (403 sq ft) | 25 |
| A2 | 2BHK | 44 sq m (474 sq ft) | 12 |
| A2 | 2BHK | 46 sq m (491 sq ft) | 38 |
| A2 | 1BHK | 37 sq m (401 sq ft) | 35 |
| A2 | 1BHK | 35 sq m (377 sq ft) | 19 |
| A2 | 1BHK | 37 sq m (403 sq ft) | 28 |
| A2 | 1BHK | 36 sq m (384 sq ft) | 21 |
| B1 | 2 BHK | 50 sq m (541 sq ft) | 79 |
| B1 | 2BHK | 48 sq m (512 sq ft) | 24 |
| C1 | 2BHK | 47 sq m (509 sq ft) | 4 |
| C1 | 2 BHK | 50 sq m (541 sq ft) | 18 |
| C1 | 3BHK | 63 sq m (677 sq ft) | 10 |
| C1 | 2 BHK | 49 sq m (527 sq ft) | 41 |
| C1 | 3 BHK | 65 sq m (705 sq ft) | 17 |
| C1 | 2BHK | 46 sq m (498 sq ft) | 13 |
| C2 | 2 BHK | 50 sq m (541 sq ft) | 19 |
| C2 | 2 BHK | 49 sq m (527 sq ft) | 40 |
| C2 | 3BHK | 63 sq m (677 sq ft) | 7 |
| C2 | 2BHK | 47 sq m (509 sq ft) | 3 |
| C2 | 3 BHK | 65 sq m (705 sq ft) | 20 |
| C2 | 2BHK | 46 sq m (498 sq ft) | 14 |
Construction progress as reported to the portal
A1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
A2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
B1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
C1
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
C2
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 100%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 100% - COMPLETED
- Water Supply: 100% - COMPLETED
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - COMPLETED
- Storm Water Drains: 100% - COMPLETED
- Landscaping & Tree Planting: 100% - COMPLETED
- Street Lighting: 100% - COMPLETED
- Community Buildings: 100% - COMPLETED
- Treatment And Disposal Of Sewage And Sullage Water: 100% - COMPLETED
- Solid Waste Management And Disposal: 100% - COMPLETED
- Water conservation /Rain water harvesting: 100% - COMPLETED
- Energy managemcnt: 100% - COMPLETED
- Fire protection and fire safety requirements: 100% - COMPLETED
- Electrical meter room, sub-station, receiving station: 100% - COMPLETED
- Aggregate area of recreational Open Space: 100% - COMPLETED
- Open Parking: 50% - WIP
Reviews
Write a review
Be the first to write a review of Runwal MyCity and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Runwal MyCity
Enter some positive aspects of Runwal MyCity
Cons:
Enter some negative aspects of Runwal MyCity
Enter some negative aspects of Runwal MyCity
Location
Runwal MyCity, Dombivli East, Thane - 400612 (Maharashtra)
Nearby
-
Transport
- Hindustan Petroleum (<1 km)
- Diva Junction (~5 km)
- Dombivali MSRTC Bus Terminal (~6 km)
- Sarovar Vihar (CBD Belapur) (~27 km)
- Navi Mumbai International Airport (~30 km)
- Chhatrapati Shivaji Maharaj International Airport (~34 km)
-
Shopping & Dining
- Rmall (~2 km)
- D'Mart (~2 km)
- Mamledar Misal (~3 km)
- Café Coffee Day (~3 km)
- Lodha Xperia Mall (~3 km)
- Local Market (~14 km)
-
Healthcare
- Jupiter Hospital (~2 km)
- MediMart Pharmacy (~4 km)
- Apollo Pharmacy Riverwood Park (~4 km)
- Shree Ashirwad Hospital, Dombivli (~4 km)
- Sai Jyot hospital (~5 km)
- VOCARD (~5 km)
-
Education
- Dnc Ground (~4 km)
- Casa Rio Gold Library (~6 km)
- Greens English School (~6 km)
- Vidya Prasarak Mandal Polytechnic (~14 km)
- Smt. Chandibai Himathmal Mansukhani College (~14 km)
- Industrial Training Institute (ITI) (~15 km)
-
Leisure & Entertainment
- Meenatai Thakrey Udhyan (~5 km)
- Tilak Movie Theater (~5 km)
- KDMC sports complex (~6 km)
- Mukund Keni Playground (~13 km)
- Kharghar Valley Golf Course (~20 km)
- Butterfly Park (~25 km)
-
Services
- ICICI Bank (~2 km)
- HDFC Bank ATM (~3 km)
- Vishnunagar Police Station (~5 km)
- Mumbra Post Office (~8 km)
- R.T.O. Kalyan (~10 km)
- Rustomjee Fire Station (~13 km)
-
Religious Places
- Shri Guru Datt Temple (~2 km)
- Swami Samarth Math (~3 km)
- P&T Colony Hanuman Templw (~3 km)
- Ayre road cha maharaja (~4 km)
-
Business & Hospitality
- Mukund Steel (~11 km)
- Electric/Diesel Locomotive Shed Kalyan (~13 km)
- Reliance Corporate Park (~13 km)
- ibis Thane (~17 km)
- Ashar IT Park (~18 km)
- Navi Mumbai Marriott Hotel (~20 km)
- Project ID
- J679118981
- Updated
- Searches
- 5405
- Views
- 2014