Elevation
Front View
Swimming Pool
 10

Runwal MyCity - Dombivli East, Thane

Builder
Runwal Developers
Construction
Partially Completed
Completion
Dec, 2023
Properties
Apartments
RERA
P51700000528, P51700005477, P51700009168

Description

Raise the overall quality of your life

Runwal My City by Runwal Developers offers spacious 1, 2 and 3 bhk apartments in the size ranges in between 406 to 760 sqft. spread over an area of 65 acre of land.The project comes with various amenities which gives the residents a comfortable life. The project is located strategically and is connected with other parts of the city with various modes of transportation.
Amenities :
  • 24x7 Security
  • Intercom
  • Indoor Games
  • Club House
  • 24X7 Water Supply
  • Car Parking
  • Security Guards
  • Shopping Mall
  • Gymnasium
  • Swimming Pool
  • Lift(s)
  • Children's Play Area
  • Power Backup
Established in 1978, Runwal is one of Mumbai’s premier real estate developers, operating in the residential, commercial and organized retails verticals. With a robust track record of 51 delivered projects with over 20 thousand Happy families, it has continuously driven to keep the ‘customer’ as a focal point in the designing, planning and construction of all its projects.

Highlights

  • Power Back-up
  • Water Softner
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • Centrally Air Conditioned
  • Lifts
  • High Speed Internet
  • RO System
  • Balcony
  • Security Guards
  • Electronic Security
  • Intercom Facility
  • Woodwork
  • Modular Kitchen
  • Feng Shui / Vaastu Compliant
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center

Configurations

Type Area Possession Price *
1BHK Apartment337 SqFeetImmediate/Ready to move₹ 37.9 lakhs
1BHK Apartment406 SqFeetImmediate/Ready to move₹ 35 lakhs
1BHK Apartment406 SqFeetImmediate/Ready to move₹ 50.24 lakhs
1BHK Apartment406 SqFeetImmediate/Ready to move₹ 42.75 lakhs
1BHK Apartment59.83 SqMetersImmediate/Ready to move₹ 39 lakhs
2BHK Apartment43.98 SqMetersImmediate/Ready to move₹ 45 lakhs
2BHK Apartment524 SqFeetImmediate/Ready to move₹ 54.03 lakhs
2BHK Apartment525 SqFeetImmediate/Ready to move₹ 62.77 lakhs
2BHK Apartment580 SqFeetImmediate/Ready to move₹ 39.9 lakhs
2BHK Apartment79.9 SqMetersImmediate/Ready to move₹ 70 lakhs
3BHK Apartment70.6 SqMetersImmediate/Ready to move₹ 69.07 lakhs
3BHK Apartment760 SqFeetImmediate/Ready to move₹ 87.9 lakhs
3BHK Apartment760 SqFeetImmediate/Ready to move₹ 76.25 lakhs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51700000528 MY CITY - PHASE I - PART I Completed

Confirmed with MahaRERA on 22 Sep 2026. Registered as "MY CITY - PHASE I - PART I".

Promoter
HORIZON PROJECTS PVT LTD
Registered on
18 Jul 2017
Proposed completion
Dec 2022 (originally Jun 2021)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Diva-Manpada Road, Betavade, DOMBIVLI, Kalyan, Thane, 400612
Land area
17,789 sq m (191,486 sq ft)
Sanctioned built-up area
22,882 sq m (246,307 sq ft)
Buildings
A3 (31 floors); A4 (31 floors); B2 (31 floors); C3 (31 floors); C4 (23 floors)
Parking
Open Space 134, Closed/Covered 490
Complaints on the portal
24
BuildingUnit typeCarpet areaUnits
A32BHK 49 sq m (526 sq ft) 15
A31BHK 35 sq m (379 sq ft) 11
A31BHK 37 sq m (403 sq ft) 12
A31BHK 37 sq m (401 sq ft) 38
A32BHK 51 sq m (550 sq ft) 61
A31BHK 35 sq m (377 sq ft) 16
A32BHK 49 sq m (526 sq ft) 1
A31BHK 35 sq m (379 sq ft) 1
A41BHK 35 sq m (379 sq ft) 22
A41BHK 35 sq m (379 sq ft) 1
A42BHK 51 sq m (550 sq ft) 3
A4SH5 10 sq m (107 sq ft) 1
A41BHK 35 sq m (377 sq ft) 54
A4SH4 19 sq m (202 sq ft) 1
A4SH6 11 sq m (114 sq ft) 1
A4SH3 9 sq m (100 sq ft) 1
A42BHK 49 sq m (526 sq ft) 2
A4SH1 14 sq m (147 sq ft) 1
A4SH2 10 sq m (107 sq ft) 1
A42BHK 49 sq m (526 sq ft) 74
B22BHK 48 sq m (512 sq ft) 4
B22BHK 48 sq m (512 sq ft) 25
B22BHK 50 sq m (541 sq ft) 78
C32BHK 50 sq m (541 sq ft) 14
C32BHK 46 sq m (498 sq ft) 23
C33BHK 65 sq m (705 sq ft) 18
C32BHK 47 sq m (509 sq ft) 8
C33BHK 63 sq m (677 sq ft) 9
C32BHK 49 sq m (527 sq ft) 31
C4SH8 11 sq m (119 sq ft) 1
C4SH7 16 sq m (175 sq ft) 1
C42BHK 46 sq m (498 sq ft) 1
C4Shop 23 sq m (246 sq ft) 1
C42BHK 47 sq m (509 sq ft) 17
C42BHK 46 sq m (498 sq ft) 37
C43BHK 63 sq m (677 sq ft) 19
C42BHK 47 sq m (509 sq ft) 1
Construction progress as reported to the portal

A3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

A4

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

C3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

C4

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - COMPLETED
  • Water Supply: 100% - COMPLETED
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - COMPLETED
  • Storm Water Drains: 100% - COMPLETED
  • Landscaping & Tree Planting: 100% - COMPLETED
  • Street Lighting: 100% - COMPLETED
  • Community Buildings: 100% - COMPLETED
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - COMPLETED
  • Solid Waste Management And Disposal: 100% - COMPLETED
  • Water conservation /Rain water harvesting: 100% - COMPLETED
  • Energy managemcnt: 90% - wip
  • Fire protection and fire safety requirements: 100% - COMPLETED
  • Electrical meter room, sub-station, receiving station: 100% - COMPLETED
  • Aggregate area of recreational Open Space: 100% - COMPLETED
  • Open Parking: 0% - wip

P51700005477 MY CITY - PHASE I - PART III Lapsed 2% built

Confirmed with MahaRERA on 22 Sep 2026. Registered as "MY CITY - PHASE I - PART III".

Promoter
HORIZON PROJECTS PVT LTD
Registered on
11 Aug 2017
Proposed completion
Dec 2023
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Diva - Manpada Road, Betavade, DOMBIVLI, Kalyan, Thane, 400612
Land area
14,414 sq m (155,161 sq ft)
Sanctioned built-up area
11,990 sq m (129,064 sq ft)
Buildings
A5 (34 floors); B3 (34 floors); C5 (34 floors); A6 (33 floors)
Parking
Open Space 328, Closed/Covered 184
Complaints on the portal
5
BuildingUnit typeCarpet areaUnits
A52BHK 49 sq m (523 sq ft) 91
A51BHK 35 sq m (373 sq ft) 27
A51BHK 35 sq m (377 sq ft) 62
B32BHK 48 sq m (512 sq ft) 121
C52BHK 47 sq m (509 sq ft) 27
C52BHK 46 sq m (498 sq ft) 64
C53BHK 63 sq m (677 sq ft) 32
A61BHK 35 sq m (377 sq ft) 62
A61BHK 35 sq m (373 sq ft) 27
A62BHK 49 sq m (523 sq ft) 88
Construction progress as reported to the portal

A5

  • Excavation: 50%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

B3

  • Excavation: 50%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

C5

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

A6

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - YET TO BE STARTED
  • Water Supply: 0% - YET TO BE STARTED
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - YET TO BE STARTED
  • Storm Water Drains: 0% - YET TO BE STARTED
  • Landscaping & Tree Planting: 0% - YET TO BE STARTED
  • Street Lighting: 0% - YET TO BE STARTED
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - YET TO BE STARTED
  • Solid Waste Management And Disposal: 0% - YET TO BE STARTED
  • Water conservation /Rain water harvesting: 0% - YET TO BE STARTED
  • Energy managemcnt: 0% - YET TO BE STARTED
  • Fire protection and fire safety requirements: 0% - YET TO BE STARTED
  • Electrical meter room, sub-station, receiving station: 0% - YET TO BE STARTED
  • Aggregate area of recreational Open Space: 0% - YET TO BE STARTED
  • Open Parking: 0% - YET TO BE STARTED

P51700009168 MY CITY - PHASE I - PART II Completed

Confirmed with MahaRERA on 22 Sep 2026. Registered as "MY CITY - PHASE I - PART II".

Promoter
HORIZON PROJECTS PVT LTD
Registered on
19 Aug 2017
Proposed completion
Dec 2019 (originally Dec 2018)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
Diva-Manpada Road, Betavade, DOMBIVLI, Kalyan, Thane, 400612
Land area
17,789 sq m (191,486 sq ft)
Sanctioned built-up area
30,181 sq m (324,874 sq ft)
Buildings
A1 (31 floors); A2 (31 floors); B1 (30 floors); C1 (31 floors); C2 (31 floors)
Parking
Open Space 152, Closed/Covered 441
Complaints on the portal
3
BuildingUnit typeCarpet areaUnits
A12BHK 44 sq m (474 sq ft) 22
A11BHK 35 sq m (377 sq ft) 19
A11BHK 36 sq m (384 sq ft) 24
A12BHK 46 sq m (491 sq ft) 28
A11 BHK 37 sq m (401 sq ft) 35
A11 BHK 37 sq m (403 sq ft) 25
A22BHK 44 sq m (474 sq ft) 12
A22BHK 46 sq m (491 sq ft) 38
A21BHK 37 sq m (401 sq ft) 35
A21BHK 35 sq m (377 sq ft) 19
A21BHK 37 sq m (403 sq ft) 28
A21BHK 36 sq m (384 sq ft) 21
B12 BHK 50 sq m (541 sq ft) 79
B12BHK 48 sq m (512 sq ft) 24
C12BHK 47 sq m (509 sq ft) 4
C12 BHK 50 sq m (541 sq ft) 18
C13BHK 63 sq m (677 sq ft) 10
C12 BHK 49 sq m (527 sq ft) 41
C13 BHK 65 sq m (705 sq ft) 17
C12BHK 46 sq m (498 sq ft) 13
C22 BHK 50 sq m (541 sq ft) 19
C22 BHK 49 sq m (527 sq ft) 40
C23BHK 63 sq m (677 sq ft) 7
C22BHK 47 sq m (509 sq ft) 3
C23 BHK 65 sq m (705 sq ft) 20
C22BHK 46 sq m (498 sq ft) 14
Construction progress as reported to the portal

A1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

A2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

B1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

C1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

C2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 100%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

Common areas and facilities

  • Internal Roads & Footpaths: 100% - COMPLETED
  • Water Supply: 100% - COMPLETED
  • Sewerage (Chamber, Lines, Septic Tank , STP): 100% - COMPLETED
  • Storm Water Drains: 100% - COMPLETED
  • Landscaping & Tree Planting: 100% - COMPLETED
  • Street Lighting: 100% - COMPLETED
  • Community Buildings: 100% - COMPLETED
  • Treatment And Disposal Of Sewage And Sullage Water: 100% - COMPLETED
  • Solid Waste Management And Disposal: 100% - COMPLETED
  • Water conservation /Rain water harvesting: 100% - COMPLETED
  • Energy managemcnt: 100% - COMPLETED
  • Fire protection and fire safety requirements: 100% - COMPLETED
  • Electrical meter room, sub-station, receiving station: 100% - COMPLETED
  • Aggregate area of recreational Open Space: 100% - COMPLETED
  • Open Parking: 50% - WIP
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Runwal MyCity and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Runwal MyCity
Cons:
Enter some negative aspects of Runwal MyCity

Location

Runwal MyCity, Dombivli East, Thane - 400612 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Hindustan Petroleum (<1 km)
    • Diva Junction (~5 km)
    • Dombivali MSRTC Bus Terminal (~6 km)
    • Sarovar Vihar (CBD Belapur) (~27 km)
    • Navi Mumbai International Airport (~30 km)
    • Chhatrapati Shivaji Maharaj International Airport (~34 km)
  • Shopping & Dining

    • Rmall (~2 km)
    • D'Mart (~2 km)
    • Mamledar Misal (~3 km)
    • Café Coffee Day (~3 km)
    • Lodha Xperia Mall (~3 km)
    • Local Market (~14 km)
  • Healthcare

    • Jupiter Hospital (~2 km)
    • MediMart Pharmacy (~4 km)
    • Apollo Pharmacy Riverwood Park (~4 km)
    • Shree Ashirwad Hospital, Dombivli (~4 km)
    • Sai Jyot hospital (~5 km)
    • VOCARD (~5 km)
  • Education

    • Dnc Ground (~4 km)
    • Casa Rio Gold Library (~6 km)
    • Greens English School (~6 km)
    • Vidya Prasarak Mandal Polytechnic (~14 km)
    • Smt. Chandibai Himathmal Mansukhani College (~14 km)
    • Industrial Training Institute (ITI) (~15 km)
  • Leisure & Entertainment

    • Meenatai Thakrey Udhyan (~5 km)
    • Tilak Movie Theater (~5 km)
    • KDMC sports complex (~6 km)
    • Mukund Keni Playground (~13 km)
    • Kharghar Valley Golf Course (~20 km)
    • Butterfly Park (~25 km)
  • Services

    • ICICI Bank (~2 km)
    • HDFC Bank ATM (~3 km)
    • Vishnunagar Police Station (~5 km)
    • Mumbra Post Office (~8 km)
    • R.T.O. Kalyan (~10 km)
    • Rustomjee Fire Station (~13 km)
  • Religious Places

    • Shri Guru Datt Temple (~2 km)
    • Swami Samarth Math (~3 km)
    • P&T Colony Hanuman Templw (~3 km)
    • Ayre road cha maharaja (~4 km)
  • Business & Hospitality

    • Mukund Steel (~11 km)
    • Electric/Diesel Locomotive Shed Kalyan (~13 km)
    • Reliance Corporate Park (~13 km)
    • ibis Thane (~17 km)
    • Ashar IT Park (~18 km)
    • Navi Mumbai Marriott Hotel (~20 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J679118981
Updated
Searches
5405
Views
2014